Wind power consumption method of virtual power plant with consideration of comprehensive demand responses of electrical loads and heat loads

Information

  • Patent Grant
  • 11994111
  • Patent Number
    11,994,111
  • Date Filed
    Saturday, March 19, 2022
    2 years ago
  • Date Issued
    Tuesday, May 28, 2024
    29 days ago
Abstract
The present invention discloses a wind power consumption method of a virtual power plant with consideration of comprehensive demand responses of electrical loads and heat loads, which comprises: establishing a wind turbine output model, so as to obtain a wind power prediction curve; establishing heat load demand models before/after demand responses and heat supply equipment output models before/after the demand responses, so as to obtain the abandoned wind quantities per moment before/after the demand responses and the total abandoned wind quantities before/after the demand responses; judging that whether consumption is promoted or not according to the total abandoned wind quantities before/after the demand responses; and establishing a storage battery capacity model and judging the charging/discharging state and the charging/discharging capacity of a storage battery.
Description
CROSS REFERENCES TO RELATED APPLICATIONS

The present application claims foreign priority of Chinese Patent Application No. 202110296018.0, filed on Mar. 19, 2021 in the China National Intellectual Property Administration, the disclosures of all of which are hereby incorporated by reference.


TECHNICAL FIELD

The present invention belongs to field of consumption of abandoned wind, and particularly relates to a wind power consumption method of a virtual power plant with consideration of comprehensive demand responses of electrical loads and heat loads.


BACKGROUND OF THE PRESENT INVENTION

Clean energy is greatly developed due to environmental protection and renewability thereof, but at the same time, a lot of problems are caused, wherein due to the characteristics of randomness and volatility of wind power, a power grid is impacted by wind power integration; and the energy utilization rate is lower. Therefore, a wind power consumption method is studied, which has great significance for reducing abandoned wind.


Comprehensive energy scattered in a region is gathered and controlled by a virtual power plant through an advanced communication technology, so that a power generation and distribution system with excellent controllability is formed, and an effective way is provided for wind power consumption. Due to the continuous growth of various types of loads represented by electrical loads and heat loads in the power generation and distribution system, the operation of the virtual power plant needs to be coordinated and optimized. As controllable loads participate in demand responses, the economy of the system can be improved; the energy consumption capacity of the virtual power plant can also be improved; and the problem of local consumption of abandoned wind is alleviated. Therefore, it is necessary to consider comprehensive demand responses of various loads, such as comprehensive demand responses of the electrical loads and the heat loads, in order to effectively promote the wind power consumption of the virtual power plant.


SUMMARY OF PRESENT INVENTION

The present invention aims to provide a wind power consumption method of a virtual power plant with consideration of comprehensive demand responses of electrical loads and heat loads for the operation cost of the virtual power plant.


The present invention provides a method for consuming wind power, considering the comprehensive of demand response of electrical load and heat load. The method includes the following steps:

    • establishing a wind turbine power model to obtain a wind power prediction curve;
    • establishing a pre-demand-response heat load demand model and a pre-demand-response electrical boiler output model; determining a pre-demand-response heat load demand based on the pre-demand-response heat load demand model; calculating a pre-demand-response wind power consumption of the electrical boiler according to the pre-demand-response electrical boiler output model and the pre-demand-response heat load demand; calculating a pre-demand-response abandoned wind power per moment and a pre-demand-response total abandoned wind power according to the wind power prediction curve, the pre-demand-response electrical load demand, and the pre-demand-response wind power consumption of the electrical boiler;
    • establishing a post-demand-response heat load demand model and a post-demand-response electrical boiler output model; determining a post-demand-response heat load demand based on the post-demand-response heat load demand model; calculating a post-demand-response wind power consumption of the electrical boiler according to the post-demand-response electrical boiler output model and the post-demand-response heat load demand;
    • calculating a post-demand-response electrical load; calculating a post-demand-response abandoned wind power per moment and a post-demand-response total abandoned wind power according to the wind power prediction curve, the post-demand-response electrical load demand, and the post-demand-response wind power consumption of the electrical boiler; then obtaining a difference value between the pre-demand-response total abandoned wind power and the post-demand-response total abandoned wind power; promoting wind power consumption if the difference value is greater than 0; and
    • establishing a storage battery capacity model; determining a charging-discharging state and a charging-discharging capacity of the storage battery according to the storage battery capacity model and the post-demand-response abandoned wind power per moment.


The wind turbine output model is:








g
WPP

(
t
)

=

{




0
,





v
t



v

i

n












v
t

-

v

i

n





v
R

-

v

i

n





g

,





v

i

n




v
t



v
R







g
,





v
R



v
t



v
out







0
,





v
t



v
out










Where, g represents a rated power of the wind turbine; vin represents a cut-in wind speed of the wind turbine; vR represents a rated wind speed of the wind turbine; vout represents a cut-out wind speed of the wind turbine; vt represents a real-time wind speed of the wind turbine at time t; t denotes the specific moment; and gWPP(t) represents an actual output of the wind turbine at time t.


The actual output of the wind turbine meets the following constraint condition:

gWPPmin≤gWPP(t)≤gWPPmax


Where, gWPPmin represents a lower power limit of the wind turbine, and gWPPmax represents an upper power limit of the wind turbine.


The pre-demand-response heat load demand model is:








Q
heart
1

(
t
)

=





t
=
1

24




(



C
air



ρ
air


NSH

+


KA


)



(


T
PMV
1

-


T
out

(
t
)


)



-

Q
inc

-

Q
inh






Where, Qheart1(t) represents the pre-demand response heat load demand; ∂ represents a modified temperature difference factor of an envelope enclosure; K represents a heat transfer coefficient of the envelope enclosure; A represents an area of the envelope enclosure; Tout(t) represents an outdoor temperature at time t; Cair represents a specific heat capacity of air; ρair represents an air density; N represents an air change rate; S represents an area of a building; H represents an indoor height of the building; Qine represents a calorific value of an electrical equipment; Qinh represents a calorific value of a human body; and TPMV1 represents a pre-demand-response set indoor temperature.


The pre-demand-response set indoor temperature TPMV1 is obtained by the following formula:







T
PMV
1

=


T
S

-



M

(

2.43
-

λ
PMV
1


)



(


I
cl

+
0.1

)


3.76






Where, Ts represents a human skin temperature in a normal temperature state; M represents a human energy metabolism rate; λPMV1 represents an initial PMV (Predicted Mean Vote) index; and Icl represents a dress heat resistance.


The pre-demand-response electrical boiler output model is:

QEB1(t)=gEB1(t)·ηEB


Where, QEB1(t) represents a pre-demand-response heat supply of the electrical boiler at the time t; gEB1(t) represents the pre-demand-response wind power consumption of the electrical boiler at time t; and ηEB represents an electricity-heat conversion efficiency.


A pre-demand-response actual output of the electrical boiler meets the following constraint condition:

QEB1min≤QEB1(t)≤QEB1max


Where, QEB1min represents a pre-demand-response lower power limit of the electrical boiler; QEB1max represents a pre-demand-response upper power limit of the electrical boiler; and QEB1(t) represents the pre-demand-response actual output of the electrical boiler at the moment t.


QEB1(t) is equal to Qheart1(t); and an pre-demand-response output of the electrical boiler at time t is obtained based on the pre-demand-response heat load demand Qheart1(t), and then the pre-demand-response wind power consumption gEB1(t) of the electrical boiler is obtained based on the pre-demand-response electrical boiler output model.


The pre-demand-response abandoned wind power per moment and the pre-demand-response total abandoned wind power are obtained by the following formulas, respectively:









g
W
1

(
t
)

=



g
WPP

(
t
)

-


g
E
1

(
t
)

-


g
EB
1

(
t
)







g
W
1

=




t
=
1

24




g
W
1

(
t
)







Where, gW1 represents the pre-demand-response total abandoned wind power; gW1(t) represents the pre-demand-response abandoned wind power at time t; gE1(t) represents the pre-demand-response electrical load demand at time t; and gEB1(t) represents the pre-demand-response wind power consumption of the electrical boiler.


The post-demand-response heat load demand model is:








Q
heart
2

(
t
)

=





t
=
1

24




(



C
air



ρ
air


NSH

+


KA


)



(


T
PMV
2

-


T
out

(
t
)


)



-

Q
inc

-

Q
inh






Where, Qheart2(t) represents the post-demand response heat load demand; TPMV2 represents a post-demand-response set indoor temperature; ∂ represents the modified temperature difference factor of an envelope enclosure; K represents the heat transfer coefficient of the envelope enclosure; A represents the area of the envelope enclosure; Tout(t) represents the outdoor temperature at time t; Cair represents the specific heat capacity of air; ρair represents the air density; N represents the air change rate; S represents the area of a building; H represents the indoor height of the building; Qine represents the calorific value of the electrical equipment; Qinh represents the calorific value of the human body.


The post-demand-response set indoor temperature TPMV2 is obtained by the following formula:







T
PMV
2

=


T
S

-



M

(

2.43
-

λ
PMV
2


)



(


I
cl

+
0.1

)


3.76






Where, Ts represents the human skin temperature in normal temperature state; M represents the human energy metabolism rate; λPMV2 represents the initial PMV index; and Icl represents the dress heat resistance.


The post-demand-response electrical boiler output model is:

QEB2(t)=gEB2(t)·ηEB


Where, QEB2(t) represents a post-demand-response heat supply of the electrical boiler at the time t; gEB2(t) represents the post-demand-response wind power consumption of the electrical boiler at time t; and ηEB represents an electricity-heat conversion efficiency.


A post-demand-response actual output of the electrical boiler meets the following constraint condition:

QEB2min≤QEB2(t)≤QEB2max


Where, QEB2min represents a post-demand-response lower power limit of the electrical boiler; QEB2max represents a post-demand-response upper power limit of the electrical boiler; and QEB2(t) represents the post-demand-response actual output of the electrical boiler at the moment t.


QEB2(t) is equal to Qheart2(t); and an post-demand-response output of the electrical boiler at time t is obtained based on the post-demand-response heat load demand Qheart2(t), and then the post-demand-response wind power consumption gEB2(t) of the electrical boiler is obtained based on the post-demand-response electrical boiler output model.


The demand of the post-demand-response electrical load demand is obtained by following steps:

    • calculating variations of the post-demand-response electrical load per moment by the following formulas:









Δ



g
on

(
t
)


=


e
on

×


g
on

(
t
)

×


Δ



P
on

(
t
)




P
on

(
t
)




,

t


T
on








Δ



g

min

d


(
t
)


=


e

min

d


×


g

min

d


(
t
)

×


Δ



P

min

d


(
t
)




P

min

d


(
t
)




,

t


T
mind








Δ



g
off

(
t
)


=


e
off

×


g
off

(
t
)

×


Δ



P
off

(
t
)




P
off

(
t
)




,

t


T
off









    • where, Δgon(t), Δgmind(t) and Δgoff(t), respectively, represents a variation of the post-demand-response electrical load at the peak period, the flat period, and the valley period of power consumption; gon(t), gmind(t) and goff(t), respectively, represents the pre-demand-response electrical load at the peak period, the flat period, and the valley period of power consumption; Pon(t), Pmind(t) and Poff(t), respectively, represents the pre-demand-response energy consumption at the peak period, the flat period, and the valley period of power consumption; ΔPon(t), ΔPmind(t) and ΔPoff(t), respectively, represents a variation of energy consumption at the peak period, the flat period, and the valley period of power consumption; eon, emind and eoff, respectively, represents an elastic coefficient of energy consumption at the peak period, the flat period, and the valley period of power consumption; and Ton represents the peak period of energy consumption, Tmind represents the flat period of energy consumption, and Toff represents the valley period of energy consumption; and

    • obtaining the post-demand-response electrical load per moment gEB2(t) by adding variations of the post-demand-response electrical load per moment and the pre-demand-response electrical load per moment gEB1(t).





The post-demand-response abandoned wind power per moment and the post-demand-response total abandoned wind power are respectively obtained by the following formulas:









g
W
2

(
t
)

=



g
WPP

(
t
)

-


g
E
2

(
t
)

-


g
EB
2

(
t
)







g
W
2

=




t
=
1

24




g
W
2

(
t
)







Where, gW2 represents the post-demand-response total abandoned wind power; gW2(t) represents the post-demand-response abandoned wind power at time t; gE2(t) represents the post-demand-response electrical load demand at time t; and gEB2(t) represents the post-demand-response wind power consumption of the electrical boiler at time t.


The storage battery capacity model is:

Ssoc(t)=Ssoc(t−1)+(Sch(t)−Sdis(t))
Sch(t)=gch(tch
Sdis(t)=gdis(tdis


Where, Ssoc(t) represents the capacitance of the storage battery at time t; Ssoc(t−1) represents the capacitance of the storage battery at time t−1; Sch(t) represents the charging capacity of the storage battery at time t; Sdis(t) represents the discharging capacity of the storage battery at time t; gch (t) represents the charging power of the storage battery at time t; ηch represents the charging efficiency of the storage battery; gdis(t) represents the discharging power of the storage battery at time t; and ηdis represents the discharging efficiency of the storage battery.


The capacity of the storage battery meets the following constraint condition:

Ssocmin(t)≤Ssoc(t)≤Ssocmax(t)


Where, Ssocmin(t) represents the minimum charging capacity of the storage battery, and the Ssocmax(t) represents the maximum charging capacity of the storage battery.


The output constraint of the storage battery meets the following constraint condition:

gchmin≤gch(t)≤gchmax
gdismin≤gdis(t)≤gdismax


Where, gchmin represents the minimum charging power of the storage battery; gchmax represents the maximum charging power of the storage battery; gdismin represents the minimum discharging power of the storage battery; and gdismax represents the maximum discharging power of the storage battery.


When the actual output gWPP(t) of the wind turbine at time t is less than the sum of gEB2(t) and gE2(t), the gW2(t) is less than 0; and when the actual output gWPP(t) of the wind turbine at time t is greater than or equal to the sum of gEB2(t) and gE2(t), the gW2(t) is greater than or equal to 0.

    • when the post-demand-response abandoned wind power at time t, gW2(t), is less than 0, the storage battery is configured to assist in power supply to the electrical boiler and the electrical load.


When the post-demand-response abandoned wind power at time t, gW2(t), is greater than or equal to 0, the storage battery is configured receive power from the wind turbine, and the charging capacity of the storage battery at time t, Sch (t), is equal to the post-demand-response abandoned wind power at time t, gW2(t). Namely, gW2(t)=Sch(t).


The discharging capacity of the storage battery at time t, Sdis(t) is equal to an absolute value of the post-demand-response abandoned wind power at time t, gW2(t). Namely, |gW2(t)|=Sdis(t).


The working principle of the storage battery is: under the conditions that the wind power is sufficient, and abandoned wind is generated, the abandoned wind quantity is stored; when the wind power is insufficient to provide the required electrical loads, the storage battery is configured to discharge to assist the wind turbine to supply power.


The virtual power plant of the present invention comprises the electrical boiler, the storage battery and the wind turbine.


The present invention has the beneficial effects that:


According to the method, power utilization and heat utilization can be reasonably guided, the energy utilization rate is improved, and the operation cost of the virtual power plant is lowered; the method has the reference value for wind power consumption of the virtual power plant with the consideration that the comprehensive demand responses are implemented on various loads, and the scientific basis is provided for more efficiently improving the energy utilization rate; and an effective way is provided for lowering the operation cost of a power generation and distribution system, such as the virtual power plant, and the like.





DESCRIPTION OF THE DRAWINGS


FIG. 1 is a schematic diagram of wind power consumption of a virtual power plant of the present invention;



FIG. 2 is a diagram of a demand curve of electrical loads and heat loads in an embodiment of the present invention;



FIG. 3 is a diagram of the condition of wind power consumption in a scenario 1 of the embodiment of the present invention;



FIG. 4 is a diagram of a demand change curve after demand responses of the electrical loads in the embodiment of the present invention;



FIG. 5 is a diagram of a demand change curve after demand responses of the heat loads in the embodiment of the present invention; and



FIG. 6 is a diagram of the condition of wind power consumption in a scenario 2 of the embodiment of the present invention.





DETAILED DESCRIPTION OF PREFERRED EMBODIMENTS

The present invention is further described in detail hereinafter through combination with the drawings and specific embodiments.


In the implementation of the present invention, the present invention is implemented according to the specific steps in the contents of the description and the contents of the claims, and the specific step process is not described here.


The embodiments of the present invention are described as follows:


Embodiments of the present invention provides a method for consuming win power in a virtual power plant, considering the comprehensive demand responses of electrical load and heat load. Referring to FIG. 1, the virtual power plant includes an electrical boiler, a storage battery, and a wind turbine. The wind turbine is capable of supplying wind power to the electrical boiler and an electrical load, while the rest power, e.g., abandoned wind power, generated by the wind turbine is capable of being supplied to the storage battery. The storage battery is capable of supplying power to the electrical load, and assisting in power supply to the electrical boiler when needed. The electrical boiler is capable of providing heat supply to a heat load.


establishing a wind turbine power model to obtain a wind power prediction curve;


establishing a pre-demand-response heat load demand model and a pre-demand-response electrical boiler output model; determining a pre-demand-response heat load demand based on the pre-demand-response heat load demand model; calculating a pre-demand-response wind power consumption of the electrical boiler according to the pre-demand-response electrical boiler output model and the pre-demand-response heat load demand; calculating a pre-demand-response abandoned wind power per moment and a pre-demand-response total abandoned wind power according to the wind power prediction curve, the pre-demand-response electrical load demand, and the pre-demand-response wind power consumption of the electrical boiler;


establishing a post-demand-response heat load demand model and a post-demand-response electrical boiler output model; determining a post-demand-response heat load demand based on the post-demand-response heat load demand model; calculating a post-demand-response wind power consumption of the electrical boiler according to the post-demand-response electrical boiler output model and the post-demand-response heat load demand;


calculating a post-demand-response electrical load; calculating a post-demand-response abandoned wind power per moment and a post-demand-response total abandoned wind power according to the wind power prediction curve, the post-demand-response electrical load demand, and the post-demand-response wind power consumption of the electrical boiler; then obtaining a difference value between the pre-demand-response total abandoned wind power and the post-demand-response total abandoned wind power; promoting wind power consumption if the difference value is greater than 0; and


establishing a storage battery capacity model; determining a charging-discharging state and a charging-discharging capacity of the storage battery according to the storage battery capacity model and the post-demand-response abandoned wind power per moment.


The wind turbine output model is:








g
WPP

(
t
)

=

{




0

,





v
t



v
in











v
t

-

v
in




v
R

-

v
in




g

,





v
in



v
i



v
R







g
,





v
R



v
t



v
out







0
,





v
t



v
out










Where, g represents a rated power of the wind turbine; vin represents a cut-in wind speed of the wind turbine; vR represents a rated wind speed of the wind turbine; vout represents a cut-out wind speed of the wind turbine; vt represents a real-time wind speed of the wind turbine at time t; t denotes the specific moment; and gWPP(t) represents an actual output of the wind turbine at time t.


The actual output of the wind turbine meets the following constraint condition:

gWPPmin≤gWPP(t)≤gWPPmax


Where, gWPPmin represents a lower power limit of the wind turbine, and gWPPmax represents an upper power limit of the wind turbine.


The pre-demand-response heat load demand model is:








Q
heart
1

(
t
)

=





t
=
1

24




(



C
air



ρ
air


NSH

+


KA


)



(


T
PMV
1

-


T
out

(
t
)


)



-

Q
inc

-

Q
inh






Where, Qheart1(t) represents the pre-demand response heat load demand; ∂ a represents a modified temperature difference factor of an envelope enclosure; K represents a heat transfer coefficient of the envelope enclosure; A represents an area of the envelope enclosure; Tout(t) represents an outdoor temperature at time t; Cair represents a specific heat capacity of air; ρair represents an air density; N represents an air change rate; S represents an area of a building; H represents an indoor height of the building; Qine represents a calorific value of an electrical equipment; Qinh represents a calorific value of a human body; and TPMV1 represents a pre-demand-response set indoor temperature.


The pre-demand-response set indoor temperature TPMV1 is obtained by the following formula:







T
PMV
1

=


T
S

-



M

(

2.43
-

λ
PMV
1


)



(


I
cl

+
0.1

)


3.76






Where, Ts represents a human skin temperature in a normal temperature state; M represents a human energy metabolism rate; λPMV1 represents an initial PMV (Predicted Mean Vote) index; and Ici represents a dress heat resistance.


The pre-demand-response electrical boiler output model is:

QEB1(t)=gEB1(t)·ηEB


Where, QEB1(t) represents a pre-demand-response heat supply of the electrical boiler at the time t; gEB1(t) represents the pre-demand-response wind power consumption of the electrical boiler at time t; and ηEB represents an electricity-heat conversion efficiency.


A pre-demand-response actual output of the electrical boiler meets the following constraint condition:

QEB1min≤QEB1(t)≤QEB1max


Where, QEB1min represents a pre-demand-response lower power limit of the electrical boiler, QEB1max represents a pre-demand-response upper power limit of the electrical boiler; and QEB1(t) represents the pre-demand-response actual output of the electrical boiler at the moment t.


QEB1(t) is equal to Qheart1(t); and an pre-demand-response output of the electrical boiler at time t is obtained based on the pre-demand-response heat load demand Qheart1(t), and then the pre-demand-response wind power consumption gEB1(t) of the electrical boiler is obtained based on the pre-demand-response electrical boiler output model.


The pre-demand-response abandoned wind power per moment and the pre-demand-response total abandoned wind power are obtained by the following formulas, respectively:









g
W
1

(
t
)

=



g
WPP

(
t
)

-


g
E
1

(
t
)

-


g
EB
1

(
t
)







g
W
1

=




t
=
1

24




g
W
1

(
t
)







Where, gW1 represents the pre-demand-response total abandoned wind power; gW1(t) represents the pre-demand-response abandoned wind power at time t; gE1(t) represents the pre-demand-response electrical load demand at time t; and gEB1(t) represents the pre-demand-response wind power consumption of the electrical boiler.


The post-demand-response heat load demand model is:








Q
heart
2

(
t
)

=





t
=
1

24




(



C
air



ρ
air


NSH

+


KA


)



(


T
PMV
2

-


T
out

(
t
)


)



-

Q
inc

-

Q
inh






Where, Qheart2(t) represents the post-demand response heat load demand; TPMV2 represents a post-demand-response set indoor temperature; ∂ represents the modified temperature difference factor of an envelope enclosure; K represents the heat transfer coefficient of the envelope enclosure; A represents the area of the envelope enclosure; Tout(t) represents the outdoor temperature at time t; Cair represents the specific heat capacity of air; ρair represents the air density; N represents the air change rate; S represents the area of a building; H represents the indoor height of the building; Qine represents the calorific value of the electrical equipment; Qinh represents the calorific value of the human body.


The post-demand-response set indoor temperature TPMV2 is obtained by the following formula:







T
PMV
2

=


T
S

-



M

(

2.43
-

λ
PMV
2


)



(


I
cl

+
0.1

)


3.76






Where, Ts represents the human skin temperature in normal temperature state; M represents the human energy metabolism rate; λPMV2 represents the initial PMV index; and Icl represents the dress heat resistance.


The post-demand-response electrical boiler output model is:

QEB2(t)=gEB2(t)·ηEB


Where, QEB2(t) represents a post-demand-response heat supply of the electrical boiler at the time t; gEB2(t) represents the post-demand-response wind power consumption of the electrical boiler at time t; and ηEB represents an electricity-heat conversion efficiency.


A post-demand-response actual output of the electrical boiler meets the following constraint condition:

QEB2min≤QEB2(t)≤QEB2max


Where, QEB2min represents a post-demand-response lower power limit of the electrical boiler; QEB2max represents a post-demand-response upper power limit of the electrical boiler; and QEB2(t) represents the post-demand-response actual output of the electrical boiler at the moment t.


QEB2(t) is equal to Qheart2(t); and an post-demand-response output of the electrical boiler at time t is obtained based on the post-demand-response heat load demand Qheart2(t), and then the post-demand-response wind power consumption gEB2(t) of the electrical boiler is obtained based on the post-demand-response electrical boiler output model.


The demand of the post-demand-response electrical load demand is obtained by following steps:

    • calculating variations of the post-demand-response electrical load per moment by the following formulas:









Δ



g
on

(
t
)


=


e
on

×


g
on

(
t
)

×


Δ



P
on

(
t
)




P
on

(
t
)




,

t


T
on








Δ



g

min

d


(
t
)


=


e

min

d


×


g

min

d


(
t
)

×


Δ



P

min


d


(
t
)




P

min


d


(
t
)




,

t


T
mind








Δ



g
off

(
t
)


=


e
off

×


g
off

(
t
)

×


Δ



P
off

(
t
)




P
off

(
t
)




,

t


T
off







where, Δgon(t), Δgmind(t) and Δgoff(t), respectively, represents a variation of the post-demand-response electrical load at the peak period, the flat period, and the valley period of power consumption; gon(t), gmind(t) and goff(t), respectively, represents the pre-demand-response electrical load at the peak period, the flat period, and the valley period of power consumption; Pon(t), Pmind(t) and Poff(t), respectively, represents the pre-demand-response energy consumption at the peak period, the flat period, and the valley period of power consumption; ΔPon(t), ΔPmind(t) and ΔPoff(t), respectively, represents a variation of energy consumption at the peak period, the flat period, and the valley period of power consumption; eon, emind and eoff, respectively, represents an elastic coefficient of energy consumption at the peak period, the flat period, and the valley period of power consumption; and Ton represents the peak period of energy consumption, Tmind represents the flat period of energy consumption, and Toff represents the valley period of energy consumption; and


obtaining the post-demand-response electrical load per moment gEB2(t) by adding variations of the post-demand-response electrical load per moment and the pre-demand-response electrical load per moment gEB1(t).


The post-demand-response abandoned wind power per moment and the post-demand-response total abandoned wind power are respectively obtained by the following formulas:









g
W
2

(
t
)

=



g
WPP

(
t
)

-


g
E
2

(
t
)

-


g
EB
2

(
t
)







g
W
2

=




t
=
1

24




g
W
2

(
t
)







Where, gW2 represents the post-demand-response total abandoned wind power; gW2(t) represents the post-demand-response abandoned wind power at time t; gE2(t) represents the post-demand-response electrical load demand at time t; and gEB2(t) represents the post-demand-response wind power consumption of the electrical boiler at time t.


The storage battery capacity model is:

Ssoc(t)=Ssoc(t−1)+(Sch(t)−Sdis(t))
Sch(t)=gch(tch
Sdis(t)=gdis(tdis


Where, Ssoc(t) represents the capacitance of the storage battery at time t; Ssoc(t−1) represents the capacitance of the storage battery at time t−1; Sch(t) represents the charging capacity of the storage battery at time t; Sdis(t) represents the discharging capacity of the storage battery at time t; gch(t) represents the charging power of the storage battery at time t; ηch represents the charging efficiency of the storage battery; gdis(t) represents the discharging power of the storage battery at time t; and ηdis represents the discharging efficiency of the storage battery.


The capacity of the storage battery meets the following constraint condition:

Ssocmin(t)≤Ssoc(t)≤Ssocmax(t)


Where, Ssocmin(t) represents the minimum charging capacity of the storage battery, and the Ssocmax(t) represents the maximum charging capacity of the storage battery.


The output constraint of the storage battery meets the following constraint condition:

gchmin≤gch(t)≤gchmax
gdismin≤gdis(t)≤gdismax


Where, gchmin represents the minimum charging power of the storage battery; gchmax represents the maximum charging power of the storage battery; gdismin represents the minimum discharging power of the storage battery; and gdismax represents the maximum discharging power of the storage battery.


When the actual output gWPP(t) of the wind turbine at time t is less than the sum of gEB2(t) and gE2(t), the gW2(t) is less than 0; and when the actual output gWPP(t) of the wind turbine at time t is greater than or equal to the sum of gEB2(t) and gE2(t), the gW2(t) is greater than or equal to 0.

    • when the post-demand-response abandoned wind power at time t, gW2(t), is less than 0, the storage battery is configured to assist in power supply to the electrical boiler and the electrical load.


When the post-demand-response abandoned wind power at time t, gW2(t), is greater than or equal to 0, the storage battery is configured receive power from the wind turbine, and the charging capacity of the storage battery at time t, Sch (t), is equal to the post-demand-response abandoned wind power at time t, gW2(t). Namely, gW2(t)=Sch(t).


The discharging capacity of the storage battery at time t, Sdis(t) is equal to an absolute value of the post-demand-response abandoned wind power at time t, gW2(t). Namely, |gW2(t)|=Sdis(t).


The working principle of the storage battery is: under the conditions that the wind power is sufficient, and abandoned wind is generated, the abandoned wind quantity is stored; when the wind power is insufficient to provide the required electrical loads, the storage battery is configured to discharge to assist the wind turbine to supply power.


In the embodiments, a virtual power plant which comprises a wind turbine, a storage battery and an electrical boiler is taken as an example. The output condition of the wind turbine is shown in FIG. 2. The initial capacity of the storage battery is 0 kWh. A demand curve of electrical loads and heat loads is shown in FIG. 3. The uniform energy consumption cost before demand responses is 0.5/kWh; after peak-valley energy consumption is adopted, the peak period of energy consumption is 11:00-15:00 and 19:00-21:00; the cost at the peak period of energy consumption is 0.8/kWh; and the corresponding elastic coefficient eon of energy consumption is −0.07. The flat period of energy consumption is 08:00-10:00, 16:00-18:00 and 22:00-23:00; the cost at the flat period of energy consumption is 0.4/kWh; and the corresponding elastic coefficient emind of energy consumption is 0.05. The valley period of energy consumption is 24:00-07:00; the cost at the valley period of energy consumption is 0.2/kWh; and the corresponding elastic coefficient eoff of energy consumption is 0.08. In the embodiments, two scenarios are considered. In the first scenario, energy storage equipment is not considered, and the demand responses are not implemented on the electrical loads and the heat loads. In the second scenario, the energy storage equipment is considered, and comprehensive demand responses are implemented on the electrical loads and the heat loads. In the embodiment, the abandoned wind quantities of the virtual power plant in the two scenarios are respectively calculated and are compared with each other.


The virtual power plant in the embodiment is mainly used for wind power consumption for the power utilization of users and the electricity to heat conversion of the electrical boiler. In the scenario 2, the demand of the electrical loads after the demand responses is obtained according to the elastic cost coefficients of the electrical loads at different periods. It can be seen from FIG. 4 that peak load shifting of the electrical loads is realized by the demand responses. At the demand peak period of the heat loads, incentive demand responses are implemented by lowering the set indoor temperature TPMV, and the compensation cost for the demand responses of the virtual power plant is considered to be minimum. In the embodiment, the incentive demand responses of the heat loads are implemented at the common peak period (19:00-23:00) of the electrical loads and the heat loads. It can be seen from FIG. 5 that the curtailment of the heat loads is realized by the demand responses; meanwhile, when the abandoned wind quantity is larger, the storage battery is configured to store energy, so as to promote wind power consumption. Through comparison on the conditions of wind power consumption in the two scenarios, as shown in Tab. 1, it is found that the abandoned wind quantity in the scenario 2 is reduced, and the consumption capacity is higher.









TABLE 1







Table of conditions of wind power consumption


of a virtual power plant in two scenarios










Scenario 1
Scenario 2















Wind power generation/kW
4886
4886



Electrical load/kW
2177
2184.3



Output of electrical boiler/kW
2656.66
2653.89



Output of storage battery/kW
0
12.76



Abandoned wind quantity/kW
52.34
35.05










Therefore, the comprehensive responses of the electrical loads and the heat loads are considered in the present invention, the capacity of wind power consumption of the virtual power plant is effectively improved; the reference is provided for a research that the comprehensive demand responses are implemented on various loads; and an effective way is provided for promoting wind power consumption of a power generation and distribution system, such as the virtual power plant and the like and relieving the problem of wind abandonment.


Finally, it should be noted that the above example is only used for describing the technical solution of the present invention, rather than the limit to technical solution of the present invention. Although the present invention is described with reference to the above example, those skilled in the art should understand that a specific implementation manner of the present invention can still be modified or equivalently replaced, and any modification or equivalent replacement made without departing from the spirit and the scope of the present invention shall be covered in the scope of the claims of the present invention.

Claims
  • 1. A method for consuming wind power in a virtual plant with consideration of comprehensive demand response for electrical loads and heat loads, comprising the following steps: providing the virtual power plant which comprises an electrical boiler, a storage battery and a wind turbine; wherein the wind turbine is capable of supplying power to the electrical boiler and an electrical load; the storage battery is capable of supplying power to the electrical load, and assisting power supply to the electrical boiler; the electrical boiler is capable of providing heat supply to a heat load;establishing a wind turbine power model to obtain a wind power prediction curve;establishing a pre-demand-response heat load demand model and a pre-demand-response electrical boiler output model; determining a pre-demand-response heat load demand based on the pre-demand-response heat load demand model; calculating a pre-demand-response wind power consumption of the electrical boiler according to the pre-demand-response electrical boiler output model and the pre-demand-response heat load demand; calculating a pre-demand-response abandoned wind power per moment and a pre-demand-response total abandoned wind power according to the wind power prediction curve, a pre-demand-response electrical load demand, and the pre-demand-response wind power consumption of the electrical boiler;establishing a post-demand-response heat load demand model and a post-demand-response electrical boiler output model; determining a post-demand-response heat load demand based on the post-demand-response heat load demand model; calculating a post-demand-response wind power consumption of the electrical boiler according to the post-demand-response electrical boiler output model and the post-demand-response heat load demand;calculating a post-demand-response electrical load demand; calculating a post-demand-response abandoned wind power per moment and a post-demand-response total abandoned wind power according to the wind power prediction curve, the post-demand-response electrical load demand, and the post-demand-response wind power consumption of the electrical boiler; then obtaining a difference value between the pre-demand-response total abandoned wind power and the post-demand-response total abandoned wind power; promoting wind power consumption if the difference value is greater than 0; andestablishing a storage battery capacity model; determining a charging-discharging state and a charging-discharging ability of the storage battery according to the storage battery capacity model and the post-demand-response abandoned wind power per moment.
  • 2. The method according to claim 1, wherein the wind turbine output model is:
  • 3. The method according to claim 1, wherein the pre-demand-response heat load demand model is:
  • 4. The method according to claim 3, wherein QEB1(t) is equal to Qheart1(t); and an pre-demand-response output of the electrical boiler at time t is obtained based on the pre-demand-response heat load demand Qheart1(t), and then the pre-demand-response wind power consumption gEB1(t) of the electrical boiler is obtained based on the pre-demand-response electrical boiler output model.
  • 5. The method according to claim 1, wherein the pre-demand-response abandoned wind power per moment and the pre-demand-response total abandoned wind power are obtained by the following formulas, respectively:
  • 6. The method according to claim 1, wherein the post-demand-response heat load demand model is:
  • 7. The method according to claim 6, wherein QEB2(t) is equal to Qheart2(t); and an post-demand-response output of the electrical boiler at time t is obtained based on the post-demand-response heat load demand Qheart2(t), and then the post-demand-response wind power consumption gEB2(t) of the electrical boiler is obtained based on the post-demand-response electrical boiler output model.
  • 8. The method according to claim 5, wherein the demand of the post-demand-response electrical load demand is obtained by following steps: calculating variations of the post-demand-response electrical load demand per moment by the following formulas:
  • 9. The method according to claim 1, wherein the post-demand-response abandoned wind power per moment and the post-demand-response total abandoned wind power are respectively obtained by the following formulas:
  • 10. The method according to claim 1, wherein the storage battery capacity model is: Ssoc(t)=Ssoc(t−1)+(Sch(t)−Sdis(t))Sch(t)=gch(t)ηch Sdis(t)=gdis(t)ηdis where, Ssoc(t) represents a capacitance of the storage battery at time t; Ssoc(t−1) represents a capacitance of the storage battery at time t−1; Sch(t) represents a charging ability of the storage battery at time t; Sdis(t) represents a discharging capacity of the storage battery at time t; gch(t) represents a charging power of the storage battery at time t; ηch represents a charging efficiency of the storage battery; gdis(t) represents a discharging power of the storage battery at time t; and ηdis represents a discharging efficiency of the storage battery;the capacity of the storage battery meets the following constraint condition: Ssocmin(t)≤Ssoc(t)≤Ssocmax(t)where, Ssocmin(t) represents a minimum charging ability of the storage battery, and the Ssocmax(t) represents a maximum charging ability of the storage battery;the output constraint of the storage battery meets the following constraint condition: gchmin≤gch(t)≤gchmax gdismin≤gdis(t)≤gdismax where, gchmin represents a minimum charging power of the storage battery; gchmax represents a maximum charging power of the storage battery; gdismin represents a minimum discharging power of the storage battery; and gdismax represents a maximum discharging power of the storage battery;when an actual output gWPP(t) of the wind turbine at time t is less than a sum of gEB2(t) and gE2(t), the gW2(t) is less than 0; and when the actual output gWPP(t) of the wind turbine at time t is greater than or equal to the sum of gEB2(t) and gE2(t), the gW2(t) is greater than or equal to 0; andwhen a post-demand-response abandoned wind power at time t, gW2(t), is less than 0, the storage battery is configured to assist in power supply to the electrical boiler and the electrical load;when the post-demand-response abandoned wind power at time t, gW2(t), is greater than or equal to 0, the storage battery is configured receive power from the wind turbine, and the charging ability of the storage battery at time t, Sch(t), is equal to the post-demand-response abandoned wind power at time t, gW2(t); and the discharging ability of the storage battery at time t, Sdis(t) is equal to an absolute value of the post-demand-response abandoned wind power at time t, gW2(t).
Priority Claims (1)
Number Date Country Kind
202110296018.0 Mar 2021 CN national
US Referenced Citations (14)
Number Name Date Kind
8892264 Steven Nov 2014 B2
9367052 Steven Jun 2016 B2
9772643 Steven Sep 2017 B2
20070110579 Ross, Sr. May 2007 A1
20090293502 Vandor Dec 2009 A1
20100152905 Kusiak Jun 2010 A1
20110089693 Nasiri Apr 2011 A1
20120296482 Steven Nov 2012 A1
20130204443 Steven Aug 2013 A1
20130245847 Steven Sep 2013 A1
20140316973 Steven Oct 2014 A1
20150326015 Steven Nov 2015 A1
20160363948 Steven Dec 2016 A1
20210281080 Danielsen Sep 2021 A1
Foreign Referenced Citations (2)
Number Date Country
113612258 Nov 2021 CN
113690940 Nov 2021 CN
Related Publications (1)
Number Date Country
20220299009 A1 Sep 2022 US