Claims
- 1. A hydrocarbon production system in a substantially horizontal borehole comprising:a gravel packing base pipe including at least one blank base pipe section and at least one holed base pipe section; an openable and closeable port in said blank pipe section, said port extending from an outside diameter of said blank pipe section to an inside diameter of said blank pipe section, said port facilitating leak-off of gravel slurry fluid; a gravel pack having a quantity of gravel packed around said holed base pipe section and said blank base pipe section; and a completion string including at least one sensor.
- 2. A hydrocarbon production system in a substantially horizontal borehole as claimed in claim 1 wherein said at least one sensor is one or more of temperature flow rate, pressure and chemical composition sensors.
- 3. A hydrocarbon production system in a substantially horizontal borehole as claimed in claim 1 wherein said completion string includes a downhole processor.
- 4. A hydrocarbon production system in a substantially horizontal borehole as claimed in claim 1 wherein said completion string includes a communication capability for communicating with a remote location.
- 5. A hydrocarbon production system in a substantially horizontal borehole as claimed in claim 4 wherein said communication is by wire conductor.
- 6. A hydrocarbon production system in a substantially horizontal borehole as claimed in claim 4 wherein said communication is by optic fiber conductor.
- 7. A hydrocarbon production system in a substantially horizontal borehole as claimed in claim 4 wherein said communication is by wireless means.
- 8. A hydrocarbon production system in a substantially horizontal borehole as claimed in claim 7 wherein said wireless means is acoustic.
- 9. A hydrocarbon production system in a substantially horizontal borehole as claimed in claim 4 wherein said communication is by hydraulic line.
- 10. A hydrocarbon production system in a substantially horizontal borehole as claimed in claim 1 wherein said completion string includes at least one intelligent flow control device.
- 11. A hydrocarbon production system in a substantially horizontal borehole as claimed in claim 1 wherein said completion string includes at least one flow control device for every zone of a well having at least one zone.
- 12. A hydrocarbon production system in a substantially horizontal borehole as claimed in claim 11 wherein said at least one flow control device is an intelligent flow control device.
- 13. A hydrocarbon production system in a substantially horizontal borehole as claimed in claim 12 wherein said device includes at least one sensor.
- 14. A hydrocarbon production system in a substantially horizontal borehole as claimed in claim 12 wherein said device includes at least one processor.
- 15. A hydrocarbon production system in a substantially horizontal borehole comprising:a gravel packing base pipe including at least one holed base pipe section and at least one blank base pipe section; a selectively closeable port in said blank base pipe section; and an intelligent completion string disposed within said gravel packing base pipe.
- 16. A hydrocarbon production system in a substantially horizontal borehole as claimed in claim 15 wherein said string includes at least one flow control device and at least one sensor.
- 17. A hydrocarbon production system in a substantially horizontal borehole as claimed in claim 16 wherein said string further includes at least one controller located at said string.
- 18. A method for building a zonally isolated gravel packed wellbore comprising:installing a base pipe having one or more slotted base pipe sections and a screen associated with each slotted base pipe section separated by at least one blank base pipe section having at least one closeable port and a screen located immediately over said at least one closeable port; installing a washpipe; pumping gravel to an annulus between one of an open hole formation and a casing, and said base pipe; pulling said washpipe; closing said at least one closeable port in said blank base pipe section; and installing an intelligent completion string in said base pipe.
- 19. A method as claimed in claim 18 wherein said method further includes reopening said at least one closeable port and pumping a contaminant into said gravel pack through said at least one closeable port.
- 20. A method as claimed in claim 19 wherein said contaminant is selected from cement, drilling mud and epoxy.
- 21. A well zonal control and isolation system comprising:a plurality of holed base pipe segments; at least one blank base pipe segment separating at least two of said plurality of holed base pipe segments into zones; at least one closeable port in said blank pipe base segment; a screen located circumferentially around each said holed base pipe segments and a separate screen located around each said at least one closeable port in said blank base pipe segment; and an intelligent completion string within at least one of said base pipe segments.
CROSS-REFERENCE TO RELATED APPLICATIONS
This is a continuation-in-part application of U.S. Ser. No. 09/411,686, now U.S. Pat. No. 6,318,465, filed Oct. 4, 1999 which claims the benefit of an earlier filing date from U.S. Provisional Application No. 60/107,266 filed Nov. 3,1998.
US Referenced Citations (9)
Foreign Referenced Citations (1)
Number |
Date |
Country |
2 265 399 |
Sep 1993 |
GB |
Provisional Applications (1)
|
Number |
Date |
Country |
|
60/107266 |
Nov 1998 |
US |
Continuation in Parts (1)
|
Number |
Date |
Country |
Parent |
09/411686 |
Oct 1999 |
US |
Child |
09/990936 |
|
US |