The present disclosure relates to the field of communication systems, and more particularly, to a user equipment, a base station, and channel access method in an unlicensed band.
Wireless communication systems, such as the third-generation (3G) of mobile telephone standards and technology are well known. Such 3G standards and technology have been developed by the Third Generation Partnership Project (3GPP). The 3rd generation of wireless communications has generally been developed to support macro-cell mobile phone communications. Communication systems and networks have developed towards being a broadband and mobile system. In cellular wireless communication systems, user equipment (UE) is connected by a wireless link to a radio access network (RAN). The RAN comprises a set of base stations (BSs) that provide wireless links to the UEs located in cells covered by the base station, and an interface to a core network (CN) which provides overall network control. As will be appreciated the RAN and CN each conduct respective functions in relation to the overall network. The 3rd Generation Partnership Project has developed the so-called Long Term Evolution (LTE) system, namely, an Evolved Universal Mobile Telecommunication System Territorial Radio Access Network, (E-UTRAN), for a mobile access network where one or more macro-cells are supported by a base station known as an eNodeB or eNB (evolved NodeB). More recently, LTE is evolving further towards the so-called 5G or NR (new radio) systems where one or more cells are supported by a base station known as a gNB.
In NR-Unlicensed (NR-U), a channel occupancy time (COT) may be initiated by a base station or a UE in a fixed frame period (FFP). A device, such as a base station or a UE, initiates a COT is referred to as a COT initiator or an initiating device. COT has two COT types. A COT initiated by a gNB is referred to as a gNB-initiated COT. A COT initiated by a UE is referred to as a UE-initiated COT. Uplink (UL) transmission and downlink (DL) transmission between a UE and a base station in a COT are performed based on FFP parameters of a COT initiator of the COT.
Currently, determination of the COT initiator for scheduled UL transmissions or configured UL transmissions has following alternatives Alt-a or Alt-b. In a semi-static channel access mode when a UE can operate as initiating device, one of the following alternatives may be selected to determine whether a UL transmission is based on a UE-initiated COT or sharing a gNB-initiated COT:
In a semi-static channel access mode, cross-FFP scheduling, for example, is a scheduling operation where a gNB can use a DCI to schedule UL transmission(s) in a later gNB's FFP period that is different from the gNB's FFP period that carries the scheduling DCI. In addition to intra-FFP scheduling, cross-FFP scheduling is under investigation. A gNB's FFP period is referred to as g-FFP. The cross-FFP scheduling has pending technical issues including whether and how to process a case where a gNB schedules an UL transmission in the later g-FFP.
Hence, a method to support cross-FFP scheduling is desired.
An object of the present disclosure is to propose a user equipment, a base station, and a channel access method in an unlicensed band.
In a first aspect, an embodiment of the invention provides a channel access method executable in a user equipment (UE), comprising:
In a second aspect, an embodiment of the invention provides a user equipment (UE) comprising a processor configured to call and run a computer program stored in a memory, to cause a device in which the processor is installed to execute the disclosed method.
In a third aspect, an embodiment of the invention provides a channel access method executable in a base station, comprising:
In a fourth aspect, an embodiment of the invention provides a base station comprising a processor configured to call and run a computer program stored in a memory, to cause a device in which the processor is installed to execute the disclosed method.
The disclosed method may be programmed as computer executable instructions stored in non-transitory computer-readable medium. The non-transitory computer-readable medium, when loaded to a computer, directs a processor of the computer to execute the disclosed method.
The non-transitory computer-readable medium may comprise at least one from a group consisting of: a hard disk, a CD-ROM, an optical storage device, a magnetic storage device, a Read-Only Memory, a Programmable Read-Only Memory, an Erasable Programmable Read-Only Memory, EPROM, an Electrically Erasable Programmable Read-Only Memory and a Flash memory.
The disclosed method may be programmed as a computer program product that causes a computer to execute the disclosed method.
The disclosed method may be programmed as a computer program, that causes a computer to execute the disclosed method.
At least one embodiment of the disclosed method provides procedures and schemes to support cross-FFP DL scheduling, wherein a COT for DCI that schedules physical downlink shared channel (PDSCH) or a COT for PDSCH transmission can be gNB-initiated or UE-initiated.
At least one embodiment of the disclosed method provides procedures and schemes to support cross-FFP UL scheduling, wherein a COT for DCI that schedules PUSCH or a COT for PUSCH transmission can be gNB-initiated or UE-initiated.
Embodiments of the disclosure provide useful technical effects of improving scheduling flexibility for semi-static channel access.
A base station scheduling physical downlink shared channel (PDSCH) and/or physical uplink shared channel (PUSCH) in a current FFP carrying a scheduling DCI and/or a later FFP can enhance the efficiency of radio resource utilization.
When the location of the scheduling DCI is at the end of a current FFP, a UE-initiated COT in the next FFP can reduce transmission latency.
In order to more clearly illustrate the embodiments of the present disclosure or related art, the following figures will be described in the embodiments are briefly introduced. It is obvious that the drawings are merely some embodiments of the present disclosure. A person having ordinary skills in this field may obtain other figures according to these figures without paying the premise.
Embodiments of the disclosure are described in detail with the technical matters, structural features, achieved objects, and effects with reference to the accompanying drawings as follows. Specifically, the terminologies in the embodiments of the present disclosure are merely for describing the purpose of the certain embodiment, but not to limit the disclosure.
Embodiments of the invention address the issues of cross-FFP scheduling for both DL and UL cases, such as cross-FFP scheduling indication, determination of UL and DL scheduling based on gNB-initiated or UE-initiated COT, DL/UL cancellation scheme, etc.
With reference to
Each of the processors 11a, 11b, 21a, and 31 may include an application-specific integrated circuit (ASICs), other chipsets, logic circuits and/or data processing devices. Each of the memory 12a, 12b, 22a, and 32 may include read-only memory (ROM), a random access memory (RAM), a flash memory, a memory card, a storage medium and/or other storage devices. Each of the transceivers 13a, 13b, 23a, and 33 may include baseband circuitry and radio frequency (RF) circuitry to process radio frequency signals. When the embodiments are implemented in software, the techniques described herein may be implemented with modules, procedures, functions, entities, and so on, that perform the functions described herein. The modules may be stored in a memory and executed by the processors. The memory may be implemented within a processor or external to the processor, in which those may be communicatively coupled to the processor via various means are known in the art.
The network entity device 30 may be a node in a CN. CN may include LTE CN or 5G core (5GC) which includes user plane function (UPF), session management function (SMF), mobility management function (AMF), unified data management (UDM), policy control function (PCF), control plane (CP)/user plane (UP) separation (CUPS), authentication server (AUSF), network slice selection function (NSSF), and the network exposure function (NEF).
An example of the UE in the description may include one of the UE 10a or UE 10b. An example of the base station in the description may include the base station 20a. Uplink (UL) transmission of a control signal or data may be a transmission operation from a UE to a base station. Downlink (DL) transmission of a control signal or data may be a transmission operation from a base station to a UE. In the following description, unless elsewhere specified, a UE can be interpreted as an embodiment of the UE 10, and a gNB or a base station can be interpreted as an embodiment of the gNB 20.
In the description, for simplicity, a COT initiated by a base station is referred to as a gNB-initiated COT, a BS-initiated COT, or a gNB's COT. A COT initiated by a UE is referred to as a UE-initiated COT or a UE's COT. In the description, unless being specifically pointed out, a gNB-initiated COT may be a COT initiated by a base station, such as gNB 20, according to an embodiment of the disclosure; a UE-initiated COT may be a COT initiated by a UE, such as the UE 10, according to an embodiment of the disclosure; a gNB's FFP referred to as g-FFP is an FFP according to a set of FFP parameters associated with a base station, such as the gNB 220, according to an embodiment of the disclosure; and a UE's FFP referred to as u-FFP is an FFP according to a set of FFP parameters associated with a UE, such as the UE 10, according to an embodiment of the disclosure.
A scheme of initiating a COT by a base station is referred to as a gNB-initiated COT scheme or gNB-initiated COT function, and a scheme of initiating a COT by a UE is referred to as a UE-initiated COT scheme or UE-initiated COT function. For simplicity, the scheme of gNB-initiated COT may be referred to as gNB-initiated COT, and the scheme of UE-initiated COT may be referred to as UE-initiated COT.
In the description, PUSCH transmission means transmission performed by a UE, such as the UE 10, for PUSCH(s) scheduled by DCI. DCI that schedules PUSCH(s) is referred to as scheduling DCI. In the description, PUSCH scheduled for PUSCH transmission may comprise one or more PUSCHs. In the description, PDSCH transmission means transmission performed by a UE, such as the UE 10, for PDSCH (s) scheduled by DCI. DCI that schedules PUSCH(s) is referred to as scheduling DCI. PDSCH scheduled for PDSCH transmission may comprise one or more PDSCHs.
In the description, the term of “UL channel” means a UL channel in the unlicensed band, and the term of “DL channel” means a DL channel in the unlicensed band. To access a channel means to access a channel in the unlicensed band. The terms “channel access method”, “channel access mode”, and “channel access scheme” means a channel access method, channel access mode, and channel access scheme for a channel in the unlicensed band.
With reference to
The UE derives a channel occupancy time (COT) initiator associated with a COT within the region of the second FFP (S004). The UE transmits the at least one portion of the scheduled UL data in the COT initiated by the derived COT initiator according to a transmission condition for the UE (S006). The base station receives the at least one portion of the scheduled UL data in the COT associated with a COT initiator within the region of the second FFP according to a reception condition for the base station (S007).
With reference to
The UE derives a COT initiator associated with a COT within the region of the second FFP (S015). The base station transmits at least one portion of the scheduled DL data in the COT associated with a COT initiator within the region of the second FFP according to a transmission condition for the base station (S016).
The UE receives the at least one portion of the scheduled DL data in the COT initialized by the derived initiator according to a reception condition for the UE (S017).
For cross-FFP UL scheduling in the semi-static channel access mode, i.e., the gNB 20 can use DCI (referred to as scheduling DCI) in a g-FFP to schedule physical uplink shared channel (PUSCH) transmission(s) in later g-FFP(s) that is different from the g-FFP that carries the scheduling DCI, the location of g-FFP(s) used for scheduled PUSCH transmission can be indicated by the gNB 20 using an indication, such as bit field, in the DCI. With reference to
In an embodiment, the gNB 20 may use a g-FFP configuration to indicate a g-FFP length of an FFP (e.g., FFP 320) at a granularity.
In an embodiment, the gNB 20 may use an indication to indicate a location of a g-FFP (e.g., FFP 320) for scheduled PUSCH transmission. The indicated location of a g-FFP (e.g., FFP 320) for scheduled PUSCH transmission (e.g., PUSCH 324) is an offset value relative to the g-FFP (e.g., FFP 310) that carries the scheduling DCI that schedules the PUSCH transmission.
For cross-FFP DL scheduling in the semi-static channel access mode, i.e., the gNB 20 can use DCI (referred to as scheduling DCI) in a g-FFP to schedule physical downlink shared channel (PDSCH) transmission(s) in a later g-FFP that is different from the g-FFP that carries the scheduling DCI, the location of g-FFP(s) used for scheduled PDSCH transmission can be indicated by the gNB 20 using an indication, such as a bitfield, in the DCI. With reference to
In an embodiment, the gNB 20 may use a g-FFP configuration to indicate a g-FFP length of an FFP (e.g., FFP 320) at a granularity.
In an embodiment, the gNB 20 may use an indication to indicate a location of a g-FFP (e.g., FFP 320) for scheduled PDSCH transmission. The indicated location of a g-FFP (e.g., FFP 320) for scheduled PDSCH transmission (e.g., PDSCH 323) is an offset value relative to the g-FFP (e.g., FFP 310) that carries the scheduling DCI that schedules the PUSCH transmission.
For cross-FFP UL scheduling in the semi-static channel access mode, the gNB 20 may use DCI to schedule one or more PUSCHs in one or more g-FFPs. The one or more g-FFPs may comprise one current g-FFP carrying scheduling DCI and/or one or more later g-FFPs carrying one or more PUSCHs scheduled by the DCI. The one or more PUSCHs may comprise PUSCH repetitions of the same transport block (TB) or comprise different TBs. Embodiments of scheduling and transmission schemes are illustrated in the following.
In an embodiment, the one or more g-FFPs comprise consecutive g-FFPs. The gNB 20 may use DCI to indicate the consecutive g-FFPs by indicating a starting g-FFP and an ending g-FFP of the consecutive g-FFPs. Alternatively, the gNB 20 may use DCI to indicate the consecutive g-FFPs by indicating a starting g-FFP and a length of the consecutive g-FFPs.
In an embodiment, at least one of uplink control information similar to uplink control information used for a configured grant scheduling (CG-UCI), such as COT sharing indication, hybrid automatic repeat request (HARQ) process identifier (ID), new data indicator (NDI), or redundancy version (RV) can be carried in one or more scheduled PUSCHs in the region of one or more g-FFPs.
Thus, in an embodiment, the UL data comprises one or more physical uplink shared channels (PUSCHs), transmissions of the one or more PUSCHs are transmitted in one or more FFPs starting from the second FFP, and the one or more PUSCHs carry PUSCH repetitions of the same transport block (TB) or carry different TBs. In an embodiment, the indicated COT initiator is applied to the one or more PUSCHs.
In an embodiment, COT sharing information is carried in at least one of the one or more PUSCHs. The UE provides sharing information of the COT initiated by the UE to the base station.
For cross-FFP DL scheduling in the semi-static channel access mode, the gNB 20 may use DCI to schedule one or more PDSCHs in one or more g-FFPs. The one or more g-FFPs may comprise one current g-FFP carrying scheduling DCI and/or one or more later g-FFPs carrying one or more PDSCHs scheduled by the DCI. The one or more PDSCHs may comprise PDSCH repetitions of the same transport block (TB) or comprise different TBs. Embodiments of scheduling and transmission schemes are illustrated in the following.
In an embodiment, the one or more g-FFPs comprise consecutive g-FFPs. The gNB 20 may use DCI to indicate the consecutive g-FFPs by indicating a starting g-FFP and an ending g-FFP of the consecutive g-FFPs. Alternatively, the gNB 20 may use DCI to indicate the consecutive g-FFPs by indicating a starting g-FFP and a length of the consecutive g-FFPs.
Thus, in an embodiment, the DL data comprises one or more physical downlink shared channels (PDSCHs), transmissions of the one or more PDSCHs are transmitted in one or more FFPs starting from the second FFP, and the one or more PDSCHs carry PDSCH repetitions of the same transport block (TB) or carry different TBs. In an embodiment, the indicated COT initiator is applied to the one or more PDSCHs.
The embodiment 5 provides examples of the transmission condition and the reception condition in
In the description, PUSCH scheduled for PUSCH transmission by a UE may comprise one or more PUSCHs. If PUSCH is cross-FFP scheduled by DCI or the location of PUSCH is not confined before an idle period of a g-FFP that carries the scheduling DCI or is ended at a later g-FFP, the following applies.
Transmission of the scheduled PUSCH can be based on sharing a gNB-initiated COT initiated by a gNB or a UE-initiated COT initiated by an initiative UE. Whether a scheduled PUSCH transmission is based on sharing a gNB-initiated COT or a UE-initiated COT can be determined by the UE according to an indication, such as a bitfield, in the scheduling DCI.
If sharing gNB-initiated COT is indicated in the scheduling DCI, whether the scheduled PUSCH transmission is performed or not depends on whether a gNB (e.g., the gNB 20) can successfully initiate a COT during the later g-FFP in which the PUSCH is scheduled.
If UE-initiated COT is indicated in the scheduling DCI, and if the scheduled PUSCH is also aligned with a boundary of a UE's FFP (u-FFP), the UE can perform PUSCH transmission for the scheduled PUSCH based on a UE-initiated COT. Otherwise, the UE cancels the PUSCH transmission automatically. A boundary of a UE's FFP (u-FFP) may be referred to as a u-FFP boundary. Thus, in an embodiment, the derived COT initiator is the UE. The transmission condition for the UE comprises that the initial point of the scheduled UL data is aligned with a boundary of an FFP associated with the UE and the UE successfully initiates the COT based on a channel access scheme. The reception condition for the base station comprises that the initial point of the scheduled UL data is aligned with a boundary of an FFP associated with the UE and the UE successfully initiates the COT based on a channel access scheme.
If gNB-initiated COT is indicated in the scheduling DCI, and the gNB cannot initiate the COT due to LBT failure during the later g-FFP in which the PUSCH is scheduled, and hence no DL signal/channel can be detected by UE:
If UE-initiated COT is indicated in the scheduling DCI, and the scheduled PUSCH is not aligned with a u-FFP boundary, the following applies:
Thus, in an embodiment, the derived COT initiator is the UE. When the initial point of the scheduled UL data is not aligned with a boundary of an FFP associated with the UE, the transmission condition for the UE comprises that the UE has initiated the COT in the FFP associated with the UE covering the scheduled UL data and the UE successfully accessing the COT based on a channel access scheme, and the reception condition for the base station comprises that the UE has initiated the COT in the FFP associated with the UE covering the scheduled UL data and the UE successfully accesses the COT initiated by the UE based on a channel access scheme.
With reference to
If UE-initiated COT is indicated in the DCI for PUSCH transmission (S102), then:
If gNB-initiated COT is indicated in the DCI for PUSCH transmission (S102), then:
The embodiment 6 provides examples of the transmission condition and the reception condition in
In the description, PDSCH scheduled for PDSCH reception by a UE may comprise one or more PDSCH s. If PDSCH is cross-FFP scheduled by DCI or the location of PDSCH is not confined before an idle period of a g-FFP that carries the scheduling DCI or is ended at the later g-FFP, the following applies. Transmission of the scheduled PDSCH can be based on sharing a UE-initiated COT initiated by an initiative UE or a gNB-initiated COT initiated by gNB. Whether a scheduled PDSCH transmission is based on sharing a UE-initiated COT or a gNB-initiated COT can be determined by the UE according to an indication, such as a bitfield, in the scheduling DCI.
If gNB-initiated COT is indicated in the scheduling DCI, whether the scheduled PDSCH transmission is performed or not depends on whether a gNB (e.g., the gNB 20) can successfully initiate a COT during the later g-FFP in which the PDSCH is scheduled.
If sharing UE-initiated COT for PDSCH transmission is indicated in the scheduling DCI, whether the scheduled PDSCH is to be transmitted or not depends on if the UE can successfully initiate a COT during the later g-FFP in which the PDSCH is scheduled.
With reference to
If UE-initiated COT is indicated in the DCI for PDSCH transmission (S202), then:
If gNB-initiated COT is indicated in the DCI for PDSCH transmission (S202), then:
In the description, PUSCH scheduled for PUSCH transmission may comprise one or more PUSCHs. If PUSCH is cross-FFP scheduled by DCI or the location of the PUSCH is not confined before a idle period of a g-FFP that carries the scheduling DCI or is ended at the later g-FFP, the following applies.
Whether transmission of the scheduled PUSCH is based on sharing a gNB-initiated COT or a UE-initiated COT can be implicitly determined according to at least one of the following channel access rules:
Thus, in an embodiment, the UE may derive the COT initiator based on whether an initial point of the scheduled UL data is aligned with a boundary of the second FFP.
When the initial point of the scheduled UL data is aligned with the boundary of the FFP associated with the UE, the derived COT initiator is the UE. The transmission condition for the UE comprises that the UE successfully initiates the COT in the FFP associated with the UE based on a channel access scheme. The reception condition for the base station comprises that the UE successfully initiates the COT in the FFP associated with the UE based on a channel access scheme.
When the initial point of the scheduled UL data is aligned with the boundary of the FFP associated with the UE, the derived COT initiator is the base station if the UE determines that the base station has initiated the COT in the second FFP. The transmission condition for the UE comprises that the UE successfully shares the COT in the second FFP based on a channel access scheme. The reception condition for the base station comprises that the UE successfully shares the COT in the second FFP based on a channel access scheme.
When the initial point of the scheduled UL data is not aligned with the boundary of the FFP associated with the UE, the derived COT initiator is the UE if the UE has initiated the COT in the FFP associated with the UE covering the scheduled UL data. That is the COT initiated by the UE covers the scheduled UL data. The transmission condition for the UE comprises that UE successfully accesses the COT based on a channel access scheme. The reception condition for the base station comprises that UE successfully accesses the UE-initiated COT based on a channel access scheme.
With reference to
If the starting point of the scheduled PUSCH is aligned with a u-FFP boundary (S302), the following applies:
If the starting point of the scheduled PUSCH is not aligned with the u-FFP boundary (S302), the following applies:
If the scheduled PUSCH is also overlapped with a later g-FFP and is ended before the idle period of the g-FFP and the UE determines that the gNB has initiated the g-FFP based on detection of a DL signal or a DL channel (S306), the UE assumes the PUSCH transmission for the scheduled PUSCH is based on sharing the gNB-initiated COT (S304).
If the condition in S306 is not satisfied and the UE has initiated a u-FFP (S307), the UE assumes that the PUSCH transmission is based on a UE-initiated COT (S305).
Otherwise, the UE cancels the PUSCH transmission for the scheduled PUSCH (S308).
In the description, PDSCH scheduled for PDSCH transmission may comprise one or more PDSCH s. If PDSCH is cross-FFP scheduled by DCI or the location of the PDSCH is not confined before an idle period of a g-FFP that carries the scheduling DCI or is ended at the later g-FFP, the following applies.
Whether transmission of the scheduled PDSCH is based on sharing a UE-initiated COT or a gNB-initiated COT can be implicitly determined according to at least one of the following channel access rules:
Thus, in an embodiment, the UE may derive the COT initiator based on whether an initial point of the scheduled DL data is aligned with a boundary of the second FFP.
Thus, in an embodiment, the derived COT initiator is the base station. The transmission condition for the base station comprises that the initial point of the scheduled DL data is aligned with a boundary of the second FFP and the base station successfully initiates the COT in the second FFP based on a channel access scheme. The reception condition for the UE comprises that the initial point of the scheduled DL data is aligned with a boundary of the second FFP and the base station successfully initiates the COT in the second FFP based on a channel access scheme.
Alternatively, when the COT initiator is the base station and when the initial point of the scheduled DL data is not aligned with a boundary of the second FFP, the reception transmission condition for the base station comprises that the base station initiates the COT in the second FFP and the base station successfully accesses the COT based on a channel access scheme. The reception condition for the UE comprises that the base station initiates the COT in the second FFP and the base station successfully accesses the COT based on a channel access scheme.
In an embodiment, when the initial point of the scheduled DL data is aligned with the boundary of the second FFP, the derived COT initiator is the base station. The transmission condition for the base station comprises that the base station successfully initiates the COT in the second FFP based on a channel access scheme. The reception condition for the UE comprises that the base station successfully initiates the COT in the second FFP based on a channel access scheme.
In an embodiment, when the initial point of the scheduled DL data is not aligned with the boundary of the second FFP, the COT initiator is the UE if the UE has successfully initiated the COT in an FFP associated with the UE and the initiated COT covers the scheduled DL data. The transmission condition for the base station comprises that the base station successfully shares the COT initiated by the UE based on a channel access scheme. The reception condition for the UE comprises that the base station successfully shares the COT initiated by the UE based on a channel access scheme.
In an embodiment, when the initial point of the scheduled DL data is not aligned with the boundary of the second FFP, the derived COT initiator is the base station if the base station has initiated the COT in the second FFP. The transmission condition for the base station comprises that the base station successfully accesses the COT initiated by the base station based on a channel access scheme. The reception condition for the UE comprises that the base station successfully accesses the COT initiated by the base station based on a channel access scheme.
With reference to
If the starting point of the scheduled PDSCH is aligned with a g-FFP boundary (S402), the following applies:
The UE assumes the PDSCH transmission is based on a gNB-initiated COT (S403).
If the starting point of the scheduled PDSCH is not aligned with the g-FFP boundary (S402), the following applies:
If the scheduled PDSCH is overlapped with a later g-FFP and is ended before the idle period of the later g-FFP and the UE has determined the gNB has initiated the g-FFP (S404), the UE assumes the PDSCH transmission is based on a gNB-initiated COT (S403).
If the condition in S404 is not satisfied and the UE has already initiated a u-FFP (S405), the UE assumes that the PDSCH transmission is based on sharing the UE-initiated COT (S406).
Otherwise, the PDSCH transmission of the scheduled PDSCH is cancelled by the base station. (S407).
For cross-FFP UL scheduling in a semi-static channel access mode, in a period from the end of physical downlink control channel (PDCCH) that schedules PUSCH during an earlier g-FFP to the start of the scheduled PUSCH during a later g-FFP, the following applies:
If the UE receives a dynamic UL cancellation indication (CI) intended for the scheduled PUSCH or receives a time division duplexing (TDD) UL/DL configuration or slot format indication (SFI) to indicate that slot format of the scheduled PUSCH is not UL, the no matter the COT type is UE-initiated COT or gNB-initiated COT, the UE cancels the transmission of the scheduled PUSCH.
Thus, in an embodiment, the transmission condition for the UE comprises that slot format of each of the one or more slots for the scheduled at least one portion of the UL data is a UL slot. The transmission condition for the UE comprises that slot format of each of the one or more slots for the scheduled at least one portion of the UL data is a UL slot. The reception condition for the base station comprises that slot format of each of the one or more slots for the scheduled at least one portion of the UL data is a UL slot.
For cross-FFP DL scheduling in a semi-static channel access mode, in a period from the end of PDCCH that schedules PDSCH during an earlier g-FFP to the start of the scheduled PDSCH during a later g-FFP, the following applies:
If the UE receives a dynamic DL pre-emption indication (PI) intended for the scheduled PDSCH or receives a TDD UL/DL configuration or slot format indication (SFI) to indicate that slot format of the scheduled PDSCH is not DL, the no matter the COT type is UE-initiated COT or gNB-initiated COT, the UE assumes the scheduled PDSCH is not transmitted.
Thus, in an embodiment, the transmission condition for the base station comprises that slot format of each of the one or more slots for the scheduled at least one portion of the DL data is a DL slot. The reception condition for the UE comprises that slot format of each of the one or more slots for the scheduled at least one portion of the DL data is a DL slot.
For cross-FFP UL scheduling in a semi-static channel access mode, the following applies. Since a region of a u-FFP can overlap with a region of a g-FFP, a COT that carries the scheduling DCI transmitted by a gNB (e.g., the gNB 20) can be a gNB-initiated COT in the g-FFP or a UE-initiated COT in a u-FFP.
For cross-FFP UL scheduling in a semi-static channel access mode, the following applies. Since a region of a u-FFP can overlap with a region of a g-FFP, the COT that carriers the scheduled PUSCH transmitted by a UE (e.g., the UE 10) can be a UE-initiated COT in the u-FFP or a gNB-initiated COT in the g-FFP.
The cross-FFP UL scheduling may include one of the following scheduling schemes:
With reference to
With reference to
With reference to
With reference to
Thus, in some embodiments, a COT initiator of a COT within the region of the first FFP carrying the DCI may be the base station or the UE. The first FFP and the second FFP belong to different FFPs of the base station.
For cross-FFP DL scheduling in a semi-static channel access mode, the following applies. Since a region of a u-FFP can overlap with a region of a g-FFP, the COT that carries the scheduling DCI transmitted by the gNB can be a gNB-initiated COT in the g-FFP or a UE-initiated COT in the u-FFP.
For cross-FFP DL scheduling in a semi-static channel access mode, the following applies. Since a region of a u-FFP can overlap with a region of a g-FFP, the COT that carries the scheduled PDSCH transmitted by a UE (e.g., the UE 10) can be a UE-initiated COT in the u-FFP or a gNB-initiated COT in the g-FFP.
The cross-FFP DL scheduling may include one of the following scheduling schemes:
With reference to
With reference to
With reference to
With reference to
Thus, in some embodiments, a COT initiator of a COT within the region of the first FFP carrying the DCI may be the base station or the UE. The first FFP and the second FFP belong to different FFPs of the base station.
In a semi-static channel access mode, if a UE (e.g., the UE 10) is scheduled for dynamic PUSCH transmission, and is configured with an energy detection (ED) threshold and a UE's maximum transmission power by a gNB (e.g., the gNB 20) via dedicated radio resource control (RRC) singling. The UE can use the ED to determine whether an unlicensed band channel is occupied or idle.
In some embodiments, at least one of the following parameters is carried in DCI and configured for scheduled PUSCH transmission of the scheduled PUSCH.
Thus, in an embodiment, the COT initiator derived based on the indication in the DCI is jointly encoded with a channel access scheme in a bitfield of the DCI.
If the scheduled UL transmission is based on sharing a gNB-initiated COT, the following parameters can be further provided in the scheduling DCI:
If the scheduled UL transmission is based on a UE-initiated COT, the gNB can further indicate the UE at least one of the following:
Any combination of the aforementioned parameters can be partially or jointly encoded into a bitfield in scheduling DCI.
The bitfield can indicate one set of at least one of the aforementioned parameters preconfigured by the gNB, where each set of parameters can include a combination of at least one of the aforementioned parameters.
The bitfield can be a row index in a look up table to indicate one set of parameters in a look up table, wherein each parameter corresponds to a column index in the look up table.
Candidate values for parameters of corresponding columns in each row in the look up table can be preconfigured by the gNB via RRC signalling.
Default values for parameters of corresponding columns in each row in the look up table can be specified in the standard for UE not entering RRC_CONNECTED state.
The bitfield can be indicated in DCI format 0_0, 0_1, or 0_2. Thus, in an embodiment, a DCI format used for indicating the COT initiator may include DCI format 0_0, 0_1, or 0_2.
A bit length of the bitfield can be configured in the DCI format 0_1 and/or 0_2.
The processing unit 730 may include circuitry, such as, but not limited to, one or more single-core or multi-core processors. The processors may include any combinations of general-purpose processors and dedicated processors, such as graphics processors and application processors. The processors may be coupled with the memory/storage and configured to execute instructions stored in the memory/storage to enable various applications and/or operating systems running on the system.
The baseband circuitry 720 may include circuitry, such as, but not limited to, one or more single-core or multi-core processors. The processors may include a baseband processor. The baseband circuitry may handle various radio control functions that enable communication with one or more radio networks via the RF circuitry. The radio control functions may include, but are not limited to, signal modulation, encoding, decoding, radio frequency shifting, etc. In some embodiments, the baseband circuitry may provide for communication compatible with one or more radio technologies. For example, in some embodiments, the baseband circuitry may support communication with 5G NR, LTE, an evolved universal terrestrial radio access network (EUTRAN) and/or other wireless metropolitan area networks (WMAN), a wireless local area network (WLAN), a wireless personal area network (WPAN). Embodiments in which the baseband circuitry is configured to support radio communications of more than one wireless protocol may be referred to as multi-mode baseband circuitry. In various embodiments, the baseband circuitry 720 may include circuitry to operate with signals that are not strictly considered as being in a baseband frequency. For example, in some embodiments, baseband circuitry may include circuitry to operate with signals having an intermediate frequency, which is between a baseband frequency and a radio frequency.
The RF circuitry 710 may enable communication with wireless networks using modulated electromagnetic radiation through a non-solid medium. In various embodiments, the RF circuitry may include switches, filters, amplifiers, etc. to facilitate communication with the wireless network. In various embodiments, the RF circuitry 710 may include circuitry to operate with signals that are not strictly considered as being in a radio frequency. For example, in some embodiments, RF circuitry may include circuitry to operate with signals having an intermediate frequency, which is between a baseband frequency and a radio frequency.
In various embodiments, the transmitter circuitry, control circuitry, or receiver circuitry discussed above with respect to the UE, eNB, or gNB may be embodied in whole or in part in one or more of the RF circuitries, the baseband circuitry, and/or the processing unit. As used herein, “circuitry” may refer to, be part of, or include an Application Specific Integrated Circuit (ASIC), an electronic circuit, a processor (shared, dedicated, or group), and/or memory (shared, dedicated, or group) that execute one or more software or firmware programs, a combinational logic circuit, and/or other suitable hardware components that provide the described functionality. In some embodiments, the electronic device circuitry may be implemented in, or functions associated with the circuitry may be implemented by, one or more software or firmware modules. In some embodiments, some or all of the constituent components of the baseband circuitry, the processing unit, and/or the memory/storage may be implemented together on a system on a chip (SOC).
The memory/storage 740 may be used to load and store data and/or instructions, for example, for the system. The memory/storage for one embodiment may include any combination of suitable volatile memory, such as dynamic random access memory (DRAM)), and/or non-volatile memory, such as flash memory. In various embodiments, the I/O interface 780 may include one or more user interfaces designed to enable user interaction with the system and/or peripheral component interfaces designed to enable peripheral component interaction with the system. User interfaces may include, but are not limited to a physical keyboard or keypad, a touchpad, a speaker, a microphone, etc. Peripheral component interfaces may include, but are not limited to, a non-volatile memory port, a universal serial bus (USB) port, an audio jack, and a power supply interface.
In various embodiments, the sensor 770 may include one or more sensing devices to determine environmental conditions and/or location information related to the system. In some embodiments, the sensors may include, but are not limited to, a gyro sensor, an accelerometer, a proximity sensor, an ambient light sensor, and a positioning unit. The positioning unit may also be part of, or interact with, the baseband circuitry and/or RF circuitry to communicate with components of a positioning network, e.g., a global positioning system (GPS) satellite. In various embodiments, the display 750 may include a display, such as a liquid crystal display and a touch screen display. In various embodiments, the system 700 may be a mobile computing device such as, but not limited to, a laptop computing device, a tablet computing device, a netbook, an ultrabook, a smartphone, etc. In various embodiments, the system may have more or less components, and/or different architectures. Where appropriate, the methods described herein may be implemented as a computer program. The computer program may be stored on a storage medium, such as a non-transitory storage medium.
The embodiment of the present disclosure is a combination of techniques/processes that may be adopted in 3GPP specification to create an end product.
A person having ordinary skill in the art understands that each of the units, algorithm, and steps described and disclosed in the embodiments of the present disclosure are realized using electronic hardware or combinations of software for computers and electronic hardware. Whether the functions run in hardware or software depends on the condition of the application and design requirement for a technical plan. A person having ordinary skills in the art may use different ways to realize the function for each specific application while such realizations should not go beyond the scope of the present disclosure. It is understood by a person having ordinary skill in the art that he/she may refer to the working processes of the system, device, and unit in the above-mentioned embodiment since the working processes of the above-mentioned system, device, and unit are basically the same. For easy description and simplicity, these working processes will not be detailed.
It is understood that the disclosed system, device, and method in the embodiments of the present disclosure may be realized in other ways. The above-mentioned embodiments are exemplary only. The division of the units is merely based on logical functions while other divisions exist in realization. It is possible that a plurality of units or components are combined or integrated into another system. It is also possible that some characteristics are omitted or skipped. On the other hand, the displayed or discussed mutual coupling, direct coupling, or communicative coupling operate through some ports, devices, or units whether indirectly or communicatively by ways of electrical, mechanical, or other kinds of forms.
The units as separating components for explanation are or are not physically separated. The units for display are or are not physical units, that is, located in one place or distributed on a plurality of network units. Some or all of the units are used according to the purposes of the embodiments. Moreover, each of the functional units in each of the embodiments may be integrated into one processing unit, physically independent, or integrated into one processing unit with two or more than two units.
If the software function unit is realized and used and sold as a product, it may be stored in a readable storage medium in a computer. Based on this understanding, the technical plan proposed by the present disclosure may be essentially or partially realized as the form of a software product. Or, one part of the technical plan beneficial to the conventional technology may be realized as the form of a software product. The software product in the computer is stored in a storage medium, including a plurality of commands for a computational device (such as a personal computer, a server, or a network device) to run all or some of the steps disclosed by the embodiments of the present disclosure. The storage medium includes a USB disk, a mobile hard disk, a read-only memory (ROM), a random access memory (RAM), a floppy disk, or other kinds of media capable of storing program codes.
At least one embodiment of the disclosed method provides procedures and schemes to support cross-FFP DL scheduling, wherein a COT for DCI that schedules physical downlink shared channel (PDSCH) and a COT for PDSCH transmission can be gNB-initiated or UE-initiated.
At least one embodiment of the disclosed method provides procedures and schemes to support cross-FFP UL scheduling, wherein a COT for DCI that schedules PUSCH and a COT for PUSCH transmission can be gNB-initiated or UE-initiated.
Embodiments of the disclosure provide useful technical effects of improving scheduling flexibility for semi-static channel access.
A base station simultaneously scheduling physical downlink shared channel (PDSCH) and/or physical uplink shared channel (PUSCH) in a current FFP and a next FFP can enhance the efficiency of radio resource utilization.
When the location of the scheduling DCI is at the end of a current FFP, a UE-initiated COT in the next FFP can reduce transmission latency.
While the present disclosure has been described in connection with what is considered the most practical and preferred embodiments, it is understood that the present disclosure is not limited to the disclosed embodiments but is intended to cover various arrangements made without departing from the scope of the broadest interpretation of the appended claims.
Filing Document | Filing Date | Country | Kind |
---|---|---|---|
PCT/CN2022/091283 | 5/6/2022 | WO |
Number | Date | Country | |
---|---|---|---|
63185370 | May 2021 | US | |
63128500 | Dec 2020 | US |
Number | Date | Country | |
---|---|---|---|
Parent | PCT/CN2021/140165 | Dec 2021 | WO |