1. Field of the Invention
The present invention relates to valve body and condensate holding tank systems and methods for use in delayed coker unit operations. In particular, the present invention relates to allowing accumulated condensate and particulate matter in a valve body or in a condensate holding tank to be flushed into a coker pit by water or other solvent.
2. Background
Petroleum refining operations in which crude oil is processed frequently produce residual oils. Many oil refineries recover valuable products from the heavy residual hydrocarbons. Residual oil, when processed in a delayed coker is heated in a furnace to a temperature sufficient to cause destructive distillation in which a substantial portion of the residual oil is converted, or “cracked” to usable hydrocarbon products and the remainder yields petroleum coke, a material composed mostly of carbon.
Generally, the delayed coking process involves heating the heavy hydrocarbon feed from a fractionation unit, then pumping the heated heavy feed into a large steel vessel commonly known as a coke drum. The unvaporized portion of the heated heavy feed settles out in the coke drum, where the combined effect of retention time and temperature causes the formation of coke. Vapors from the top of the coke vessel are returned to the base of the fractionation unit for further processing into desired light hydrocarbon products. Normal operating pressures in coke drums typically range from twenty-five to fifty p.s.i, and the feed input temperature may vary between 800° F. and 1000° F.
The structural size and shape of the coke drum varies considerably from one installation to another. Coke drums are generally large, upright, cylindrical, metal vessel ninety to one-hundred feet in height, and twenty to thirty feet in diameter. Coke drums have a top head and a bottom portion fitted with a bottom head. Coke drums are usually present in pairs so that they can be operated alternately. Coke settles out and accumulates in a vessel until it is filled, at which time the heated feed is switched to the alternate empty coke drum. While one coke drum is being filled with heated residual oil, the other vessel is being cooled and purged of coke.
Coke removal, also known as decoking, begins with a quench step in which steam and then water are introduced into the coke filled vessel to complete the recovery of volatile, light hydrocarbons and to cool the mass of coke. After a coke drum has been filled, stripped and then quenched so that the coke is in a solid state and the temperature is reduced to a reasonable level, quench water is drained from the drum through piping to allow for safe unheading of the drum. The drum is then vented to atmospheric pressure when the bottom opening is unheaded, to permit removing coke. Once the unheading is complete, the coke in the drum is cut out of the drum by high pressure water jets.
During the unheading and decoking process, the bottom deheader unit is often pressurized by steam and exposed to liquid and solid particular matter falling from the coke drum. Accordingly, the art of decoking a coke drum may be improved by developing a bottom deheading unit which has the ability to drain excess condensate from steam and to be flushed of any solid particulate matter which accumulates.
The present invention relates to systems and methods for flushing condensate and particulate matter from a valve body or condensate holding tank in a delayed coker unit operation. Some embodiments comprise fluid preferably water inlet lines, which allow fluid to be flushed into a valve body and/or into a condensate holding tank.
Some embodiments may comprise a coke drum, a fluid inlet line to a deheading body; a shut off valve for the fluid inlet line to the deheading body; a fluid inlet line to a condensate holding tank; a shut off valve to the fluid inlet line to the condensate holding tank; a condensate inlet valve running between the valve body and the condensate holding tank; a shut off valve between the valve body and the condensate holding tank and the condensate inlet line; a valve body; and a condensate holding tank and a chute to a coke pit.
Some embodiments comprise a method for flushing excess condensate and particulate matter from the valve body; and/or from the condensate holding tank. Preferred embodiments for flushing the valve body comprise shutting off the flow of steam into the valve body; opening the valve from the valve body to the condensate holding tank; opening the valve on the fluid inlet line to the valve body; allowing fluid to flow through the valve body; and flushing fluid through the valve body into the condensate inlet line through the condensate holding tank into a chute which empties into a coke pit.
Some embodiments for flushing the condensate holding tank preferably comprise closing the shut off valve in the condensate inlet line; opening the valve in the fluid inlet line; and allowing fluid to flow from the fluid inlet line into the condensate holding tank through a drain into a chute which connects to a coke pit.
The foregoing and other objects and features of the present invention will become more fully apparent from the following description and appended claims, taken in conjunction with the accompanying drawings. Understanding that these drawings depict only typical embodiments of the invention and are, therefore, not to be considered limiting of its scope, the invention will be described and explained with additional specificity and detail through the use of the accompanying drawings in which:
It will be readily understood that the components of the present invention, as generally described and illustrated in the figures herein, could be arranged and designed in a wide variety of different configurations. Thus, the following more detailed description of the embodiments of the system, device, and method of the present invention, as represented in
Embodiments of the invention will be best understood by reference to the drawings wherein like parts are designated by like numerals throughout. Although reference to the drawings and a corresponding discussion follow below, the following more detailed description is divided into sections. The first section pertains to and sets forth a general discussion of the delayed coking process. The second section pertains to and sets forth the vibration monitoring system that may be utilized in the delayed coking process, as well as the various methods for utilizing the system within a delayed coking or other similar environment. It is noted that these sections are not intended to be limiting in any way, but are simply provided as convenience to the reader.
1. General Discussion on the Delayed Coking Process
In the typical delayed coking process, high boiling petroleum residues are fed to one or more coke drums where they are thermally cracked into light products and a solid residue - petroleum coke. Coke drums are typically large cylindrical vessels having a top head and a conical bottom portion fitted with a bottom head. The fundamental goal of coking is the thermal cracking of very high boiling point petroleum residues into lighter fuel fractions. Coke is a byproduct of the process. Delayed coking is an endothermic reaction with a furnace supplying the necessary heat to complete the coking reaction in a drum. The exact mechanism is very complex, and out of all the reactions that occur, only three distinct steps have been isolated: 1) partial vaporization and mild coking of the feed as it passes through the furnace; 2) cracking of the vapor as it passes through the coke drum; and 3) cracking and polymerization of the heavy liquid trapped in the drum until it is converted to vapor and coke. The process is extremely temperature-sensitive with the varying temperatures producing varying types of coke. For example, if the temperature is too low, the coking reaction does not proceed far enough and pitch or soft coke formation occurs. If the temperature is too high, the coke formed generally is very hard and difficult to remove from the drum with hydraulic decoking equipment. Higher temperatures also increase the risk of coking in the furnace tubes or the transfer line. As stated, delayed coking is a thermal cracking process used in petroleum refineries to upgrade and convert petroleum residuum into liquid and gas product streams leaving behind a solid concentrated carbon material, or coke. A furnace is used in the process to reach thermal cracking temperatures, which range upwards of 1,000° F. With short residence time in the furnace, coking of the feed material is thereby “delayed” until it reaches large coking drums downstream of the heater. In normal operations, there are two coke drums so that when one is being filled, the other may be purged of the manufactured coke.
In a typical petroleum refinery process, several different physical structures of petroleum coke may be produced. These are namely, shot coke, sponge coke, and/or needle coke (hereinafter collectively referred to as “coke”), and are each distinguished by their physical structures and chemical properties. These physical structures and chemical properties also serve to determine the end use of the material. Several uses are available for manufactured coke, some of which include fuel for burning, the ability to be calcined for use in the aluminum, chemical, or steel industries, or the ability to be gasified to produce steam, electricity, or gas feedstock for the petrochemicals industry.
To produce the coke, a delayed coker feed originates from the crude oil supplied to the refinery and travels through a series of process members and finally empties into one of the coke drums used to manufacture coke. A basic refinery flow diagram is presented as
As the bottom valve is opening, some contaminated steam from inside the still partially pressurized drum may pass into the body of the opening valve. Although most bottom deheading systems are not exposed internally to this steam when completely opened or closed, some valves do experience infiltration of contaminated stem while partially opened or closed. Any debris introduced into the valve internal by the steam, typically falls to the bottom of the bonnet portion of the valve as the steam condenses. Steam concentrate is trapped at the bottom of the bonnet or lower valve internals. Since this area is typically still pressurized, this condensate is not allowed to escape but is held until the valve body is depressurized for maintenance and is then drained into the pit. Unfortunately, debris may clod the drain hole preventing draining.
2. Flushing System
Although the present invention is intended to cover the use of flushing systems in delayed coker unit systems or rather the devices of the present invention may be used to clear debris from the drain area as well as cleaning or flushing the inside of the bonnet.
The present invention describes various embodiments of a valve body condensate holding tank flushing system, and methods for using the same. As depicted in
In some embodiments, the valve body 10 contains pressurized steam, which is fed into the valve body 10 by a steam line. As steam cools inside the valve body 10 condensate is allowed to flow from the valve body 10 into a condensate holding tank 20. In most utilized valve body systems, because the body of the valve 10 is under pressure, the condensate holding 20 tank must be a closed system. That is the drain, (not depicted) leading from the condensate holding tank 20 to the chute 30 is separated by a valve which allows the condensate holding tank 20 to remain at pressure. This allows the valve body 10 to remain pressurized.
In some embodiments, when the condensate holding tank 20 has filled to capacity with condensation or debris, e.g. byproducts of the decoking operation, the shut off valve 7 in the condensation inlet line may be closed allowing the body of the valve 10 to maintain steam pressure while the drain connecting the condensate holding tank 20 to the chute 30 is opened, allowing the full condensate holding tank 20 to empty its contents into a chute 30. Accordingly, in some embodiments the condensate holding tank 20 may be emptied of its contents during continuous use of the deheading valve.
In some embodiments, the valve body 10 may also be flushed of any excess condensation or debris. In a non-limiting example, during the delayed coker operation coke or other material flowing from the coke drum 1 through the valve body 10 into the chute 30 and into the coke pit, may leak into the valve body 10 itself, and overtime build up a substantial residue, which may impair the functionality of the valve. This may cause the valve to have diminished sealing capabilities. Accordingly, it is desirable to utilize a system which actively prevents the flow of materials from the coke drum 1 into the valve body 10, in order to protect the moving parts of the valve. Additionally, it is desirable to develop systems which allow the continued operation of a valve despite some leakage of material into the valve body 10. In some prior art systems, and in preferred embodiments of the present invention, the valve body 10 is pressurized by a steam system which prevents the flow of material from the coke drum 1 into the valve body 10. Accordingly, some systems exist already that are designed to prevent the flow of contaminants or debris into the valve body 10
Some embodiments of the present invention provide the significant advantage of allowing the valve body 10 to be flushed of any debris which accumulates into the valve body 10. Some embodiments of the flush system comprise a valve body 10, a fluid inlet line 2 to the deheader body 10, a shut off valve for a fluid inlet line 3 to the valve body 10. Accordingly, in some embodiments once a valve has accumulated a significant amount of debris, the high pressure steam inlet may be shut off, and the shut off valve for the fluid inlet line 3 may be opened allowing the fluid to flow from the fluid inlet line 2 into the valve body 10, effectively flushing any debris or, residual materials from the valve body 10. This cleans the internal components of the valve body 10. The fluid flushed into the system from the fluid inlet line 2 through the valve body 10 is allowed to drain through the condensation inlet line 6, and subsequently into the condensation holding tank 20 where it may be held for a period of time or allowed to flow directly into the chute 30 and coke pit.
Some embodiments allow for a valve body 10 and condensate holding tank 20 to be cleared of debris or excess condensation. Once the flushing of the valve body 10 is complete, the fluid inlet line 2 to the valve body 10 may be shut off at the shut off valve 3 and the steam pressure turned on repressurizing the body of the valve 10 again. This may be done to prevent the flow of material from the coke drum into the moving parts of the valve body 10.
As depicted in
As depicted in
As described above, the debris and fluid allowed to flow into the valve body 10 from the fluid inlet line 2 may flow into the condensate inlet line 6 and subsequently into the condensate holding tank 20 and be immediately drained into the chute/coke pit 30 or retained for a period of time in the condensate holding tank to be released later.
As described above, the condensate holding tank 20 may be drained of its contents by closing the condensate inlet line shut off valves 7 and opening the drain 9 allowing the excess condensate and debris in the condensate holding tank 20 to drain into a pipe 11 which leads to the chute and coke pit 30. Accordingly, the condensate holding tank 20 may be emptied during operation of the valve without depressurizing the valve body 10. Once the condensate holding tank 20 has expelled the excess condensate and debris, the drain 9 may be closed. Thereafter, the shut off valve from the condensate inlet line 6 may be opened allowing condensate and debris generated in the valve body 10 to drain to the condensate holding tank 20.
As depicted in
This application claims priority to U.S. Provisional Patent Application Ser. No. 60/780,926, filed Mar. 9, 2006, entitled “Valve Body and Condensate Hodling Tank Flushing System and Methods.”
Number | Date | Country | |
---|---|---|---|
60780926 | Mar 2006 | US |