Communications connectivity via the Internet, cellular data networks and other systems is available in many parts of the world. However, there are other locations where such connectivity is unavailable, unreliable or subject to outages from natural disasters and other problems. Some systems provide network access to remote locations or to locations with limited networking infrastructure via high altitude platforms operating in the stratosphere, for instance using lighter-than-air platforms such as balloons that take advantage of wind currents to stay aloft for weeks, months or longer.
Launch of balloon-type platforms involves inflating an envelope or other enclosure with lift gas. As the envelope is inflated, wind may cause the envelope to sway unpredictably. Thus, deploying balloons under less than ideal weather conditions can be very challenging. For example, launching such balloons in a windy environment can be potentially hazardous to bystanders, and in some cases, windy conditions can cause damage to the balloons or their payloads before they are fully inflated and deployed. Solutions such as using a wind shield to block wind from certain directions can become less useful when wind changes direction quickly, and the shield(s) may have to be constantly adjusted. Tower structures can be employed to protect balloons during inflation may work well until a balloon is actually launched and moves out of the exit at the top of the tower, or if the balloon envelope is very large, for instance having a length exceeding the height of the tower structure. A strong cross wind can cause the balloon to hit the tower, potentially damaging the balloon envelope or the balloon payload.
Conventional balloon launches involve inflating a balloon envelope with lift gas, with part of the envelope restrained during fill. A launch platform with a restraining mechanism may be employed with a portable launch rig that may be adjusted depending on the wind conditions. However, as lighter-than-air high altitude platforms (HAPs) are made larger to enhance their operational capabilities and lifespans, the inflated envelopes may become significantly larger than a portable launch rig can enclose, which can be adversely affected by the wind before launch Also, restraining mechanisms that employ a releasable restraint for holding a portion of the balloon envelope during inflation and prior to launch may, in certain situations, place undue stress on the envelope, which can cause damage or otherwise shorten the operational life of the HAP.
Thus, in accordance with aspects of the technology larger and more permanent launch systems are employed to accommodate large HAPs. This includes a launch rig structure capable of filling the envelope while the balloon is arranged vertically. The launch rig structure is configured to rotate up to 360° in response to current wind conditions, and to protect against wind gusts exceeding, e.g., 20-35 mph. The launch system includes an integrated lifting boom and gas handling system to fill the envelope. A payload release assembly is configured to couple with a rigid connection mechanism of the HAP, rather than holding down a portion of the envelope during inflation. This enables the envelope to be filled while in a vertical orientation, which can further mitigate stress on the envelope.
According to one aspect of the technology, a system is configured for launching a lighter-than-air platform including a balloon envelope and a payload coupled to the balloon envelope. The system comprises a support structure and a lifting assembly. The support structure includes a plurality of vertical supports extending above an ideal finished height for full inflation of the balloon envelope, a plurality of base members disposed perpendicular to the plurality of vertical supports, a plurality of wedge assemblies, and a plurality of bogies. Each wedge assembly is affixed to one of the plurality of vertical supports and to at least one of the plurality of base members, wherein the plurality of vertical supports, the plurality of base members and the plurality of wedge assemblies form an enclosure frame configured to at least party surround the lighter-than-air platform during lifting, inflating and launching. Each of the plurality of bogies is coupled to a corresponding one of the plurality of wedge assemblies, the plurality of bogies being configured to rotate the support structure about a central axis. The lifting assembly is adjustably coupled to a selected one of the plurality of vertical supports. The lifting assembly is configured to modulate vertically within the support structure to raise the balloon envelope to the ideal finished height.
In one example, the system further comprises a vertical elevator subassembly coupling the lifting assembly to the selected vertical support, the vertical elevator subassembly being configured to raise and lower the lifting assembly along the selected vertical support. Here, the lifting assembly may include a boom subassembly configured to raise the balloon envelope to the ideal finished height. In this case, the lifting assembly may further include a slewing assembly coupling the boom subassembly to the vertical elevator subassembly, in which the slewing assembly is configured to rotate the lifting assembly away from the balloon envelope prior to launch of the lighter-than-air platform.
In another example, the lifting assembly is configured to lower to a selected height in response to an abort operation. In a further example, the system further comprises a set of wind blocks coupled to the support structure. The set of wind blocks may include subsets of retractable walls arranged along a plurality of facets between pairs of adjacent vertical supports.
In a further example, the system also comprises a central platform assembly coupled to the support structure, in which the central platform assembly is configured to rotate about the central axis along with rotation of the support structure. The central platform assembly may include a central turntable and a utility bridge disposed between the central turntable and the support structure. The utility bridge may be affixed to one of the plurality of wedge assemblies. The utility bridge may be aligned with the lifting assembly. The central platform assembly may further include a payload bridge opposite the utility bridge. The central platform assembly may further include a platform disposed on the central turntable.
In these examples, the system may further comprise a track configured to provide up to 360° rotation of the support structure about the central axis. The track may include a pair of rails and the plurality of bogies are configured to move along the pair of rails. One or more of the plurality of bogies may include a drivetrain to actuate for movement in at least one of a clockwise or counterclockwise direction about the central axis. The drivetrain may include a hydraulic motor with a parking brake.
In another example, each wedge assembly comprises a wedge body and a base plate, with the wedge body being affixed to a respective one of the vertical supports and a respective one of the plurality of base members. In yet another example, the system further comprises a catwalk disposed along upper ends of the vertical supports opposite the plurality of base members. In this case, the catwalk may include a set of crown panels extending upward away from the vertical supports, in which the set of crown panels is configured to mitigate wind along an upper section of the support structure.
The technology relates to launching lighter-than air HAPs, such as balloons configured for operation in the stratosphere. As an example, a typical balloon may include a balloon envelope having a top plate and a base plate, a plurality of tendons between the top plate and the base plate, and a payload such as to provide telecommunications (e.g., 4G, LTE, 5G, etc.) and/or other services. As noted above, it can be challenging to inflate and launch a balloon. This is especially true for large balloons (e.g., with an envelope length of 20-35 meters or longer, an envelope width of 5-15 meters or more, and/or a gas fill volume on the order of 15,000-25,000 mols or more) in windy conditions. Various equipment can be used to aid the process. For instance, a specialized release assembly may hold the HAP during inflation. Wind shields and launch towers can also be used to protect the envelope and payload. In some configurations, a specialized launch rig (LR) may be used to fill and launch the HAP in a vertical arrangement. A top fill method may be employed that involves concurrently filling the envelope in a vertical orientation while raising the assembly to launch height.
As an example, the specialized launch rig may include a rotational support structure surrounding an interior space configured for inflating and launching of balloons in a vertical arrangement. The support structure may include a series of vertical supports affixed to one or more base support elements, which may extend upward at least 75-125 feet. The base support elements are mounted on a circular or arcuate track, so that the launch rig may be reoriented as needed to accommodate varying wind directions, for instance up to 360° or continuously. Retractable wind blocks may be panels formed of fabric sections that can be raised or lowered via winches, which may be actuated by hydraulics, electric motors, or other actuators. Horizontal spar members attach to the vertical supports provide rigidity. In one configuration, the vertical supports and wind blocks form a partially open enclosure. The enclosure may be at least 50% enclosed. In some examples, the enclosure may be up to 60-75% enclosed or more. The open area permits a HAP launch module to be moved into and out of the support structure for inflating and launching.
The wind blocks and vertical supports are able to transfer large forces from the wind to the base support elements and other ground-contacting components. For instance, torque tube members of the base support elements are able to transfer the load forces to the foundation and other components arranged along the track. This arrangement permits filling and launching in wind conditions exceeding 20-30 mph.
The support structure may also include one or more cranes for lifting the HAP and inflating the balloon envelope. In one example, a crane assembly is mounted on one of the vertical supports so that the crane can move vertically along the length of the support, and to pivot in different directions to provide multiple degrees of freedom. A bridge assembly extends across the base of the launch rig. The bridge assembly is coupled to a central turntable and is configured to rotate in conjunction with the launch rig.
In order to assist with the lift, fill and launch of the balloon, a launch cart assembly may be arranged within the interior space of the launch rig. The launch cart assembly is able to enter and exit the launch rig via the bridge assembly. The launch cart assembly is configured to support the HAP payload during initial inflation of the envelope. A gripper assembly is removably engaged with a support member of the HAP, such as a rigid connection member coupling the envelope and the payload. Once the envelope is filled and the HAP is ready for launch, the gripper assembly is disengaged from the connection member and the HAP floats up and away from the launch rig.
A lift gas supply is provided in conjunction with the launch rig. The lift gas supply may be integrated into the support structure, including gas conduits run along or within at least one vertical support in order to reduce the likelihood of kinking of the lift gas supply line when the support structure is moved. In one example, upon securing the fill component of the HAP to the lift gas supply, lift gas then flows into the balloon envelope until the inflating is complete or the desired fill volume is reached within the balloon envelope.
The various features and subsystems of the launch rig may be electrically or hydraulically connected to a control system. Various user inputs may be included within a cab that is part of the launch rig or a separate control structure. The user inputs allow a human operator to communicate with the control system in order to control the movement and position of the crane, hydraulically and/or electromechanically rotate support structure, and raise or lower the wind blocks (panels). They also allow for starting, adjusting and stopping the fill process, crimping the fill connection, and disengaging the gripper assembly so that the HAP launches.
The launch rig may also include a data acquisition system. The data acquisition system may include various sensors arranged to detect the position/location and state of the various launch rig components, the launch cart assembly, the HAP itself, and environmental conditions such as wind speed, wind direction, pressure, humidity, temperature, etc. A control system can be employed using the received information to set the launch rig orientation, wind block status, fill rate and launch time, and to control operation of various system components to perform these operations. Sensor inputs may be used to dynamically adjust launch parameters to account for variations in weather, balloon state, or other factors.
The devices in system 100 are configured to communicate with one another. As an example, the balloons may include communication links 108 and/or 110 in order to facilitate intra-balloon network communications. By way of example, links 110 may employ radio frequency (RF) signals (e.g., millimeter wave transmissions) while links 108 employ free-space optical transmission. Alternatively, all links may be RF, optical, or a hybrid that employs both RF and optical transmission. In this way balloons or other HAPs 102A-D may collectively function as a mesh network for data communications. At least some of the balloons may be configured for communications with ground-based stations 104 and 106 via respective links 112 and 114, which may be RF and/or optical links. In addition, the ground-based stations 304 and 306 may communicate directly via link 116, which may be a wired or wireless link.
In one scenario, a given balloon 102 may be configured to transmit an optical signal via an optical link 108. Here, the given balloon 102 may use one or more high-power light-emitting diodes (LEDs) to transmit an optical signal. Alternatively, some or all of the balloons 102 may include laser systems for free-space optical communications over the optical links 108. Other types of free-space communication are possible. Further, in order to receive an optical signal from another balloon via an optical link 108, the balloon may include one or more optical receivers.
The balloons 102 may also utilize one or more of various RF air-interface protocols for communication with ground-based stations via respective communication links. For instance, some or all of balloons 102A-D may be configured to communicate with ground-based stations 104 and 106 via RF links 112 using various protocols described in IEEE 802.11 (including any of the IEEE 802.11 revisions), cellular protocols such as GSM, CDMA, UMTS, EV-DO, WiMAX, and/or LTE, 5G and/or one or more proprietary protocols developed for long distance communication, among other possibilities.
The balloons or other lighter-than-air platforms of
In a superpressure or other balloon arrangement, the envelope 202 may be formed from a plurality of gores 208 sealed to one another. An upper portion of the envelope 202 has an apex section configured for connection to an apex (or top) load ring or plate 210, and a lower portion having a base section configured for connection to a base load ring or plate 212 positioned at the bottom of the balloon envelope. Tendons (e.g., webbing or load tape) 214 are shown running longitudinally from the apex load ring 210 to the base load ring 212. The tendons are configured to provide strength to the gores and to help the envelope 202 withstand the load created by the pressurized gas within the envelope when the balloon is in use. There may be a 1:1 correspondence between the number of gores and the number of tendons. Alternatively, there may be more (or less) tendons than gores.
The envelope 202 may take various shapes and forms. For instance, the envelope 202 may be made of materials such as polyethylene, mylar, FEP, rubber, latex or other thin film materials or composite laminates of those materials with fiber reinforcements imbedded inside or outside. Other materials or combinations thereof or laminations may also be employed to deliver required strength, gas barrier, RF and thermal properties. Furthermore, the shape and size of the envelope 202 may vary depending upon the particular implementation. Additionally, the envelope 202 may be filled with different types of gases, such as air, helium and/or hydrogen. Other types of gases, and combinations thereof, are possible as well. Shapes may include typical balloon shapes like spheres and “pumpkins”, or aerodynamic shapes that are symmetric, provide shaped lift, or are changeable in shape. Lift may come from lift gasses (e.g., helium, hydrogen), electrostatic charging of conductive surfaces, aerodynamic lift (wing shapes), air moving devices (propellers, wings, electrostatic propulsion, etc.) or any hybrid combination of lifting techniques. One or more solar panels 216 may be arranged on or extending from the chassis of the payload 204, for instance to provide power to the components of the payload during daylight hours, and to recharge batteries of the payload.
As noted above, the payload of balloon may be affixed to the envelope by a connection member, for instance a cable or other tether, or a rigid down-connect.
As shown in
As shown in view 400 of
Returning to
As seen in the exploded view of
During installation of the base ring structure, the bogie/wedge assembly modules can be positioned on the rails, and then attached to the base members. An example of such an installation is shown in the views of
As seen in perspective view 310 of
A top sheave assembly 626 and a slewing mechanism 628 are also shown in
Adjustments are made as the envelope is filled with lift gas. A mass metering rig may be coupled to the lifting assembly. Placing the mass metering rig on the boom (or jib) minimizes gas line volume between the meter and HAP thereby enhancing fill accuracy. Example fill procedures for filling the envelope while the balloon is in a vertical arrangement are discussed further below.
According to one aspect, the lifting assembly is engineered to withstand side loading. In one scenario, the boom may be raised vertically by the elevator subassembly up to 100-120 feet or more, and provide a lateral translation of +/−40° or more. Should detected (or predicted) wind speeds exceed a threshold level of, e.g., 40-60 mph, an abort procedure may include lowering the lifting assembly either to ground level or to some other designated height.
The lifting system is configured to move in three distinct axes. The hoist moves vertically up and down the vertical column 606, translating the entire lifting assembly. The luff axis allows the jib tip to rotate upwards and downwards in reference to an axis perpendicular to the elevator motion and parallel to the ground. This enables the jib tip to reach the ground and to reach maximum height without the lifting assembly making contact with any part of the balloon envelope. Rotation of the lifting assembly about the slew axis (“slew motion”) provides for rotation about an axis parallel to the vertical column 606 to move the entire structure out of the way before balloon launch.
According to one aspect, at any point the system can go into emergency abort, in which it will automatically release the balloon before overloading the crane. At this point the lifting assembly will hoist down at an increased rate, taking both the boom/jib and balloon down to the ground where the hazard can be minimized. This may be done with a dual speed hydraulic motor, enabling “emergency descent” of the system when extra speed is required.
The lifting assembly may also house the mass metering rig as well, which hangs off the boom or jib at the bow of the structure. In one example, this rig is hung on a pivot member and thus stays level through any luff position (which is ideal for flow meter measurement accuracy). By placing the mass metering rig in this position, the machine is able to achieve higher accuracy fill amounts. For instance, by being proximally closer to the balloon entrance, the measured flow in the mass metering rig is closest to the amount of gas input into the balloon.
As noted above, wind blocks can be employed to mitigate the wind's impact during fill and launch. The panels may be raised or lowered via hydraulic or mechanical winches or other actuating mechanisms integrated in spar members attached to the vertical supports. For instance, the panels can be raised prior to launch, and may be adjusted as the support structure is rotated about the rail system.
As shown in view 700 of
An example assembly process for the wind block assembly is as follows. First, a bottom rail 706 and bottom supports 708 are attached to the wedge assemblies as shown in
The retractable walls may be raised and lowered hydraulically or mechanically via the winches. A control system may automatically control adjustment of the walls by actuating the winches. As noted above, the walls can be raised prior to launch, for instance before the fill process has started. Adjustments may be made depending on wind conditions (e.g., speed or direction), as well as the orientation of the launch system in relation to the wind. According to one aspect, a mechanical or a soft fuse may be used to disable the function of the panels by means of restricting the motion or opening up the walls in case of wind or another overload condition. This is to minimize the effect of wind loading on the rest of the structure and to maintain the integrity of the wind walls.
In order to enable efficient launch of the HAP, a central platform assembly is provided for loading the HAP into the launch platform and for making adjustments as the support structure is repositioned.
As shown in the close-up view of
Also shown in
The platform 808 may also include a carriage 814, which enables automated or manual positioning of the flight vehicle and the launch cart. A predetermined path along the bridges with one or multiple predetermined locations may be included for automation and or consistency of balloon launches. The carriage 814 may be moved along the bridges using rollers and bearings and/or wheels, to minimize the vibration on the flight vehicle. The mobility of the carriage 814 in one or both directions may be achieved through actuation (e.g., hydraulic or mechanical) or manual means. The carriage 814 may have components or features to secure the launch cart as well as features and components to guide the docking and un-docking of the launch cart. This can include, e.g., bump posts, a laser guide, etc. Thus, the carriage and its actuation enable the dynamic launching of the balloon by synchronizing the movement of the balloon, during the launch process.
In order to lift, fill and launch the HAP, an arrangement may be provided that includes a configuration to support the HAP when it is in the launch platform. In accordance with aspects of the technology, a launch cart supports the HAP and a payload release assembly secures the HAP during lift and fill. The launch cart may be moved onto the central platform assembly via the payload bridge, for instance being loaded onto the payload bridge by a forklift.
The launch cart, including the payload release assembly, are configured to hold the HAP during a vertical filling process (discussed further below), without directly holding the balloon envelope. This avoids stress on the envelope, minimizing the likelihood of damage to it. In one example, the payload release assembly provides a single release point along a down-connect or tether element of the HAP between the balloon envelope and the payload.
The pulling gas spring is a normally retracted spring acting with a certain force which keeps the actuator of the gripper assembly in an extended position. The bump stops 1016 are adjustable in travel and limit the extend/retract motion of the gripper actuator. Arm latch 1020 may comprise a solid steel locking bar, which engages the track roller 1030 and prevents the rotation of the arm track roller of the gripper assembly. The track roller 1030 includes a roller bearing feature that reduces contact friction when the arm latch is disengaged from it. The pulling gas spring 1014 is a normally retracted spring configured to act with a selected amount of force that pulls on the arm and provides a force to keep it in the down position. The pedestal 1018 may be, e.g., a metal frame weldment serving as mounting base for various components. The launch arm actuator 1024 is a pneumatic actuator that operates the arm. The latch actuator 1022 is a pneumatic actuator that operates the arm latch 1020. The launch arm frame 1012 may be, e.g., a metal frame weldment serving as mounting base for the payload release mechanism and various components. The damper 1028 is used to decelerate the downward motion of the arm after HAP release.
The cradles 1038 comprise the primary release features for launching the payload. The cradles 1038 support and hold the crossbar 920 of the HAP and constrain the HAP in the X,Y,Z directions. The cradles 1038 are actuated (rotated) by the pull cables 1006. The cradles house the track rollers 1042, which are roller bearings that serve as cam followers and low-friction points of contact for the crossbar 920 of the HAP. The pull cables 1006 may be stainless steel cables pulled by the gripper actuator 1010, which rotate the cradles 1038. Cable pulleys 1008 serves to guide and redirect the respective pull cable 1006. Torsion springs 1044 are axially mounted with the cradles 1038, causing rotational preload on the cradles and forcing the cradles in a closed orientation prior to launch. The torsion springs 1044 also keep the cradle-end of the pull cables 1006 in tension. Bearings 1048 allow low-friction axial rotation of the cradles 1038. The V block 1036 serves as a bump stop to limit the inward travel of the shaft member 918 of the HAP. Cradle latch 1040 acts as a locking safety latch that engages on the latch pin 1052 and prevents rotation of the cradle 1038. The latch pin 1052 may be, e.g., a press-fit dowel pin that engages the cradle latch 1040 to prevent rotation of the cradle 1038. The top support block 1034 may be formed as a solid metal block that can slide in and out (towards and away from the shaft member 918), exposing a cavity into which the crossbar 920 of the HAP can be inserted. As shown in this example, the top support block 1034 contains a cutout (e.g., V-shaped or U-shaped) forming fingers 1035, which clamp down on the crossbar 920 to prevent upward motion. The guide rail 1046 may be configured as a sliding ball bearing guide rail that allows the movement of the top support block 1034 in and out. The latch actuator 1054 is, e.g., a pneumatic actuator that operates the cradle latch 1040.
Prior to securing the HAP, the to block support may be retracted and the cradles rotated into a receive position, as shown in
According to one aspect of the technology, the HAP may be coupled to and released from the payload release assembly as follows. To install the HAP, the top support block 1034 is retracted in the open position, e.g., manually. This can be done by pulling a spring-actuated securing pin and pushing the top support block all the way in (away from the cradles 1038). When the top support block is pushed all the way in (see
To prepare for launch, first the cradle latch 1040 and the arm latch 1020 are retracted, as they are the primary safety devices for restraining motion. The cradle latch 1040 is first disengaged to allow free rotation of the cradles 1038. To do so, the latch actuator 1022 is retracted (either manually or electrically). By retracting the latch actuator 1022, the cradle latch 1040 disengages from the latch pin 1052, allowing unrestrained rotation of the cradles 1038. Concurrently, or after a slight delay (e.g., on the order of few milliseconds) the arm latch actuator 1022 is retracted (either manually or electrically). In doing so, the arm latch 1020 moves upward, overcoming the opposing force of the pulling gas spring 1026, which serves to keep the arm latch 1020 normally closed, and disengages from the track roller 1030 mounted on the arm. This unlatching allows for unobstructed rotation of the arm.
The gripper actuator 1010 is then retracted (either manually or electrically), moving downward and overcoming the opposing force of the pulling gas spring 1026, which serves to keep the gripper actuator normally extended. This action pulls on the cables 1006, which are connected to the cradles 1038 and are guided by the cable pulleys 1008. The cables 1006 rotate the cradle 1038. The lower bump stop 1016 serves as a physical limit to the gripper actuator travel and also limits the rotation of the cradles. When the gripper actuator 1010 hits the lower bump stop 1016, the cradles 1038 are rotated to such a degree to allow for an unobstructed release of the crossbar 920 of the HAP over the fingers 1035 of the top support block 1034 due to the upward force of the HAP. Either concurrently, or after a slight delay (e.g., on the order of a few milliseconds) the arm actuator 1024 is retracted (either manually or electrically), moving downward and overcoming the opposing force of the pulling gas spring 1026, which serves to keep the arm in the down position. Towards the end of the stroke, the motion of the arm is decelerated by the damper(s) 1028, until the arm rests on the bump stops 1016. This completes the HAP release process.
An onboard control system may be employed to manage the sequence of actuations for the HAP release process. For instance, the control system may manage the sequence of operation of the cradle latches, arm latches, cradles and arm. Timing of these actuations is essential in ensuring a smooth and continuous release operation; thus a computer-implemented control system may be used. Depending on wind speeds, HAP mass, volume of gas, etc., the timing and synchronization of the aforementioned actuations may be altered and optimized to best suit the HAP release performance. Triggering the release process may be done by via remote control or can be done from a control room. One key advantage of having a control system is that all the sequencing, actuation speed, gas pressure, gas flow, etc. can be programmed and quickly executed.
Some or all of the HAP engagement and release operations may be performed manually or automatically. For instance, a control system may be located on the launch cart or the carriage. The control system may manage operation of the overall launch arm and the gripper assembly module, for example via one or more mechanical or electromagnetic (e.g., solenoid) actuators.
Using a gripper assembly and the overall payload release assembly provides significant advantages over systems that use a releasable restraint that holds down a section of the balloon envelope during fill. For instance, holding down the envelope may produce tears in the envelope material or otherwise cause strain or other damage to the envelope. This can substantially degrade the lifetime of the HAP. In addition, the gripper assembly secures the HAP along multiple degrees of freedom. For example, the shaft member of the HAP is secured in a vertical direction, and is also prevented from moving laterally or rotating due to the engagement of the crossbar by the cradles. This prevents the HAP payload from moving until the envelope is inflated. There are additional advantages to having a HAP mounted on a moving carriage that rides on the payload bridge. For instance, the launch system can achieve dynamic launches in addition to typically static balloon launches. In particular, the equipment discussed herein allows for “catapulting” the HAP with some predetermined acceleration and/or final velocity. This approach could reduce the time for launch, improve controllability, and increase longevity of the envelope by minimizing time spent on the ground.
As a matter of practicality, it is necessary to maintain the balloon envelope in a desired position within the launch structure in order to fill it with lift gas safely. As the envelope is filled with lift gas, it changes shape, which can put undue stress on the envelope if the attachment points are fixed in place. Conventionally, large balloons are filled and launched from an orientation where they are partly folded and pinched in the middle with a “p-nut” style releasable restraint. However, it is desirable to fill large balloons in the vertical orientation, without folding or using a releasable restraint on the envelope for the reasons mentioned previously. As noted above, the payload release assembly can be used to constrain the HAP by securing a down connect or another part of the system rather than the envelope. In accordance with related aspects of the technology, a fill system and process are employed that modulate positioning of the envelope in the interior of the launch rig to ensure the tensioning is within predefined limits. As a result, the envelope of a high altitude platform can be filled with lift gas without placing undue stress on the inflatable housing while the payload is secured to the launch cart, so that the HAP can be launched for extended operation in the upper atmosphere.
As discussed above with regard to
For example, in order to lift the balloon envelope out of the box, the lifting assembly may be positioned over and lowered towards the box. This may be achieved by positioning the boom and jib as needed by lowering the vertical elevator subassembly to the bottom of the support structure.
As illustrated, an initial amount of gas has flowed into the balloon envelope so that it is partially filled. Here, the envelope extends a vertical distance upward from the box (omitted for clarity). In this example, as the envelope is inflated, the lifting assembly attached to the top plate may be adjusted in height (e.g., by raising the vertical elevator subassembly and/or angling the jib so as to raise the boom). Lift gas from flows into the balloon envelope via the lift gas supply until the filling is complete and the desired inflation pressure is reached within the balloon envelope.
The lifting assembly used to raise the balloon envelope may be controlled in conjunction with or independently of adjustments to the support structure (e.g., rotation about the central axis and/or raising or lowering the wind blocks. In that regard, the movement of the assembly may be independent of or synchronized with the movement of the support structure. Such operations can be employed in view of data received from various sensors at the launch facility, for instance to affect balloon tilt during fill or launch. The supply lines for the lift gas may be integrated into the support structure, for instance in order to reduce the likelihood of kinking of the supply lines when the support structure is moved. Alternatively, the lift and process gasses (used for pneumatic actuation throughout the structure) may be supplied via an independent assembly, such as a pressure regulating manifold (PRM). This assembly may be located near the gas source (e.g., tube trailers, bottles or other source) to regulate high pressure gasses down to safer pressures for flowing across the launch site. This assembly can move to attach to different gas sources easily, allowing for a smooth transition between new and old gas containers. An example lift gas supply module 1300 is shown in
Regardless of whether it is integrated into the support structure or is on a cart or other separate module, the lift gas supply system may include a supply of lift gases, such as hydrogen and/or helium, as well as various metering devices which provide for highly accurate metering of the amount of lift gas in the balloon envelope during inflation. The lift gas supply system also be configured to provide lift gas to the balloon envelope at very high rates of speed and a range of temperatures, such as between −20 degrees C. to 50 degrees C. In one configuration, the gases run through a section of fixed underground pipe sections to meet with a rotary union, through which they can pass into the rotating section of the launch assembly. This allows all of the lift and process gas piping fixed to the launch assembly to rotate with the structure while allowing gas flow therethrough.
There are different methods of filling a balloon vertically. These include (i) raising the top of the envelope to the ideal finished height, then filling the envelope, (ii) raising the top of the envelope to more than the ideal finished height, tensioning empty envelope, and then lowering to the ideal finished height during fill, and (ii) filling the envelope while raising it to the ideal finished height. The ideal finished height represents the position of the lifting system that would approximate the “at rest” height of a full balloon with nothing attached. The first approach (i) would start with the envelope being loose and floppy, which can place undue stress on envelope. The second approach (ii) requires some amount of envelope management, for instance by using one or more load cells to modulate the tension along the envelope during fill. The third approach (iii) is beneficial for several reasons. First, it may save a significant amount of time (e.g., on the order of 15-30 minutes) during fill. And it may improve the envelope management process and place less total stress on the envelope before and during fill.
With regard to the second approach, in one scenario a load cell is coupled between the boom and the top plate. In another scenario, a load cell may be coupled between the payload release assembly secured to the down connect or other portion of the HAP and the base load plate of the envelope. In yet another scenario, a first load cell may be disposed between the top plate and the boom, and a second load cell may be disposed between the base load plate and the payload release assembly. In still further scenarios, load cells may be positioned between any other portion of the envelope and the launch cart so that envelope tension may be measured during fill.
Regardless of the specific location of the load cell(s), the system may modulate the top and/or bottom (or other) attachment points of the envelope based on load cell readings referenced to the amount of lift gas that has been introduced into the envelope. By way of example, a typical balloon may weigh about 100 lbs at the top load cell before fill. During filling with lift gas, the weight goes down. Once the balloon has enough lift gas to support itself, the system may modulate the attachment points to maintain 20 to 40 lbs as measured by a load cell operatively coupled to the top plate. In contrast, if the load cell is operatively coupled to the base plate or another contact point below the portion of the envelope filling with gas (e.g., at the payload release assembly), the load cell readings would be the opposite. In this case, as the envelope fills with gas, there would be an upward force and the system may modulate the attachment points to maintain slightly more than 100 lbs.
The modulation process includes monitoring the load cell readings and adjusting modulation based on the calculated buoyancy of the amount of gas filled. As more lift gas is introduced, the logic executed, e.g., by a control system of the launch rig allows the lifting assembly to modulate within a range that is determined by the calculated buoyancy. When a threshold is reached that indicates the envelope has enough lift gas to support itself, then it free modulates, i.e., attempts to maintain a desired tension setpoint.
In one aspect, the tension measurement device may include an encoder, in which encoder positioning of the attachment points can also be used in the tension analysis. Here, the encoder would complement the load cell. Encoder positioning can include any system of measuring the location in space of the attachment point(s) of the envelope relative to the lifting assembly or the launch rig in general. It could be encoders disposed on a motor shaft of the boom, or encoders on the lifting assembly cables, or on a positioning sensor on a hydraulic cylinder of the lifting assembly.
With regard to the third approach, the balloon envelope needs to be lifted for clearance from the box, for instance by lifting it out some nominal amount (e.g., 0.25-1.0 meters away from the box) before starting to fill. In addition, the fill rate needs to be controlled (modulated) during different stages of the fill process. In particular, at a first stage (e.g., during the first 15-30% of fill as shown in view 1200 of
At a second stage (e.g., during the next 20-60% of fill, as shown in view 1210 of
With regard to modulation, in particular at stage 1, a load cell will show the weight of the balloon envelope that has been lifted out of the packaging. The upward force from the lift gas will be nominal compared to the weight of the envelope. This is the stage where the fill system ramps from a first, slow fill rate to a faster flow rate (e.g., 50-75% or up to a maximum flow rate). At this stage there is minimal modulation of the lifting assembly. During stage 2, the lift gas (at the faster flow rate) will offset the increasing weight of the balloon. As more of the balloon is lifted from the packaging, the weight shown on the load cell will increase. At the same time, as fill is progressing, the upward force of the lift gas will increase and will be supporting a noticeable portion of the weight. The change in value on the load cell will slow down during this phase. In one example, the fill system may operate at full speed (maximum flow rate), and the lifting assembly can modulate as desired. This allows for the load on the balloon to stay low, close to a target zero value, preserving the life of the balloon. With larger envelopes, it is critical lift and fill with this method, as the weight of the envelope can be hundreds of pounds (meaning the load at the apex plate would also be hundreds of pounds).
During a final, third stage, where the last 20-60% the lift gas is pumped into the envelope, the gas exerts enough upwards force to support the weight of the balloon, and the lifting assembly can modulate to the finished height. At this point (e.g., as shown in view 1220 of
At this point, the lifting assembly is modulated to keep the load close to zero. For instance, once the full envelope has been pulled from the box and fill continues, the hoist continues to modulate to keep the load close to zero. As more gas is added, the envelope further expands outward, which may require the hoist to descend slightly. This action is continued until fill is complete. The final launch height is not an exact height, and may vary based on a number of factors including keeping the load close to zero, the final fill amount, etc. In one scenario, it may be desirable to minimize stage 2. This would mean leaving the lifting assembly in place at stage 1 until sufficient lift gas has been injected, and then use the upwards force from the lift gas to modulate the lifting assembly, as in stage 3, and using this to pull the remaining envelope from the packaging. This is as opposed to lifting the envelope out of the box before the lift gas can support the entire weight of the envelope.
Once the fill process has reached the point where the envelope has enough lift gas to bring the balloon and its payload to a desired altitude in the stratosphere, the filling is stopped, the lift gas line supply is disconnected from the top plate and the HAP is readied for launch. Upon fill completion, the fill tube from the lift gas supply is crimped, permanently sealing the lift gas inside the envelope. Then the top plate 1204 may be released from the lift and fill assembly 1202. At the same time or shortly thereafter, the assembly 1202 may be pulled away from the top plate 1202 (via the slew motion of the lifting assembly). This may reduce the likelihood of damage to the balloon envelope from hitting the lifting assembly during launch. As seen in top-down view 1230 of
At launch, as noted above the gripper assembly disengages from the down connect or other connection point along the HAP. This causes the balloon envelope to begin to rise away from the launch facility as shown in view 1240 of
Returning to the launch process, once fill has been completed and the fill tube has been crimped or removed from the balloon envelope, the control system may evaluate the position and orientation of the envelope, wind conditions and other factors in order to decide an appropriate time to launch. This may include the control system evaluating received sensor data, for instance from cameras or lidar that observe the balloon envelope, payload and launch facility components, and/or environmental sensors (e.g., an anemometer, thermometer, barometer, rain gauge, humidity sensor, etc.) positioned around the launch area.
Prior to, during and after the inflation, the launch rig may be moved in order to obtain the best possible launch conditions within the interior space as wind conditions around the launch rig change. For example, the wind blocks may be raised to reduce the wind within the interior space of the support structure. Even in situations where the direction of the wind changes, the support structure components may be actuated to change the position of the launch rig so that the open side (e.g., by the end of the payload bridge) is downwind. This can even further reduce the amount of wind within the interior space.
In particular, as noted above, the launch rig is configured to change its position by rotation of the support structure. For instance, one or more of the bogies of the launch rig may be driven using hydraulic drivetrains to rotate the support structure clockwise or counterclockwise about the central turntable.
The various features of the launch rig may be electrically connected to a control system. For instance, user inputs such as a controller, may be included within a cab or control center of the launch rig sized to accommodate an operator. These user inputs may allow the operator to communicate with the control system in order to control the movement of the bogies, payload release assembly, lifting assembly, gas flow of the fill assembly, raising and lowering of the wind blocks, as well as other components of the launch rig.
The operator need not rely only on visible observation of the state of the launch rig and wind conditions; rather, the launch rig may include a data acquisition system. The data acquisition system may include various sensors arranged to detect the position and location of the bogies, payload release assembly, the envelope, the lifting assembly, the wind blocks, as well as environmental sensors and other equipment used to evaluate the position and orientation of the balloon envelope prior to launch.
The instructions 1408 may be any set of instructions to be executed directly (such as machine code) or indirectly (such as scripts) by the processor. For example, the instructions 1408 may be stored as computing device code on the computer-readable medium. The instructions 1408 may be stored in object code format for direct processing by the processor, or in any other computing device language including scripts or collections of independent source code modules that are interpreted on demand or compiled in advance. The data 1410 may be retrieved, stored or modified by processor(s) 1404 in accordance with the instructions 1408. By way of example, the instructions and data may be employed by the processor(s) for use by the control system to manage operation of different subsystems via one or more control modules as explained below.
As shown, the control system 1400 may also include sensor system 1412 that includes one or more camera modules 1414 (and/or lidar, ultrasonic or other sensors) to obtain imagery and other data about the balloon and other components within the support structure, environmental sensors 1416 to measure wind, temperature, humidity, pressure etc., position and location sensors 1418 to measure the orientation of the support structure, balloon assembly and other components, and lift gas or fill sensors 1420, for instance to measure the flow rate and volume of gas in the envelope.
In addition, the control system 1400 may include a communication module 1422 configured to send information to the ground crew and/or to a remote computer via a communication link, for instance so that an operator outside of the cab may still be able to remotely control the movement and position of the various components and subassemblies. For example, this communication link can be a wired or wireless link that uses several kinds wireless communication protocols, such as WiFi, Bluetooth or other protocols. As with control system 1400, the remote computer may include a processor and memory storing data and instructions as discussed above.
In one scenario, the control system 1400 operates autonomously. That is, rather than having an operator control the various aspects of balloon fill and/or launch, the control system may use the data from the various sensors to automatically control the movement and position of the launch rig components, as well as various other features such as gas fill, according to its instructions and in view of the position and orientation of the balloon envelope. For example, rather than having an operator adjust the position (height) of the lift assembly during fill, the control system may adjust its position automatically according to the instructions of the control system's memory. The control system may also determine when to launch the balloon based on the positioning of the envelope, wind speed and direction, etc. Of course, for safety reasons, the control system may be controlled in a manual mode by an operator either within the cab or remotely at any time. Such operation may be performed by the control module via one or more sub-modules, such as a lift assembly interface and control module 1424, a launch and fill interface module 1426, a drive train module 1428, and/or a wind block control module 1430.
Aspects, features and advantages of the disclosure will be appreciated when considered with reference to the foregoing description of embodiments and accompanying figures. The same reference numbers in different drawings may identify the same or similar elements. Furthermore, the following description is not limiting; the scope of the present technology is defined by the appended claims and equivalents. While certain processes in accordance with example embodiments are shown in the figures as occurring in a linear fashion, this is not a requirement unless expressly stated herein. Different processes may be performed in a different order or concurrently. Steps may also be added or omitted unless otherwise stated.
Most of the foregoing alternative examples are not mutually exclusive, but may be implemented in various combinations to achieve unique advantages. As these and other variations and combinations of the features discussed above can be utilized without departing from the subject matter defined by the claims, the foregoing description of the embodiments should be taken by way of illustration rather than by way of limitation of the subject matter defined by the claims. As an example, the preceding operations do not have to be performed in the precise order described above. Rather, various steps can be handled in a different order or simultaneously. Steps can also be omitted unless otherwise stated. In addition, the provision of the examples described herein, as well as clauses phrased as “such as,” “including” and the like, should not be interpreted as limiting the subject matter of the claims to the specific examples; rather, the examples are intended to illustrate only one of many possible embodiments.
This application claims the benefit of the filing date of U.S. Provisional Application No. 62/947,825, filed Dec. 13, 2019, the entire disclosure of which is incorporated by reference herein. This application is related to co-pending application Ser. No. 17/114,780, entitled Payload Release System for Vertical Launch, attorney docket No. LOON 3.0E-2238 [9093], and to co-pending application Ser. No. 17/114,714, entitled Vertical Fill Method, attorney docket No. LOON 3.0E-2230 [9072], filed concurrently herewith, the entire disclosures of which are incorporated by reference herein.