The present invention relates generally to an inspection system and method for underground power line inspection.
Underground power lines require inspection and maintenance to ensure long-term performance and reliable operations. Inspection and maintenance access is typically obtained through vaults (manholes) or tunnels,
Entering a confined space with potential hazards is restricted by many electric utilities. As a result, inspection personnel cannot easily or safely access certain sections of underground power lines. In many occasions, getting access to those sections or areas is costly. For example, line outages are required by many utilities for personnel to enter an underground vault for inspection. In some instances, inspection for these areas may be performed with the assistance of extension sticks or moving carts. However, such inspection methods can be limited and difficult to standardize.
Under a limited scope, inspection may also be performed using remote sensing. In this sensing technology, sensors are fixed at specific locations adjacent to or near the components to be inspected. The measurements are then made, and data retrieved and processed on site or transferred to a remote location. However, because remote sensing devices, if used, are fixed at specific locations within the vaults, they may not have full view of all components, thereby limiting the effectiveness of the inspection.
Accordingly, there is a need for an underground power line vault inspection system and method that allows complete inspection of an underground power line without compromising personnel safety or performing a costly line outage.
These and other shortcomings of the prior art are addressed by the present invention, which provides a system and method for the inspection of underground power lines running through a vault or tunnel.
According to one aspect of the invention, an underground utility vault inspection system includes a pre-defined railway installed in an underground utility vault; and an inspection vehicle adapted to traverse the railway to provide inspection results to inspection personnel. The inspection vehicle includes inspection tools for inspecting underground power lines and equipment, recording inspection results, and transmitting the inspection results to the inspection personnel.
According to another aspect of the invention, a method for inspecting underground utility vaults includes the steps of providing an inspection vehicle adapted to traverse a railway disposed in an underground utility vault; moving the inspection vehicle to a pre-determined location in the utility vault; and using the inspection vehicle to inspect utilities located in the utility vault.
The subject matter that is regarded as the invention may be best understood by reference to the following description taken in conjunction with the accompanying drawing figures in which:
Referring to the drawings, an exemplary underground utility vault inspection system and method according to an embodiment of the invention is illustrated in
The vehicle 11 uses various sensors, cameras, and instruments to conduct the inspection. For example, the vehicle 11 may be equipped with optical image sensors, infrared temperature sensors, radio frequency interference sensors, acoustic sensors, hazard gas detectors, and corrosion sensors to perform visual inspection, thermal inspection, gas monitoring, and arcing detection. For optical image sensing or visual inspection, lighting may be provided on the device to assist the inspection. The area coverage of the inspection can be preprogrammed, controlled by image/object recognition, or manually controlled by the operator aboveground through real-time image monitoring. The inspection device may also be used to collect data from locally fixed sensors or data loggers (i.e., inside the vault or tunnel) as it passes by these devices. The inspection information can be processed in real-time by the inspection device itself or in a post analysis by other processing equipment.
The vehicle 11 may also be fitted with a manipulator arm 14,
The vehicle 11, sensors, cameras, and instruments may be remotely controlled by wireless or wired technologies, wherein the wireless or wired technology operates in conjunction with or independent of the railway 12. The vehicle 11 may be powered through a battery system or a wired power supply, wherein the wired supply may or may not utilize the railway 12, or by indirect power transfer as an inductive pickup. The vehicle may be retrieved by the operator by backing off from the same railway or through a return railway.
The vehicle 11 may be permanently installed on the railway 12 to perform routine and scheduled inspections or used as a portable device to inspect components where a permanent, temporary, or retrofit railway is installed. Thus, one vehicle 11 may be used for multiple locations. The vehicle 11 may be universal for inspection of various types of vaults, tunnels, or inspections or it may be specifically designed for a specific type of inspection.
The vehicle 11 is custom fitted to travel on the railway 12. The vehicle 11 may move along the line of the railway 12 in a linear mode (i.e., parallel to the track) or in a circular motion around the axis of the railway 12 (i.e., executing a circle whose radius is perpendicular to the track). The railway 12 itself may incorporate inventive features to permit rotational as well as linear movement of the vehicle. For example, the railway 12 may have sections that are adapted to rotate (i.e., around its own axis) when the vehicle 11 enters the section. Alternatively, the railway 12 may contain embedded circumferential grooves or axial spines that guide and/or enable the vehicle 12 to accomplish a circular motion. The vehicle 11 may itself have the capability to swivel, turn, extend, telescope, or move in any suitable direction.
The railway 12 may be portable or permanently installed in underground or confined spaces so that the vehicle 11 can travel through a preprogrammed path for the inspection. The railway 12 may be a solid and fixed rail system, a flexible wire system, or a controllable flexible path that has the capability to reach a specific location. The railway 12 may consist of any number of tracks or rails, and may have switches to direct vehicle 11 travel along different routes. The railway 12 may be made of any suitable material capable of supporting the vehicle 11 to allow the vehicle 11 to carry out its intended function. The railway 12 may be specially designed and installed in new/existing vaults or tunnels, an existing system, or a retrofit to an existing structure.
As shown in
The railway 12 may also incorporate a means to power the vehicle 11. For example, the railway could include a low voltage conductor embedded in the railway 12 that provides power to an inductively coupled power pickup device on the vehicle 11. The railway 12 could also receive power from state of the art power harvesting devices inside the vault or tunnel, or from local power sources (e.g., a battery pack) and distribute that power to the vehicle 11. The railway 12 may also incorporate components of a power harvesting scheme, such as integrally providing an inductive loop or pickup for harvesting power from cable sheath currents. The railway 12 may similarly incorporate a means of routing control signals to the vehicle 11 and/or means to transmit information back to the operator. For example, the railway 12 may be used to obtain the distance, speed, and stops that the vehicle 11 travels using suitable fixed sensors or RFI devices along the track. The terminus of the railway 12 that is near the aboveground access port could also be fitted with a low power transmitter/receiver, for example, to permit easy “drive-by” communications by suitably equipped utility vehicles, or for low-power wireless mesh transmissions to nearby transmitter/receivers.
Once the railway 12 is installed in the underground vault or tunnel, the vehicle 11 is attached to the railway 12 and positioned for operation. The vehicle 11 may be pre-programmed to traverse a specific path along the railway 12 or may be controlled by wire or wirelessly to traverse the railway 12 as desired. As the vehicle 11 traverses the railway 12, the vehicle uses its many sensors and arm 14 to inspect the underground power lines. The vehicle 11 may be used to perform an inspection for a specific problem or problems or may be used to perform an overall inspection of the health of the underground power line.
The foregoing has described an underground utility vault inspection system and method. While specific embodiments of the present invention have been described, it will be apparent to those skilled in the art that various modifications thereto can be made without departing from the spirit and scope of the invention. Accordingly, the foregoing description of the preferred embodiment of the invention and the best mode for practicing the invention are provided for the purpose of illustration only and not for the purpose of limitation.
This application claims the benefit of Provisional Application No. 61/476,923 filed on Apr. 19, 2011.
Number | Date | Country | |
---|---|---|---|