Well completion method and apparatus

Information

  • Patent Grant
  • 6464008
  • Patent Number
    6,464,008
  • Date Filed
    Wednesday, April 25, 2001
    23 years ago
  • Date Issued
    Tuesday, October 15, 2002
    21 years ago
Abstract
An apparatus and method for the completion of wells through a production tube includes a tool body having cement flow ports and pressure displaced port closure elements. A perforated mandrel tube concentrically aligned within the production tube is secured to said tool body at its upper end. Concentrically within the mandrel tube is a dart transport tube. The dart transport tube is releasably secured to the tool body by a set of locking dogs. A first dart plug is placed in the production tubing bore at the well surface to be pumped or allowed to gravitate onto a closure seat in the lower end of the of the transport tube. This seat closure allows the production tubing to be pressurized for setting well annulus packers and opening of a cement port closure sleeve. After the production tube has been set by cement pumped down the production tubing bore and through the cement flow port, a second dart plug is positioned atop the cement column in the production tube. A pumped column of water or other well working fluid sweeps most of the production tube cement column into the well annulus and lower end of the transport tube. The second dart plug lands against an upper bore seat in the transport tube to enable another pressure increase in the production tube fluid column. This next pressure increase shifts a sleeve piston that closes the cement flow ports and releases the transport tube locking dogs. With the locking dogs released, the transport tube falls to the end of the perforated mandrel and opens the mandrel perforations to formation fluid flow from the screens into the production tube bore. Residual cement remaining in the tube bore is all displaced into the transport tube and removed from the production flow path without drilling.
Description




BACKGROUND OF THE INVENTION




1. Field of the Invention




The present invention relates to deep well completion and production procedures and apparatus. More particularly, the invention relates to completion procedures and apparatus that avoid a final cement plug drilling procedure and a corresponding tool change trip.




2. Description of the Prior Art




The process and apparatus by which deep production wells for fluids such as oil and gas are completed and prepared for production involves the step of sealing the production zone or earth strata from contamination by foreign fluids from other strata, above or below. Additionally, the tubing through which the produced fluid flows to the surface must be secured and sealed within the well bore. Often, the production zones are thousands of feet below the earth's surface. Consequently, prior art procedures for accomplishing these steps are complex and often dangerous. Any procedural or equipment improvement that eliminates a downhole “trip” is a welcomed improvement.




Consistent with prior art practice, production tube setting and opening are separate “trip” events. First, the raw borehole wall casing is secured by placing cement in the annulus between the raw borehole wall and the outer surface of the casing pipe. A string of fluid production tubing is then positioned where desired within the borehole and the necessary annulus sealing packers are set by a controlled fluid pressure increase internally of the tubing bore, for example. After the packers are set, a cementing circulation valve in the production tube assembly is opened by another controlled change in the tubing bore pressure. Cement is then pumped into the segment of annulus around the production tubing that extends upwardly from the upper production zone packer.




This prior art procedure leaves a section of cement within the tubing below the cementing valve that blocks the upper tubing bore from production flow. The cement blockage is between the upper tubing bore and the production screen at or near the terminal end of the tubing string. Pursuant to prior art practice, the residual cement blockage is usually removed by drilling. A drill bit and supporting drill string must be lowered into the well, internally of the production tubing, on a costly, independent “trip” to cut away the blockage.




SUMMARY OF THE INVENTION




An objective of the present invention, therefore, is to position well production tubing within the wellbore, secure the tubing in the well by suitable means such as cement or epoxy, and open the tubing to production flow in one downhole trip.




Another objective of the invention is a completion assembly having the capacity for complete removal of the cement tubing plug without drilling.




It is also an object of the present invention to provide a more expeditious method of well completion by the elimination of at least one downhole trip.




In pursuit of these and other objectives to hereafter become apparent, the present invention includes a production tubing string having the present well completion tool body attached above the upper production packer and the production screen. The completion tool body includes upper and lower pipe subs that are linked by concentric radially spaced tubular walls. The tubular walls are perforated by flow trans for ports. With the annular space between the concentric walls are a pair of axially sliding sleeve pistons. Both sleeve pistons may be axially displaced by fluid pressure within a central flow bore of the tool to close flow continuity through the flow transfer ports between the central flow bore and the surrounding well annulus. An elongated mandrel tube is secured to the internal bore surface of the tool body at a point below the flow transfer ports. From the tool body attachment point, the mandrel tube extends downwardly and concentrically within the production tubing. A retainer socket terminates the lower end of the mandrel tube. The mandrel tube wall is perforated along the upper portion of its length above the plug seat.




Also secured within the internal bore surface of the tool body at a point above the flow transfer port is an elongated dart transport tube having a dart seat at each distal end. The dart transport tube extends longitudinally within the internal bore of the perforated mandrel and is releasably secured to the internal bore surface of the tool body by a set of locking dogs. Proximate of its upper end, the dart transport tube is perforated for flow continuity with the flow transfer ports in the tool body tubular walls.




The completion assembly is placed downhole with all tubes open. When in place, a first closing dart is dropped along the production string bore from the surface to be transferred by gravity and/or pumping onto the closure seat at the downhole end of the dart transport tube. Closure of the downhole seat permits the internal bore of the tubing string to be pressurized independently of the of the production zone wall.




The normal procedural sequence provides for a relatively low tubing string pressure to set the zone isolation packers. A second and greater fluid pressure within the production tubing opens the flow transfer ports in the tool body by shifting one of the closure sleeves. Cement is then delivered down the tubing bore under a pressure head sufficient to discharge the cement through the dart transport tube perforation and flow transfer ports in the tool body into the annulus between the tubing string and the casing wall.




When the appropriate quantity of cement has been delivered into the production tubing, a second closure dart is placed in the tubing bore to cap the surface of the cement column standing in the tubing bore. A finishing fluid such as water is pumped against the second dart thereby completing the flow displacement of the cement remaining in the production tube. When the second dart engages the upper seat of the dart transport tube, all cement is displaced into the well annulus except that remaining in the dart transport tube between the dart seats. Upon closure of the upper transport tube seat, internal tubing bore pressure may be increased to shift the second sleeve piston in the tool body that simultaneously closes the flow transfer ports and releases the locking dogs from the dart transport tube. When released, the dart transport tube travels down the perforated mandrel taking all of the residual cement with it.




At the end of the perforated mandrel is a retainer socket that receives and engages a nose dart on the dart transport tubing. This retainer socket secures the dart transport tube within and along a lower segment of the mandrel. Above the dart transport tube, the perforated mandrel is preferably pierced by numerous large apertures to accommodate a free flow of formation fluid into the internal bore of the production tube.











BRIEF DESCRIPTION OF THE DRAWINGS




The advantages and further aspects of the invention will be readily appreciated by those of ordinary skill in the art as the same becomes better understood by reference to the following detailed description when considered in conjunction with the accompanying drawings in which like reference characters designate like elements throughout the several figures of the drawings and wherein:





FIG. 1

is a schematic well having the present invention in place for completion and production;





FIG. 2

A-C are an axial quarter section view of the invention as configured for initial downhole placement;





FIG. 3

A-C are an axial quarter section view of the invention as configured for cement displacement into the well bore;





FIG. 4

A-C are an axial quarter section view of the invention as configured to purge the upper production tube bore of residual cement;





FIG. 5

A-C are an axial quarter section of the invention as configured for formation fluid production;





FIG. 6

is an axial section view of the first conduit closure dart;





FIG. 7

is an axial section view of the second conduit closure dart;





FIG. 8

is an axial quarter section view of an alternative transport tube end dart within the perforated section of the perforated mandrel;





FIG. 9

is an axial quarter section view of the alternative transport tube end dart with the rectifying barb engaged with an internal ledge;





FIG. 10

is an axial quarter section view of the alternative transport tube end dart projecting from the end of the perforated mandrel.











DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS




The utility environment of this invention is typified by the schematic of

FIG. 1

, which illustrates a well bore


10


that is normally initiated from the earth's surface in a vertical direction. By means and procedures well known to the prior art, the vertical well bore may be continuously transitioned into a horizontal bore orientation as desired for bottom hole location or the configuration of a fluid production zone


12


. Usually, a portion of the vertical, surface borehole


10


is internally lined by steel casing pipe


14


, which is set into place by cement in the annulus between the borehole wall and outer surface of the casing


14


.




Valuable fluids such as petroleum and natural gas held within the production zone


12


are efficiently conducted to the surface for transport and refining through a production tubing string


16


. Herein the term “fluid” is given its broadest meaning to include liquids gases, mixtures and plastic flow solids. In many cases, the annulus between the outer surface of the production tube


16


and the inner surface of the casing


14


or raw well bore


10


will be blocked with some form of annulus barrier such as a production packer


18


. The most frequent need for an annulus barrier such as a production packer


18


is to shield the lower production zone


12


from contamination by fluids drained along the borehole


10


from higher zones and strata.




The terminal end of a production string


16


may be an uncased open hole. However, the terminal end is also often equipped with a liner or casing shoe


20


and a production screen


22


. In lieu of a screen, a length of drilled or slotted pipe may be used. The production screen


22


is effective to grossly separate particles of rock and earth from the desired fluids carried by the formation


12


structure and admits the production zone fluids into the inner bore of the tubing string


16


. Accordingly, the term “screen” is used expansively herein as the point of well fluid entry into the production tube.




Pursuant to practice of the present invention, a production string


16


is provided with the present well completion tool assembly


30


. The tool assembly is positioned in the uphole direction from the production screen


22


but usually in close proximity therewith. As represented by

FIG. 1

, the production packer


18


, the completion tool assembly


30


, the production screen


22


and the casing shoe


20


are preassembled with the production tube


16


as the production string is lowered into the wellbore


10


.




Referring to

FIG. 2

, the tool assembly comprises a tool body


32


, a perforated mandrel


34


and a dart transport tube


36


. The tool body


32


is terminated at opposite ends by a top sub


40


and a bottom sub


42


, respectively. The subs


40


and


42


are joined by an internal sleeve


44


and an external sleeve


46


. Between the sleeves


44


and


46


is an annular cylinder space. Axially slidable along the annular cylinder space are two annular pistons


50


and


52


. The upper annular piston


50


is secured to the external sleeve


46


at an initial position by several shear pins


54


. The lower annular piston is secured at an initial position by several shear pins


56


.




The internal sleeve


44


is perforated by several cement flow transfer ports


58


distributed around the sleeve circumference. The external sleeve


46


is also perforated by several flow transfer ports


60


distributed around the sleeve circumference. The flow transfer ports


58


and


60


are aligned to facilitate fluid flow continuity through both ports from the interior bore of the internal sleeve


44


when the lower annular piston


52


is translated from an initial, flow blocking position as illustrated by

FIG. 2

, into the lower annular space


62


. However, radial alignment of the flow transfer ports is not essential.




The inner sleeve


44


also includes several perforations


48


around the circumference thereof that provide fluid pressure communication between the internal bore of the tool body


32


and the upper piston pressure chamber


67


. (See

FIG. 4A

) The inside surface of the upper piston


50


is circumferentially channeled as a relief detent


66


for radial locking dogs


68


. The locking dogs


68


are carried by caging apertures in the internal sleeve


44


.




The perforated mandrel


34


is a subassembly of a connecting sub


70


and a perforated flow tube


72


. The connecting sub


70


threads internally to the lower tool body sub


42


and provides an internal assembly thread for the perforated flow tube. An annulus sealing device such as a sand barrier, plug or packer tube


18


assembles over the external threads of the lower sub


42


. An O-ring ridge and seal


74


isolates an annular space between the outer surface of the perforated flow tube and the inner surface of the packer tube bore. At the end of the flow tube


72


is a dart plug retainer socket


76


around a bore end aperture


78


. A plurality of production flow perforations


80


penetrate the flow tube


72


wall along an upper end length section.




The dart transport tube


36


slidably assembles coaxially within the internal bore of the internal sleeve


44


and extends coaxially into the internal bore of the mandrel flow tube


72


. The transport tube is axially retained by the locking dogs


68


in meshed cooperation with a circumferential detent channel


82


. The upper end of the transport tube form a dart plug seat


85


. Below the dart plug seat are several fluid flow apertures


87


distributed around the transport tube circumference. The lower end of the transport tube is terminated by a finale


89


having a projecting dart plug


90


and an internal plug seat


92


. An axial bore


94


extends through the finale


89


and plug


90


.




The dart plugs


100


and


102


of

FIGS. 6 and 7

are essentially the same except for size. The smaller dart plug


100


comprises a pintle nose


104


and several dart fins


106


. The pintle nose


104


is sized and shaped to engage the transport tube seat


92


with a fluid seal fit. The fins


106


facilitate the pumped transfer of the dart along the length of a production string. The larger dart plug


102


has a pintle nose


108


that is appropriately sized to make a fluid tight seal with the upper transport tube seat


85


. The nose of dart plug


90


at the terminal end of the transport tube


36


is sized to fit the retainer socket


76


at the terminal end of the perforated flow tube


72


. A mechanical latching relationship between the retainer socket


78


and dart plug


90


secures the transport tube


36


at the lower end of the mandrel flow tube


72


once the dart plug


90


engages the socket


78


.




For purposes of this preferred embodiment, the plugs


100


and


102


have been described as “darts”. It should be understood, however, that the plugs may also be configured as balls, sponges or rods.




As an additional note to the perforated mandrel


34


design, the length of the mandrel flow tube


72


preferably includes a non-perforated section below the perforated section. The length of the non-perforated section of flow tube


72


generally corresponds to the length of the dart transport tube


36


. An anti-reversing clip


96


is secured to the flow tube wall preferably at numerous point along the mandrel flow tube. Once the dart transport tube


36


has been translated to the lower end of the mandrel flow tube


72


, the anti-reversing clips


96


will prevent a reverse translation of the transport tube


36


by engaging the trailing edges of the terminal fins


110


.




The machine element alignments for running into a well are as illustrated by FIG.


2


. Specifically, flow continuity between the cement flow transfer ports


58


,


60


and


87


are aligned but closed between the ports


58


and


60


is interrupted by the annular piston


52


. The closed position of the piston


52


is secured by the shear pin


56


. The annular piston


50


is confined in the annular cylinder space above the lower piston


52


by the shear pin


54


and the end of the lower piston


52


. In the upper position, the upper piston


50


confines the locking dogs


68


within respective caging apertures in the internal sleeve


44


to penetrate the detent channel


82


in the dart transport tube


36


. Consequently, the transport tube


36


is secured at the required axial position. There are no plugs in the bore so there is a free transfer of well fluids along the tubing bore.




With respect to

FIG. 3

, the completion string assembly is positioned along the borehole length at the desired set position. At this point, the dart plug


100


is placed in the production tubing bore at the well surface and either pumped or permitted to gravitate down onto the transport tube bore seat


92


to close the flow bore


94


. With the flow bore


94


closed, the fluid pressure within the tubing string bore may be increased by surface pumps (Not Shown) to set the packer


18


against the well wall, whether cased or raw borehole.




With the packer


18


set, the tubing bore pressure is further increased to bear against the upper end of the annular piston


52


. When sufficient, the pressure load on the piston


52


shears the retainer pins


56


and drives the piston


52


down into the annular cylinder space


62


and away from the openings of flow transfer ports


58


and


60


. Well completion cement may now be pumped along the bore of tubing


16


into the production tube annulus. Due to the presence of the packer


18


, downflow of the cement between the screens


22


and the production zone face is prevented. The cement is forced to flow upward from outer flow ports


60


around the production tube.




When the predetermined quantity of cement has been placed in the production tube bore, the tail end of the cement column is capped by the larger dart plug


102


. Another well working fluid such as water is then pumped against the dart fins


110


thereby driving the column of cement in the production tube bore out through the flow ports


58


,


60


and


87


. Cement displacement by the dart plug


102


ends when the dart plug engages the transport tube upper seat


85


as illustrated by FIG.


4


. The only residual cement remaining within the production tube is that filling the transport tube


36


between the seats


85


and


92


.




With the dart plug


102


set against the transport tube seat


85


, tubing borehole pressure may again be increased. Such increased pressure bears now against the upper end of the upper piston


50


through the pressure ports


48


. When the resultant force on the piston end face is sufficient, the retainer pins


54


will fail thereby permitting the upper piston to translate down the annular space against the end face of the lower piston


52


to obstruct the cement flow path between ports


58


and


60


. Simultaneously, the down position of the upper piston


50


aligns the detent channel


66


with the locking dogs


68


thereby permitting the dogs to translate radially out of interfering engagement with the detent channel


82


in the dart transport tube


36


.




A body lock ring


64


that is secured to the upper end of the upper piston


50


engages strategically positioned circumferential threads or serrations on the outer perimeter of the internal sleeve


44


to secure the displaced position of the piston


50


and the closure of flow continuity between flow transfer ports


58


and


60


.




Upon withdrawal of the locking dogs


68


, the dart transport tube is free to translate down the length of the perforated mandrel


34


to latch the dart


90


into the retainer socket


76


as illustrated by

FIGS. 4 and 5

. This shift opens a formation fluid flow channel from the screens


22


, along an annulus between the screen tubing bore and the perforated mandrel


34


, through the mandrel perforations


80


and into the internal flow bore of the tool body internal sleeve


44


.





FIGS. 8

,


9


and


10


illustrate an alternative design embodiment for securing the transport tube


36


to the distal end of the perforated mandrel. Primarily, the alternative dart plug


120


comprises a projecting stinger


122


having several radially projecting spring barbs


124


. As shown by

FIG. 8

, the barb


124


flexes away from the inside bore wall of the perforated mandrel flow tube


72


as it passes through the section of perforations


80


. Below the perforations


80


but above the distal end of the mandrel flow tube


72


, one or more sharp bottom grooves


128


may be cut into the inside wall of the flow tube as shown by

FIG. 9

, to latch the barbs intermediate of the flow tube end.

FIG. 10

illustrates the stinger


122


projecting from the end of the mandrel flow tube


72


and the dart shoulder


126


effectively engaging the shoulder


76


.




The foregoing preferred embodiment of the invention has been described in relation to a previously cased and perforated well bore. It should be understood, however, that the invention is equally applicable to an uncased borehole. It should also be understood that “production tubing”, “tubing string”, “production string”, “production casing”, etc. are all equivalent terms in the lexicon of the art.




Although the invention has been described in terms of certain preferred embodiments, it will become apparent to those of ordinary skill in the art that modifications and improvements can be made to the inventive concepts herein without departing from the scope of the invention. The embodiments shown herein are merely illustrative of the inventive concepts and should not be interpreted as limiting the scope of the invention.



Claims
  • 1. A well completion tool for disposition in a production tubing string, said tool comprising:(a) A substantially cylindrical tool body having a central flow bore therethrough and a flow transfer port between the tool body bore and external surroundings of said tool body; (b) A flow transfer port closure element within said tool body that is selectively opened by fluid pressure within said flow bore; (c) A tubular mandrel secured to said tool body and projecting axially therefrom, said mandrel having a mandrel wall around an internal mandrel bore, and mandrel wall perforations between said tool body and a lower end of said mandrel bore; (d) A plug transport tube releasably secured to said tool body and projecting axially from said tool body within said mandrel bore, said transport tube having a tube wall around an internal tube bore, flow transfer ports through the transport tube wall and a tube bore closure seat distal from said flow transfer ports; and, (e) A transport tube release element within said tool body that is selectively displaced by fluid pressure within the tool body flow bore to release said transport tube from said tool body for translation along said mandrel whereby a flow channel from said mandrel wall perforations into said tool body flow bore is opened.
  • 2. A well completion tool as described by claim 1 wherein said transport tube release element is also a flow transfer port closure element.
  • 3. A well completion tool as described by claim 1 wherein said flow transfer port closure element comprises first and second flow transfer closure elements whereby said flow transfer ports are initially closed by said first closure element and selectively opened by displacement of said first closure element.
  • 4. A well completion tool as described by claim 3 wherein said second flow transfer closure element is subsequently and selectively displaced to close said flow transfer ports.
  • 5. A well completion tool as described by claim 1 wherein the lower end of said mandrel bore includes a retainer mechanism to secure said transport tube at a displaced position along said mandrel bore after release from said tool body.
  • 6. A well completion tool as described by claim 5 wherein said transport tube includes a latch plug element for engaging said mandrel bore retainer mechanism.
  • 7. A well completion tool as described by claim 1 wherein said mandrel wall perforations extend along a first length of said mandrel wall from said tool body to a second length of said mandrel wall between said perforations and said mandrel bore lower end.
  • 8. A well completion tool as described by claim 7 wherein said second length of mandrel wall substantially corresponds with the length of said transport tube.
  • 9. A method of producing a well comprising the steps of:(a) positioning well fluid production tubing within a well borehole in flow communication with a well production zone; (b) cementing said production tubing within said well borehole above said well production zone; (c) confining substantially all residual cement remaining in said production tubing within the bore of an axially transported tube; and, (d) opening the internal bore of said production tubing to fluid flow from said production zone by moving said axially transported tube within said production tubing from a flow obstructing position.
  • 10. A method of producing a well as described by claim 9 wherein an annulus barrier is erected in said borehole around said production tubing and above said well production zone.
  • 11. A method of completing a fluid producing well comprising the steps of:(a) Providing a tubing string tool having a cement flow port selectively opened by fluid pressure within a fluid flow bore in said tool, a perforated tube extending below said cement flow port and a tubular plug releasably secured to said tool and positioned to extend past said cement flow port into said perforated tube; (b) providing a perforated tube within said fluid flow bore extending below said cement flow port; (c) releasably securing a transfer tube within said fluid flow bore, said transfer tube positioned to extend past said cement flow port into said perforated tube, said transfer tube having a fluid flow channel therein that is open to said fluid flow bore and to said cement flow port; (d) plugging a lower end of a fluid flow bore within said transfer tube to facilitate a first fluid pressure increase within said tubing string; (e) opening-said cement flow port by said first fluid pressure increase; (f) pumping cement through said open cement flow port; (g) capping a cement column in said tubing with a transport plug; (h) pumping fluid against said transport plug for moving said transport plug against a sealing seat in said transfer tube fluid flow channel, such transport plug movement driving the displacement of said cement column through said cement flow port into a well annulus around said tool; (i) closing said cement flow port by a fluid pressure increase in said production tubing bore; (j) releasing said transfer tube from said tool by a fluid pressure increase in said production tubing bore; and, (k) transporting said transfer tube along said perforated tube substantially past tube wall perforations therein to admit formation fluid flow through said perforations into said production tube bore.
  • 12. A method of completing a fluid producing well as described by claim 11 wherein a well annulus barrier is erected by said first fluid pressure increase, said cement flow port being opened by a second fluid pressure increase.
  • 13. A method of completing a fluid producing well comprising the steps of:(a) positioning well fluid production tubing in said well, said production tubing having a well annulus barrier and a selectively opened and closed first flow port between a main flow channel in said tubing and a well annulus around said tubing; (b) providing a perforated tube within said main flow channel below said first flow port, said perforated tube having a first tube bore; (c) providing a transport tube within said main flow channel extending from above said first flow port into said first tube bore, said transport tube having a second tube bore, a tube wall perforation between said second tube bore and said first flow port, said transport tube further having a releasable attachment to said tubing; (d) depositing a first plug in said main flow channel to close said second tube bore and enable a first pressurization of said main flow channel for engagement of said well annulus barrier; (e) providing a second pressurization of said main flow channel to open said first flow port; (f) deposition a second plug in said main flow channel to close said second tube bore above said first flow port; (g) providing a third pressurization of said main flow channel to close said first flow port and release said attachment to said tubing; and (h) displacing said transport tube along said perforated tube to open a production flow channel from below and said annulus barrier into said main flow channel.
  • 14. A method as described by claim 13 wherein cement is pumped through said open first flow port into said well annulus around said tubing.
  • 15. A method as described by claim 14 wherein residual cement remaining within said second tube bore in the proximity of said first flow port is displaced from said first flow port along said first tube bore.
US Referenced Citations (17)
Number Name Date Kind
3270814 Richardson et al. Sep 1966 A
3662834 Young May 1972 A
3768562 Baker Oct 1973 A
3882935 Calhoun May 1975 A
3948322 Baker Apr 1976 A
4105069 Baker Aug 1978 A
4484632 Vann Nov 1984 A
4602684 Van Wormer et al. Jul 1986 A
5020597 Braddick et al. Jun 1991 A
5024273 Coone et al. Jun 1991 A
5117910 Brandell et al. Jun 1992 A
5497840 Hudson Mar 1996 A
5598890 Richard et al. Feb 1997 A
5738171 Szarka Apr 1998 A
5746274 Voll et al. May 1998 A
5960881 Allamon et al. Oct 1999 A
6286594 French Sep 2001 B1
Foreign Referenced Citations (1)
Number Date Country
WO 9715748 May 1997 WO