The present invention relates to an unmanned or remotely operated platform concept. Such platforms include a jacket standing on the seabed. The jacket extends through the body of water and projects above the sea level. A topside is mounted on top of the jacket. The purpose of this platform concept is to bring the subsea infrastructure to the surface, which makes the wellheads, blow out preventer, Xmas trees, valves, actuators etc. dry and far more accessible.
The term un-manned or remotely operated platform must be interpreted broadly. The term could be an unmanned wellhead platform, an unmanned platform, remotely operated platform, normally unmanned platform, unmanned process platform or simpler facilities offshore.
Typical for these platform concepts is that the platform has no permanent manning and the concept grant options for removing typical functions as living quarters, helicopter deck and lifeboats. All these facilities may be found on a service operations vessel (SOV) that may be chosen to serve and operate the unmanned wellhead platform during eg. maintenance campaigns.
There is a continuous and ongoing demand and challenge to save cost during the development of oilfields in order to extract hydrocarbons from subsea oil reservoirs in a cost-effective way. It is only in the more recent years it has been proposed to make use of the rather new concept of unmanned wellhead platforms. The alternative would have been to install the wellheads on the seabed. However, the costs of subsea wells have grown extremely the last decades. The total cost for unmanned wellhead platforms is found very beneficial in respect of the expensive subsea concept.
The overall design philosophy is to minimize the equipment on the platform, thus minimizing the requirement for visiting the platform for operation and maintenance. Visits to the platform is planned limited to once a year except for unplanned well maintenance. Further, focus is on efficient and safe evacuation if for some reason a leakage and/or fire should occur during a visit.
Publication WO2016/122334 discloses an unmanned platform supported on a structure arranged on the seabed. The platform structure of the publication is standardized so that the same platform may be used on several installation structures.
Publication US2016/0221648 discloses a floating facility for offshore hydrocarbon production with drilling slots and production slots and a cart that is movable together with a drilling riser above the well bay to drill the well through the drilling riser.
GB2515021 discloses a support structure for use in an offshore platform. The support structure comprises a main support strut having one end anchored to the seabed and guide rail extending to the top of the support strut for cooperation with a framework with a payload slidably mountable to the guide rail for elevating the frame work and payload to the top of the structure.
None of the above publications do however discloses a platform structure for an unmanned platform that is adapted and designed for possible future expansion.
According the present invention, an unmanned wellhead platform comprising a jacket design and adapted to be supported on the seabed and projecting above the sea level, which jacket includes a topside installed on top of said jacket, is provided. The unmanned wellhead platform is distinguished in that the topside is designed as a standardized base concept tailored for repetitive future topside constructions, each topside construction being adapted to the number of wells to be developed, the topside construction being made up by a number of different but standardized sections, each standardized section being dedicated for a particular and predetermined purpose and location in said topside construction.
In one embodiment, some of the standardized sections of the topside construction has defined well slots, each well slot having received its respective and unique number from one and up, each numbered well slot repeatedly receives the same location in the topside construction each time a base topside construction is constructed, hence “standardizing” such base topside construction.
The many standardized sections may adopt different sizes and configurations, though normally grouped in sets of sections having equal dimension. Even if the topside frame construction is subdivided into a number of different sections, each section has its standard in respect of size and intended use.
In one embodiment, the at least one of the standardized sections may be adapted to receive and mount various components associated with a dedicated well.
In one embodiment, the number of standardized sections are grouped in standardized structural sections and standardized equipment sections.
Each standardized section may span over at least two decks, or alternatively each standardized section may span over three decks, i.e. a cellar deck, a middle deck and a weather deck.
Further, the topside sectioned frame structure may include eight, twelve or sixteen dedicated well slots, each well slot being adapted to receive required components for one respective well. Any number of dedicated well slots are conceivable, but eight, twelve or sixteen are shown here.
In one embodiment, the topside may be rotated in the horizontal plane approximately 45 degrees relative to corner legs of the jacket. This provides benefits with regard to accessibility and reach for a jack-up rig (not shown) to be located adjacent to the unmanned wellhead platform. The legs of the jack-up rig are able to straddle over the corner leg of the jacket and in this way being able to arrive as close as possible to the unmanned wellhead platform topside construction and thus the well area.
In one embodiment, the topside construction is adapted and designed for possible future expansion, where such expansion takes place by adding one or more structural section elements as required.
While the various aspects of the present invention have been described in general terms above, a more detailed and non-limiting example of embodiments will be described in the following with reference to the drawings, in which:
Reference is made to
Basically, the topside frame construction 3 is designed as a frame construction (also numbered 3), normally made up by several decks, here three decks are shown. The lowest deck is a cellar deck D1, next is a XMT deck D2 and weather deck D3 on top. The top area can easily be expanded or diminished.
The topside frame construction 3 is designed as a standardized base concept. This means that the concept is prepared for repetitive future use. However, the topside frame construction 3 needs to be adapted to each project depending on the number of wells to be operated and the site where it is to be located. The topside frame construction 3 could be adjusted according to the number of wells that are needed. This could be any number from 1-16. Further the number of decks are adjusted. The deck area and the height between the decks are defined accordingly.
The topside frame construction 3 is divided into a number of sections 4. Each section 4 is standardized in respect of size and intended use. However, even if many sections 4 are equal, many sections 4 are different also. Hence, they are grouped into particular sizes, but each size is standardized. Each section size is dedicated for a particular and predetermined purpose and location in the topside frame construction 3. Example of purpose and location are shown in
As more clearly shown in
The number of standardized sections 4 can be grouped in sets of equal sections, though the sections may adopt different sizes and configurations in the various sets. Two coarsely divided groups of sections can be “standardized structural sections” and “standardized equipment sections”, as an example. In
At least one of the standardized sections 4 is adapted to receive and mount various components associated with a dedicated well.
In the embodiment shown in
As mentioned, the topside construction 3 is sectioned where the most important parameter for the total size of the topside construction 3 is the number of well slots 1S to 16S. The well slots are dedicated to be either producers, injectors, flexibles (both producer and injector) and redundant.
Referring to
Each well slot has a set of components topside in order to be able to produce or inject the well. This is typically wellhead, XMT (Christmas tree), flow control valves, flow meters and isolation valves.
Each well slot is typically 2.5×2.5 meters. The wellhead and XMT are installed within this area.
The topside construction 3 is sectioned with predetermined location and design of the respective sections 4.
As mentioned, the sections 4 can have different sizes, dependent of the number of well slots and location in the topside construction 3.
As an example, shown in
Typical values for sections having four different sizes, dependent of the number of well slots, can be:
The equipment has standardized layout (for example the
As an example, a water and gas/injection well on a 10 slots unmanned wellhead platform then will have:
As mentioned, the construction typically has three deck levels, cellar deck D1, xmas tree deck D2 and weather deck D3.
On cellar deck D1 (
On xmas tree deck D2, the xmas tree is placed together with equipment for power supply (electro), control systems, inlet of umbilical from the mother platform, injection systems.
The weather deck D3 has hatches 12 for access to the various wells. The weather deck D3 shields the well area and operates as base for connection to the wells for conducting well intervention. On the weather deck D3 there are room for a pig skidder. The pig skidder can easily be connected to a temporary piping spool connected to the risers 2 down at the cellar deck D1. The pig skidder is arranged to launch or receive a plug device that is forced through the pipeline system for cleaning purpose after the installation and before the start production/operation of the platform.
As an Example, one global layout is shown in
The hook-up philosophy is as follows. It is kept at a minimum, only risers and J-tubes are required. The topside is designed for single lift offshore. This means that all components are ready installed and tested. Only hook-up spools are required to complete the connection between topside and jacket. Hook-up spools are fabricated onshore and shipped to the topside. Possible adaptions are made offshore.
The control system is preferably in an EICT container. The choice was to collect electrical and instrument cabinets within the EICT container. The size of the container can vary, it is determined by the equipment it is to contain. Primary location for such container will be in direction south on the Xmas tree deck D2, since this will provide a good air direction on Norwegian offshore sector, i.e. prevailing wind is often toward north-east. All equipment within the container are Ex secured.
The external material handling takes place either to/from Jack-Up Rig (JUR) or to/from Service Operation Vessel (SOV). Toward jack up rig (JUR) the external material handling is performed by crane located on jack up rig (JUR) and towards dedicated landing areas on the unmanned wellhead platform. Toward unmanned wellhead platform also called SOS (subsea on a stick), the external material handling takes place with crane located on SOV toward dedicated load platform on. unmanned wellhead platform
Internal material handling takes place in vertical shafts typically 2 m×3 m extending from weather deck to cellar deck.
Number | Date | Country | Kind |
---|---|---|---|
20161956 | Dec 2016 | NO | national |
Filing Document | Filing Date | Country | Kind |
---|---|---|---|
PCT/EP2017/082159 | 12/11/2017 | WO | 00 |