Claims
- 1. A hydrocarbon production system in a substantially horizontal borehole comprising:a gravel packing base pipe including at least one blank base pipe section and at least one holed base pipe section; an openable and closeable port in said blank pipe section, said port extending from an outside diameter of said blank pipe section to an inside diameter of said blank pipe section, said port facilitating leak-off of gravel slurry fluid; and a gravel pack having a quantity of gravel packed around said holed base pipe section and said blank base pipe section.
- 2. A hydrocarbon production system in a substantially horizontal borehole as claimed in claim 1 wherein said port is a sliding sleeve controlled port.
- 3. A hydrocarbon production system in a substantially horizontal borehole as claimed in claim 2 wherein said sleeve is closed by withdrawal of a washpipe from said system.
- 4. A hydrocarbon production system in a substantially horizontal borehole as claimed in claim 3 wherein said sleeve is locked when closed.
- 5. A hydrocarbon production system in a substantially horizontal borehole as claimed in claim 1 wherein said port when closed is locked closed.
- 6. A hydrocarbon production system in a substantially horizontal borehole as claimed in claim 1 wherein a contaminant is injected into said gravel pack through said port in said blank pipe section.
- 7. A hydrocarbon production system in a substantially horizontal borehole as claimed in claim 6 wherein said contaminant is selected from cement, drilling mud and epoxy.
- 8. A hydrocarbon production system for building a gravel pack in a substantially horizontal borehole comprising:a gravel packing base pipe including at least one holed base pipe section and at least one blank base pipe section; and a selectively closeable port in said blank base pipe section.
- 9. A method for building a zonally isolated gravel pack comprising:installing a base pipe having one or more slotted base pipe sections and a screen associated with each slotted base pipe section separated by at least one blank base pipe section having at least one closeable port and a screen located immediately over said at least one closeable port; installing a washpipe; pumping gravel to an annulus between one of an open hole formation and a casing, and said base pipe; pulling said washpipe; and closing said at least one closeable port in said blank base pipe section.
- 10. A method as claimed in claim 9 wherein said closing of said at least one closeable port is by actuating a closing sleeve to cover said at least one closeable port.
- 11. A method as claimed in claim 10 wherein said sleeve is actuated by a profile on said washpipe during pulling of said washpipe.
- 12. A method as claimed in claim 9 wherein said method further includes reopening said at least one closeable port and pumping a contaminant into said gravel pack through said at least one closeable port.
- 13. A method as claimed in claim 12 wherein said contaminant is selected from cement, drilling mud and epoxy.
- 14. A well zonal control and isolation system comprising:a plurality of holed base pipe segments; at least one blank base pipe segment separating at least two of said plurality of holed base pipe segments into zones; at least one closeable port in said blank pipe base segment; a screen located circumferentially around each said holed base pipe segments and a separate screen located around each said at least one closeable port in said blank base pipe segment.
CROSS-REFERENCE TO RELATED APPLICATIONS
This application claims the benefit of U.S. Provisional Application Serial No. 60/107,266 filed Nov. 3, 1998.
US Referenced Citations (9)
Foreign Referenced Citations (1)
Number |
Date |
Country |
2 265 399 A |
Sep 1993 |
GB |
Provisional Applications (1)
|
Number |
Date |
Country |
|
60/107266 |
Nov 1998 |
US |