H. Itoh and I. Sakamoto, "Special Edition: Total Production Information System-CIM-Commitment to CIM in PFU Kasajima Works," Fujitsu Journal No. 197, Vol. 18, No. 4, 1992, pp. 60-69. (An English Language Translation is Attached.). |
L. E. Holloway, et al., IEEE, "Integration of Behavioral Fault-detection Models and An Intelligent Reactive Scheduler", Aug. 1991, pp. 134-139. |
K. Brankramp, ZWF Zeitschrift Fur Wirtschaftliche Fertigung Und Automatisierung, "Der Werker Im Mittelpunkt", Oct. 1992, vol. 87, No. 10, pp. 571-573. |
Shari L. S. Worthington, Proceedings of the Industrial Computing Conference, "The Personalization of Manufacturing: Redefining the Human Interface", Oct. 1991, vol. 1, 27-31, pp. 421-434. |
Shi-Chung Chang, et al., IEEE, "Scheduling Flexible Flow Shops With No Setup Effects", May 1992, pp. 1179-1184. |