The present invention relates to a pipeline and a manufacturing method thereof, and in particular to an underground steel-concrete structure pipeline with a spiral composite reinforcement ring on an inner wall and a manufacturing method thereof.
In recent years, with the rapid development of urban rail transportation, communication, electric power and the like in our country, the demands on underground trenches and underground passages are more and more, most traditional underground common trenches are constructed in an open excavation method, and concrete is poured after excavation to form tubular structures, which are usually rectangular or round, and internal pipelines are installed after the poured concrete reaches the use intensity; and large pipelines are typically constructed in such manners as manpower construction, stone building, cement building and the like. Under normal circumstances, due to pipeline installation and pipeline erection of water, electricity, gas, communication and the like, the grounds are repeatedly excavated to result in waste of manpower and material resources, damage to the grounds and damage to various pipelines are not conducive to management and planning; meanwhile, the engineering quantity of the construction method and the structure thereof is large, the construction period is long, and the construction cost is higher; and in addition, during the construction, a part of structures at the tops of the pipelines must be completely cleared, and thus the additional land acquisition compensation fees are quite high.
Besides the open excavation method, a shield construction method is also available, it can be used for constructing underground passages without disturbing the structures above, even penetrating through high-rise buildings without disturbing surface buildings, controlling collapse instability of excavation faces and surrounding soil while tunneling and deslagging, splicing duct pieces in a machine to form linings and grouting after forming walls so as to build tunnels without disturbing the surrounding soil bodies. However, in the method, the pipeline linings are concrete sheet bars, which resist against the internal stress of the surrounding rocks by means of the strength and rigidity per se, therefore the thicknesses of the duct pieces need to be increased to improve the section strength of the pipelines in deeper underground engineering, and if the diameters of the pipelines are larger, the necessary engineering quantity is generally quite large, so that the construction operation is quite complex, the technical standard requirements are very high, and excessive steel and concrete are consumed to increase the cost.
Besides the above construction methods, a pipe-jacking construction method is also available, which is an underground pipeline construction method developed after the shield construction. By adopting the pipe-jacking construction method, surfaces are not excavated necessarily, and roads, railways, rivers, ground buildings, underground buildings and a variety of pipelines or the like can be passed through. The pipe-jacking construction depends on the thrust of a main jacking oil cylinder and relaying chambers between pipelines and the like to push a tool pipe or a heading machine from the interior of a working well into a receiving wheel to be lift by penetrating through soil layers; and meanwhile, pipelines following the tool pipe or the heading machine are buried between the two wells, in order to achieve a non-excavation underground pipeline construction method. The method is convenient to construct and is fast in process, but cement pipes are too heavy, and the wall thicknesses of the pipelines with ultra large pipe diameters are too large, so that pipe jacking is difficult, the manufacturing cost is high, and the construction is inconvenient.
Purpose of the Invention: a first purpose of the present invention is to provide an underground steel-concrete structure pipeline with a spiral composite reinforcement ring on an inner wall, which can improve the circumferential strength of a pipe body, improve the stability of the pipe body and reduce the construction difficulty, and a second purpose of the present invention is to provide a manufacturing method of the pipeline.
Technical Solution: the underground steel-concrete structure pipeline of the present invention includes a pipe body, multiple rows of concrete overflow holes are spirally arranged on a pipe wall of the pipe body along a circumferential direction, a reinforcement ring capable of wrapping the concrete overflow holes is correspondingly arranged on an inner wall of the pipe body, and concrete is filled in a hollow cavity between the reinforcement ring and the pipe wall to form a spiral concrete flow passage.
Wherein, the pipe body is a steel pipe body spirally winded by a main steel belt. Meanwhile, one or multiple rows of concrete overflow holes are arranged along a length direction of the main steel belt.
The reinforcement ring is a steel belt with a cambered, semicircular, rectangular or trapezoidal section, bent by a narrow steel belt. Meanwhile, the bent narrow steel belt is laminated with the main steel belt and covers the concrete overflow holes on the main steel belt, and the main steel belt and the narrow steel belt are winded along a spiral direction to form a steel pipe together.
In addition, the bent narrow steel belt forms two end faces, and the end faces are welded on the main steel belt.
The manufacturing method of the underground steel-concrete structure pipeline includes the following steps:
(1) preparing the pipeline and spirally forming the concrete overflow holes on the pipe wall of the pipe body along the circumferential direction; (2) preparing the narrow steel belt, and bending the narrow steel belt into a hollow reinforcement ring with a cambered, semicircular, rectangular or trapezoidal section; (3) spirally laminating the hollow reinforcement ring on the inner wall of the pipe body and wrapping the concrete overflow holes; and (4) respectively forming holes on the reinforcement ring on the head and tail ends of the pipeline placed in a pit, and pouring concrete from the hole on the head end, wherein the concrete fills a hollow cavity formed between the reinforcement ring and the inner wall of the pipe body along a spiral direction, meanwhile, the concrete flows out from the concrete overflow holes to fill a gap between the pipe wall and the pit, and when the concrete overflows from the hole on the tail end, the pouring operation is finished.
Wherein, the pipeline can be manufactured according to the following method: preparing the main steel belt, forming the concrete overflow holes along the length direction of the main steel belt, laminating the reinforcement ring on the main steel belt and covering the concrete overflow holes thereon, winding the main steel belt and the laminated reinforcement ring along the spiral direction together to form the pipeline with the reinforcement ring on the inner wall. Meanwhile, the pipelines are connected by a flange.
Principle of the Invention: the body of the pipeline is of a flexible structure, surrounding rocks can be fully used to form a pipe-soil effect with the main pipeline, the main pipeline and the surrounding soil are stressed together, serving as a skeleton of the pipe body, the reinforcement ring increases the second moment of area of the pipe wall, the filled concrete improves the compressive strength of the steel pipe, and the jacking force or traction of the pipeline can be reduced to the uttermost while guaranteeing the strength of the pipe body.
Beneficial Effects: compared with the prior art, the present invention has the remarkable advantages that: the overall annular strength of the pipeline is reinforced by the reinforcement ring; the concrete filled between the reinforcement ring and the inner wall of the pipe body further improves the compressive strength of the pipe body; the concrete overflowing from the overflow holes on the pipe wall combines the pipe body with the pit, so that the pipe body is stable and firm; the pipeline of the present invention solves the difficulty of using large-size steel structure products in underground common pipeline projects, underground comprehensive pipe racks and underground access roads; and meanwhile, the method of the present invention is easy to operate, simple and convenient to construct, and can be used for shortening the construction period and reducing the cost.
On a construction site as shown in
According to the diameter of the pipeline to be manufactured, a forming angle of the pipeline processing equipment 13 is adjusted to a proper value. As shown in
A narrow steel belt 40 is prepared, after unreeling, leveling, trimming and other procedures, the narrow steel belt is placed according to the position as shown in
The reinforcement ring 4 is laminated with the main steel belt 10, wherein the narrow steel belt is bent to form two end faces 41, contact positions of the end faces 41 and the main steel belt 10 are laminated, for example, by a welding process, meanwhile, the reinforcement ring 4 covers or wraps the concrete overflow holes 3 on the main steel belt 10, and the centers of the concrete overflow holes 3 on the main steel belt 10 can be overlapped with the center of the reinforcement ring 4, as shown in
As shown in
As shown in
As shown in
The pipeline of the present invention is applicable to underground common trenches, municipal common pipe galleries and underground collector pipes and the like, and meanwhile, the pipeline is buried deeply, which is larger than 10 meters.
Number | Date | Country | Kind |
---|---|---|---|
2014 1 0541898 | Oct 2014 | CN | national |
Filing Document | Filing Date | Country | Kind |
---|---|---|---|
PCT/CN2014/095448 | 12/30/2014 | WO | 00 |
Publishing Document | Publishing Date | Country | Kind |
---|---|---|---|
WO2016/058275 | 4/21/2016 | WO | A |
Number | Name | Date | Kind |
---|---|---|---|
3812884 | Breitfuss | May 1974 | A |
3955600 | Tamburello | May 1976 | A |
4365911 | Rossberg | Dec 1982 | A |
5454402 | Andre | Oct 1995 | A |
5516229 | Atchley | May 1996 | A |
5829916 | Evans | Nov 1998 | A |
Number | Date | Country |
---|---|---|
2668964 | Jan 2005 | CN |
1746434 | Mar 2006 | CN |
202559342 | Nov 2012 | CN |
202812511 | Mar 2013 | CN |
3619973 | Nov 1987 | DE |
Entry |
---|
May 15, 2015 International Search Report issued in International Patent Application No. PCT/CN2014/095448. |
Number | Date | Country | |
---|---|---|---|
20160319962 A1 | Nov 2016 | US |