The present disclosure relates to an evaluation of a power generation amount of a wind turbine group.
Conventionally, in a wind farm where power is generated with a plurality of wind turbine power generating apparatuses (to be referred to as wind turbines hereinafter), compared to front wind turbines disposed on the upwind side, the back wind turbines disposed on the downwind side normally have smaller power generation outputs due to the influence of wake of the front wind turbines. Thus, various operation methods and control methods are proposed in order to optimize the output of the entire wind farm, which is the sum of power generation outputs produced by the respective wind turbines (for example, see Patent Document 1).
Patent Document 1: JP2018-109367A
In order to optimize power generation amounts of at least some wind turbine groups of a wind farm, it is considered that a change in set value of a parameter influencing an output (output control parameter) is made on each of at least some wind turbines, and power generation amounts measured before and after the change are compared. However, it may be impossible to appropriately make an evaluation if wind conditions are different before and after the change. Moreover, while a power generation amount depends on a wind direction/wind speed, a wind vane anemometer installed above a nacelle of a wind turbine may not be accurate enough to appropriately evaluate such power generation amounts.
In view of the above, an object of at least one embodiment of the present invention is to provide a wind turbine group power generation amount evaluation device capable of appropriately evaluating a power generation amount by a wind turbine group.
(1) A wind turbine group power generation amount evaluation device according to at least one embodiment of the present invention is a wind turbine group power generation amount evaluation device for evaluating a power generation amount of a wind turbine group including a plurality of wind turbines, the wind turbine group power generation amount evaluation device including a wind direction acquisition unit configured to acquire a wind direction acting on the wind turbine group, a criterial correlation acquisition unit configured to acquire a criterial correlation which is a correlation between a target power generation amount by a target wind turbine group and a reference power generation amount by a reference wind turbine group, the target wind turbine group being the wind turbine group of an evaluation target having, as members, n (n is an integer greater than or equal to 2) wind turbines disposed along the acquired wind direction, the reference wind turbine group having, as members, the wind turbines which are not the members of the target wind turbine group and are disposed along the wind direction, a set value changing unit configured to change a set value of an output control parameter of at least one of the wind turbines in the target wind turbine group, a power generation amount acquisition unit configured to acquire the target power generation amount and the reference power generation amount measured after the change in the set value, a target power generation amount estimation unit configured to calculate, based on the criterial correlation and the reference power generation amount acquired after the change, an estimated value before the change of the target power generation amount which corresponds to the reference power generation amount acquired after the change, and an evaluation unit configured to evaluate a target power generation amount after the change based on a comparison between the target power generation amount after the change and the estimated value before the change.
With the above configuration (1), an evaluation is made as to, for example, whether the power generation amount of the target wind turbine group in a case in which the output control parameter of the wind turbine (for example, the wind turbine positioned on the upwind side) belonging to the target wind turbine group which is the wind turbine group of the evaluation target is changed (target power generation amount after the change) is larger than the target power generation amount obtained before the change by using the correlation (criterial correlation) between the target power generation amount before the change and the reference power generation amount of the reference wind turbine group disposed in Parallel to the target wind turbine group.
That is, the target power generation amount and the reference power generation amount each measured, for example, at the same time after the change of the output control parameter described above are measured under the same wind condition. In addition, likewise, the criterial correlation is the correlation between the target power generation amount and the reference power generation amount measured under the same wind condition before the change of the output control parameter described above. Accordingly, using the criterial correlation, it is possible to estimate the target power generation amount before the above-described change, which may be obtained under the wind condition when the reference power generation amount acquired after the above-described change is measured. Therefore, it is possible to evaluate that the estimated value before the change of the target power generation amount thus obtained before the change and the measurement value of the target power generation amount after the change are the power generation amounts on the same wind condition. Thus, comparing the both, it is possible to easily evaluate how the target power generation amount after the change is as compared with that before the change without obtaining a power generation amount from a measured wind speed.
(2) In some embodiments, in the above configuration (1), the set value changing unit changes the set value of the output control parameter of at least one of the wind turbines positioned on an upwind side in the wind direction in the target wind turbine group.
With the above configuration (2), the wind turbine whose output control parameter is to be changed is one or the plurality of wind turbines positioned on the upwind side, for example, the wind turbine positioned on the most upwind side in the target wind turbine group. Compared to the front wind turbines disposed on the upwind side, the back wind turbines disposed on the downwind side normally have a smaller power generation output due to the influence of wake of the front wind turbines. Moreover, it is known that each wind turbine generates power most efficiently in the region positioned midway between the cut-in wind speed and the rated wind speed. Thus, if the power generation amount of the front wind turbines is, for example, decreased, the back wind turbines can utilize more wind energy by the decreased power generation amount of the front wind turbines. Accordingly, the power generation amount of each of the wind turbines changes, making it possible to achieve optimization of the power generation amount of the target wind turbine group, such as maximization of the target power generation amount, through such adjustment of the power generation amount.
(3) In some embodiments, in the above configuration (1) and (2), the wind turbine group power generation amount evaluation device further includes a criterial correlation generation unit configured to generate the criterial correlation for each of a plurality of combinations of the target wind turbine group and the reference wind turbine group each having the members determined in advance in accordance with a corresponding one of a plurality of wind directions, and the criterial correlation acquisition unit acquires the criterial correlation with respect to the combinations according to the acquired wind direction.
With the above configuration (3), the combinations of the target wind turbine group and the reference wind turbine group are determined with respect to the plurality of assumed wind directions, the criterial correlation for each of the combinations is generated, and the above-described evaluation is made by using the criterial correlation according to the acquired wind direction. Thus, it is possible to quickly make the above-described evaluation according to the wind direction.
(4) In some embodiments, in the above configuration (1) to (3), the wind turbine group power generation amount evaluation device further includes a criterial correlation generation unit configured to generate the criterial correlation for each of a plurality of combinations of the target wind turbine group and the reference wind turbine group each having the members determined in accordance with a corresponding one of a plurality of wind directions, and a wind direction change detection unit configured to detect a change in the wind direction, and if the change in the wind direction is detected, the criterial correlation acquisition unit acquires the criterial correlation according to the wind direction after the change.
With the above configuration (4), it is possible to acquire the criterial correlation between the target power generation amount of the reference wind turbine group and the target power generation amount of the target wind turbine group according to the changed wind direction which is, for example, determined in advance in accordance with the change in the wind direction. Thus, triggered by the change in the wind direction, it is possible to evaluate the target power generation amount by the target wind turbine group described above.
(5) In some embodiments, in any one of the above configurations (1) to (4), the wind turbine group power generation amount evaluation device further includes a setting adoption unit configured to specify, based on an evaluation result of the evaluation unit, a position of a setting change wind turbine and to change a set value of the output control parameter of the wind turbine in the reference wind turbine group corresponding to the specified position to the set value after the setting change wind turbine is changed, the setting change wind turbine being the wind turbine whose set value of the output control parameter is changed in the target wind turbine group.
With the above configuration (5), as a result of the evaluation by the evaluation unit, if the evaluation unit evaluates that the target power generation amount by the target wind turbine group is increased by changing the output control parameter, the set value of the wind turbine in the reference wind turbine group at a position corresponding to the position of the setting change wind turbine in the target wind turbine group is changed in the same manner as the setting change wind turbine. Thus, it is also possible to optimize the power generation amount of the reference wind turbine group in the same manner as the target wind turbine group.
(6) A wind turbine group power generation amount evaluation method according to at least one embodiment of the present invention is a wind turbine group power generation amount evaluation method of evaluating a power generation amount of a wind turbine group including a plurality of wind turbines, the method including a step of acquiring a wind direction acting on the wind turbine group, a step of acquiring a criterial correlation which is a correlation between a target power generation amount by a target wind turbine group and a reference power generation amount by a reference wind turbine group, the target wind turbine group being the wind turbine group of an evaluation target having, as members, n (n is an integer greater than or equal to 2) wind turbines disposed along the acquired wind direction, the reference wind turbine group having, as members, the wind turbines which are not the members of the target wind turbine group and are disposed along the wind direction, a step of changing a set value of an output control parameter of at least one of the wind turbines in the target wind turbine group, a step of acquiring the target power generation amount and the reference power generation amount measured after the change in the set value, a step of calculating, based on the criterial correlation and the reference power generation amount acquired after the change, an estimated value before the change of the target power generation amount which corresponds to the reference power generation amount acquired after the change, and a step of evaluating a target power generation amount after the change based on a comparison between the target power generation amount after the change and the estimated value before the change.
With the above configuration (6), it is possible to achieve the same effect as the above configuration (1).
(7) A non-transitory storage medium storing a wind turbine group power generation amount evaluation program according to at least one embodiment of the present invention is a wind turbine group power generation amount evaluation program for evaluating a power generation amount of a wind turbine group including a plurality of wind turbines, the program causing a computer to implement a unit configured to acquire a wind direction acting on the wind turbine group, a unit configured to acquire a criterial correlation which is a correlation between a target power generation amount by a target wind turbine group and a reference power generation amount by a reference wind turbine group, the target wind turbine group being the wind turbine group of an evaluation target having, as members, n (n is an integer greater than or equal to 2) wind turbines disposed along the acquired wind direction, the reference wind turbine group having, as members, the wind turbines which are not the members of the target wind turbine group and are disposed along the wind direction, a unit configured to change a set value of an output control parameter of at least one of the wind turbines in the target wind turbine group, a unit configured to acquire the target power generation amount and the reference power generation amount measured after the change in the set value, a unit configured to calculate, based on the criterial correlation and the reference power generation amount acquired after the change, an estimated value before the change of the target power generation amount which corresponds to the reference power generation amount acquired after the change, and a unit configured to evaluate a target power generation amount after the change based on a comparison between the target power generation amount after the change and the estimated value before the change.
With the above configuration (7), it is possible to achieve the same effect as the above configuration (1).
According to at least one embodiment of the present invention, a wind turbine group power generation amount evaluation device is provided, which is capable of appropriately evaluating a power generation amount by a wind turbine group.
Some embodiments of the present invention will now be described in detail with reference to the accompanying drawings. It is intended, however, that unless particularly identified, dimensions, materials, shapes, relative positions and the like of components described in the embodiments or shown in the drawings shall be interpreted as illustrative only and not intended to limit the scope of the present invention.
For instance, an expression of relative or absolute arrangement such as “in a direction”, “along a direction”, “Parallel”, “orthogonal”, “centered”, “concentric” and “coaxial” shall not be construed as indicating only the arrangement in a strict literal sense, but also includes a state where the arrangement is relatively displaced by a tolerance, or by an angle or a distance whereby it is possible to achieve the same function.
For instance, an expression of an equal state such as “same”, “equal”, and “uniform” shall not be construed as indicating only the state in which the feature is strictly equal, but also includes a state in which there is a tolerance or a difference that can still achieve the same function.
Further, for instance, an expression of a shape such as a rectangular shape or a cylindrical shape shall not be construed as only the geometrically strict shape, but also includes a shape with unevenness or chamfered corners within the range in which the same effect can be achieved.
On the other hand, an expression such as “comprise”, “include”, “have”, “contain” and “constitute” are not intended to be exclusive of other components.
As shown in
The drive train 84 and the generator 8p may be housed inside a nacelle 86 rotatably supporting the main shaft 83 via a main shaft bearing 83b. A nacelle base plate 86b forms the bottom surface of the nacelle 86, and may be supported by a tower 8t via a yaw rotational bearing 87. A yaw rotational mechanism 88 including a yaw motor (not shown) and a pinion gear may be fixed to the nacelle base plate 86b. The nacelle 86 may be rotatable relative to the tower 8t by driving the yaw motor (not shown) in a state where the pinion gear of the yaw rotational mechanism 88 is engaged with the ring gear disposed on the side of the tower 8t. Furthermore, each of the blades 81 is supported on the hub 82 via a blade rotational bearing (not shown), and the pitch angle may be adjustable by a pitch drive actuator (not shown) disposed inside the hub 82. In addition, an anemoscope 8w may be installed on the wind turbine T.
In the embodiment shown in
Then, the above-described wind farm 8 further includes a wind turbine group power generation amount evaluation device 1, as shown in
In wind turbine groups where the plurality of wind turbines T thus form the rows along the wind direction D, if other wind turbines (front wind turbines) exist on the upwind side, wind energy to be obtained by each of the wind turbines T is lower than that of the front wind turbines due to the influence of wake. Therefore, for example, rated outputs cannot be obtained from back wind turbines positioned at the back along the front wind turbines even if rated outputs are obtained from the front wind turbines, which may result in smaller outputs. At this time, the wind turbines T generate power most efficiently in a region positioned midway between a cut-in wind speed (a wind speed at which power generation is started) and a rated wind speed (a wind speed at which a rated output is reached). Thus, for example, if a parameter influencing the output of the front wind turbines (to be referred to as an output control parameter S hereinafter) is changed (adjusted) so that the back wind turbines can obtain more wind energy, the output of the back wind turbines may increase more, despite a possible decrease in the output of the front wind turbines. As a result, it is possible to optimize the wind turbine groups as a while, such as a power generation amount by the entire wind turbine groups increases more.
However, even if power generation amounts by the wind turbine group before and after the above-described output control parameter S is changed (to be simply referred to as after change, as needed, hereinafter) are compared to confirm an effect by the change, wind conditions such as a wind speed may change before and after the change. Accordingly, even if the power generation amount by the wind turbine group after the change of the above-described output control parameter S is larger than that before the change, it is difficult to determine whether this is due to the change of the output control parameter S or the change of the wind conditions. Thus, a wind turbine group (to be referred to as a reference wind turbine group Gr hereinafter) is set which has, as members, the plurality of other wind turbines T disposed along the same wind direction D used to determine the members of the wind turbine group of an evaluation target (to be referred to as the target wind turbine group Gt), which is the above-described wind turbine group including the wind turbines T each undergoing the change of the output control parameter S. With reference to the reference wind turbine group Gr, an evaluation is made as to how the power generation amount by the target wind turbine group Gt after the change of the output control parameter S is, as compared with that before the change. At this time, with regard to the reference wind turbine group Gr, the output control parameter S is not changed.
Hereinafter, the wind turbine group power generation amount evaluation device 1 for making the above-described evaluation will be described with reference to
As shown in
The wind turbine group power generation amount evaluation device 1 may comprise, for example, a computer including a CPU (processor, not shown) and a storage device m, for example, memories such as ROM and RAM. Then, the CPU operates (computes data, for example) in accordance with an instruction of a program (wind turbine group power generation amount evaluation program) loaded into a main storage device, implementing the respective functional units to be described later of the wind turbine group power generation amount evaluation device 1.
The wind direction acquisition unit 12 is the functional unit configured to acquire the wind direction D which acts on the wind turbine groups including the target wind turbine group Gt and the reference wind turbine group Gr described above. More specifically, the wind direction acquisition unit 12 is connected to the anemoscope 8w which is installed on the wind turbine T and is used to measure the wind direction D, and acquires a measurement value of the wind direction D measured by the anemoscope. As shown in
The criterial correlation acquisition unit 2 is the functional unit configured to acquire the criterial correlation Cr which is a correlation between the target power generation amount Pt by the target wind turbine group Gt according to the wind direction D acquired by the above-described wind direction acquisition unit 12 and the reference power generation amount Pr by the reference wind turbine group Gr according to the said wind direction D. The target wind turbine group Gt is the wind turbine group of the evaluation target which has, as the members, the n (n is an integer greater than or equal to 2) wind turbines T disposed along the wind direction D acquired as described above. The target power generation amount Pt is a power generation amount by all the wind turbines T belonging to the target wind turbine group Gt. Moreover, the reference wind turbine group Gr is the wind turbine group having, as the members, the same number (n) of wind turbines T as the target wind turbine group Gt which are not the members of the target wind turbine group Gt and are disposed along the wind direction D acquired as described above. The reference power generation amount Pr is a power generation amount by all the wind turbines T belonging to the reference wind turbine group Gr.
More specifically, the number of members of the target wind turbine group Gt and the number of members of the reference wind turbine group Gr may be the same or different. However, the number of members disposed along the wind direction D is the same. Furthermore, the target wind turbine group Gt and the reference wind turbine group Gr are determined in accordance with the wind direction D. For example, in the embodiment shown in
If the wind direction D is from the southwest as shown in
Moreover, the above-described criterial correlation Cr is obtained by measuring the respective power generation amounts (Pt, Pr) of the target wind turbine group Gt and the reference wind turbine group Gr determined as described above at a timing when the wind conditions can be regarded as the same (for example, the same time). More specifically, a plurality of data are generated which associate the reference power generation amount Pr and the target wind turbine group Gt measured at the same timing. Each of the data is a result of the target power generation amount Pt obtained when the certain reference power generation amount Pr is obtained. A regression analysis (such as a least-square method) is performed on such a plurality of result data, generating a function F (Pt=F(Pr)) to calculate the target power generation amount Pt from the arbitrary reference power generation amount Pr, as shown in
The set value changing unit 3 is the functional unit configured to change a set value of the output control parameter S of at least one wind turbine T in the above-described target wind turbine group Gt. A change value of the output control parameter S may be input by a worker or may automatically be generated by the set value changing unit 3 with a predetermined logic. Furthermore, the output control parameter S may be, for example, at least one of a power generation output command value, a pitch angle, or a yaw angle.
More specifically, in some embodiments, the wind farm 8 may include a control device (not shown) capable of changing the set value of the output control parameter S of each of the wind turbines T. Then, the set value changing unit 3 is connected to the control device by wire or wireless. The set value changing unit 3 may output (communicate) the change value of the output control parameter S with respect to the desired wind turbine T to the control device (not shown), thereby changing the set value of the output control parameter S of the arbitrary wind turbine T to the change value. In some other embodiments, the set value changing unit 3 may be configured to output a message to prompt a change in the set value of the output control parameter S on a screen such as a display and to cause the worker to make the above-described change. In this case, a next process by the power generation amount acquisition unit 4 may be performed after receiving an input that the above-described change is made from the worker.
The power generation amount acquisition unit 4 is the functional unit configured to acquire the target power generation amount Pt (to be referred to as a target power generation amount Pt′ after the change hereinafter) and the reference power generation amount Pr (to be referred to as a reference power generation amount Pr′ after the change) each measured after the set value of the output control parameter S described above is changed. The target power generation amount Pt′ after the change and the reference power generation amount Pr′ after the change are measurement values each measured at the timing, such as the same time, when the wind conditions can be regarded as the same. In the embodiments shown in
The target power generation amount estimation unit 5 is the functional unit configured to calculate, based on the above-described criterial correlation Cr and the reference power generation amount Pr′ after the change acquired by the above-described power generation amount acquisition unit 4 after the above-described change, an estimated value of the target power generation amount Pt corresponding to the reference power generation amount Pr′ after the change (to be referred to as an estimated value before the change Pa). At this time, the output control parameter S of at least one wind turbine T which is the member of the target wind turbine group Gt is changed, whereas the output control parameter S of each of the wind turbines T which is the member of the reference wind turbine group Gr is not changed. Moreover, the criterial correlation Cr indicates the relationship between the reference power generation amount Pr and the target power generation amount Pt before the change of the above-described output control parameter S. Thus, using the criterial correlation Cr, it is possible to calculate the target power generation amount Pt (estimated value) obtained before the change of the output control parameter S with respect to the arbitrary reference power generation amount Pr.
Accordingly, the target power generation amount Pt (Pa) obtained by, for example, substituting the reference power generation amount Pr by the reference wind turbine group Gr having, as the members, the wind turbines T without the change of the output control parameter S into the above-described function F (see
The evaluation unit 6 is the functional unit configured to evaluate the target power generation amount Pt′ after the change of the output control parameter S based on the comparison between the target power generation amount Pt′ after the change and the estimated value before the change Pa. More specifically, the evaluation unit 6 evaluates whether the above-described target power generation amount Pt′ after the change is larger than the estimated value before the change Pa corresponding to the target power generation amount Pt before the change. That is, the evaluation unit 6 can evaluate that the target power generation amount Pt by the target wind turbine group Gt is increased by the change of the output control parameter S, if the target power generation amount Pt′ after the change is larger than the estimated value before the change Pa (Pr′>Pa). Conversely, the evaluation unit 6 can evaluate that the target power generation amount Pt by the target wind turbine group Gt is unchanged (in the case of Pr′=Pa) or is decreased (in the case of Pr′<Pa) by the change of the output control parameter S, if the target power generation amount Pt′ after the change is not more than the estimated value before the change Pa (Pr′<Pa).
Then, as a result of the evaluation by the wind turbine group power generation amount evaluation device 1 described above, if the evaluation unit 6 evaluates that the target power generation amount Pt by the target wind turbine group Gt is increased by the change of the output control parameter S, the output control parameter S may also be changed in the same manner with respect to the reference wind turbine group Gr. In the embodiments shown in
With the above configuration, the evaluation is made as to, for example, whether the power generation amount of the target wind turbine group Gt in the case in which the output control parameter S of the wind turbine (for example, the wind turbine positioned on the upwind side) belonging to the target wind turbine group Gt which is the wind turbine group of the evaluation target is changed (target power generation amount Pt′ after the change) is larger than the target power generation amount Pt obtained before the change of the output control parameter S by using the correlation (criterial correlation Cr) between the target power generation amount Pt before the change and the reference power generation amount Pr of the reference wind turbine group Gr disposed in Parallel to the target wind turbine group Gt.
That is, the target power generation amount Pt′ and the reference power generation amount Pr′ each measured, for example, at the same time after the change of the output control parameter S described above are measured under the same wind condition. In addition, likewise, the criterial correlation Cr is the correlation between the target power generation amount Pt and the reference power generation amount Pr measured under the same wind condition before the change of the output control parameter S described above. Accordingly, using the criterial correlation Cr, it is possible to estimate the target power generation amount Pt before the change described above, which may be obtained under the wind condition when the above-described reference power generation amount Pr′ after the change is measured. Therefore, it is possible to evaluate that the estimated value before the change Pa of the target power generation amount Pt before the change which is thus obtained and the measurement value of the target power generation amount Pt′ after the change are the power generation amounts on the same wind condition. Thus, comparing the both, it is possible to easily evaluate how the target power generation amount Pa′ after the change is, as compared with that before the change without obtaining a power generation amount from a measured wind speed.
In some embodiments, the set value changing unit 3 may change the set value of the output control parameter S of at least one wind turbine T positioned on the upwind side in the wind direction D in the target wind turbine group Gt described above. In the embodiments shown in
With the above configuration, the wind turbine T whose output control parameter S is to be changed is one or the plurality of wind turbines positioned on the upwind side, for example, the wind turbine positioned on the most upwind side in the target wind turbine group Gt. Compared to the front wind turbines disposed on the upwind side, the back wind turbines disposed on the downwind side normally have a smaller power generation output due to the influence of wake of the front wind turbines. Moreover, it is known that each wind turbine generates power most efficiently in the region positioned midway between the cut-in wind speed and the rated wind speed. Thus, if the power generation amount of the front wind turbines is, for example, decreased, the back wind turbines can utilize more wind energy by the decreased power generation amount of the front wind turbines. Accordingly, the power generation amount of each of the wind turbines T changes, making it possible to achieve optimization of the power generation amount of the target wind turbine group GT, such as maximization of the target power generation amount Pt, through such adjustment of the power generation amount.
Next, the criterial correlation generation unit 7 generating the criterial correlation Cr described above and some embodiments related thereto will be described.
In some embodiments, the wind turbine group power generation amount evaluation device 1 may further include the criterial correlation generation unit 7 that generates the criterial correlation Cr for each of a plurality of combinations C of the target wind turbine group Gt and the reference wind turbine group Gr which have members determined in advance in accordance with the plurality of wind directions D. In this case, the above-described criterial correlation acquisition unit 2 acquires the criterial correlation Cr with respect to each of the above-described combinations C according to a corresponding one of the wind directions D acquired by the above-described wind direction acquisition unit 12. The above-described plurality of wind directions D may be, for example, the directions of wind blowing from the four cardinal directions of north, south, east, and west which divide 360° C. into quarters or the eight intercardinal directions of north, south, east, west, northeast, southeast, southwest, and northwest which divide 360° C. into eight directions.
Once the wind directions D are determined, it is possible to determine the target wind turbine group Gt and the reference wind turbine group Gr in accordance with the wind directions D. Thus, it is possible to predetermine each of the combinations C of the target wind turbine group Gt and the reference wind turbine group Gr according to the corresponding one of the above-described plurality of wind directions D. In addition, it is possible to quickly perform a process after the measurement result of the wind direction D is acquired by the above-described wind direction acquisition unit 12, if each of the above-described combinations C is determined with respect to the corresponding one of the plurality of assumed wind directions D. That is, it is possible to quickly obtain the respective members of the target wind turbine group Gt and the reference wind turbine group Gr based on management information I which associates, for example, the plurality of wind directions D and the above-described combinations C determined in accordance with the respective wind directions D, without performing a process of determining the respective members of the target wind turbine group Gt and the reference wind turbine group Gr. Furthermore, once the criterial correlation Cr according to each of the above-described combinations C is generated in advance, and the corresponding one of the wind directions D is determined, preparing the management information I associated so as to obtain the criterial correlation Cr and the respective members of the target wind turbine group Gt and the reference wind turbine group Gr, it is possible to quickly acquire the criterial correlation Cr in the above-described combination C with respect to the acquired with direction D as well after obtaining the said combination C.
In the embodiments shown in
Moreover, the above-described management information I may be generated as shown in
With the above configuration, the combinations C of the target wind turbine group Gt and the reference wind turbine group Gr are determined with respect to the plurality of assumed wind directions D, the criterial correlation Cr for each of the combinations C is generated, and the above-described evaluation is made by using the criterial correlation Cr according to the acquired wind direction D. Thus, it is possible to quickly make the above-described evaluation according to the wind direction D.
Furthermore, in some embodiments, the wind turbine group power generation amount evaluation device 1 may further include the above-described criterial correlation generation unit 7 and a wind direction change detection unit 14 which detects a change in the wind direction D. In this case, the above-described criterial correlation acquisition unit 2 acquires the criterial correlation Cr according to the changed wind direction D if the change in the wind direction D is detected. That is, the above-described evaluation is made if the change in the wind direction D is detected.
The wind direction change detection unit 14 may be configured to detect the change in the wind direction D if it is determined that the wind direction D is different from how it was before during a predetermined time period. If the wind direction D continuously changes at short time intervals, it may be inappropriate to determine that the wind direction D has changed every time the change is made, and to make the above-described evaluation. Thus, if it is determined that the wind direction D has changed, the target power generation amount Pt by the target wind turbine group Gt determined in accordance with the changed wind direction D is evaluated by using the reference power generation amount Pr by the reference wind turbine group Gr determined in accordance with the changed wind direction D.
More specifically, wind blowing from any direction of 360-degree direction is classified into any of the plurality of wind directions D obtained through division by the predetermined number such as four cardinal directions or the eight intercardinal directions. For example, if the plurality of wind directions D are classified into the four cardinal directions of 0° in the north, 90° in the south, 45° in the east, and 135° in the west, wind may be classified based on a comparison with a threshold determined in accordance with the four cardinal directions, such as wind is classified into the north if the cardinal point of the measured wind is greater than −22.5° and not greater than 22.5°.
Then, it may be determined that the wind direction D has changed if, for example, the wind direction D is measured at measurement intervals such as periodically, and the wind direction D which is different from the current wind direction D is obtained for a predetermined time period (for example, 30 minutes) which is longer than the above-described measurement intervals. Alternatively, it may be determined that the wind direction D has changed if a change occurs in a moving average of the measurement value at predetermined intervals (for example, 1-degree intervals) of the wind direction D measured periodically. It is possible to reduce the influence of noise by thus causing delay in the change of the wind direction which is obtained little by little as compared with that in the case of the classification by the cardinal points.
With the above configuration, it is possible to acquire the criterial correlation between the target power generation amount of the reference wind turbine group and the target power generation amount of the target wind turbine group according to the changed wind direction which is, for example, determined in advance in accordance with the change in the wind direction D. Thus, triggered by the change in the wind direction, it is possible to evaluate the target power generation amount by the target wind turbine group Gt described above.
A wind turbine group power generation amount evaluation method corresponding to the process performed by the wind turbine group power generation amount evaluation device 1 described above will be described below with reference to
The wind turbine group power generation amount evaluation method is the method for evaluating the power generation amount of the wind turbine group including the plurality of wind turbines T (the target power generation amount Pt by the target wind turbine group Gt). As shown in
Each of the above steps will be described along the flow of
In step S1 of
In step S2 of
In step S3 of
In step S4 of
In step S5 of
In step S6 of
In the embodiment shown in
Moreover, in some embodiments, the wind turbine group power generation amount evaluation method may further include the criterial correlation generation step (S72 of
Furthermore, in some embodiments, as shown in
The present invention is not limited to the above-described embodiment, and also includes an embodiment obtained by modifying the above-described embodiment and an embodiment obtained by combining these embodiments as appropriate.
Number | Date | Country | Kind |
---|---|---|---|
2019-074053 | Apr 2019 | JP | national |