The invention relates to a device and a method for stabilizing a well head which includes a well base arranged on a seabed.
When a subsea well for extracting petroleum, for example, is established, a well-foundation system is installed on the seabed. A conventional base is usually established by a hole being drilled in the seabed (usually 36″ or 42″), in which a conductor casing (usually 30″ or 36″) is lowered into and fixed in the unconsolidated masses by a cement slurry being pumped in for the purpose of completely filling the space between the conductor casing and the hole wall. Thereby it is sought to achieve two primary aims:
1) the cured cement is to give full lateral support to the conductor casing up to the seabed, and
2) the cured cement is to give enough cover and strength for the first coupling of the conductor casing to be fully embedded and protected from any movements transmitted from a connected riser system to the conductor casing.
It turns out in practice that loss of cement slurry into, above all, permeable layers of unconsolidated mass may occur, and the conductor casing may move during the curing of the cement. This leads to the cement having a reduced quality, and it leads to the stiffness of the conductor casing being reduced to such a degree that specific design requirements are not reached, with the consequence that the fatigue strength of the well will be too low or that the load capacity of the well will not be fulfilled.
The invention has for its object to remedy or reduce at least one of the drawbacks of the prior art or at least provide a useful alternative to the prior art. The object is achieved through features, which are specified in the description below and in the claims that follow.
A well-foundation system for a subsea well for the production of petroleum, for example, is provided. A support column is set into an unconsolidated mass below a sea floor and forms a reliable mounting for a conductor casing so that a structure, which is predictable and as reliable as possible with respect to the stability and load capacity of a well head is provided through a direct coupling between the unconsolidated mass, the support column and the conductor casing of the well. The support column is driven down into the unconsolidated mass with a jacket surface in direct contact with the unconsolidated mass without any predrilling of holes or use of cement or other fillers, for example by the use of a suction base, for example a so-called CAN (Conductor Anchor Node) according to the applicant's own NO patent No. 313340, or other methods. Then the conductor casing is installed through the support column in a manner known per se, for example by a hole being drilled into the unconsolidated mass into which the conductor casing is lowered. The conductor casing is fixed and supported in the sup- port column. Thereby a predetermined and controlled hanging-off of the conductor casing, an accurate positioning of the attachment point of the conductor casing, that is to say the transition between a supported portion and a freely flexible portion of the conductor casing, and full cementing of the conductor casing in the support column below said attachment point are achieved.
The support column can be driven down into the unconsolidated mass, for example as an integral part of a suction base, that is to say a suction base with a closed top and an open bottom, in which an underpressure is worked up inside the well base by water mass enclosed by the well base and the seabed being pumped out, so that the downward resultant force arising on the well base through said underpressure is used to press the suction base and the support column down into the unconsolidated mass. Thereby the support column is positioned in good contact with the unconsolidated mass over its entire length and forms a reliable lateral and vertical support for the conductor casing during the subsequent installation of the conductor casing in the support column.
The support column may also be driven down into the unconsolidated mass by means other than the suction base as described above, for example by it being driven in by means of a hammer, and it may be part of a well frame or other supporting structure, which is anchored to the seabed with one or more suction anchors.
The task of the support column is to provide a continuous contact surface against the unconsolidated mass without the use of cement or other types of filler or grouting material between the unconsolidated mass and the jacket surface of the support column, so that a planned and checkable stability and a well-defined interface against the unconsolidated mass are achieved.
The support column may form a seat for the conductor casing, as the conductor casing is passed through the former and hung off by means of suitable means, for example a suspension clamp, with a prescribed length projecting freely above the seabed. The conductor casing may then be cemented into the support column and, in a manner known per se, against the unconsolidated mass below the support column up to a prescribed level in the support column, so that the conductor casing will have an optimum free top length (for example in the range of 2-5 metres) with respect to fatigue and allowed distance of deflection. Primarily, the upper cement level is governed by the vertical positioning of a cement-diversion system arranged in the support column, alternatively by cement being flushed out of the annulus between the support column and the conductor casing until a prescribed upper cement level has been provided. To achieve an even and continuous filling of the annulus, the support column may be provided with a system for separately introducing cement or other grouting material from a lower level in the support column up to the chosen level of attachment of the conductor casing.
Advantageously, one or more centring means may be arranged between the support column and the conductor casing optimally placed for an exact definition of the attachment of the conductor casing to the support column.
In an alternative embodiment, the planned free conductor-casing length in the support column may have a coating of a suitable elastomer material in a prescribed, optimized thickness applied to it. In this embodiment, the conductor casing is cemented with a full cement filling to the top of the support column. After the cement has cured, this elastomer material will give the conductor casing the free conductor-casing length chosen in advance. A further effect of the elastomer material may be a damping of any potential large single swings resulting from lateral forces imposed through the riser system.
The invention is defined by the independent claims. The dependent claims define advantageous embodiments of the invention.
In a first aspect, the invention relates more specifically to a device for stabilizing a well head including a well base arranged on a seabed, characterized by the well base including at least a support column, and a first portion of a conductor casing being encircled by the support column, an annulus encircling the first conductor-casing portion being filled with cement, and a second portion of the conductor casing projecting in an elastically flexible manner up from the first conductor-casing portion.
At the transition between the first and second conductor-casing portions, the annulus may be provided with a packer downstream of a cement-diversion system, which is arranged to carry any excess of cement away from the annulus.
The jacket surface of the second conductor-casing portion may be provided with an elastomer coating extending from the transition to the first conductor-casing portion and at least to the upper edge of the upper portion of the well base, and at least a portion of the elastomer coating is surrounded by cement.
The support column may be provided with a flushing line which discharges into the annulus at the level of the transition between the first and second conductor-casing portions.
The support column may be provided with a cementing line, which discharges into a lower portion of the annulus between the support column and the conductor casing.
In a substantial part of its longitudinal extent, the support column may rest in a laterally supporting manner against an unconsolidated mass.
A third conductor-casing portion may extend downwards in an unconsolidated mass below the support column.
The conductor casing may extend upwards from a conductor-casing attachment, the conductor casing and a lower end portion of the support column being interconnected via the conductor-casing attachment.
In a second aspect, the invention relates more specifically to a method of stabilizing a well head which includes a well base arranged on a seabed, characterized by the method including the following steps:
driving a support column down into an unconsolidated mass below the seabed;
lowering a first portion of a conductor casing into the support column;
filling an annulus which is formed between the support column and a first portion of the conductor casing with cement;
letting a second portion of the conductor casing project above the support column; and
establishing the well head on the second conductor-casing portion projecting upwards.
The method may further include the step:
limiting the annulus with a packer at the transition between the first and second conductor-casing portions.
The method may further include the step:
filling the annulus by letting the cement enter a lower portion of the support column.
The method may further include the steps:
limiting the annulus with a packer at the transition between the first and second conductor-casing portions;
filling the annulus by letting the cement enter a lower portion of the support column; and
carrying an excess amount of cement out of the annulus through a cement-diversion system arranged at the lower edge of the packer.
The method may further include:
flushing an excess amount of cement out of the annulus by means of a flushing line discharging into the annulus at the level of the transition between the first and second conductor-casing portions.
In what follows, an example of a preferred embodiment is described, which is visualized in the accompanying drawings, in which:
In the figures, the reference numeral 1 indicated a well head arranged on a seabed 21 over a layer of unconsolidated mass 2. In a well base 11, which, in its simplest embodiment, may be a support column 12 driven down into the unconsolidated mass, but which is shown in the figures as a suction base which is driven down, together with an integrated support column 12, into the unconsolidated mass 2, the support column 12 being arranged for the support and hanging-off of a conductor casing 13 extending downwards in the unconsolidated mass 2 in a manner known per se. The conductor casing 13 may be placed in the unconsolidated mass 2 in any known way. The conductor casing 13 may be sectioned and may thereby include several conductor-casing joints 131 in a manner known per se, only one shown in
In an annulus 125 between the support column 12 and a first portion 13′ of the conductor casing 13, cement 14 has been introduced. The cement 14 may have been injected separately into the annulus 125 through a cementing line 124 as it is shown in
In
With its embodiments, the invention provides a system for a predetermined fixing of the conductor casing 13 of a subsea well head 1 into the surrounding unconsolidated masses 2, it being possible to give the conductor casing 13 a controllable attachment point, preferably placed below the seabed 21, so that the conductor casing 13 will be arranged with a predetermined free length of the second conductor-casing portion 13″ for optimum utilization of the elastic properties of the conductor casing 13 in a calculated, reliable way.
The support column 12 is forced down into the unconsolidated mass 2 below the seabed 21 and given stable lateral support in the unconsolidated mass 2 as a well base 11 alone or part of a more complex well base 11.
By providing the conductor casing 13 with a suspension device, not shown, for vertical support in the support column 12 or the well base 11, the conductor casing 13 according to the exemplary embodiments of
A further advantage of the invention is that the support column 12 forms a barrier between the cement 14 and the unconsolidated mass 2 during the introduction of the cement 14, so that the cementing of the first conductor-casing portion 13′ may take place under near-ideal conditions and full cement strength be achieved after curing and planned stability be achieved for both the conductor casing 13 in general and the conductor-casing joint 131 in particular.
Number | Date | Country | Kind |
---|---|---|---|
20140210 | Feb 2014 | NO | national |
Filing Document | Filing Date | Country | Kind |
---|---|---|---|
PCT/NO2015/050034 | 2/18/2015 | WO | 00 |