1. Field of the Invention
The present invention relates to a valve, system and method for completion, stimulation and subsequent re-stimulation of well(s) or borehole(s) for hydrocarbon production.
2. Related and Prior Art
The process of making a production well, after drilling it, ready for production and/or injection is called completion of a well. This principally involves preparing the bottom of the borehole at or in the proximity of the production layer(s) to the required specifications, running in the production tubing or pipe and its associated downhole tools, as well as perforating and stimulating, as required. The process of running in and cementing the casing can also be included, if necessary due to the strata structure. All these processes will be described in detail below.
A subterranean formation containing hydrocarbons consists of at least one layer of soft or fractured rock(s) or strata containing the hydrocarbons, in the following called a production layer. Each production layer must be covered by a layer of impermeable rock(s) or strata preventing the hydrocarbons from escaping. The production layers in an oil or gas field are collectively known as a reservoir.
The drilling can be done vertically through one or more strata/rock layers in order to reach the desired production layer(s), and then possibly horizontally along one or more strata to provide as efficient well(s) as possible. A production well extending through the reservoir is conventionally divided into production zones, and particularly one or more production zones per production layer. A production well may extend several thousand meters vertically through the formation, and be connected to substantially horizontal branches extending up to several kilometres through the production layer(s).
The drilling in the geological strata can be done by rotating a drill bit at the end of a drill string and forcing it in the desired direction through geological or rock layers or strata to create or form a wellbore. Once a predetermined length of the wellbore is drilled, the drill string with the drill bit may be pulled out, and the wellbore may be lined with a steel pipe called a casing or liner. Hence, an outer annular space is formed between the casing and the formation. It is a common, but not obligatory, practice to cement the casing to the formation by filling all or part of the outer annular space with cementing slurry or slurries. Open boreholes or wellbores are also common, when the strata allow having such. A fully or partially cemented casing can stabilize the formation, and at the same time can make it possible to isolate certain layers or regions behind the casing for retrieval of hydrocarbons, gas, water or even geothermal heat. It is well known to anyone skilled in the art that e.g. epoxy/resin-based cementing slurries in some cases are better suited for the task than cement based mixtures. The terms “cement” and “cementing” are thus to be construed generally as use or injection of a viscous slurry, which then hardens, for the purpose of retaining the casing in the formation and/or stabilizing the formation and/or creating a barrier between different zones, and not exclusively as use of cement only. Cementing tools or valves may be arranged in the casing at predetermined locations. When a segment of the casing is to be cemented, the cementing valve is opened and cement slurry is pumped down the casing, out through the valve-ports, and into the outer annular space between the casing and the formation. The person skilled in the art will be familiar with the use of suitable plugs, staged cementing, in which a first batch of cement or liquid slurry is allowed to set before the next batch of cement or liquid slurry is pumped into the outer annular space above it, thus reducing the hydro-static pressure from the cement, which might otherwise harm or damage a weak formation, and other cementing techniques and details.
During cementing, injection and production in wells as those described above, the possibility for large differential pressures between different zones increases with increasing depth(s). Production of hydrocarbons from strata deep below the seabed and geothermal applications are both likely to involve large or high pressures. Isolation of zones and injection of liquid or gas to increase the pressure in the production zones or regions can lead to correspondingly large differential pressures.
When a well is drilled and lined with a casing, a return flow path from the formation around the casing to the surface must be established. In some instances, it is possible to penetrate the casing by setting off explosive charges at one or more predetermined depths to enable radial flow of production fluid from the formation into the casing. In other instances, the casing may be provided with prefabricated holes or slits, possibly combined with sand screens. In many applications, the combination of high hydraulic pressure and relatively porous production strata implies a substantial risk for damage of the formation if explosives are used to penetrate the casing. In these cases, it is a common practice to use valve sections with radially extending openings which are opened to allow radial flow of cement or epoxy/resin out of the casing for stabilizing and retaining the casing in the formation, for radial flow of injection fluid from inside the pipe to the surrounding formation to maintain or increase the hydraulic pressure in the formation, and/or for radial flow of production fluid from the formation into the casing. Such valve sections designed for inclusion in a tubular, usually by means of threaded couplings of the same kind as used when connecting the pipe segments to a string, are called “valves” in the following for simplicity.
Hydraulic fracturing, poses particularly demanding requirements to the design, robustness and durability of the valve(s). In hydraulic fracturing, a mixture containing e.g. 4% small ceramic particles can be injected into the formation at a pressure quite above the formation pressure. Fractures in the formation are expanded by the pressure and filled with these particles. When the hydraulic pressure is removed, the particles remain in the fractures and keep them open. The purpose is to improve the inflow of production fluid from the formation.
It is also a common practice to insert at least one production pipe into the casing. The inner annular space between the casing and the production pipe is filled with a suitable liquid/fluid or mud, and is generally used to maintain and increase hydraulic pressure. The production pipe is in these cases used as the return path, and conveys the production fluid up to the surface. When using a production pipe within the casing, it is of course also necessary to provide the production pipe with openings or apertures for production fluid, and it may be necessary to isolate production zones from the liquid/fluid or mud in the inner annular space between the production pipe(s) and the casing. Isolating the different zones can be accomplished by using mechanical plugs called “packers”, rather than by using cementing slurry or slurries. Such packers are mainly used in the inner annular space between the production pipe and the casing, because it may be problematic to achieve sufficient sealing against the formation, especially if the formation is porous. Valves corresponding to the valves described above can be arranged in the production pipe(s), and they can be opened once they are localized in the production zone(s).
One or more injection wells may be provided at a distance from the production well(s) in a field. The injection well(s) can be used to pump water, saline or gas back into the formation in order to increase the pressure. Additives such as acid, solvents or surfactants may be added to the fluid in order to enhance production of hydrocarbons in processes known as “stimulating a zone”.
Valves can be used to control the flow of formation fluid from a production zone into the production pipe through the casing, possibly through a horizontal and/or vertical branch. Valves can also be used for controlling an injection fluid from an injection well into a certain zone of the formation to be stimulated. When the formation fluid from a production zone contains too much water to be economically sustainable, the production zone can be shut down, typically by means of one or more valves. The valves are operated between open and closed, and possibly choked, positions using a variety of techniques, including use of wireline tools, strings of pipes, coiled tubing, self-propagating tools known as borehole or well tractors or runners, and drop balls. Some valves may be operated using separate hydraulic control lines. However, the space and cost required for providing separate hydraulic control lines and relatively expensive hydraulic valves quickly make hydraulically operated valves impractical for use in a tubular with many valves.
Hence, it is an object of the present invention to provide a tubular or a pipeline with a large number of valves, while avoiding expensive valves, hydraulic control lines and/or unnecessary loss of expensive production time, etc.
The valve, system and method according to the present invention will permit completion of well(s) for production of hydrocarbons by use or means of (sliding) valves, in which well(s) a drop ball may operate said multiple valves during initial activation. This is very time saving and effective and enables operator(s) to get the first oil produced earlier.
The valve, system and method according to the present invention will further allow making, at a later time, both water cut(s) and repeated stimulation(s) of the well(s), if necessary, by drilling out the ball seats of the (sliding) valves and using thereafter different suitable mechanical tools in order to operate the valves.
The main features of this invention are given in the independent claims. Additional features of the present invention are given in the dependent claims.
The invention will be described in greater detail in the following with reference to the accompanying drawings in which similar numerals refer to similar parts, and where:
A production pipe 103 is provided within the casing 102, and the completed production well can be divided into several production zones by using packers (not shown) in order to seal off the annular space formed by the outer surface of the production pipe 103 and the inner surface of the casing 102. Valves 110A-110C, 210A-210C, . . . shown in
In order to increase the amount and/or rate at which hydrocarbons are produced from a zone, one or more injection wells 300 may be provided at a certain distance from the production well 101-103. The injection well 300 injects fluid into one or more zones, e.g. to increase the pressure in the reservoir 100, 200 or to provide some chemical composition(s), and can be made in a similar manner as the production well. A typical oil or gas field can comprise one or more production wells and zero or more injection wells.
As discussed above, various devices, like sliding sleeve valves/sliding valves, butterfly valves and ball valves of different sizes and designs, can be used to control the fluid flow and for other purposes. For convenience, the term “ball operated device” is intended to include these and other devices when hydraulically operated using a drop ball, dart or similar (falling) device. All such ball operated devices comprises a seat on which the ball, dart or similar device can land. The ball seat can be a cage- or tubular- or circular-shaped element displaced within a valve arrangement or sleeve and with a ring-shaped lug having a diameter less than the diameter of the ball, dart or similar device that is to land thereon. Obviously, drop balls of different sizes may be provided as in a conventional drop ball system. The difference is that a drop ball will pass groups of seats having similar sizes until it operates a group of valves rather than just one single device passed and operated on by conventional drop ball systems.
The present invention provides a valve 110A for inclusion or insertion in a tubular, comprising a substantially cylindrical outer valve housing or outer sleeve 450 having radially extending side ports 300 and a substantially cylindrical inner sliding sleeve 800 mounted axially movable inside the valve housing or outer sleeve 450. A substantially cylindrical end part or portion 400 can be (firmly) connected to the valve 110A housing or outer sleeve 450 in order to form an outer shell 400, 450 of the valve 110A. As mentioned, the inner sliding sleeve 800 can be moved axially inside the valve housing or outer sleeve 450 in order to open or close the radial side ports 300. The sliding sleeve 800 has no ports, and the top or upper edge of the sleeve 800 can be moved past the housing ports 300 in order to reach the open position. The inner sliding sleeve 800 can further comprise a seat or ball seat 500, e.g. an expandable ball seat as described in NO 20100211 and U.S. Ser. No. 12/705,428 “Expandable ball seat” both being assigned to i-Tec AS and herein incorporated by reference in its entirety. The seat 500 can be operated by a drop ball (not shown) landing thereon, so that the valve 110A could be opened.
Since the sliding sleeve 800 has no ports, a simpler design is achieved. In particular, the cost of adding hard insets in the ports is reduced.
The inner sliding sleeve 800 can also be rotationally locked or prevented from rotating in the valve housing 450, because it may become necessary to rotate an activating, shifting, drilling or other mechanical tool (not shown), if necessary.
The near or top or upper side or end or edge of the valve 110A or inner sleeve 800 can be defined as the valve 110A or inner sleeve 800 end being closer to surface, than the other valve 110A or inner sleeve 800 end, which is being defined as the far or bottom or lower side or end or edge of said valve 110A or inner sleeve 800.
The first time the hydrocarbon layer 100 will be stimulated (with e.g. sand or ceramic particles “fraccing” and/or acid injecting), a plurality of drop balls with increasing diameters can be used in order to open each group of valves in a number of zones 100, 200, wherein the lowest zone 100 is being opened first and so on upwards, as it is described in NO 20111679 and NO 20100211 both being assigned to i-Tec AS and herein incorporated by reference in its entirety.
After this operation is done and either immediately or at a later time, the ball seat 500 in each inner sleeve 800 or valve 110A and the used drop ball(s) can be removed e.g. by drilling them out, so that the valve 110A and the rest of the seat 500′ will be as shown in
The inner sliding sleeve 800 of the valve 110A comprises further a first or upper grooved or recessed profile 600 arranged or formed on its inner wall and in the proximity of its upper or top end and a second or lower grooved or recessed profile 700 arranged or formed on its inner wall and the proximity of in its lower or far end in order to operate the valve 110A with the help of an activating or shifting tool inserted and run in the tubular after the ball seat 500′ is removed or drilled out (
As the seat 500′ is removed or drilled out, there will not be any constrictions or narrowings or restrictions or area reductions in the well or tubular. As mentioned above it will therefore be possible to enter into the well or tubular with different mechanical tools (e.g. coiled tubing or pipe, activating or shifting tool, opening-closing tool, etc.), which can cooperate/connect with or grab the first or upper profile 600 in order to pull or push the valve 100A sliding sleeve 800 to its closed position when necessary, e.g. if certain zone(s) produce only water.
This (the drawing of the sliding sleeve 800 to the closed position) can also be done with all valves in order to prepare the production well to re-stimulation. This can be done by opening, after production shut down or closing of all valves, a certain number of valves that are to be stimulated (typically those valve that are in a certain zone), wherein an inserted mechanical tool or device can cooperate/connect with or grab the lower or far profile 700 of the sliding sleeve 800 in order to push or pull the respective valve(s) open. When the stimulation is done or completed, the upper or top or near profile 600 of the sliding sleeve 800 can once again be pulled or pushed by said mechanical tool or device in order to close the respective valve(s). This operation or process can be repeated for other valves/zones. When all re-stimulation operations are completed or finished, all the valves can then be re-opened in order to start again the hydrocarbon production. This re-stimulation operation or process can be repeated at a later time, if needed or desired.
The inner wall of the valve 110A housing 450 and/or the outer wall of the sliding sleeve 800 can comprise or have arranged thereto at least one means 460, 470, 900, e.g. shoulder(s) e.g. 460, 470 formed on the inner wall of the housing 450 and/or a latch ring 900 arranged in a recess formed on the outer wall of the sliding sleeve 800, for keeping or retaining the valve 110A in an open or a closed position. Hence, said at least one means for position retaining prevents the sliding sleeve 800 from being swept along by the fluid flowing in the central bore, and thus from being opened or closed unintentionally.
Some or all of the side ports 300 in the valve 110A can be designed with different diameters for different purposes with respect to other side ports within the same valve and/or the side ports in other valve(s) in the valve group 1108, 110C or the valve system 210A-210C.
The side ports 300 can be manufactured from a material, e.g. tungsten carbide (WC), that is (much) harder than the material of the valve 110A housing 450, such that the valve 110A will withstand the wear from the ceramic balls used in hydraulic fracturing.
The inner surfaces of the valve 110A or housing 450 may also be hardened.
The inner and/or outer surface(s) of the valve 110A housing 450 and/or the sliding sleeve 800 can be coated with at least one non-stick coating layer, thus preventing e.g. cement from bonding to the valve components and allowing it to be used as a part of a cemented liner.
Magnets, e.g. permanent magnets, or other suitable means (not shown) in the valve 110A can indicate if the valve 110A is in an open or a closed position.
Thus, the present invention provides a simple, robust, durable cylindrical valve, valve system and method for completion, stimulation and subsequent re-stimulation of well(s) for hydrocarbon production.
The invention according to the accompanying claims and described in detail above, thereby solves a number of the problems and/or disadvantages of the prior art.
Additional modifications, alterations and adaptations of the present invention will suggest themselves to those skilled in the art without departing from the scope of the invention as expressed and stated in the following patent claims.
Number | Date | Country | Kind |
---|---|---|---|
20121073 | Sep 2012 | NO | national |
Filing Document | Filing Date | Country | Kind |
---|---|---|---|
PCT/NO2013/050151 | 9/6/2013 | WO | 00 |
Number | Date | Country | |
---|---|---|---|
61704056 | Sep 2012 | US |