Article entitled "TCP Perforating on Coiled Tubing Utilizing a Deployment System" dated Mar. 13-16, 1995. |
"Perforating and Testing Review" dated May 1995. |
"Coiled Tubing Deployment System adapted for single Trip Perforating" by Campbell and Davidson dated Jun. 28-30, 1994. |
"Markham Well 49/5a-B2--2-7/8" TCP Guns on Coiled Tubing with the Deployment System--Report. |
"Coiled Tubing 1995 Update: Production applications" by Sas-Jaworsky II, et al. World Oil, vol. 216, No. 6, 1 Jun. 1995, pp. 97-105. |
"Safe Deployment of Specialized Coiled-Tubing in Live Wells" by H.V. Thomeer, et al. SPE Proceedings, No. SPE 24621, 4 Oct. 1992, 799-808. |
"Coiled Tubing Deployed TCP", undated. |
"4.06 Safeconn Development System 10,000 psi Working Pressure" Texas Oil Tools, Mar. 1994, 25 pages. |
"Toolstring Deployment System Trials" Nowsco Well Services, Jul. 1994, 21 pages. |
"Tool Deployment System Incorporating Connect Perforating System", Guiberson AVA and Dresser, Jun. 1994, 17 pages. |
Drawing, 1 pg.--3.06 O.D. .times. 2.88 I.D. Deployment Connector Assembly, Texas Oil Tools Inc., Jun. 22, 1994. |
PCT/US97/01201 Search Report mailed Jun. 16, 1997 relating to this application, 7 pgs. |
Article entitled "TCP Perforating on Coiled Tubing Utilizing a Deployment System" dated Mar. 13-16, 1995. |
"Perforating and Testing Review" dated May 1995. |
"Coiled Tubing Deployment System adapted for single Trip Perforating" by Campbell and Davidson dated Jun. 28-30, 1994. |
"Markham Well 49/5a-B2--2-7/8" TCP Guns on Coiled Tubing with the Deployment System--Report". |