An improved undersea anchoring system for anchoring objects in water.
Mooring of offshore objects typically requires multiple mooring lines between the platform and the sea floor, and suitable anchors on the sea floor connected to the mooring lines. Mooring systems currently used include catenary mooring illustrated in
In catenary mooring, catenary mooring lines resist horizontal forces by the weight of the lines, which are usually steel chain or wire rope. As the top of the line moves horizontally, the sag in the catenary is reduced and the horizontal restoring force increases. The horizontal stiffness of the line is directly related to the weight of the line relative to the horizontal force.
In taut mooring, taut mooring lines resist horizontal force by stretching. The lines are relatively light (for example synthetic rope), and remain relatively straight under tension. The horizontal stiffness is directly related to the stiffness of the line, not to its weight.
Anchors for these types of moorings must be designed to take the maximum horizontal and vertical loads at the seabed exerted by the lines. Catenary moorings generally are designed so that the anchors do not experience any vertical loads (“uplift”). This requires longer line length (“scope”) than a taut mooring, and requires a larger area on the seafloor assigned for the mooring spread, i.e. a larger “foot print”. Mooring of offshore objects in deep water in recent years has favored taut moorings because the reduced cost for mooring lines and the smaller foot print. However, taut mooring requires anchors that are able to withstand uplift.
There are many common types of anchors in use today. The drag embedment anchor is commonly used with catenary moorings for temporary systems such as drilling rigs. Most permanent moorings in use today use a taut mooring and a piled anchor, either driven with underwater pile hammers, or installed using a suction principle. These “suction anchors” are installed by setting them vertically on the seabed to create a seal around their base, By pumping water from their interior a large pressure differential is achieved which results in the pile being “sucked” into the seabed.
Many conventional anchors require a thick layer of suitable sediment or sand to function. They are not suitable for rock bottoms, or for areas with highly organic sediment, e.g. coralific or calcareous sediments. For these types of areas, gravity anchors or bored piled anchors are available. Two forms of a gravity anchor include a grillage overlaid with rock or iron ore, or a gravity box filled with ballast. Gravity anchors resist uplift with weight, and horizontal forces with bottom friction.
Gravity anchors need to be very heavy to resist vertical and horizontal loads. If the anchors are deployed in deep water, the only vessels capable of lifting and lowering these heavy anchors may be large derrick vessels costing several hundred thousand dollars per day. Alternately, a lighter box or grillage may be lowered with a smaller cheaper vessel, but ballast must then be installed.
Bored piled anchors typically require an expensive drilling vessel for installation. In addition, bored piled anchors require mooring line attachment above the seabed. It is not generally favorable to attach the mooring line at the top of the pile because of the large bending moment that is imparted to the pile from the eccentricity of the horizontal force. The attachment point is typically below the sea floor, close to the center of the reaction force from the soil. This presents a difficult design issue for piles that are bored into rock, as it becomes impossible to attach the mooring line below the seabed. For this reason, drilled anchors are more commonly used as tension piles.
An undersea anchoring concept is described that is particularly applicable to a rock bottom or where the sediment thickness is insufficient for a conventional anchor. The undersea anchor can be remotely installed with a seabed drill, eliminating the need for an expensive deep water drilling rig on the surface. In addition, the anchor is designed in a manner that allows most of the mooring force to be taken in the axial direction along a pile, eliminating the bending and shear forces which are associated with a conventional bored pile and mooring. The undersea anchor can be employed with, for example, a taut mooring system to achieve an optimum relationship between the horizontal and vertical forces on the anchor.
In one embodiment, the undersea anchor employs a frame that is fixed to the seafloor by one or more pile anchors, for example grouted pile anchors. The frame is configured to permit it to function with one or more seabed drills, and to orient the drill(s) to allow the pile anchor(s) to be installed at a predetermined angle. For example, the predetermined angle can be an angle relative to horizontal so the pile anchor(s) can take horizontal and vertical loads. In one embodiment, the frame is designed to permit use of a plurality of pile anchors. When grouted pile anchors are used, a system for grouting the pile anchors in deep water can be employed.
The disclosed undersea anchor can be used to anchor any type of object in water, for example floating structures such as an Ocean Thermal Energy Conversion (OTEC) system, a drilling platform, and the like. In addition, the disclosed undersea anchor can be used for anchoring, floating objects in any body of water, freshwater or saltwater. Therefore, the terms undersea, seafloor and the like are intended to include freshwater uses as well.
In one embodiment, an undersea anchor includes a frame, a mooring line connection site connected to the frame, and a seabed drill mounting system on the frame permitting mounting of a seabed drill on the frame. The mounting system orients a seabed drill so that the seabed drill can install a pile anchor in the seabed at a predetermined angle. The seabed drill is used to install at least one pile anchor that is connected to the frame, with the pile anchor being disposed at the predetermined angle. In one embodiment, the pile anchor extends at an angle that is generally parallel with a resultant load direction of a mooring line that is connected to the frame.
The mounting system permits adjustment of the position of the seabed drill on the frame so that the seabed drill can install a plurality of the pile anchors. The mounting, system can be any system allowing adjustment of the drill position, for example a pair of parallel U-shaped rails. The frame can include a pair of the parallel U-shaped rails on first and second sides of the frame.
In one embodiment, when the pile anchors are at an acute angle, the pile anchor(s) can extend at an angle of greater than or equal to about 20 degrees but less than about 90 degrees relative to horizontal.
An anchoring method includes placing a frame, that includes a mooring line connection site, on the sea floor. A seabed drill is installed on the frame so that the seabed drill can install a pile anchor in the seabed at a predetermined angle relative to horizontal. The seabed drill is used to install a pile anchor at the predetermined angle, and the installed pile anchor is then connected to the frame.
With reference to
In the illustrated example, the frame 12 is generally rectangular in shape, comprised of a latticework of steel beams or beams of other suitable material), and uses eight pile anchors 14, in this example, the bottom of the frame 12 is generally flat, allowing the frame to rest on a generally flat seafloor. The bottom of the frame 12 could have other configurations to generally correspond to the contour of the seafloor on which the frame will be disposed. The frame 12 also includes a mooring line connection site 16 formed by a pair of flanges 22a, 22b on a plate 24 that is suitably fixed to the top of the frame 12. Other mooring line connection configurations could be employed. In addition, additional mooring line connection sites could also be provided on the frame 12.
Along opposing sides of the frame 12, angled walls 18 are formed. The walls 18 form connection sites for connecting the ends of the pile anchors 14 to the frame. The walls 18 are disposed at angles such that the planes of the walls are generally perpendicular to the longitudinal axes of the pile anchors 14.
The pile anchors 14 are for example grouted pile anchors, oriented and configured to take both vertical and horizontal loads. Although eight pile anchors 14 are illustrated, a larger or lesser number of pile anchors could be used, based in part on the particular application of the anchor 10 and the anticipated loads. In addition, although
The pile anchors can extend at any predetermined angle. In the illustrated embodiment, the pile anchors extend at an acute angle a relative to horizontal. In the illustrated embodiment, the pile anchors extend at the same angle α relative to horizontal. For example, the pile anchor(s) can extend at an angle α of greater than or equal to about 20 degrees but less than about 90 degrees relative to horizontal. In one embodiment, the angle α can be about 45 degrees.
In one embodiment, the longitudinal axis of at least one of the pile anchors 14 is generally parallel to the mooring line resultant load direction, designated by arrow 20. in the example illustrated in
In addition, the size and configuration of the pile anchors 14 can vary depending in part on loading, as well as the number of pile anchors 14 that are used. However, in the illustrated embodiment, it is believed that pile anchors between about 100 mm to about 200 mm in diameter, and approximately 12 m long would suffice. The length can change based on the composition and strength of the seabed. In another embodiment, a spacing of the pile anchors 14 can be, for example, at least about 8 times the pile anchor diameter to avoid interaction effects and maximize the load carrying efficiency of the pile anchors.
An example of a suitable grouted pile anchor useable with the frame 12 is the Ischebek Titan 103/51. Grouted piles are a well established anchoring technique in onshore civil engineering construction applications. The piles are drilled into the ground using a tubular pipe with a sacrificial drill bit on the end. Once the pile reaches the desired depth, drilling is stopped. Fluid grout is then pumped into the tubular pipe and exits through drainage holes in the pipe and/or drill bit. The fluid grout then fills the annular spacing between the tubular pipe and the borehole wall in the ground. Once the grout sets the tubular pile is bonded to the ground.
The frame 12 is designed to interact with one or more seabed drills to allow the angled piles to be installed, A means of configuring the frame 12 to interact with the seabed drill will be described below with respect to
In addition, each side of the frame 32 is angled so that when the seabed drill 34 is mounted in the guide channel, the drill 34 is oriented at the correct angle for drilling pile anchors 38 into the seabed at the desired angle α. Other mechanisms for allowing the seabed drill to interact with the frame fix drilling the pile anchors at the appropriate angle can be used.
The grout for the pile anchor can be prepared and mixed on a surface support vessel and pumped down to the seabed drill rig. The grout can then be pumped into the tubular pile as discussed above. This is a well known process in the oil & gas industry where tubular oil well casings and pipes are regularly grouted into the seabed. Alternatively, the grout could be mixed at or near the seafloor. A pressure control system can be used to control the grout pressure and avoid the risk of seabed hydro-fracture. Seabed hydro-fracture is not desired as it may degrade the strength of the seabed soil or rock and therefore compromise the strength of the pile anchors.
Although not illustrated in
Different drilling orientation angles are also possible.
In order to ensure the integrity of the anchor frame with grouted pile anchors once it has been installed, a number of quality control operations may be carried out. For example, to obtain and verify the tensile capacity for a single application, a remote controlled pull out test can be performed. In this test, a jacking system with load monitoring equipment can be used to pull against the pile, reacting from the frame, and the load capacity of the pile can thus be verified. This test creates a tensile load. A lateral push/pull test can also be performed between two adjacent working piles in order to verify the lateral capacity. All tests can be performed at a uniform rate of load application or alternatively they may be performed cyclically or indeed to simulate any pre-planned load regime. The ability to perform these tests is provided by the rail mounting system used for mounting the seabed drill on the frame, where the testing equipment can be configured to mount on the frame in the same manner as the seabed drill(s).
The examples disclosed in this application are to be considered in all respects as illustrative and not limitative. The scope of the invention is indicated by the appended claims rather than by the foregoing description; and all changes which come within the meaning and range of equivalency of the claims are intended to be embraced therein.
Number | Date | Country | |
---|---|---|---|
61349314 | May 2010 | US |
Number | Date | Country | |
---|---|---|---|
Parent | 13117628 | May 2011 | US |
Child | 14700777 | US |