Well screen having an internal alternate flowpath

Information

  • Patent Grant
  • 6220345
  • Patent Number
    6,220,345
  • Date Filed
    Thursday, August 19, 1999
    25 years ago
  • Date Issued
    Tuesday, April 24, 2001
    23 years ago
Abstract
A well screen having an internal, blank alternate flowpath for delivering fracturing fluid/gravel slurry to different levels within a well annulus. The well screen includes an outer pipe which is positioned over a base pipe thereby forming an annulus therebetween. The circumference of each pipe has a perforated sector and a blank sector, both of which extend along their respective lengths. When assembled, the respective perforated sectors are aligned to form a perforated, production sector and the respective blank sectors are aligned to form the blank, alternate flowpath. The base pipe is wrapped with wire to prevent solids from flowing through the openings therein. Slurry is pumped into the annulus where it flows circumferently from the blank, alternate flowpath to exit into the well annulus through the openings in the perforated sector of the annulus.
Description




DESCRIPTION




1. Technical Field




The present invention relates to a well screen and in one of its aspects relates to a well screen for fracturing/gravel packing a well having an internal, alternate flowpath which, in turn, is formed between the aligned, blank sectors of two pipes.




2. Background of the Invention




In producing hydrocarbons or the like from certain subterranean formations, it is common to produce large volumes of particulate material (e.g. sand) along with the formation fluids, especially when the formation has been fractured to improve flow therefrom. This sand production must be controlled or it can seriously affect the economic life of the well. One of the most commonly-used techniques for controlling sand production is known as “gravel packing”. In a typical gravel pack completion, a screen is positioned within the wellbore adjacent the interval to be completed and a gravel slurry is pumped down the well and into the well annulus around the screen. As liquid is lost from the slurry into the formation and/or through the screen, gravel is deposited within the well annulus to form a permeable mass around the screen. This gravel (e.g. sand) is sized to allow the produced fluids to flow therethrough while blocking the flow of most particulate material into the screen.




A major problem in fracturing/gravel packing a well-especially where long or inclined intervals are to be completed lies in adequately distributing the fracturing fluid/gravel slurry (hereinafter referred to as “gravel slurry”) over the entire completion interval. That is, in order to insure an adequate “frac-pac” of a long completion and/or inclined interval, it is necessary for the gravel slurry to reach all levels within that interval. Poor distribution of the gravel slurry throughout the interval (i.e. along the entire length of the screen) typically results in (a) only a partial fracturing of the formation and (b) a gravel pack having substantial voids therein.




Poor distribution of the gravel slurry is often caused when carrier fluid from the slurry is lost prematurely into the more permeable portions of the formation and/or into the screen, itself, thereby causing “sand bridge(s)” to form in the well annulus around the screen before the formation has been adequately fractured and all of the gravel has been placed. These sand bridges effectively block further flow of the gravel slurry through the well annulus thereby preventing delivery of gravel to all levels within the completion interval.




To alleviate this problem, “alternate-path” well tools (e.g. well screens) have been proposed and are now in use which provide for the good distribution of gravel throughout the entire completion interval even when sand bridges form before all of the gravel has been placed. Such tools typically include perforated shunts or by-pass conduits which extend along the length of the tool and which are adapted to receive the gravel slurry as it enters the well annulus around the tool. If a sand bridge forms before the operation is complete, the gravel slurry can still be delivered through the perforated shunt tubes (i.e. “alternate-paths”) to the different levels within the annulus, both above and/or below the bridge. For a more complete description of a typical alternate-path well screen and how it operates, see U.S. Pat. No. 4,945,991, which is incorporated herein by reference.




In many prior-art, alternate-path well screens of the type described above, the individual shunts tubes are carried externally on the outer surface of the screen; see U.S. Pat. No. 4,945,991; 5,082,052; 5,113,935; 5,417,284; and 5,419,394. While this arrangement has proven highly successful, externally-mounted shunts do have some disadvantages. For example, by mounting the shunts externally on the screen, the effective, overall outside-diameter of the screen is increased. This can be very important especially when a screen is to be run into a relatively small-diameter wellbore where even fractions of an inch in its outer diameter may make the screen unusable or at least difficult to install in the well.




Another disadvantage in mounting the shunts externally lies in the fact that the shunts are exposed to damage during assembly and installation of the screen. If the shunt is crimped or otherwise damaged during installation, it can become totally ineffective in delivering the gravel to all of the levels in the completion interval which, in turn, may result in the incomplete fracturing/packing of the interval. Several techniques have been proposed for protecting these shunts by placing them inside the screen; see U.S. Pat. Nos. 5,341,880, 5,476,143, and 5,515,915. However, this can make the construction of such screens more sophisticated, if not more complicated, which, in turn, normally results in substantially higher production costs.




Recently, another alternate-path screen is disclosed and claimed in co-pending and commonly assigned, US patent application Ser. No. 09/290,605, filed Apr. 13, 1999 which simplifies the construction of a screen having an internal alternate flowpath. The screen disclosed therein is comprised of two concentric pipes, i.e. an inner base pipe and an outer pipe. A portion of the annulus which is formed between the two concentric pipes provides the alternate flowpath(s) for conveying gravel slurry to different levels within the completion interval.




Dividers (e.g. ribs) extend longitudinally within the annulus between the pipes to separate the alternate flowpath portion of the annulus from a perforated, production portion of the annulus. The outer surface of the outer pipe is wrapped with wire or the like to prevent sand from flowing into the production portion of the annulus. Openings are longitudinally-spaced along the outer pipe to provide outlets for the alternate flowpath whereby gravel slurry can be delivered from the alternate flowpath to different levels within the completion interval.




SUMMARY OF THE INVENTION




The present invention provides still another well screen which has an internal, alternate flowpath for delivering fracturing fluid/gravel slurry to different levels within a well annulus during a fracturing/gravel pack or “frac-pac” operation. The delivery of gravel directly to several different levels within the well annulus provides a much better distribution of the gravel throughout the completion interval especially when sand bridges form in the annulus before all of the gravel has been placed. By placing the alternate flowpath inside the screen, it is protected from damage and abuse during the handling and installation of the screen and does not increase the effective diameter of the screen.




More specifically, the well screen of the present invention is comprised of a larger-diameter, outer pipe which is positioned over a base pipe whereby an annulus (e.g. preferably less than about one inch in width) is formed between the two pipes. Preferably, the pipes are substantially concentric but in some instances they may be positioned slightly off-center wherein the annulus is slightly larger on one side than the other. The circumference of each pipe has a perforated sector (i.e. sector having openings therein) which subtends a central angle of “α” and a blank sector (i.e. sector which is devoid of openings) which extend along the lengths of the respective pipes. When the well screen is assembled and the base pipe is positioned within the outer pipe, the respective perforated sectors are radially aligned to form a perforated, production sector within the annulus between the pipes and the respective blank sectors are radially aligned to form a blank, alternate flowpath sector within the annulus.




The base pipe is wrapped with wire to allow the flow of fluids through the openings in the base pipe while blocking the flow of solids therethrough. An inlet is provided through the upper end of the annulus to allow gravel slurry to flow into the annulus between the pipes. The slurry flows into the blank, alternate flowpath sector of the annulus but, since there are no openings in this sector, the slurry can not exit directly into the well annulus. Accordingly, the slurry must first flow downward into the blank sector and then circumferentally into the perforated sector of the annulus from which, it can then exit into the well annulus to fracture the formation and/or to form the gravel pack.




As the slurry flows into the perforated sector, either directly or from the blank sector, carrier fluid begins to leak-off from the slurry into the formation and/or through the openings in the base pipe thereby causing the perforated sector to begin to fill with sand from the slurry. When this occurs, a “sand bridge” will have likely already been formed in the well annulus which, in the absence of an alternate flowpath, would block further flow of slurry through the well annulus and would likely result in an unsuccessful completion.




As the sand pack in the perforated sector of the present screen begins to build back into the blank, alternate flowpath sector of the annulus, the high viscosity (e.g. not less than about 20 centipoises) of the carrier fluid of the slurry greatly retards further circumferential leak-off through the built-up sand pack within the annulus. The continued pumping of the slurry will now force the slurry downward through the blank, alternate flowpath sector of the annulus to a different level within the annulus where no sand pack has yet formed. The alternate flowpath sector is kept open by the slow circumferential growth of the sand pack within the annulus and by the relatively high fluid velocity in the remaining open sector of the annulus.




Once the completion interval has been fractured and/or gravel packed and the well has been put on production, the produced fluids can now flow through the newly-placed gravel pack, through the production, perforated sector of the screen and into the base pipe to be produced to the surface. By being able to deliver fracturing fluid/gravel slurry directly to different levels within the completion interval through the blank, alternate flowpath of the present screen, there will be a better distribution of gravel throughout the entire completion interval, especially when sand bridges form in the well annulus before all of the gravel has been placed. Also, since the alternate flowpath is internally formed between the two pipes, the present screen is relatively simple in construction and relatively inexpensive to build and the flowpath is protected from damage and abuse during handling and installation of the screen.











BRIEF DESCRIPTION OF THE DRAWINGS




The actual construction, operation, and apparent advantages of the present invention will be better understood by referring to the drawings which are not necessarily to scale and in which like numerals identify like parts and in which:





FIG. 1

is an elevational view, partly in section and cutaway, of a well tool in accordance with the present invention in an operable position within a well;





FIG. 2

is a perspective view, partly cut-away, of a portion of the tool of

FIG. 1

; and





FIG. 3

is a cross-sectional view, taken along line


3





3


of FIG.


2


.











BEST KNOWN MODE FOR CARRYING OUT THE INVENTION




Referring more particularly to the drawings,

FIG. 1

illustrates the present well tool


10


in an operable position within the lower end of a producing and/or injection wellbore


11


. Wellbore


11


extends from the surface (not shown) and into or through formation


12


. Wellbore


11


, as shown, is cased with casing


13


having perforations


14


therethrough, as will be understood in the art. While wellbore


11


is illustrated as being a substantially vertical, cased well, it should be recognized that the present invention can be used equally as well in “open-hole” and/or underreamed completions as well as in horizontal and/or inclined wellbores. Well tool


10


(e.g. gravel pack screen) may be of a single length or it may be comprised of several joints (only the portion of the upper joint is shown) which are connected together with threaded couplings and/or blanks or the like as will be understood in the art.




As shown, a typical joint


15


of gravel pack screen


10


is comprised of a base pipe


17


which is positioned within a larger-diameter, outer pipe or shroud


18


. Preferably, the two pipes are concentrically positioned with respect to each other but in some instances the base pipe may be slightly off-center with respect to the outer pipe. When assembled for operation, base pipe


17


will be fluidly connected to the lower end of a workstring


16


which, in turn, extends to the surface (not shown). The respective diameters of base pipe


17


and outer pipe


18


are sized to provide an annulus


19


therebetween, the width of which is preferably small; e.g. less than about one inch and even more preferably from about ⅛ inch to about ¼ inch for most typical completions.




Base pipe


17


has a perforated sector (i.e. that sector of the circumference of base pipe


17


which subtends central angle “α”, see

FIG. 3

) and a blank sector (the remaining sector of the circumference of base pipe


17


which subtends central angle “β”), both of these sectors extending substantially along the effective length of base pipe


17


. Only the perforated sector has openings (i.e.


17




a


) therein with the blank sector being completely devoid of openings. While central angle “α” may vary widely depending on the particular completion involved, preferably “α” is equal to less than about 180° of the total circumference of base pipe


17


. That is, base pipe


17


is perforated about less than 180° of its circumference. However, in some completions where relatively large-diameter pipes (e.g. outer pipe


18


having a 4 inch O.D. or larger) are used, “α” may need to exceed 180°.




In most typical completions, “α” will be significantly less that 180° (e.g. less than about 45°) and in some completions, the perforated sector of base pipe


17


may consist of a single row of openings


17




a


which would be longitudinally-spaced, one above the others along the length of base pipe


17


. Again, the remaining blank sector of the circumference of base pipe


17


(subtending angle “β”

FIG. 3

) is solid along its length and has no perforations or openings therein.




Outer pipe


18


is similar to base pipe


17


in that it also has a perforated sector (i.e. that sector of the circumference of outer pipe


18


which subtends central angle “α”, see

FIG. 3

) and a blank sector (the remaining sector of the circumference of outer pipe


18


which subtends central angle “β”); both of these sectors extending substantially along the effective length of outer pipe


18


. Again, only the perforated sector of outer pipe


18


has any openings (i.e.


18




a


) therein with the blank sector being devoid of any openings. Openings


18




a


are large enough to allow the unrestricted flow of both fluids and particulates (e.g. sand) therethrough; hence, slurry can easily flow through the openings


18




a


in outer pipe


18


.




As best seen in

FIG. 3

, when base pipe


17


is assembled within outer pipe


18


, the openings


17




a


in base pipe


17


will effectively be radially-aligned with openings


18




a


in outer pipe


18


to thereby provide a “perforated, production sector”, through which slurry can exit into the well annulus during the completion operation and through which the produced fluids can flow into screen


10


after the well interval has been completed, this being more fully discussed below. At the same time, the remaining blank sector of outer pipe


18


subtending angle “β” aligns with the blank sector of base pipe


17


to provide a “blank, alternate flowpath” through which the slurry can be delivered to different level within the completion interval.




The upper and lower ends of annulus


19


are effectively open to allow slurry to readily flow into the annulus. Preferably, caps or plates


22


(only top plate shown) or the like, having openings


23


therethrough, are secured to both the inner and outer pipes and act as spacers to thereby maintain the pipes in their spaced, concentric relationship. The openings


23


through top plate


22


which lie over the blank sector provide a direct inlet for a fracturing fluid/gravel slurry into the blank sector of annulus


19


(i.e. “alternate flowpath” of the screen). Also, the upper portions of base pipe


17


and outer pipe


18


can be extended for length


17




b


,


18




b


, respectively, above the upper end of the perforated sector of annulus


19


wherein the entire circumferences of both pipes are unperforated; i.e. annulus


19


is unperforated or blank at its upper end above the perforated sector therein. This allows slurry to freely flow into annulus


19


even if a bridge should quickly form in well annulus


35


adjacent the top of the screened section of tool


10


.




In assembling the well tool


10


, both the base pipe


17


and the outer pipe


18


, respectfully, are perforated to provide openings throughout their respective perforated sectors which subtend the central angle “α” as described above. Again, the size of the central angle “α” will depend on the particular interval to be completed. For example, if large production is expected from a particular interval, a greater sector of the respective pipes will be need to be perforated (hence a greater angle “α”) than where lesser production is predicted. Also, to alleviate erosion of these openings during a fracturing/gravel pack operation, a hardened insert (not shown) may be secured in the appropriate openings; see U.S. Pat. No. 5,842,516, issued Dec. 1, 1998, and incorporated herein by reference.




Once openings


17




a


have been provided in the perforated sector of base pipe


17


, a continuous length of a wrap wire


30


is wound around its outer surface. Each coil of the wrap wire


30


is slightly spaced from the adjacent coils to form gaps or fluid passageways (not shown) between the respective coils of wire as is commonly done in commercially-available, wire-wrap screens, e.g. BAKERWELD Gravel Pack Screens, Baker Sand Control, Houston, Tex. This allows fluids to readily flow from annulus


19


through the openings


17




a


and into base pipe


17


while effectively blocking the flow of solids (e.g. sand) therethrough. While base pipe


17


has been illustrated as being a wire-wrapped pipe, it should be understood that other known elements used to allow the flow of fluids while blocking the flow of solids can be used as a base pipe, e.g. slotted liners having properly-sized slots, screen material other than wire to cover openings


17




a


, etc.




Outer pipe


18


is positioned over base pipe


17


and the two are held in a spaced relationship by perforated plates


22


(only top plate shown) or the like. At least one inlet


23


is aligned so as to provide an inlet into the blank sector or “alternate flowpath” sector of annulus


19


. It will be understood that if more than one length or joint


15


of well screen


10


is used in a particular completion, the outlet from the annulus of an upper joint which will be fluidly-connected to the inlet


23


on an adjacent lower joint so that the alternate flowpath will be continuous throughout the entire length of the well screen


10


.




In operation, screen


10


is assembled and lowered into wellbore


11


on workstring


16


until it is positioned adjacent formation


12


and packer


28


is set, as will be understood in the art. Fracturing/gravel slurry (arrows


33


) is pumped down the workstring


16


and out ports


32


in “cross-over”


34


. The slurry


33


will flow through inlet


23


in plate


22


directly into the blank, alternate flowpath sector “α” of annulus


19


. In some instances, the entire flow of slurry


33


may be directed into the top of annulus


19


(e.g. inlet(s)


23


) through a manifold


37


or the like. In other completions, the slurry


33


may also be directed simultaneously (a) into the well annulus


35


which surrounds well screen


10


, as is typical in prior-art completions of this type.




As the slurry


33


(e.g. a carrier fluid having particulates such as sand suspended therein) flows into the annulus


19


, it can not exit from the blank, alternate flowpath sector directly into the well annulus


35


since the outer pipe


18


has no openings in this sector. Accordingly, for the blank sector of annulus


19


to effectively act as an alternate flowpath for the slurry, it is necessary to retard the rate of loss of carrier fluid from the slurry while it is in the blank sector of annulus


19


and as the slurry flows circumferentially from the blank sector into the perforated sector of annulus


19


. This is preferably accomplished by using a viscous carrier fluid to form the slurry (i.e. a fluid having a viscosity of not less than about 20 centipoises at a shear rate of 100 reciprocal seconds). Of course, the viscosity of the carrier fluid may be substantially higher (i.e. hundreds or even thousands of centipoises) as needed to retard the rate of fluid loss from the slurry.




As the slurry flows into the perforated sector of annulus


19


either directly from cross-over


34


or circumferentally from the alternate flowpath sector of annulus


19


, the slurry will flow out openings


18




a


in outer pipe


18


and into the well annulus


35


where the slurry will fracture the formation


12


and the sand therein will prop the formation and/or be deposited in the well annulus


35


to form a gravel pack around tool


10


. Also, as the slurry flows into the perforated sector of annulus


19


, the carrier fluid begins to leak-off into the formation or through openings


17




a


in base pipe


17


. This causes the perforated sector of annulus


19


to begin to fill with the sand from the slurry. As this occurs, a “sand bridge” will have likely already been formed in well annulus


35


.




As the sand pack in the perforated sector begins to build back into the blank sector of annulus


19


, the high viscosity of the carrier fluid in the slurry greatly retards further circumferential leak-off through the built-up sand pack within annulus


19


. Now, the continued pumping of slurry into the blank sector of the annulus


19


forces the slurry downward to a location where the sand pack has not yet formed within the perforated sector of the annulus


19


thereby effectively extending the length of the completion interval within well annulus


35


.




The alternate flowpath sector of annulus


19


is kept open by the slow circumferential growth of the sand pack within annulus


19


and by the relatively high fluid velocity in the remaining open sector of the annulus


19


. Thus an alternate flowpath is formed and maintained within annulus


19


by hydraulics which continuously divert the slurry on downstream within annulus


19


much in the same manner as is done mechanically by the perforated, shunt tubes in prior art, alternate-path screens of this type.




It is noted that in some cases, the leak-off of the carrier fluid from the slurry may continue along the blank, alternate flowpath sector of annulus which, in turn, may eventually close or bridge off, thereby blocking any further flow of slurry therethrough. Accordingly, the present invention will likely find greater use in completing relatively shorter intervals (e.g. about 150 feet or less) than those capable of being completed with screens which use shunt tubes to form the alternate paths for the slurry. However, the actual length that can be completed with the present screen may be extended by (a) raising the viscosity of the carrier fluid used in the slurry; (b) decreasing the size and permeability of the sand in the slurry; (c) increasing the pump rate of the slurry; (d) decreasing the width of annulus


19


, and etc.




Further, the construction of the perforated sector of base pipe


17


can also have an influence on the length of interval which can be completed with the present invention. That is, if the leak-off of carrier fluid through the openings in base pipe


17


can be limited, the length of the completion interval can be increased. For example, wire wrap


30


is preferably wound directly onto base pipe


17


, as herein illustrated, instead of onto spacers which are typically used in prior screens of this type. This prevents carrier fluid within the blank sector of annulus


19


from leaking between the coils of wire and around base pipe


17


to be lost into the perforated sector of the annulus.




Even where the wire


30


is wound directly around the surface of base pipe


17


, leak-off of carrier fluid from slurry in the blank sector of annulus


19


can be further retarded by filling the gaps (i.e. flow passages) between the coils of wire


30


which lie in the blank sector with a sealant (e.g. epoxy, tar, etc.) to thereby block any incidental flow of carrier fluid between the coils and around the base pipe into the perforated sector of annulus


19


. Still further, the size and number of openings


17




a


in base pipe


17


or the slots in a slotted liner, where such a liner is used as the base pipe, can be limited to the minimum required to handle the expected production of fluids once a well has been completed and has been put on production.




Once the well interval has been completed, the cross-over


34


and workstring


16


are removed and are replaced with a string of production tubing (not shown). The fluids from formation


12


will flow through perforations


14


in casing


13


, through the newly-placed gravel pack (not shown), through openings


18




a


in outer pipe


18


, between the coils of wire


30


, through openings


17




a


and into base pipe


17


to then be produced to the surface through the production tubing. It will be recognized that at this time, annulus


19


between the pipes may also be filled with sand but this will not be a problem since the sand pack within annulus


19


will allow the screen


10


to act much in the same way as a “pre-packed” screen in that the sand in the annulus


19


will allow the produced fluids to readily flow therethrough while at the same time aid in blocking the flow of any unwanted particulates into base pipe


17


.



Claims
  • 1. A well screen comprising:a base pipe having (a) a perforated sector of its circumference subtending a central angle α and extending along substantially the length of the base pipe, said perforated sector of said base pipe having openings therein and (b) a blank sector of its circumference subtending a central angle β and extending substantially the length of said base pipe, said second sector being blank and devoid of openings; an outer, larger-diameter pipe positioned over said base pipe thereby forming an annulus therebetween, said outer pipe having (a) a perforated sector of its circumference substantially subtending said central angle α and extending substantially the length of said outer pipe, said perforated sector of said outer pipe having openings therein and (b) a blank sector of its circumference substantially subtending said central angle β and extending substantially the length of said outer pipe, said blank sector of said outer pipe being blank and devoid of openings; said perforated sector and said blank sector of said outer pipe being radially-aligned with said perforated sector and said blank sector of said base pipe, respectively, when said pipes are assembled to thereby provide a perforated, production sector and an blank, alternate flowpath sector, respectively, within said annulus; means for allowing flow of fluids through the openings in said perforated sector of said base pipe while blocking flow of solids therethrough; and an inlet at the upper end of said annulus for allowing flow of a slurry containing solids into said annulus wherein said slurry will flow circumferentally from said blank, alternate flowpath sector, into said perforated, production sector of said annulus, and out said openings along the length of said perforated sector of said outer pipe.
  • 2. The well screen of claim 1 wherein said central angle a is less than 180°.
  • 3. The well screen of claim 1 wherein said central angle α is less than 45°.
  • 4. The well screen of claim 1 wherein the width of said annulus is less than about one inch.
  • 5. The well screen of claim 4 wherein the width of said annulus is between about ⅛ inch and about ¼ inch.
  • 6. The well screen of claim 1 wherein said pipes are concentrically-positioned in relation to each other.
  • 7. The well screen of claim 1 wherein said means for allowing flow of fluids through said openings in said base pipe comprises:a continuous length of wire coiled around the circumference said base pipe wherein each coil of said wire is spaced from the adjacent coils to thereby provide fluid passages between the coils of wire.
  • 8. The well screen of claim 7 including:means for sealing the portions of said fluid passage between said coils of wire which lie within said blank, alternate flowpath sector of said annulus.
  • 9. The well screen of claim 1 wherein said slurry comprises:a liquid having a viscosity of not less than about 20 centipoises; and particulates.
US Referenced Citations (10)
Number Name Date Kind
4945991 Jones Aug 1990
5107927 Whiteley et al. Apr 1992
5113935 Jones et al. May 1992
5333688 Jones et al. Aug 1994
5341880 Thorstenson et al. Aug 1994
5355949 Sparlin et al. Oct 1994
5413180 Ross et al. May 1995
5419394 Jones May 1995
5476143 Sparlin et al. Dec 1995
5515915 Jones et al. May 1996