Field of the Invention
The invention relates to the field of ocean engineering, and more particularly to an underwater operation platform and method for using the same.
Description of the Related Art
Typically, underwater operations are implemented by using small, single-purpose devices. The devices are costly, inefficient, can carry low loads only, are difficult to coordinate, and exhibit poor stability, which makes them unsuitable for use under severe swell conditions.
In view of the above-described problems, it is one objective of the invention to provide an underwater operation platform that is multifunctional, safe, stable, easy to operate and maintain. The platform can provide various services such as underwater resources exploration, auxiliary maintenance of oil and gas resources, emergency rescue and salvage, underwater engineering support precisely, efficiently, and reliably under variable load conditions.
It is another objective of the invention to provide a method for using the same.
To achieve the above objective, in accordance with one embodiment of the invention, there is provided an underwater operation platform, comprising:
Specifically, the main body is rectangular and comprises four corners; the moonpool is rectangular and runs through a molded depth of the main body; the pile legs are disposed at the four corners of the main body, respectively; the tower crane sleeves one of the pile legs disposed at the tail end of the main body; the deck comprises two parallel pathways which are located at two sides of the moonpool, respectively, for supporting the gantry crane; the lifting devices are disposed on the deck and are close to four corners of the moonpool; a surface area of the submergence module is less than that of the moonpool; each lifting device is connected to one corner of the submergence module via the steel cable; the support plate and the base plate are integrated with the plurality of truss members; the main body further comprises inner side walls facing the moonpool, and the inner side walls are provided with watertight doors communicating with operation cabins of the main body.
In a class of this embodiment, the tower crane comprises a suspension arm, a lifting hook, a control room, and a balance weight.
In a class of this embodiment, the lifting devices each further comprise a winch, a bracket, and a pulley disposed on the bracket; the steel cable winds the pulley, one end of the steel cable is connected to a hub of the winch, and the other end of the steel cable is connected to a lifting lug of the submergence module.
In another aspect, the disclosure also provides a method for using the underwater operation platform, the method comprising:
Advantages of the underwater operation platform and method for using the same according to embodiments of the invention are summarized as follows. The underwater operation platform comprises: a main body comprising a deck and a moonpool; two ducted propellers disposed at a tail end of the main body; a living building disposed on the front end of the deck; pile legs; a tower crane; a submergence module comprising a support plate, a plurality of truss members, and a base plate; lifting devices comprising a steel cable; and a gantry crane. The main body is rectangular and comprises four corners; the moonpool is rectangular and runs through a molded depth of the main body; the pile legs are disposed at the four corners of the main body, respectively; the tower crane sleeves one of the pile legs disposed at the tail end of the main body; the deck comprises two parallel pathways which are located at two sides of the moonpool, respectively, for supporting the gantry crane; the lifting devices are disposed on the deck and are close to four corners of the moonpool; a surface area of the submergence module is less than that of the moonpool; each lifting device is connected to one corner of the submergence module via the steel cable; the support plate and the base plate are integrated with the plurality of truss members; the main body further comprises inner side walls facing the moonpool, and the inner side walls are provided with watertight doors communicating with operation cabins of the main body. The underwater operation platform is multifunctional, safe, stable, easy to operate and maintain. The platform can provide various services such as underwater resources exploration, auxiliary maintenance of oil and gas resources, emergency rescue and salvage, underwater engineering support precisely, efficiently, and reliably under variable load conditions.
In the drawings, the following reference numbers are used: 1. Main body; 1a. Operation cabin; 1b. Engine room; 1c. Ballast tank; 1d. Fresh water tank, 1e. Fuel tank, 1f. Pump room; 1g. Main deck; 1h. Pile fixing area; 1i. Air inlet pipe; 1j. Air outlet; 2. Moonpool; 3. Watertight door; 4. Ducted propeller; 5. Diversion channel; 6. Pile leg; 6a. Leg sleeve; 6b. Pin hole; 7. Tower crane; 7a; Suspension arm; 7b. Lifting hook; 7c. Control room; 7d. Balance weight; 8. Living building; 8a. Helideck; 8b. Ladder; 8c. Window; 9. Submergence module; 9a. Support plate; 9b. Truss member; 9c. Base plate; 9d. Lifting lug; 10. Lifting device; 10a. Winch; 10b. Bracket; 10c. Pulley; 10d. Steel cable; 11. Gantry crane; 11a. Hanger; 11b. Wheel; 12. Pathway; 13. Lifeboat.
For further illustrating the invention, experiments detailing an underwater operation platform and method for using the same are described below. It should be noted that the following examples are intended to describe and not to limit the invention.
The lifting devices 10 each comprise a winch 10a, a bracket 10b, a pulley 10c, and a steel cable 10d. The pulley 10c is disposed on the bracket 10b. The steel cable 10a winds the pulley 10c, one end of the steel cable 10a is connected to the hub of the winch 10a, and the other end thereof is connected to the lifting lug 9d of the submergence module 9 (as shown in
A tower crane 7 is disposed above the pile fixing area 1h of the main deck. The tower crane 7 and the pile fixing area 1h form a continuous structure. The tower crane 7 is disposed out of the pile legs 6, and there is no motion interference between the two components. The tower crane 7 comprises a suspension arm 7a, a lifting hook 7b, a control room 7c, and a balance weight 7d. The length of the suspension arm 7a meets the hoisting requirements in the area of the main deck 1g. In addition to lifting the main body 1 and the submergence module 9, the tower crane 7 also adapts to lift the auxiliary vessels. The main deck 1g comprises two parallel pathways 12 which are located at two sides of the moonpool 2, respectively, for supporting the gantry crane 11. The pathways 12 are disposed on the main body 1 lengthways. The wheels 11b of the gantry crane 11 slide on the pathways 12. The gantry crane 11 comprises a beam and a hanger 11a fixed on the beam (as shown in
The living building 8 is in the shape of a tank with an opening and is located in the center of the head part of the main deck 1g. The top of the living building 8 is a helideck 8a. Widows 8b are disposed on the side walls of the living building 8, and ladders are disposed to connect the top and the bottom of the living building, and also operate as a fire and escape passage, so that the personnel can quickly reach the lifeboats 13 placed at two sides of the head part of the main body 1. Streamlined diversion channels 5 are disposed at the tail end of the main body 1 (as shown in
The disclosure also provides a method using the underwater operation platform, which comprises:
When the underwater operation platform operates in deep sea, there is no need to descend and withdraw the pile legs 6 and the leg sleeves 6a.
Unless otherwise indicated, the numerical ranges involved in the invention include the end values. While particular embodiments of the invention have been shown and described, it will be obvious to those skilled in the art that changes and modifications may be made without departing from the invention in its broader aspects, and therefore, the aim in the appended claims is to cover all such changes and modifications as fall within the true spirit and scope of the invention.
Number | Date | Country | Kind |
---|---|---|---|
2016 1 0200499 | Apr 2016 | CN | national |
This application is a continuation-in-part of International Patent Application No. PCT/CN2017/078080 with an international filing date of Mar. 24, 2017, designating the United States, now pending, and further claims foreign priority benefits to Chinese Patent Application No. 201610200499.X filed Apr. 3, 2016. The contents of all of the aforementioned applications, including any intervening amendments thereto, are incorporated herein by reference.
Number | Name | Date | Kind |
---|---|---|---|
8739717 | Ellnor | Jun 2014 | B2 |
9051783 | Croatto | Jun 2015 | B2 |
20130322969 | Gleadowe | Dec 2013 | A1 |
20140238289 | Sun | Aug 2014 | A1 |
20160177631 | Chiu | Jun 2016 | A1 |
Number | Date | Country | |
---|---|---|---|
20180229819 A1 | Aug 2018 | US |
Number | Date | Country | |
---|---|---|---|
Parent | PCT/CN2017/078080 | Mar 2017 | US |
Child | 15951134 | US |