This application is a national phase application based on international application no. PCT/GB2005/0005000, filed Feb. 10, 2005, which claims the priority of Great Britain Patent Application No. 0404194.3, filed Feb. 25, 2004, the content of which is incorporated herein by reference.
The invention relates to the field of wireless communications. For example, the invention is applicable to the field of mobile telephony.
Technical specifications will differ from one wireless communications network to another. This leads to the problem that a wireless communications device designed to work in one network is unlikely to be compatible with other networks. One approach to ameliorating the compatibility issue is to provide a standard operating scheme for adoption by designers and manufacturers of wireless communications networks. For example, standards such as GSM, AMPS, CDMAOne and UMTS exist in the mobile telephony field. In fact, the mobile telephony field illustrates the situation where several incompatible standards coexist with the result that the compatibility problem, although reduced, is not eliminated. For example, a mobile telephone designed according to the AMPS standard will not work in a GSM network.
In practice, wireless communications networks do not have perfect coverage, i.e. there will be places where a user will find it difficult or impossible to connect to his or her wireless communications network. Even if another network provides adequate coverage to the user's location, the user's device may be incompatible with the other network, as discussed above.
One object of the present invention is to improve the chances of a user being able to connect to a wireless communications network.
According to one aspect, the invention provides a wireless communications network participant comprising: a plurality of communications subsystems, each subsystem being arranged to transmit and/or receive signals under a different telecommunications standard; means for generating a clock signal; and scheduling means for sending commands to at least one of the subsystems for its or their operation, the scheduling means deducing the timing of the commands relative to the clock signal. Typically, these commands cause the subsystem(s) to begin, modify or stop performing certain processes.
Thus, the invention provides a system which can operate under several standards, thereby facilitating connection by a user to a number of wireless communications networks, with the result that the chances of a wireless communications device being used successfully are enhanced.
Furthermore, the invention advantageously permits a single timing signal within the wireless communications network participant to be used for interacting with networks organised according to different standards so that separate timing signals do not need to be generated for use with different standards. Moreover, where the wireless communications network participant switches from interacting with a network organised according to one standard to interacting with a network organised according to another standard, the use of a single timing signal allows the switchover to be implemented efficiently as the timings required under the different standards are reckoned relative to the same clock signal.
In one embodiment, the process of determining how the timing of operations of the wireless communications network participant should be controlled relative to the timing signal in order to permit the participant to interact with a target unit involves producing an offset indicating a timing offset between a point in the timing signal and a corresponding point in a notional timing signal formatted for communicating between the participant and the target unit.
The wireless communications network participant may be, for example, a mobile telephone. The target units interacting with the wireless communications device may be, for example, basestations in a mobile telephony network. Two of the standards used by the subsystems may be, for example, the UMTS and GSM standards.
By way of example only, certain embodiments of the invention will now be described with reference to the accompanying figures, in which:
As shown in
The scheduling and timing of tasks performed by the processing subsystems 16 and 18 are controlled, ultimately, by a clock signal 23 provided by the clock 24. Clock 24 contains a crystal oscillator for the purpose of generating the clock signal 23. The crystal oscillator is arranged such that the clock signal 23 is at the frequency required by the UMTS subsystem 18 to perform UMTS tasks. Thus, when the telephone 10 is communicating with a UMTS basestation, the UMTS subsystem 18 times and schedules UMTS tasks by using the clock signal 23 directly.
The clock signal 23 conforms to the UMTS standard so it cannot be used directly in the control of GSM operation of the mobile telephone 10 because the GSM standard demands a clock signal at a different frequency. To allow GSM tasks to be performed with the correct timing, the telephone 10 contains a scheduler 22 that interacts with the clock signal 23. The scheduler 22 uses the clock signal 23 as a reference signal to calculate the moments when certain actions must be begun or stopped by the GSM subsystem 16. Based on the calculated event timings, the scheduler can send commands to the GSM subsystem 16 to cause GSM tasks to be carried out at the correct times. Thus, the GSM tasks are not controlled directly by a master clock signal but on the contrary the GSM subsystem 16 receives commands to perform the required GSM tasks at the correct times.
The operation of the subsystems 16 and 18 and the scheduler will now be described with reference to
For the purposes of this example, it is assumed that the mobile telephone 10 is initially operating in the UMTS mode and that it first establishes a link to UMTS#2. The UMTS core 18 determines that the boundary of the frame structure of the signals from basestation UMTS#2 occurs at time t3. Therefore, the UMTS subsystem 18 records offset C indicating the position of t3 relative to t0 so that the UMTS subsystem 18 has a record of the frame structure of the signals of basestation UMTS#2. At some subsequent time, if the mobile telephone is required to interact with basestation UMTS#2, the appropriate UMTS task can be scheduled to commence at the appropriate time by taking offset C into account. In a similar way, the UMTS subsystem 18 can acquire signals from basestation UMTS#1 and determine an offset A indicating the position t1 of the boundary of the frame structure of the signals from the basestation UMTS#1 relative to the arbitrary origin t0 of clock signal 23. Likewise, the GSM subsystem 16 can acquire signals from basestations GSM#1 and GSM#2 and process them under commands from the scheduler 22 to determine offsets B and D indicating the boundaries t2 and t4 of the frame structures of the signals from GSM#1 and GSM#2 respectively relative to the arbitrary origin t0 of the clock signal 23.
When linked to basestation UMTS#2, the telephone 10 will monitor the other basestations UMTS#1, GSM#1 and GSM#2 in the vicinity. Primarily, this monitoring is done to determine whether better communications can be achieved (e.g. with fewer errors) by using a communications link to a different basestation.
Number | Date | Country | Kind |
---|---|---|---|
0404194.3 | Feb 2004 | GB | national |
Filing Document | Filing Date | Country | Kind | 371c Date |
---|---|---|---|---|
PCT/GB2005/000500 | 2/10/2005 | WO | 00 | 8/25/2006 |
Publishing Document | Publishing Date | Country | Kind |
---|---|---|---|
WO2005/084050 | 9/9/2005 | WO | A |
Number | Name | Date | Kind |
---|---|---|---|
6219564 | Grayson et al. | Apr 2001 | B1 |
6473607 | Shohara et al. | Oct 2002 | B1 |
6707822 | Fadavi-Ardekani et al. | Mar 2004 | B1 |
6785352 | Ranta | Aug 2004 | B1 |
6895255 | Bridgelall | May 2005 | B1 |
6959201 | Leprieur et al. | Oct 2005 | B2 |
7035596 | Sato | Apr 2006 | B2 |
7046649 | Awater et al. | May 2006 | B2 |
7245725 | Beard | Jul 2007 | B1 |
7260068 | Hsieh et al. | Aug 2007 | B2 |
7362188 | Leclercq | Apr 2008 | B2 |
7433709 | Ormson | Oct 2008 | B2 |
20030003951 | Leprieur et al. | Jan 2003 | A1 |
20030157912 | Atkinson et al. | Aug 2003 | A1 |
20030169825 | Wenzel | Sep 2003 | A1 |
20030214916 | Khawand et al. | Nov 2003 | A1 |
20040037379 | Khlat | Feb 2004 | A1 |
Number | Date | Country |
---|---|---|
1400835 | Mar 2003 | CN |
1 162 754 | Dec 2001 | EP |
1 213 830 | Jun 2002 | EP |
1 458 111 | Sep 2004 | EP |
WO 0186977 | Nov 2001 | WO |
WO 2004004389 | Jan 2004 | WO |
Number | Date | Country | |
---|---|---|---|
20070197204 A1 | Aug 2007 | US |