Well operations system

Information

  • Patent Grant
  • 6547008
  • Patent Number
    6,547,008
  • Date Filed
    Thursday, September 7, 2000
    25 years ago
  • Date Issued
    Tuesday, April 15, 2003
    22 years ago
Abstract
A wellhead has, instead of a conventional Christmas tree, a spool tree (34) in which a tubing hanger (54) is landed at a predetermined angular orientation. As the tubing string can be pulled without disturbing the tree, many advantages follow, including access to the production casing hanger (21) for monitoring production casing annulus pressure, and the introduction of larger tools into the well hole without breaching the integrity of the well.
Description




Conventionally, wells in oil and gas fields are built up by establishing a wellhead housing, and with a drilling blow out preventer stack (BOP) installed, drilling down to produce the well hole whilst successively installing concentric casing strings, which are cemented at the lower ends and sealed with mechanical seal assemblies at their upper ends. In order to convert the cased well for production, a tubing string is run in-through the BOP and a hanger at its upper end landed in the wellhead. Thereafter the drilling BOP stack is removed and replaced by a Christmas tree having one or more production bores containing actuated valves and extending vertically to respective lateral production fluid outlet ports in the wall of the Christmas tree.




This arrangement has involved problems which have, previously, been accepted as inevitable. Thus any operations down hole have been limited to tooling which can pass through the production bore, which is usually no more than five inch diameter, unless the Christmas tree is first removed and replaced by a BOP stack. However this involves setting plugs or valves, which may be unreliable by not having been used for a long time, down hole. The well is in a vulnerable condition whilst the Christmas tree and BOP stack are being exchanged and neither one is in position, which is a lengthy operation. Also, if it is necessary to pull the completion, consisting essentially of the tubing string on its hanger, the Christmas tree must first be removed and replaced by a BOP stack. This usually involves plugging and/or killing the well.




A further difficulty which exists, particularly with subsea wells, is in providing the proper angular alignment between the various functions, such as fluid flow bores, and electrical and hydraulic lines, when the wellhead equipment, including the tubing hanger, Christmas tree, BOP stack and emergency disconnect devices are stacked up. Exact alignment is necessary if clean connections are to be made without damage as the devices are lowered into engagement with one another. This problem is exacerbated in the case of subsea wells as the various devices which are to be stacked up are run down onto guide posts or a guide funnel projecting upwardly from a guide base. The post receptacles which ride down on to the guide posts or the entry guide into the funnel do so with appreciable clearance. This clearance inevitably introduces some uncertainty in alignment and the aggregate misalignment when multiple devices are stacked, can be unacceptably large. Also the exact orientation will depend upon the precise positions of the posts or keys on a particular guide base and the guides on a particular running tool or BOP stack and these will vary significantly from one to another. Consequently it is preferable to ensure that the same running tools or BOP stack are used for the same wellhead, or a new tool or stack may have to be specially modified for a particular wellhead. Further misalignments can arise from the manner in which the guide base is bolted to the conductor casing of the wellhead.




In accordance with the present invention, a wellhead comprises a wellhead housing; a spool tree fixed and sealed to the housing, and having at least a lateral production fluid outlet port connected to an actuated valve; and a tubing hanger landed within the spool tree at a predetermined angular position at which a lateral production fluid outlet port in the tubing hanger is in alignment with that in the spool tree.




With this arrangement, the spool tree, takes the place of a conventional Christmas tree but differs therefrom in having a comparatively large vertical through bore without any internal valves and at least large enough to accommodate the tubing completion. The advantages which are derived from the use of such spool tree are remarkable, in respect to safety and operational benefits.




Thus, in workover situations the completion, consisting essentially of the tubing string, can be pulled through a BOP stack, without disturbing the spool tree and hence the pressure integrity of the well, whereafter full production casing drift access is provided to the well through the large bore in the spool tree. The BOP can be any appropriate workover BOP or drilling BOP of opportunity and does not have to be one specially set up for that well.




Preferably, there are complementary guide means on the tubing hanger and spool tree to rotate the tubing hanger into the predetermined angular position relatively to the spool tree as the tubing hanger is lowered on to its landing. With this feature the spool tree can be landed at any angular orientation onto the wellhead housing and the guide means ensures that the tubing string will rotate directly to exactly the correct angular orientation relatively to the spool tree quite independently of any outside influence. The guide means to control rotation of the tubing hanger into the predetermined angular orientation relatively to the spool tree may be provided by complementary oblique edge surfaces one facing downwardly on an orientation sleeve depending from the tubing hanger the other facing upwardly on an orientation sleeve carried by the spool tree.




Whereas modern well technology provides continuous access to the tubing annulus around the tubing string, it has generally been accepted as being difficult, if not impossible, to provide continuous venting and/or monitoring of the pressure in the production casing annulus, that is the annulus around the innermost casing string. This has been because the production casing annulus must be securely sealed whist the Christmas tree is fitted in place of the drilling BOP, and the Christmas tree has only been fitted after the tubing string and hanger has been run in, necessarily inside the production casing hanger, so that the production casing hanger is no longer accessible for the opening of a passageway from the production casing annulus. However, the new arrangement, wherein the spool tree is fitted before the tubing string is run in provides adequate protected access through the BOP and spool tree to the production casing hanger for controlling a passage from the production casing annulus.




For this purpose, the wellhead may include a production casing hanger landed in the wellhead housing below the spool tree; an isolation sleeve which is sealed at its lower end to the production casing hanger and at its upper end to the spool tree to define an annular void between the isolation sleeve and the housing; and an adapter located in the annular space and providing part of a passage from the production casing annulus to a production casing annulus pressure monitoring port in the spool tree, the adapter having a valve for opening and closing the passage, and the valve being operable through the spool tree after withdrawal of the isolation sleeve up through the spool tree. The valve may be provided by a gland nut, which can be screwed up and down within a body of the adapter to bring parts of the passage formed in the gland nut and adapter body, respectively, into and out of alignment with one another. The orientation sleeve for the tubing hanger may be provided within the isolation sleeve.




Production casing annulus pressure monitoring can then be set up by method of completing a cased well in which a production casing hanger is fixed and sealed by a seal assembly to a wellhead housing, the method comprising, with BOP installed on the housing, removing the seal assembly and replacing it with an adapter which is manipulatable between configurations in which a passages from the production casing, annulus up past the production casing hanger is open or closed; with the passage closed, removing the BOP and fitting to the housing above the production casing hanger a spool tree having an internal landing for a tubing hanger; installing a BOP on the spool tree; running a tool down through the BOP and spool tree to manipulate the valve and open the passage; inserting through the BOP and spool tree an isolation sleeve, which seals to both the production casing and spool tree and hence defines between the sleeve and casing an annular void through which the passage leads to a production casing annulus pressure monitoring port in the spool tree; and running a tubing string down through the BOP and spool tree until the tubing hanger lands in the spool tree with lateral outlet ports in the tubing hanger and spool tree for production fluid flow, in alignment with one another.




According to a further feature of the invention the spool tree has a downwardly depending location mandrel which is a close sliding fit within a bore of the wellhead housing. The close fit between the location mandrel of the spool tree and the wellhead housing provides a secure mounting which transmits inevitable bending stresses to the housing from the heavy equipment, such as a BOP, which projects upwardly from the top of the wellhead housing, without the need for excessively sturdy connections. The location mandrel may be formed as an integral part of the body of the spool tree, or may be a separate part which is securely fixed, oriented and sealed to the body.




Pressure integrity between the wellhead housing and spool tree may be provided by two seals positioned in series one forming an environmental seal (such as an AX gasket) between the spool tree and the wellhead housing, and the other forming a production seal between the location mandrel and either the wellhead housing or the production casing hanger.




During workover operations, the production casing annulus can be resealed by reversing the above steps, if necessary after setting plugs or packers down hole.




When production casing pressure monitoring is unnecessary, so that no isolation sleeve is required, the orientation sleeve carried by the spool tree for guiding and rotating the tubing hanger down into the correct angular orientation may be part of the spool tree location mandrel itself.




Double barrier isolation, that is to say two barriers in series, are generally necessary for containing pressure in a well. If a spool tree is used instead of a conventional Christmas tree, there are no valves within the vertical production and annulus fluid flow bores within the tree, and alternative provision must be made for sealing the bore or bores through the top of the spool tree which provide for wire line or drill pipe access.




In accordance with a further feature of the invention, at least one vertical production fluid bore in the tubing hanger is sealed above the respective lateral production fluid outlet port by means of a removable plug, and the bore through the spool tree being sealed above the tubing hanger by means of a second removable plug.




With this arrangement, the first plug, takes the function of a conventional swab valve, and may be a wireline set plug. The second plug could be a stopper set in the spool tree above the tubing hanger by, e.g., a drill pipe running tool. The stopper could contain at least one wireline retrievable plug which would allow well access when only wire line operations are called for. The second plug should seal and be locked internally into the spool tree as it performs a barrier to the well when a BOP or intervention module is deployed. A particular advantage of this double plug arrangement is that, as is necessary to satisfy authorities in some jurisdictions, the two independent barriers are provided in mechanically separate parts, namely the tubing hanger and its plug and the second plug in the spool tree.




A further advantage arises if a workover port extends laterally through the wall of the spool tree from between the two plugs; a tubing annulus fluid port extends laterally through the wall of the spool tree from the tubing annulus; and these two ports through the spool tree are interconnected via an external flow line containing at least one actuated valve. The bore from the tubing annulus can then terminate at the port in the spool tree and no wireline access to the tubing annulus bore is necessary through the spool tree as the tubing annulus bore can be connected via the interplug void to choke or kill lines, i.e. a BOP annulus, so that downhole circulation is still available. It is then only necessary to provide wireline access at workover situations to the production bore or bores. This considerably simplifies workover BOP and/or riser construction. When used in conjunction with the plug at the top of the spool tree, the desirable double barrier isolation is provided by the spool tree plug over the tubing hanger, or workover valve from the production flow.




When the well is completed as a multi production bore well, in which the tubing hanger has at least two vertical production through bores each with a lateral production fluid flow port aligned with the corresponding port in the spool tree, at least two respective connectors may be provided for selective connection of a single bore wire line running tool to one or other of the production bores, each connector having a key for entering a complementary formation at the top of the spool tree to locate the connector in a predetermined angular orientation relatively to the spool tree. The same type of alternative connectors may be used for providing wireline or other running tool access to a selected one of a plurality of functional connections, e.g. electrical or hydraulic couplings, at the upper end of the tubing hanger.











The development and completion of a subsea wellhead in accordance with the present invention are illustrated in the accompanying drawings, in which:





FIGS. 1

to


8


are vertical axial sections showing successive steps in development and completion of the wellhead, the Figure numbers bearing the letter A being enlargements of part of the corresponding Figures of same number without the A:





FIG. 9

is a circuit diagram showing external connections to the spool


3


;





FIG. 10

is a vertical axial section through a completed dual production bore well in production mode;





FIGS. 11 and 12

are vertical axial sections showing alternative connectors to the upper end of the dual production bore wellhead during work over; and,





FIG. 13

is a detail showing the seating of one of the connectors in the spool tree.












FIG. 1

shows the upper end of a cased well having a wellhead housing


20


, in which casing hangers, including an uppermost production casing hanger


21


for, for example, 9⅝″ or 10¾″, production casing is mounted in conventional manner.

FIG. 1

shows a conventional drilling BOP


22


having rams


23


and kill and choke lines


24


connected to the upper end of the housing


20


by a drilling connector


25


.




As seen in more detail in

FIG. 1A

, the usual mechanical seal assemblies between the production casing hanger


21


and the surrounding wellhead housing


20


have been removed and replaced through the BOP with an adapter


26


consisting of an outer annular body part


27


and an inner annular gland nut


28


which has a screw threaded connection to the body


27


so that it can be screwed between a lowered position shown on the right hand side of

FIG. 1A

, in which radial ducts


29


and


30


, respectively in the body


27


and nut


28


, are in communication with one another, and a raised position shown on the left hand side of

FIG. 1A

, in which the ducts are out of communication with one another. The duct


29


communicates through a conduit


31


between a depending portion of the body


27


and the housing


20


, and through a conduit


32


passing through the production casing hanger


21


, to the annulus surround the production casing. The duct


30


communicates through channels


33


formed in the radially inner surface of the nut


28


, and hence to a void to be described. The cooperation between the gland nut


28


and body


27


of the adapter therefore acts as a valve which can open and close a passage up past the production casing hanger from the production casing annulus. After appropriate testing, a tool is run in through the BOP and, by means by radially projecting spring lugs engaging in the channels


33


, rotates the gland nut


28


to the valve closed position shown on the right hand side on FIG.


1


A. The well is thus resealed and the drilling BOP


22


can temporarily be removed.




As shown in

FIGS. 2 and 2A

, the body of a tree spool


34


is then lowered on a tree installation tool


35


, using conventional guide post location, or a guide funnel in case of deep water, until a spool tree mandrel


36


is guided into alignment with and slides as a close machined fit, into the upper end of the wellhead housing


20


, to which the spool tree is then fixed via a production connector


37


and bolts


48


. The mandrel


36


is actually a separate part which is bolted and sealed to the rest of the spool tree body. As seen particularly in

FIG. 2A

a weight set AX gasket


39


, forming a metal to metal environmental seal is provided between the spool tree body and the wellhead housing


20


. In addition two sets of sealing rings


40


provide, in series with the environmental seal, a production fluid seal externally between the ends to the spool tree mandrel


36


to the spool tree body and to the wellhead housing


20


. The intervening cavity can be tested through a test part


40


A. The provision of the adapter


26


is actually optional, and in its absence the lower end of the spool tree mandrel


36


may form a production seal directly with the production casing hanger


21


. As is also apparent from reasons which will subsequently become apparent, the upper radially inner edge of the spool tree mandrel projects radially inwardly from the inner surface of the spool tree body above, to form a landing shoulder


42


and at least one machined key slot


43


is formed down through the landing shoulder.




As shown in

FIG. 3

, the drilling BOP


22


is reinstalled on the spool tree


34


. The tool


44


used to set the adapter in

FIG. 1

, having the spring dogs


45


, is again run in until it lands on the shoulder


42


, and the spring dogs


45


engage in the channels


33


. The tool is then turned to screw the gland nut


28


down within he body


27


of the adapter


26


to the valve open position shown on the right hand side in FIG.


1


A. It is now safe to open the production casing annulus as the well is protected by the BOP.




The next stage, show in

FIGS. 4 and 4A

, is to run in through the BOP and spool tree on an appropriate tool


44


A a combined isolation and orientation sleeve


45


. This lands on the shoulder


42


at the top of the spool tree mandrel and is rotated until a key on the sleeve drops into the mandrel key slot


43


. This ensures precise angular orientation between the sleeve


45


and the spool tree


44


, which is necessary, and in contrast to the angular orientation between the spool tree


34


and the wellhead casing, which is arbitrary. The sleeve


45


consists of an external cylindrical portion, an upper external surface of which is sealed by ring seals


46


to the spool tree


34


, and the lower external surface of which is sealed by an annular seal


47


to the production casing hanger


21


. There is thus provided between the sleeve


45


and the surrounding wellhead casing


20


a void


48


with which the channels


33


, now defined radially inwardly by the sleeve


45


, communicate. The void


48


in turn communicates via a duct


49


through the mandrel and body of the spool tree


34


to a lateral port. It is thus possible to monitor and vent the pressure in the production casing annulus through the passage provided past the production casing hanger via the conduits


32


,


31


the ducts


29


and


30


, the channels


33


, shown in

FIG. 1A

, the void


48


, the duct


49


, and the lateral port in the spool tree. In the drawings, the radial portion of the duct


49


is shown apparently communicating with a tubing annulus, but this is draughtsman's licence and the ports from the two annuli are, in fact, angularly and radially spaced.




Within the cylindrical portion of the sleeve


45


is a lining, which may be fixed in the cylindrical portion, or left after internal machining of the sleeve. This lining provides an orientation sleeve having an upper/edge forming a cam


50


. The lowermost portion of the cam leads into a key slot


51


.




As shown in

FIGS. 5

,


6


and


6


A a tubing string of production tubing


53


on a tubing hanger


54


is run in through the BOP


22


and spool tree


34


on a tool


55


until the tubing hanger lands by means of a keyed shoulder


56


on a landing in the spool tree and is locked down by a conventional mechanism


57


. The tubing hanger


54


has a depending orientation sleeve


58


having an oblique lower edge forming a cam


59


which is complementary to the cam


50


in the sleeve


45


and, at the lower end of the cam, a downwardly projecting key


60


which is complementary to the key slot


51


. The effect of the cams


50


and


59


is that, irrespective of the angular orientation of the tubing string as it is run in, the cams will cause the tubing hanger


54


to be rotated to its correct angular orientation relatively to the spool tree and the engagement of the key


60


in the key slot


51


will lock this relative orientation between the tubing hanger and spool tree, so that lateral production and tubing annulus fluid flow ports


61


and


62


in the tubing hanger


54


are in alignment with respective lateral production and tubing annulus fluid flow ports


63


and


64


through the wall of the spool tree. Metal to metal annulus seals


65


, which are set by the weight of the tubing string, provide production fluid seals between the tubing hanger


54


and the spool tree


34


. Provision is made in the top of the tubing hanger


54


for a wireline set plug


66


. The keyed shoulder


56


of the tubing hanger lands in a complementary machined step in the spool tree


34


to ensure ultimate machined accuracy, of orientation between the tubing hanger


54


and the spool tree


34


.





FIG. 7

shows the final step in the completion of the spool tree. This involves the running down on drill pipe


67


through the BOP, an internal isolation stopper


68


which seals within the top of the spool tree


34


and has an opening closed by an in situ wireline activated plug


69


. The BOP can then be removed leaving the wellhead in production mode with double barrier isolation at the upper end of the spool tree provided by the plugs


66


and


69


and the stopper


68


. The production fluid outlet is controlled by a master control valve


70


and pressure through the tubing annulus outlet ports


62


and


64


is controlled by an annulus master valve


71


. The other side of this valve is connected, through a workover valve


72


to a lateral workover port


73


which extends through the wall of the spool tree to the void between the plugs


69


and


66


. With this arrangement, wireline access to the tubing annulus in and downstream of a tubing hanger is unnecessary as any circulation of fluids can take place through the valves


71


and


72


, the ports


62


,


64


and


73


, and the kill or choke lines of any BOP which has been installed. The spool tree in the completed production mode is shown in FIG.


8


.





FIG. 9

shows valve circuitry associated with the completion and, in addition to the earlier views, shows a production fluid isolation valve


74


, a tubing annulus valve


75


and a cross over valve


76


. With this arrangement a wide variety of circulation can be achieved down hole using the production bore and tubing annulus, in conjunction with choke and kill lines extending from the BOP and through the usual riser string. All the valves are fail/safe closed if not actuated.




The arrangement shown in

FIGS. 1

to


9


is a mono production bore wellhead which can be accessed by a single wireline or drill pipe, and the external loop from the tubing annulus port to the void between the two plugs at the top of the spool tree avoids the need for wireline access to the tubing annulus bore.





FIG. 10

corresponds to

FIG. 8

but shows a 5½ inch×2⅜ inch dual production bore wellhead with primary and secondary production tubing


53


A and


53


B. Development and completion are carried out as with the monobore wellhead except that the spool tree


34


A and tubing hanger


54


A are elongated to accommodate lateral outlet ports


61


A,


63


A for the primary production fluid flow from a primary bore


80


in the tubing hanger to a primary production master valve


70


A, and lateral outlet ports


62


A,


64


A for the secondary production fluid flow from a secondary bore


81


in the tubing hanger to a secondary production master valve


70


B. The upper ends of the bores


80


and


81


are closed by wireline plugs


66


A and


66


B. A stopper


68


A, which closes the upper end of the spool tree


34


A has openings, in alignment with the plugs


66


A and


66


B, closed by wireline plugs


69


A and


69


B.





FIGS. 11 and 12

show how a wireline


77


can be applied through a single drill pipe to activate selectively one or other of the two wireline plugs


66


A and


66


B in the production bores


80


and


81


respectively. This involves the use of a selected one of two connectors


82


and


83


. In practice, a drilling BOP


22


is installed and the stopper


68


A is removed. Thereafter the connector


82


or


83


is run in on the drill pipe or tubing until it lands in, and is secured and sealed to the spool tree


34


A.

FIG. 13

shows how the correct angular orientation between the connector


82


or


83


and the spool tree


34


A, is achieved by wing keys


84


, which are guided by Y-shaped slots


85


in the upper inner edge of the spool tree, first to bring the connectors into the right angular orientation, and then to allow the relative axial movement between the parts to enable the stabbing function when the wireline connector engages with its respective pockets above plug


66


A or


66


B. To ensure equal landing forces and concentricity on initial contact, two keys


84


A and


84


B are recommended. As the running tool is slowly rotated under a new control weight, it is essential that the tool only enters in one fixed orientation. To ensure this key


84


A is wider than key


84


B and its respective Y-shaped slots. It will be seen that one of the connectors


82


has a guide duct


86


which leads the wireline to the plug


66


B whereas the other connector


83


has a similar guide duct


87


which leads the wireline to the other plug


66


A.



Claims
  • 1. An apparatus for controlling fluid flow in a subsea well having a subsea wellhead supporting an outer casing at the subsea floor, comprising:a casing hanger suspended by the subsea wellhead at the subsea floor, said casing hanger being unsealed with the wellhead; an inner casing having a bore and suspended within the subsea wellhead by said casing hanger, said inner casing forming a casing annulus with the outer casing; a mandrel connected to the wellhead and having an aperture forming a mandrel wall and a production port adapted for fluid communication with a tubing hanger, said casing hanger being disposed below said mandrel; a member extending from said mandrel into the wellhead; a casing annulus port extending through said mandrel wall to said aperture; said member being sealed with said mandrel and said casing hanger to form a fluid passageway extending between said casing annulus and said casing annulus port; a casing annulus valve disposed on said mandrel for controlling flow through said casing annulus port; and fluid communication between said casing annulus and said casing annulus port via said fluid passageway.
  • 2. The apparatus of claim 1 wherein a space is created above said casing hanger between said wellhead, casing hanger and mandrel.
  • 3. The apparatus of claim 2 wherein a portion of said fluid passageway is formed between said space and said casing annulus.
  • 4. An apparatus for controlling fluid flow in a well having an outer casing, comprising:a wellhead suspending a casing hanger; inner casing having a flow bore and suspended within said wellhead by said casing hanger, said inner casing forming a casing annulus with the outer casing; a mandrel connected to said wellhead and having a mandrel bore forming a mandrel wall; a fluid passageway between said mandrel bore and said casing annulus; an annulus port extending through said mandrel wall to said mandrel bore adjacent said casing hanger; an annulus valve disposed on said mandrel for controlling flow through said annulus port; fluid communication between said casing annulus and said annulus port via said fluid passageway; and a casing valve disposed on said casing hanger controlling fluid flow between said casing annulus and said mandrel bore.
  • 5. An apparatus for controlling fluid flow in a well having an outer casing, comprising:a wellhead suspending a casing hanger; inner casing having a flow bore and suspended within said wellhead by said casing hanger, said inner casing forming a casing annulus with the outer casing; a mandrel connected to said wellhead and having a mandrel bore forming a mandrel wall; a fluid passageway between said mandrel bore and said casing annulus; an annulus port extending through said mandrel wall to said mandrel bore adjacent said casing hanger; an annulus valve disposed on said mandrel for controlling flow through said annulus port; fluid communication between said casing annulus and said annulus port via said fluid passageway; a space being created between said wellhead, casing hanger and mandrel; a portion of the fluid passageway being formed between said space and said casing annulus; and a casing valve for opening and closing said fluid passageway.
  • 6. The apparatus of claim 5 wherein said casing valve includes an adapter mounted on said casing hanger and a reciprocable member movably mounted on said adapter, said member and adapter each having an annulus passageway with said member having an open position where said annulus passageways are in fluid communication and a closed position when said annulus passageways are not in fluid communication.
  • 7. A wellhead system comprising:a wellhead; an inner casing suspended within said wellhead and forming a casing annulus with an outer casing; a mandrel disposed on said wellhead and having a bore therethrough; tubing insertable through said bore and suspended within said mandrel and said inner casing, said tubing having a flowbore and forming a tubing annulus with said inner casing; a first valve on said mandrel for controlling flow through said tubing flowbore; a second valve on said mandrel for controlling flow through said casing annulus; a flow passageway from said casing annulus to said bore; and a valve member disposed in said flow passageway for controlling flow through said casing annulus.
  • 8. An apparatus for controlling the flow of fluids between the surface and a subsea well suspending a casing at the subsea floor, comprising:a subsea wellhead adapted for suspending the casing at the subsea floor; a subsea production member removably disposed on said subsea wellhead by a subsea connector and having a bore forming a wall of said subsea production member, said wall having a lateral production port and at least one lateral access port therethrough, said lateral access port communicating with the surface; a tubing hanger with tubing and supported within said bore of said production member, said tubing hanger having a production aperture forming a tubing hanger wall and at least one access aperture extending through said wall, said access aperture not extending above said lateral production port; said tubing having a flowbore and forming an annulus with the casing; said production aperture providing fluid communication between said flowbore and said lateral production port; and said access aperture providing flow communication between said annulus, said lateral access port, and the surface.
  • 9. The apparatus of claim 8 further including a connection on the outside of the wall of the production member for controlling access from the surface to the tubing annulus.
  • 10. A method of conducting well operations between the surface and a subsea well at the sea floor, comprising:installing a subsea wellhead at the sea floor; lowering a casing hanger connected to the upper end of casing through the subsea wellhead; supporting the casing hanger and casing within the subsea wellhead; connecting a subsea production member on the subsea wellhead using a subsea connector with the production member having a lateral production port and a lateral access bore; communicating the lateral access bore with the surface; aligning a production passageway and an access aperture in a tubing hanger with the lateral production port and lateral access bore, respectively, as the tubing hanger is installed in the subsea production member, the access aperture not extending above the lateral production port; suspending tubing on the tubing hanger supported within the subsea production member and forming a tubing annulus with the casing; and forming an access passageway from the tubing annulus to and through the access aperture in the tubing hanger and then through the lateral access bore in the production member to the surface.
  • 11. The method of claim 10 further including a member engaging the production member and casing hanger and extending between the production member and casing hanger to form an casing annulus passageway.
  • 12. A method for the workover of a well, comprising:(a) disposing on a wellhead a production member with a central bore; (b) attaching a blowout prevention member having a BOP bore above the production member; (c) lowering tubing on a tubing hanger through the BOP bore of the blowout prevention member and into the central bore of the production member; (d) supporting the tubing hanger within the production member; (e) forming a flow passageway between the BOP bore and a portion of the central bore; (f) forming a flowbore through the tubing and an annulus around the tubing; (g) forming a production passageway from the flowbore, through a lateral port in the tubing hanger and through the wall of the production member; (h) closing the bore of the tubing hanger above the lateral port; (i) forming an annulus passageway from the annulus through the wall of the production member to the portion of the central bore; (j) producing the well through the production passageway; (k) circulating fluids through the annulus passageway; (l) working over the well; and repeating steps (h) through (j) above.
  • 13. An apparatus for controlling fluid flow in a subsea well having a subsea wellhead supporting an outer casing at the subsea floor, comprising:a casing hanger suspended by the subsea wellhead at the subsea floor, said casing hanger being unsealed with the wellhead; an inner casing having a bore and suspended within the subsea wellhead by said casing hanger, said inner casing forming a casing annulus with the outer casing; a mandrel connected to the wellhead and having an aperture forming a mandrel wall and a production port adapted for fluid communication with a tubing hanger; a casing annulus port extending through said mandrel wall to said aperture; said mandrel sealed with said casing hanger to form a fluid passageway extending between said casing annulus and said casing annulus port; a casing annulus valve disposed on said mandrel for controlling flow through said casing annulus port; fluid communication between said casing annulus and said casing annulus port via said fluid passageway; and a member extending between said mandrel and casing hanger forming said fluid passageway.
  • 14. The apparatus of claim 13 wherein said member seals with said mandrel and said casing hanger to seal off said casing annulus port.
  • 15. A method of conducting well operations in a subsea well through a subsea wellhead supporting a casing hanger with casing, comprising:connecting a subsea production member on the subsea wellhead with the production member having a production port and an access bore; aligning a production passageway and an access aperture in a tubing hanger with the production port and access bore, respectively, as the tubing hanger is installed in the subsea production member; suspending tubing on the tubing hanger supported within the subsea production member and forming a tubing annulus with the casing; forming an access passageway from the tubing annulus to and through the access aperture in the tubing hanger and then through the access bore in the production member; and sealing a member with the production member and casing hanger to seal off the access passageway.
  • 16. The method of claim 15 further including removing the tubing hanger and tubing and the member providing a pressure barrier for the access passageway.
  • 17. An apparatus for controlling fluid flow between the surface and a subsea well having a subsea wellhead supporting a casing string at the subsea floor, comprising:a first hanger suspended by the subsea wellhead at the subsea floor, said first hanger supporting a first pipe string within the well; a mandrel removably connected to the subsea wellhead and having an aperture forming a mandrel wall and first and second lateral ports disposed in said wall; a second hanger landed in said mandrel having first and second apertures in fluid communication with said first and second lateral ports, respectively, said second hanger supporting a second pipe string within the subsea well and having a flow bore communicating with said first aperture and first lateral port, said first and second pipe strings forming an annulus, said second aperture not extending above said first lateral port; said second aperture and second lateral port communicating with said annulus; a first fluid flow path extending from the well and up through the tubing flowbore, said first aperture, and first lateral port; a second fluid flow path extending from the well and up through said annulus, said second aperture, and second lateral port to the surface; and circulating fluids from the annulus to the surface through the second fluid flow path.
  • 18. An apparatus for controlling fluid flow in a subsea well having a subsea wellhead supporting a casing string at the subsea floor, comprising:a first hanger suspended by the subsea wellhead at the subsea floor, said first hanger being unsealed with the wellhead; said first hanger supporting a first pipe string within the well, said first pipe string forming a first annulus with the casing string; a mandrel connected to the wellhead and having an aperture forming a mandrel wall having first, second, and third ports disposed in said wall; a second hanger landed in said mandrel having first, second, and third apertures in fluid communication with said first, second, and third ports, respectively, said second hanger supporting a second pipe string within the well having a flow bore communicating with said first aperture and first port, said first and second pipe strings forming a second annulus; said second aperture and second port communicating with said second annulus and said third aperture and third port communicating with said first annulus; a first fluid flow path extending from the well and through the tubing flowbore, said first aperture and first port; a second fluid flow path extending from the well and through said second annulus, said second aperture and second port; and a third fluid flow path extending from the well and through said first annulus, said third aperture and third port.
  • 19. The apparatus of claim 18 further including a sleeve sealing with said mandrel below said second aperture and sealing with said first hanger, said sleeve forming passageways between said first annulus and said third aperture and between said second annulus and said second aperture.
  • 20. A spool tree assembly having a blowout preventer mounted thereon for operating a high pressure subsea well, the blowout preventer having a flow bore with at least lowermost rams adapted to close the flowbore, and choke and kill lines extending from the flowbore below the lowermost rams to the surface, the assembly comprising:a spool body having a generally cylindrical internal wall forming a spool body central bore therethrough with a lateral production passage extending from said spool body central bore; a tubing hanger assembly mounted in said spool body central bore and having a central passageway with a lateral production passageway extending from said tubing hanger central passageway and in alignment with said spool body central passage, the tubing hanger assembly further including tubing without a submersible pump, an annulus being formed around said tubing; said internal wall of said spool body having a production port in fluid communication with said production passageway, a workover port in fluid communication with the choke and kill lines through the blowout preventer flowbore below the lowermost rams, and an annulus port in fluid communication with said annulus; an internal closure member in the spool body central bore above the tubing hanger assembly; said workover port extending exteriorly of said spool body central bore to a valve in fluid communication with a conduit extending to the surface; and said annulus port extending exteriorly of said spool body central bore to a valve in fluid communication with a conduit extending to the surface.
  • 21. An apparatus for use selectively with a blowout preventer for controlling the flow of fluids in a well, the blowout preventer having at least one choke and kill line extending to the surface, comprising:a production member adapted for disposal below the blowout preventer, said production member having a central bore formed by a wall of said production member and a production passageway and an annulus passageway in said wall; a production valve disposed with said production member for controlling flow through said production passageway; an annulus valve disposed with said production member for selective fluid circulation downhole through said annulus passageway; a tubing hanger supported and sealed within said production member and suspending tubing in the well, said tubing hanger and tubing having a flowbore and forming an annulus in the well, said tubing hanger having an aperture communicating said flowbore with said production passageway, and said annulus passageway communicating with said annulus; a conduit extending to the surface and in fluid communication with the flowbore; said annulus passageway in fluid communication with the choke and kill line; said production passageway in fluid communication with said annulus passageway; and fluid circulation paths being formed from the surface through said conduit and the choke and kill line between said tubing hanger flowbore and annulus passageway to selectively circulate downhole using said tubing flowbore and tubing annulus.
  • 22. The apparatus of claim 21 wherein said production member further includes a workover passageway in said wall, said workover passageway extending laterally into said central bore;a workover valve disposed with said production member for selective fluid circulation through said workover passageway; said annulus passageway in fluid communication with said workover passageway; said workover passageway in fluid communication with said production member central bore above said tubing hanger; said production member central bore being adapted for fluid communication with the choke and kill line; and a fluid circulation pathway being formed between said production member central bore, workover passageway, and annulus passageway to selectively circulate downhole using said tubing flowbore and tubing annulus.
  • 23. A method for controlling fluid flow in a well comprising:suspending tubing from a tubing hanger; supporting and sealing the tubing hanger within the bore of a production member for selective disposal below a blowout preventer having a blowout preventer bore; forming a common flow passageway between the blowout preventer bore and a portion of the production member bore above the seals around the tubing hanger; extending a tubular member into the blowout preventer bore, attaching the tubular member to the tubing hanger, and closing the blowout preventer therearound; forming a flowpath through the tubing and the tubular member, forming an annular area between the tubular member and the production member in the common flow passageway and forming an annulus around the tubing below the tubing hanger; forming an annulus passageway from the annulus and through the wall of the production member; controlling flow through the annulus passageway by an annulus valve; forming a workover passageway from the annular area and through the wall of the production member; controlling flow through the workover passageway; providing fluid communication between the workover passageway and the annulus passageway; and circulating fluid downhole using the flowpath, tubing annulus, annulus passageway, workover passageway, and annular area.
Priority Claims (1)
Number Date Country Kind
92305014 Jun 1992 EP
RELATED APPLICATIONS

This is a continuation of application Ser. No. 09/092,549 filed Jun. 5, 1998, now abandoned, which is a divisional continuing application Ser. No. 08/679,560 filed Jul. 12, 1996, now U.S. Pat. No. 6,039,119, which is a continuation of Ser. No. 08/204,397 filed Mar. 16, 1994, now U.S. Pat. No. 5,544,707, which is a 371 of PCT application PCT/US93/05246 filed on May 28, 1993, which claims the priority of European Patent Office application 92305014 filed on Jun. 1, 1992, all of the above hereby incorporated herein by reference.

US Referenced Citations (43)
Number Name Date Kind
2094812 Penick et al. Oct 1937 A
2118094 McDonough May 1938 A
2148360 Lemley Feb 1939 A
2590688 Crain Mar 1952 A
2889886 Gould Jun 1959 A
2965174 Haeber Dec 1960 A
3041090 Ashe et al. Jun 1962 A
3043371 Rector Jul 1962 A
3064735 Bauer et al. Nov 1962 A
3090640 Otteman et al. May 1963 A
3098525 Haeber Jul 1963 A
3139932 Johnson Jul 1964 A
3236308 Leake Feb 1966 A
3279536 Wakefield, Jr. Oct 1966 A
3295600 Brown Jan 1967 A
3299958 Todd Jan 1967 A
3310107 Yancey Mar 1967 A
3331437 Jones Jul 1967 A
3332481 Wakefield Jul 1967 A
3414056 Brown et al. Dec 1968 A
3437149 Cugini et al. Apr 1969 A
3454084 Sizer Jul 1969 A
3457992 Brown Jul 1969 A
3542125 Sizer Nov 1970 A
3545541 DeVries Dec 1970 A
3552903 Townsend Jan 1971 A
3602303 Bienkarn et al. Aug 1971 A
3638725 Ahlstone Feb 1972 A
3638732 Huntsinger et al. Feb 1972 A
3662822 Wakefield, Jr. May 1972 A
4053023 Herd et al. Oct 1977 A
4130161 Jones Dec 1978 A
4154302 Cugini May 1979 A
4289199 McGee Sep 1981 A
4491176 Reed Jan 1985 A
4629003 Baugh Dec 1986 A
4903774 Dykes et al. Feb 1990 A
5092401 Heynen Mar 1992 A
5280766 Mohn Jan 1994 A
5372199 Cegielski et al. Dec 1994 A
5544707 Hopper et al. Aug 1996 A
5884706 Edwards Mar 1999 A
6039119 Hopper et al. Mar 2000 A
Foreign Referenced Citations (12)
Number Date Country
0132891 Feb 1985 EP
0534584 Mar 1996 EP
0489142 Jan 1997 EP
1494301 Dec 1977 GB
2166775 May 1987 GB
2192921 Jan 1988 GB
625021 Aug 1978 SU
1244285 Jul 1986 SU
1659625 Jun 1991 SU
8601852 Mar 1986 WO
8603799 Jul 1986 WO
9200438 Jan 1992 WO
Non-Patent Literature Citations (79)
Entry
Sanders, R.O., Installation of Concentric Subsea Completions From a Jack-Up in the Welland Field: A Case History, Society of Petroleum Engineers, Inc., SPE 23145, 1981, pp. 405-415.
Decision Dated May 14, 2002 of the United States Court of Appeals for the Federal Circuit; No. 01-1383-1408; Cooper Cameron Corporation v. Kvaerner Oilfield Products, Inc.; (pp 1-13).
Memorandum and Order; Entered Apr. 16, 2001; (26 p.).
Notice of Litigation (2 p.); dated Nov. 20, 1997.
Supplemental Notice of Litigation (1 p.) (with attached Defendant's Supplemental Response to Plaintiff's Interrogatory No. 7; dated Jan. 7, 1998.
Second Supplemental Notice of Litigation (1 p.); dated Dec. 3, 1998.
SPE 23050 Electrical Submersible Pumps in Subsea Completions; Sep. 3-6, 1991; P.A. Scott, M. Bowring, B. Coleman.
National Oilwell (UK) Limited; Through Bore Tree System; Jan. 1993; St. Magnus House.
Offshore Technology Conference (OTC 5689); The Subsea Systems of the Argyll Area Fields; D.S. Huber, R.C. Burnett; May 2-5, 1988; (pp. 81-90).
Offshore Technology Conference (OTC 5885); Detail Design of a Guidelineless Subsea Satellite Completion; H. B. Skeels, J.A. Martins, S.P. Singeethaml; May 1-4, 1989; (pp. 39-50).
Offshore Technology Conference (OTC 5887) Deepwater Christmas Tree Development; P. P. Alfano, C.H.N. Barbosa, M.A. Lewis; May 1-4, 1989; (pp. 57-65).
Offshore Technology Conference (OTC 6085); High-Performance Metal-Seal System for Subsea Wellhead Equipment; L. J. Milberger, C.F. Boehm; May 1-4, 1989; (pp. 411-422).
Offshore Technology Conference (OTC 6388); Subsea Trees and Controls for Australian Bass Strait Development; L. A. Gillette, R.K. Voss Jr., T. Goggans; May 7-10, 1990; (pp. 391-397).
Offshore Technology Conference (OTC 7065); A High-Voltage System for Subsea Electrical Submersible Pumping; Neil Duncan, P.A. Scott, E.R. Schweim,; May 4-7, 1992; (pp. 701-705).
SPE 16847; Equipment Selection Procedure for Subsea Trees; J. D. Otten, N. Brammer; Sep. 27-30, 1987; (pp. 121-130).
SPE 19288; Don A Cost Effective Approach to Subsea Design; B. Stoddard, J.J. Campbell; Sep. 5-8, 1989; (pp. 1-11).
American Petroleum Institute; RP 17A; Recommended Practice for Design and Operation of Subsea Production Systems; American Petroleum Institute 1987; (p. 88) In particular See pp. 15-20.
The American Society of Mechanical Engineers; The Development of the 7-1/16″ Through-Bore Christmas Tree; D.S. Hubner, et al.; (undated); (pp. 99-106).
Underwater Technology Conference; Subsea Production Systems: The Search for Cost-Effective Technology; Mar. 19-21, 1990; (p. 15).
Division of Petroleum Engineering and Applied Geophysics, NTH; Simplified Subsea System Design; Oct. 23-27, 1989; (pp. 2-32).
Subsea Intervention Systems Ltd.; Subsea Applications for Downhole Pumping; M. Bowring, et al; DOT 1991; (pp. 71-78).
Design Certification Manuals; Jul. 29, 1986.
Subsea Wells; A Viable Development Alternative; Ocean Industry; Nov. 1986 (p. 1).
SPE 11176; New Generation 18-3/4-in.-15,000-psi Subsea Wellhead System; Sep. 26-29, 1982; B.F. Baugh, C.R. Gordon, G.C. Weiland.
National Supply Company (UK) Limited; Through Bore Tree system and Workover Riser 7-1/16″ 5000 psi; Jun. 1985.
National Supply Company (UK) Limited; Through Bore Tree system and Workover Riser 7-1/16″-5M; Oct. 1985.
OTC 5847; Subsea Template and Trees for Green Canyon Block 29 Development; May 2-5, 1988; M.L. Teers, T.M. Stroud, A.J. Masciopinto.
OTC 5809; Critical Points for the Project of Very Deep Subsea Completions; May 2-5, 1988; J.M. Formigli Filho, O.J.S. Ribeiro.
Oil & Gas Journal; Completion Techniques Report; B.F. Baugh; 1989.
Oil & Gas Journal; Offshore Report; B.F. Baugh; May 1989.
Concentric Tubing Hanger Designs for BP's Universal Subsea Wellhead; H.P. Hopper; undated.
SPE 23145; Installation of Concentric Subsea Completions From a Jack-Up in the Welland Field: A Case History; Sep. 3-6, 1991; R. O. Sanders (pp. 405-415) (15 sheets drawings).
SPE 23045; Snorre Subsea Tree and Completion Equipment; Sep. 3-6, 1991; J.D. Williams, S. Ytreland; (pp. 149-157).
SPE 16847; Equipment Selection Procedure for Subsea Trees; Sep. 27-30, 1987; J.D. Otten, N. Brammer; (pp. 121-130).
Mathias Owe; Div. Of Machine Design; Electrical Submersible Pump for Subsea Completed Wells; Dec. 1991; (pp. 2).
The Nordic Council of Ministers Program for Petroleum Technology; Electric Submersible Pump for Subsea Completed Wells; Nov. 26-27, 1991; S. Sangesland; (pp. 17).
Declaration of Roger Moore regarding the Amoco engineering study; 1989.
The American Oil & Gas Reporter; Special Report: Offshore & Subsea Technology; Horizontal Tree Gives Access to Subsea; Jun. 1996.
SPE 13976 Through Bore Subsea Christmas Trees; Sep. 1985; D.S. Huber, G. F. Simmers and C. S. Johnson.
OTC 7063 IUHUA11-1 Field Development; An Innovative Application of Technology; May 1992; A. R. Baillie and Jing Hui Chen.
National Well Control Systems—ARMCO National Supply Co.; 1982-83 Composite Catalog.
National Subsea Equipment; 1986-87 Composite Catalog.
HYDRILL Mechanical Products Division; 1986-87 Composite Catalog.
American Petroleum Institute; API Recommended Practice 17A Second Edition, Sep. 1996 (Effective Date: Dec. 1, 1996); Recommended Practice for Design and Operation of Subsea Production Systems.
Division of Petroleum Engineering and Applied Geophysics; NTH. Trondheim; Mar. 1990; A Simplified Subsea System Design; Sigbjorn Sangesland; (pp. 1-18).
Cameron Iron Works USA, Inc.; Subsea Completion System with Downhole—ESP Conceptual Design Study; Feb. 1990; (pp. AMO 02992—AMO 03130).
Document No. SSP-020-001 and 2; SISL Project Team; Subsea Submersible Pumping Project Task Series 1000 Equipment Evaluations; (p. KAS09939-KAS10023); Undated.
Document No. SSP-020-021; Subsea Intervention Systems Ltd.; Subsea Submersible Pumping Project; Final Report vols. 1, 2 and 3; (pp. KAS10024-KAS10678); Mar. 1992.
Cooper Oil Tool; Phillips Petroleum Company Ann Subsea Facility; TMH0445, Nov. 1991; (pp. CCH 36064-36223).
SISL Subsea Submersible Pumping (S.S.P.), Second Interim Report-Technical Jun. 1991, Project No. TH/03328/89; Projects of Technological Development in the Hydrocarbons Sector (Regulation EEC 3639/85); KAS 10837-10970; Jun. 1991.
Vetco Gray; Drawings of Shell Tazerka MSP Production Tree with Tubing Hanger Spool; (1 page); undated.
Cooper Cameron; Layout Drawing of Spool Tree Arrangement for Texaco; (1 page); undated.
Cooper Cameron; Drawing of ESP Tree Arrangement for Amoco; (1 page); Dec. 18, 1989.
Cooper Cameron; Drawings of Production System Assembly—Electrical Submersible Pump for Amoco Orient re: Liuhua 11-1; (2 pages); undated.
Framo Engineering; Drawings of ESP Subsea System; (2 pages); undated.
National Oilwell Bulletin No. 186; Mudline Subsea Completion Systems; (4 pages); 1991.
Letter from Kvaerner Oilfield Products dated Jan. 16, 1998 re: Spool Tree Continuation Patent Application.
Document No. SSP-020-004; Vetco Gray; Conceptual Design Report Task Series 2000; Jan. 1992.
John R. Keville letter to Lester L. Hewitt; Jan. 14, 1999 (2 p.).
Declaration of Sigbjorn Sangesland; Undated; (13 p.).
Subsea Production Technology; Oct. 23-29, 1989 and Nov. 20-24, 1989; (3 p.).
Subsea 91 International Conference, Delegate & Exhibitor List 1991 (7 p.).
Claim Chart for Claim 10; Undated; (3 p.).
Technical Opinion by Bruce C. Volkert; Jan. 10, 1999; (11 p.).
John R. Keville letter to Lester L. Hewitt; Feb. 5, 1999; (8 p.).
Claim Charts for Claims 16, 112, 110, 91; Undated; (8 p.).
Annotated Figures 1-3; Undated; (3 p.).
Cooper Cameron Admissions 152-153; Undated; (1 p.).
Deposition of Normal Brammer; Sep. 18, 1998; (5 p.).
Deposition of Peter Scott; Sep. 18, 1998; (5 p.).
Claim Charts for Claims 16, 112, 91 (4 p.).
Declaration of Sigbjorn Sangesland; Undated; (76 p.).
Claim Chart for Claim 110; Undated; (1 p.).
Cooper Cameron Admissions 126-133; Undated; (5 p.).
Deposition of Peter Doyle; Jul. 28, 1999; (pp. 131-142, 179-182).
Deposition of Norman Brammer; (pp. 159-166).
Memorandum and Order; Feb. 19, 1999; (29 p.).
Norwegian Petroleum Directorate regulations Table of Contents and Sections 23-27, (4 p.), Jan. 20, 1997.
Norwegian Petroleum Directorate guidelines Table of Contents and Sections 2.1.3-2.3.3 and 3.2.2-3.7.1, (7 p.), Feb. 7, 1992.
Continuations (2)
Number Date Country
Parent 09/092549 Jun 1998 US
Child 09/657018 US
Parent 08/204397 US
Child 08/679560 US