The present invention is directed generally to methods of separating water and solids from oil and gas and more particularly to a wellbore completion design that separates water and solids from oil and gas downhole in such a way that the water and solids remain downhole. These solids will usually consist of granular to very fine sized formation solids, or solids introduced into the well during drilling, completion, stimulation, or production operations.
One of the most burdensome aspects of producing hydrocarbons from a well for well operators is dealing with the presence of solids and water in the hydrocarbons. It is not desirous to have either of these by-products present in the hydrocarbons. Indeed, the presence of these elements in hydrocarbons only inhibits their recovery, often to the degree that economics will force an operator to suspend or even abandon well production. Accordingly, well operators have had to develop techniques for removing or separating the sand and water from the hydrocarbons as nature itself in most wells lends no assistance in this regard. Many of the techniques developed to deal with the removal of these elements, however, are cumbersome, expensive, not always environmentally friendly and often involve complex processes and equipment.
One conventional technique for removing sand from the hydrocarbons is to install sand screens at the end of the production pipe or inside the wellbore through the producing interval. These sand screens typically comprise multiple layers of wire mesh. The pore sizes of these screens are usually selected to filter out or remove as many granules of sand present in a particular formation as possible. Thus, the screens can be, and often are, customized for a particular application. Thus, one screen does not usually “fit all.” Accordingly, well operators are required to learn as much about the nature of the formations they will be producing from to insure that they select the right sand screen to filter out as much of the sand as possible.
There are two major drawbacks to using sand screens for removing sand from hydrocarbons. First, over time the sand screens begin to plug up. This causes a decrease in the amount of hydrocarbons being produced. Eventually, the sand screens plug up entirely, requiring either removal of the sand screen or invocation of an operation to clean the sand screens, downhole. Typically, either operations will require the well to be shut down, which in turn ceases the production of hydrocarbons, and causes an additional economic loss to the well owner. Another major drawback of using sand screens attached to the production tubing is that eventually sand bridges form between the sand screen and the wellbore wall. These sand bridges block the flow of remedial treatment fluids, which occasionally need to be pumped downhole through the annulus between the production tubing and the wellbore. To unblock the sand bridges, the well often has to be shut down so that the sand screen can be removed for cleaning. This again results in an economic loss to the well owner.
Another technique for removing sand and other debris from the hydrocarbons being produced from a well is to employ a device at the surface, known as a separator; in some cases, specifically a sand separator. This technique involves producing the sand with the hydrocarbons. A drawback of this approach, however, is that the separator devices take up space at the surface, which is often limited in off-shore applications. Furthermore, it reduces the producing rate of the well, requires repeated cleaning or maintenance, and may be a separate additional device needed additional to a water separator system.
Water is usually removed from the hydrocarbons at the surface using multi-phase separation devices. These devices operate to agglomerate and coalesce the hydrocarbons, thereby separating them from the water. A drawback of this approach, however, is that no separation process is perfect. As such, some amount of the hydrocarbons always remains in the water. This can create environmental problems when disposing of the water, especially in off-shore applications. Also, the multi-phase separation devices are fairly large in size, which is another disadvantage in off-shore applications, as space is limited as pointed out above. Another limitation is that this can require additional maintenance or repair if solids are part of the produced fluid stream.
The present invention is directed to a wellbore configuration that separates water and solids from oil and gas downhole in such a way that the water and solids remain downhole.
In one embodiment, the present invention is directed to a method of separating other fluids and solids from hydrocarbons being produced from a subterranean formation. The method comprises the step of forming a primary wellbore having a deviated section in the subterranean formation, which stimulates convective separation of the other fluids and solids from the hydrocarbons during production of the hydrocarbons from the subterranean formation. The method may include the additional step of forming a secondary bore, which intersects the deviated section of the primary wellbore at an acute angle into which is accumulated one or more of the other fluids and solids separated from the hydrocarbons. The present invention may further comprise the step of drilling a tertiary bore, which intersects the secondary bore at an acute angle such that the solids accumulate in the secondary bore and the fluids accumulate in the tertiary bore. In yet another aspect of the present invention, perforations and/or fractures may be formed in either the secondary bore or the tertiary bore and a pump may be employed to pump the fluids back into the formation.
In another embodiment, the present invention is directed to an improved wellbore design, which is adapted to separate other fluids and solids from hydrocarbons being produced from the subterranean formation. The wellbore comprises a primary bore having a deviated section, which stimulates convected separation of the other fluids and solids from hydrocarbons during production of the hydrocarbons from the subterranean formation. The wellbore according to the present invention may further comprise a secondary bore, which intersects the deviated section of the primary wellbore at an acute angle and which accumulates one or more of the other fluids and/or solids separating the hydrocarbons. In yet another embodiment, the wellbore according to the present invention may further comprise a tertiary bore which intersects the secondary bore at an acute angle and a pump for pumping the fluids back into the formation.
The features and advantages of the present invention will be readily apparent to those skilled in the art upon a reading of the description of the exemplary embodiments that follows.
A more complete understanding of the present disclosure and advantages thereof may be acquired by referring to the following description taken in conjunction with the accompanying drawings, which:
The present invention is directed to a wellbore completion design that separates water and solids from oil and gas downhole in such a way that the water and solids remain downhole.
The details of the wellbore completion design in accordance with the present invention will now be described with reference to the accompanying drawings. Turning to
The wellbore 10 is formed in subterranean formation 22 by conventional drilling or equivalent techniques. Subterranean formation 22 in turn comprises an inactive or dead zone 24, a producing zone 26, and a water containing zone 28. As can be seen from
The vertical section 16 of the primary bore 12 of the wellbore 10 may be lined with a casing string 30, which may be cemented 32 to the dead zone 24 of the subterranean formation 22. This step can be accomplished using conventional casing techniques. The deviated section 18 of the primary bore 12 and the horizontal section 20 of the primary bore 12 may also be lined with a casing string, which may also be cemented to the subterranean formation 22. Those of ordinary skill in the art will appreciate the circumstances under which the various sections of the primary bore 12 should be lined with a casing string and whether the casing string should be cemented to the subterranean formation 22.
The horizontal section 20 of the primary bore 12 is the main section from which the hydrocarbons will be drawn from the subterranean formation. This can be accomplished through several well known techniques. For horizontal wellbores, the most common method currently is to leave the drilled wellbore in this section as an open hole without casing or liner; or by using a liner where the annulus between the formation and the liner is not cemented. This allows the free flow of formation fluids into the openhole. In some wells, the deviated section 18 and the horizontal section 20 have a cemented casing. If a non-cemented liner is used, at least some portions of this liner may contain sections of the pipe that are pre-slotted or have pre-drilled perforations, as is well understood by those skilled in the art. In the case of using a solid liner or a cemented casing, after placement into sections 18 and 20, the liner or the casing and cement sheath will usually be connected to the reservoir 26 by forming a plurality of perforations along the length of the horizontal section 20 (and possibly deviated section 18 also) of the primary bore 12. This can be accomplished by any one of a number of techniques, including, e.g., but not limited to, conventional explosive charge perforating techniques or by hydrajetting the perforations. In some cases, this may be followed by conventional damage removal or stimulation techniques such as acidizing or hydraulic fracturing. It may be desirable that all or a substantial portion of the deviated section 18 of the primary bore 12 not be perforated or fractured. Indeed, it is in this section that the convective separation of the hydrocarbons from other fluids and solids can most easily take place. The presence of perforations and/or fractures in this region may interfere with this process. To facilitate this convective separation, which will be explained immediately below, at least a significant length (possibly about one hundred feet (100 ft)) of the deviated section 18 of the primary bore 12 should not be perforated. Furthermore, to facilitate the separation process, the deviation section 18 of the primary bore 12, should be oriented at an acute angle α to the horizontal, which is designated by reference number 34. The horizontal line 34 generally forms an approximate right angle with the vertical section 16. The acute angle α is desirably within the range of about 20° to about 70°, and more desirably about 30° to about 60°.
The convective separation process in accordance with present invention is best illustrated in
It may be desirable to line the secondary bore 14 with a section of casing string 36, which may be cemented 38 to the subterranean formation 22 as required, so as to prevent the seepage of additional water into the secondary bore 14. It may also be desirable to form perforations 40 and possibly also fractures 42 in the subterranean formation 22, which intersect, and thereby communicate, with the secondary bore 14, as shown in
The embodiment of the present invention shown in
Another wellbore completion design in accordance with the present invention is illustrated in
In another embodiment of the present invention, the deviated section 18 of the wellbore 10 serves both to separate the water and sand from the oil and gas and also to accumulate the water and sand. There is no secondary bore 14 or tertiary bore 48 in this embodiment. In order to effectively accumulate the water and sand in this configuration, therefore, it is desirable that the deviated section 18 of the wellbore 10 be unperforated and unfractured. This will thereby prevent the seepage of water and other elements into the wellbore 10, which may interfere with the production of the hydrocarbons and the accumulation of the separated elements. In one exemplary version of this embodiment, the deviated section 18 of the wellbore is about one hundred feet (100 ft) or more, as noted above. It is particularly important that the unperforated portion of the deviated section 18 of the wellbore, which is used for the separation of the water and sand from the hydrocarbons, be of sufficient length that it does not become plugged before desired. Furthermore, as also noted above, the deviated section 18 of the wellbore 10 is desirably formed at an acute angle α to the horizontal 34, which is desirably within the range of about 30° to about 60°, and more desirably about 45°.
As those of ordinary skill in the art will appreciate, the present invention has application in virtually any type of well. For example, it can be used in multilateral wells and wells with fish bones as well as other wells not mentioned herein. Therefore, the present invention is well adapted to attain the ends and advantages mentioned as well as those that are inherent therein. While numerous changes may be made by those skilled in the art, such changes are encompassed within the spirit of this invention as defined by the appended claims