Claims
- 1. A hydroelectric power plant comprising a plurality of windmills connected to compressed air generators to provide pressurized air to a set of storage tanks, said compressed air generators each having an air dryer to dry the compressed air produced by the air generator, each storage tank having a high pressure water outlet, a water inlet and an air inlet and air outlet, the water outlet of each storage tank being connected to a water inlet of a turbine that generates electricity when water passes through the turbine, the turbine having a water outlet and an electrical power outlet, the water outlet of the turbine being connected to a recycle line that is in turn connected to the water inlets of the storage tanks, first control means connected to control the transfer and distribution of pressurized air to the storage tanks, to control the flow of high pressure water from the storage tanks to the turbine, and to control the recycling of water from the water outlet of the turbine to the water inlets of the storage tanks, said power plant having a high pressure air reserve system to store high pressure air for use when wind velocieites are not sufficient to operate the plant, said air reserve system having an air inlet and an air outlet, said first control means being connected to control the flow of high pressure air to and from said air reserve system, said electrical power outlet of the turbine being connected to a power line.
- 2. A hydroelectric power plant as claimed in claim 1 wherein the turbine is a pelton wheel.
- 3. A hydroelectric power plant as claimed in any one of claims 1 or 2 wherein air pressure on water flowing into the water inlet of the turbine is maintained at a substantially constant level.
- 4. A hydroelectric power plant as claimed in any one of claims 1 or 2 wherein there are second control means to cause the turbine to rotate at substantially constant speed to produce 60-cycle electricity.
- 5. A hydroelectric power plant as claimed in claim 1 wherein the control means is a first controller connected to control the transfer and distribution of pressurized air to the storage tanks, a second controller connected to control the flow of high pressure water from the storage tanks to the turbine, a third controller connected to control the recycling of water from the water outlet of the turbine to the water inlet of the storage tanks, a fourth controller connected to control the transfer of electricity from the electrical power outlet of the turbine to the power line and a fifth controller connected to control the first, second, third and fourth controllers.
- 6. A hydroelectric power plant as claimed in claim 1 wherein there are means to return recycle water from the water outlet of the turbine to the water storage tanks by high pressure air.
- 7. A hydroelectric power plant as claimed in claim 6, wherein there are means to bleed the high pressure air from the substantially drained water storage tanks before returning the water from the turbine.
- 8. A hydroelectric power plant as claimed in claim 1 wherein the water outlet from the water storage tank is connected to a collector line containing several valves, said valves being connected to said control means to provide a continuous volume of water to the water inlet of said turbine.
- 9. A hydroelectric power plant as claimed in claim 1 wherein the water inlet of the turbine has an interior channel shaped in the form of a vortex.
- 10. A hydroelectric power plant as claimed in claim 1 wherein there is an automatic air release in the turbine to release high pressure air when the pressure of said air exceeds a certain maximum.
- 11. A hydroelectric as claimed in claim 1 wherein the control means is connected to substantially empty each of the water storage tanks in succession.
- 12. A hydroelectric power plant as claimed in claim 7 wherein there are means for returning high pressure air to the storage tanks after returning the recycled water.
- 13. A hydroelectric power plant as claimed in claim 1 wherein there is an air pressure controller on the turbine to add or release high pressure air from the water inlet.
- 14. A hydroelectric power plant as claimed in claim 1 wherein the high pressure air produced by the air generators has a pressure of approximately 6,000 psi.
- 15. A hydroelectric power plant as claimed in any one of claims 1 or 2 wherein the power line is connected to a service line of an electrical utility in such a manner that excess electricity can flow from the power line into the service line or electricity can flow from the service line to the power line.
- 16. A hydroelectric power plant as claimed in any one of claims 1 or 2 wherein the power line is connected to a service line of an electrical utility through an electrical transfer controller to allow electricity to flow from the power line to the service line and from the service line to the power line.
- 17. A hydroelectric power plant as claimed in any one of claims 1 or 2 wherein there are means to replenish the water within the system.
- 18. A hydroelectric power plant as claimed in any one of claims 1 or 2 wherein there are no waste products produced by the plant.
- 19. A hydroelectric power plant as claimed in any one of claims 1 or 2 where the water is completely recycled, subject only to loss of water through leakage.
- 20. A hydroelectric power plant as claimed in claim 1 wherein flow of water through the turbines is controlled by opening and closing wicket gates.
- 21. A hydroelectric power plant as claimed in claim 1 wherein the water contains anti coagulant.
- 22. A hydroelectric power plant as claimed in claim 1 wherein the water contains anti-freeze.
- 23. A hydroelectric power plant as claimed in claim 1 wherein there are a series of louvres on the turbine.
- 24. A hydroelectric power plant as claimed in claim 1 wherein said air reserve system is a plurality of reserve air tanks, each having an air inlet and an air outlet.
- 25. A hydroelectric power plant as claimed in claim 24 wherein the pressure of the high pressure air within the reserve air tanks is substantially greater than the air pressure required to force water through the turbine.
- 26. A hydroelectric power plant as claimed in claim 7 wherein said means to bleed the air is connected to bleed the air to an air storage tank or to a storage tank that has already been refilled with water.
- 27. A hydroelectric power plant as claimed in any one of claims 1 or 4 wherein there are means to cause the turbine to rotate at substantially constant speed.
- 28. A method of operating a hydroelectric power plant using compressed air obtained from a plurality of windmills connected to compressed air generators, said plant having water storage tanks, said compressed air generators each having an air dryer, there being a high pressure air reserve system to store high pressure air for use when wind velocities arc not sufficient to operate said plant, said air reserve system having an air inlet and an air outlet, said method comprising producing pressurized air when the wind is blowing sufficiently strong to rotate windmills connected to compressed air generators, drying the compressed air produced by said air generators, introducing the pressurized air into a plurality of storage tanks that are nearly filled with water, controlling the flow of water out of the water storage tanks through a water outlet for each of the storage tanks, releasing high pressure water from the water outlets of the water storage tanks into a collector line connected to the water inlet of a turbine, causing the water to flow into the turbine through the water inlet and out of a water outlet from the turbine, thereby generating electricity, recycling the water from the water outlet of the turbine back to the substantially empty storage tanks, supplementing the air pressure within the storage tanks with high pressure air generated by the windmills, storing excess compressed air produced by the windmills in said high pressure air reserve system, controlling air flowing into and out of said high pressure air reserve system, using air from said high pressure air reserve system to pressurize the water filled storage tanks and wind velocities are not sufficient to operate the plant and causing electricity generated by the turbine to flow into a power line.
- 29. A method of operating a hydroelectric power plant as claimed in claim 28 including the steps of bleeding the pressurized air to an air storage tank from those storage tanks that have been substantially emptied of water, recycling the water from the water outlet of the turbine back to the substantially empty storage tanks after bleeding the pressurized air from those storage tanks, returning the high pressure air back to the water filled storage tanks, supplementing the air pressure within the storage tanks with high pressure air from the reserve air system or with high pressure air generate by the windmills.
- 30. A method of operating a hydroelectric power plant as claimed in claim 29 including the step of controlling the air pressure of water flowing in a water inlet of said turbine.
- 31. A method of operating a hydroelectric power plant as claimed in claim 30 including the steps of operating the turbine at a substantially constant speed and producing 60-cycle electricity from the turbine.
- 32. A method of operating a hydroelectric power plant as claimed in claim 28 including the step of operating the turbine at a substantially constant speed.
Parent Case Info
This application claims the benefit of Provisional Application No. 60/282,500, filed Apr. 10, 2001.
US Referenced Citations (8)
Provisional Applications (1)
|
Number |
Date |
Country |
|
60/282500 |
Apr 2001 |
US |