Claims
- 1. A method of reinforcing earth, comprising the steps of:
- (a) providing a woven grid, comprising:
- (i) a plurality of spaced-apart bundles of pick yarns positioned adjacent to one another and forming a first and a second side of the grid;
- (ii) a plurality of pairs of locking yarns oriented parallel to the pick yarns, each yarn in a locking yarn pair positioned adjacent to an edge of a pick yarn bundle;
- (iii) a plurality of spaced-apart bundles of warp yarns positioned adjacent to one another, alternately positioned on the first and second sides of the pick yarn bundles and extending between each pick yarn bundle and its corresponding locking yarns;
- (iv) a plurality of pairs of leno yarns oriented parallel to the warp yarns, the leno yarns in each pair positioned on opposite sides of the pick yarn bundles and interlocking with each other between each pick yarn bundle and its corresponding locking yarns; and
- (v) a plastic coating covering the yarns;
- (b) grading to a predetermined height and slope an area of substrate that will support the reinforced earth;
- (c) placing a layer of the woven grid on the graded fill in a direction such that the pick yarn bundles and locking yarns are oriented substantially perpendicular to the direction of the grade, the pick yarn bundles acting as anchors and the locking yarns helping lock the pick yarn bundles and the warp yarn bundles into place, and the warp yarn bundles and leno yarns are oriented substantially parallel to the direction of the grade, the warp yarn bundles acting as strength members and the leno yarns helping lock the pick yarn bundles and the warp yarn bundles into place;
- (d) placing a layer of fill on the grid; and
- (e) grading the layer of fill to a predetermined height and slope.
- 2. A method of reinforcing earth according to claim 1, comprising the additional step of repeating steps (c)-(e) at least once.
- 3. A method of reinforcing earth according to claim 2 in which at least one layer of fill comprises crushed stone.
- 4. A method of forming an embankment, comprising the steps of:
- (a) providing a woven grid, comprising:
- (i) a plurality of spaced-apart bundles of pick yarns positioned adjacent to one another and forming a first and a second side of the grid;
- (ii) a plurality of pairs of locking yarns oriented parallel to the pick yarns, each yarn in a locking yarn pair positioned adjacent to an edge of a pick yarn bundle;
- (iii) a plurality of spaced-apart bundles of warp yarns positioned adjacent to one another, alternately positioned on the first and second sides of the pick yarn bundles and extending between each pick yarn bundle and its corresponding locking yarns;
- (iv) a plurality of pairs of leno yarns oriented parallel to the warp yarns, the leno yarns in each pair positioned on opposite sides of the pick yarn bundles and interlocking with each other between each pick yarn bundle and its corresponding locking yarns; and
- (v) a plastic coating covering the yarns;
- (b) grading to a predetermined height and slope an area of substrate that will support the embankment;
- (c) placing a layer of the woven grid on the graded substrate in a direction such that the pick yarn bundles and locking yarns are oriented substantially perpendicular to the direction of the grade, the pick yarn bundles acting as anchors and the locking yarns helping lock the pick yarn bundles and the warp yarn bundles into place, and the warp yarn bundles and leno yarns are oriented substantially parallel to the direction of the grade, the warp yarn bundles acting as strength members and the leno yarns helping lock the pick yarn bundles and the warp yarn bundles into place;
- (d) placing a layer of fill on a portion of the woven grid corresponding to the cross-sectional area of the embankment to be formed by the fill, but leaving a predetermined portion of the woven grid uncovered;
- (e) grading the layer of fill to a predetermined height, slope and area;
- (f) wrapping the uncovered edges of the woven grid up around the fill from which the grid extends;
- (g) placing an additional layer of the woven grid on the graded fill in a direction such that the pick yarn bundles and locking yarns are oriented substantially perpendicular to the direction of the grade, the pick yarn bundles acting as anchors and the locking yarns helping lock the pick yarn bundles and the warp yarn bundles into place, and the warp yarn bundles and leno yarns are oriented substantially parallel to the direction of the grade, the warp yarn bundles acting as strength members and the leno yarns helping lock the pick yarn bundles and the warp yarn bundles into place;
- (h) placing an additional layer of fill on a portion of the woven grid corresponding to the cross-sectional area of the embankment to be formed by the additional layer of fill, but leaving a predetermined portion of the additional layer of woven grid uncovered;
- (i) grading the additional layer of fill to a predetermined height, slope and area;
- (j) wrapping the uncovered portions of the woven grid up around the fill from which the grid extends;
- (k) placing an additional layer of fill on the embankment; and
- (l) grading the additional layer of fill on a predetermined height, slope and area.
- 5. A method of forming an embankment according to claim 4 further comprising repeating steps (g)-(j) at least once.
- 6. A method of forming an earth retaining wall, comprising the steps of:
- (a) providing a woven grid, comprising:
- (i) a plurality of spaced-apart bundles of pick yarns positioned adjacent to one another and forming a first and a second side of the grid;
- (ii) a plurality of pairs of locking yarns oriented parallel to the pick yarns, each yarn in a locking yarn pair positioned adjacent to an edge of a pick yarn bundle;
- (iii) a plurality of spaced apart bundles of warp yarns positioned adjacent to one another, alternately positioned on the first and second sides of the pick yarn bundles and extending between each pick yarn bundle and its corresponding locking yarns;
- (iv) a plurality of pairs of leno yarns oriented parallel to the warp yarns, the leno yarns in each pair positioned on opposite sides of the pick yarn bundles and interlocking with each other between each pick yarn bundle and its corresponding locking yarns; and
- (v) a plastic coating covering the yarns;
- (b) providing a plurality of retaining wall elements, each element having at least one fastener for attachment to a length of woven grid;
- (c) grading to a predetermined height and slope an area of substrate that will support the wall and the earth it retains;
- (d) placing a layer of retaining wall elements on the graded substrate;
- (e) placing a layer of fill on the substrate;
- (f) grading the layer of fill to substantially the height of the lowest fasteners on the retaining wall elements;
- (g) attaching at least one length of woven grid to at least one lowest fastener on each retaining wall element in a direction such that the pick yarn bundles and locking yarns are oriented substantially perpendicular to the retaining wall, the pick yarn bundles acting as anchors and the locking yarns helping lock the pick yarn bundles and the warp yarn bundles into place, and the warp yarn bundles and leno yarns are oriented substantially parallel to the retaining wall, the warp yarn bundles acting as strength members and the leno yarns helping lock the pick yarn bundles and the warp yarn bundles into place;
- (h) placing an additional layer of fill on the lengths of woven grids;
- (i) grading the additional layer of fill to substantially the height of the next-higher fasteners on the retaining wall elements;
- (j) attaching at least one length of woven grid to at least one next-higher fastener in a direction such that the pick yarn bundles and locking yarns are oriented substantially perpendicular to the retaining wall, the pick yarn bundles acting as anchors and the locking yarns helping lock the pick yarn bundles and the warp yarn bundles into place, and the warp yarn bundles and leno yarns are oriented substantially parallel to the retaining wall, the warp yarn bundles acting as strength members and the leno yarns helping lock the pick yarn bundles and the warp yarn bundles into place;
- (k) placing an additional layer of retaining wall elements on the highest layer of retaining wall elements in place;
- (l) placing an additional layer of fill on the lengths of woven grids;
- (m) repeating steps f-l at least once; and
- (n) grading the additional layer of fill to a predetermined height and slope.
Parent Case Info
This application is a divisional application of pending application Ser. No. 07/280,123, filed Dec. 5, 1988.
US Referenced Citations (14)
Foreign Referenced Citations (2)
Number |
Date |
Country |
2626650 |
Dec 1977 |
DEX |
2167794 |
Jun 1986 |
GBX |
Non-Patent Literature Citations (3)
Entry |
Article from Civil Engineering, ASCE, pp. 51-57, Jan. 1979. |
Brochure entitled "Tensar.RTM. Soil Reinforcement Geogrid SR2". |
Brochure entitled "Tensar.RTM.--Guidelines for the Design & Construction of Reinforced Soil Retaining Walls Using `Tensar` Geogrids." |
Divisions (1)
|
Number |
Date |
Country |
Parent |
280123 |
Dec 1988 |
|