This invention relates to underground mining and has particular application to block and panel caving mines.
Block and panel caving is an efficient technique that uses gravity to extract ore from an ore body. Caverns of broken rock are blasted at an upper level (the undercut level) beneath the ore body to be recovered, extraction tunnels are formed at a lower level (the extraction level) beneath the undercut level and a series of relatively narrow drawbells are blasted between the extraction and undercut levels to allow broken cavern rock to fall through the drawbells into the underlying extraction tunnels through which the rock can be removed. The speed of rock falling through the drawbells is controlled by the speed at which rock is removed through the extraction tunnels and as broken rock falls through the drawbells the caverns gradually collapse further to create more broken rock to feed the drawbells under the influence of gravity.
The terms “block caving” and “panel caving” may be used according to the dimensions of the ore body being mined. Specifically the term “panel caving” may be used in relation to the mining of relatively wide and shallow ore bodies. The term “block caving” may be extended to ore bodies which are relatively deep and may be used as a wide or generic term applying to caving beneath any ore bodies and so include within its scope panel caving. The term “block caving” will be used in this broad sense throughout the remainder of this specification, including the claims, and is to be construed as including panel caving within its scope.
In traditional block cave mining excavation at both the undercut and extraction levels is carried out by drilling and blasting and removing the blasted rock to form undercut tunnels at the undercut level and extraction tunnels at the extraction level. This is a slow process and large block cave mines require significant time to develop and a very significant early investment. Both of these factors make their financial success in terms of net present value extremely sensitive to the speed at which they can be brought on stream. The present invention is concerned with methods to enable quicker development of a block cave mine.
The present invention relates to a method of block cave mining comprising:
excavating undercut tunnels at an undercut level;
drilling undercut blast holes through the undercut tunnel roofs and setting and detonating explosive charges in those holes to blast rock above the undercut tunnels to initiate the formation of broken rock caverns above the undercut tunnels;
excavating extraction level tunnels at an extraction level below the undercut level;
drilling drawbell blast holes upwardly from the extraction level tunnels at selected drawbell locations toward the broken rock caverns and setting and detonating explosive charges in those holes to blast drawbells through which broken rock falls down into the extraction level tunnels; and
progressively removing such fallen rock from the drawbell locations through the extraction level tunnels;
wherein some of the excavation is done mechanically by tunnel boring machinery.
At least parts of the extraction level tunnels and/or the undercut level tunnels may be excavated mechanically by tunnel boring machinery. In particular the extraction level tunnels may be developed in a manner which facilitates the use of tunnel boring machinery for rapid development at the extraction level.
The broken rock caverns may be formed across an undercut front which is advanced by continuing cavern formation and the extraction level tunnels may comprise a series of drawbell drifts generally parallel to the advancing undercut front and a series of extraction drifts transverse to and intersecting the drawbell drifts.
The drawbell drifts may extend through said drawbell locations and the drawbell locations may be disposed between the extraction drifts.
The extraction drifts may be oblique to the drawbell drifts so as to extend backwardly and sidewards from the direction of advance of the undercut front to connect with a perimeter extraction drift.
In one method extraction drifts may be extended by tunnel boring machinery in increments equal to the spacing between the drawbell drifts during each excavation of a new drawbell drift.
More specifically each new drawbell drift may be excavated by a tunnel boring machine operated to advance the drawbell drift to an intersection with an extraction drift, to change the boring direction at the intersection to incrementally advance the extraction drift beyond the drawbell drift and to then withdraw into the drawbell drift so that the drawbell drifts and extraction drifts are both extended progressively by successive excavations of generally ‘L’ shaped or ‘hockey stick’ shaped tunnel extensions.
In an optional method, the drawbell drifts may be excavated mechanically by tunnel boring machinery and the extraction drifts extended by drilling and blasting. In this optional method, the drawbell drifts may be excavated by tunnel boring machinery sequentially in the direction of advance of the undercut front and the extraction drifts extended incrementally by drilling and blasting between successive drawbell drifts.
Each extraction drift extension may be extended at an obtuse angle to the drawbell drift from which it is advanced.
The drawbell drafts and extraction drifts may be excavated behind the advancing undercut front and the drawbells drilled and blasted beneath rock caverns already formed at the undercut level.
The excavation of the drawbell and extraction drifts may lag the advancing undercut front by at least the distance between the undercut and extraction levels.
In order that the invention may be more fully explained some specific block cave mining methods employing tunnel boring machinery will be described with reference to the accompanying drawings, in which:
The illustrated mine comprises undercut tunnels 21 and extraction level tunnels 22 which are excavated totally or in parts by tunnel boring machines 24 one of which is shown diagrammatically in
Tunnel boring machines 24 may be of a kind conventionally used in civil engineering tunnelling such as in the formation of road and railway tunnels or water pipe tunnels. They may each comprise a series of linked vehicles mounted on crawler tracks with the lead vehicle provided with a boring head with rotary cutters and the trailing vehicles provided with conveyors to feed excavated material to the rear of the vehicle and to carry ancillary equipment to perform tunnel finishing operations such as rock drilling, bolting and concreting.
The undercut tunnels 21 are extended as a set of parallel tunnels at the undercut level below the ore body to be mined. Undercut blast holes 25 are drilled through the undercut tunnelled roofs so as to extend upwardly and transversely of the undercut tunnels. Explosive charges are set and detonated in holes 25 to blast rock above the undercut tunnels 21 to initiate the formation of broken rock caverns 26 above the undercut tunnels and across an undercut front 27. The undercut front 27 is advanced by a continuing cavern formation, the front advancing back along the undercut tunnels 21. Broken rock formed by blasting and tunnel collapse at this stage of the development is removed through sections of the undercut tunnels not yet affected by blasting. This process promotes the development of the upper caverns of broken rock.
As development of the undercut progresses one of the tunnel boring machines 24 is operated to develop the production ore extraction level tunnels 22 following a pre-undercutting method by the sequence of operations illustrated in
The extraction level tunnels 22 comprising drawbell drifts 34 and extraction drifts 35 are located with the low stress undercut zone 40 behind the advancing undercut front 27 and are thus spaced from the high stress abutment zone 41 ahead of the undercut front.
As seen by the development sequence illustrated in
At the start of the cycle shown in
The oblique angle between the drawbell drifts and the extraction drifts may be in the range of 130° to 140°, preferably about 135° to allow manoeuvring of the tunnel boring machine and also the vehicles used for subsequent ore recovery from the drawbells.
The tunnel boring method and development sequence as illustrated in
Because the tunnel boring machine is operated in a low stress zone and is far less damaging to the surrounding rock structure than blasting it is possible to excavate the drawbell drifts and extraction drifts at much closer spacing than before, so minimising the dimensions of the pillars between those drifts and the quality of ore loss to production. It is also possible to allow production, construction and development activities to be carried out simultaneously in adjacent zones 43, 44 and 45 as indicated in
The tunnel boring machine is operated to excavate one or more drawbell drifts in advance of the previously excavated two or more successive drawbell drifts between which drilling and blasting is carried out. The tunnel boring machine may be operated to excavate a new drawbell drift as drilling and blasting is being carried out between the previously excavated drawbell drifts to extend the extraction drifts.
In the layout shown in
The optional method shown in
The above described mining methods and equipment enable very significant savings in mine development time.
However, these method and equipment have been advanced by way of example only and could be varied. Various kinds of tunnel boring machinery may be employed in a method in accordance with the invention and in some mines this machinery would not need to be assembled at the foot of a mine shaft but could be transported along inclined pathways and tunnels from the mine surface. It is to be understood that these and many other modifications and variations may be made without departing from the scope of the appended claims.
Number | Date | Country | Kind |
---|---|---|---|
2010900726 | Feb 2010 | AU | national |
2010902511 | Jun 2010 | AU | national |
Filing Document | Filing Date | Country | Kind | 371c Date |
---|---|---|---|---|
PCT/AU11/00187 | 2/22/2011 | WO | 00 | 1/3/2013 |