The present invention relates generally to the field of integrated circuit design, and more particularly to accommodating engineering change orders by including spare latch circuits.
Integrated circuit design is a complex and drawn-out process. From time to time, requirements to change a circuit design are made after substantial design work has been completed. These requests, termed “Engineering Change Orders” (“ECOs”) introduce additional complexity into the process. Engineers anticipate ECOs by including extra combinatorial logic and spare latches, which can be reconfigured, if needed, by metal-only ECO. Metal-only ECO is common practice in Complementary Metal-Oxide Semiconductor (CMOS) designs. In metal-only ECO, only a few of the masks for the original design are altered, typically for metal layers, hence the designation metal-only. Using metal-only ECO, engineers can activate extra latches, gates, and other structures that have been placed in the design in case of an eventual ECO requirement for additional structures. Engineers continue to face challenges in anticipating and facilitating ECOs.
A computer-implemented method includes identifying an in initial register-transfer-level description for an integrated circuit design and adding one or more spare latches to the initial register-transfer-level description to yield a modified register-transfer-level description for the integrated circuit design. The computer-implemented method further includes performing placement and routing for the modified register-transfer-level description to yield a gate-level description for the integrated circuit design. The one or more spare latches exist in the gate-level description. The computer-implemented method further includes converting at least one of the one or more spare latches in the gate-level description into a reconfigurable latch filler cell to yield a modified gate-level description for the integrated circuit design and finalizing the integrated circuit design. A corresponding computer program product and computer system are also disclosed.
In another aspect, a computer-implemented method includes receiving a register-transfer-level description and a gate-level description for an integrated circuit design. The gate-level description includes one or more spare latches implemented as reconfigurable latch filler cells. The computer-implemented method further includes receiving an engineering change order for the integrated circuit design. The engineering change order requires at least one additional latch. The computer-implemented method further includes, responsive to the engineering change order, adding the at least one additional latch to the register-transfer-level description and, for at least one of the at least one additional latch, selecting one of the one or more spare latches in the register-transfer-level description to yield a selected spare latch. The computer-implemented method further includes, for the selected spare latch, identifying a selected reconfigurable latch filler cell in the gate-level description and replacing the selected reconfigurable latch filler cell with an operational latch in the gate-level description. The computer-implemented method further includes finalizing the integrated circuit design. A corresponding computer program product and computer systems are also disclosed.
In another aspect, a method of producing an integrated circuit include producing an integrated circuit design, adding at least one spare latch design to the integrated circuit design, replacing at least one of the at least one spare latch design with a reconfigurable latch filler cell design, and manufacturing the integrated circuit design.
In another aspect, a microelectronic structure includes a latch circuit. The latch circuit includes one or more power connection sites and one or more clock connection sites. The microelectronic structure further includes at least one disconnection. The at least one disconnection is located on at least one of any of the one or more power connection sites and any of the one or more clock connection sites.
In another aspect, a microelectronic structure includes a latch circuit. The latch circuit includes one or more power connection sites and one or more clock connection sites. At least one of any of the one or more power connection sites and any of the one more clock connection sites including a connection made by connecting a designed disconnection using a metal-only engineering change order.
Designers of integrated circuits often include spare latch circuits (also known as flip-flops) in initial designs, in the event that more latches are needed to implement later ECOs (including metal-only ECOs). As used herein, the term “spare latch” means a latch circuit that is instantiated in a circuit design but has no logic function other than to be connected later for the purpose of updating or correcting the logic as a result of a later ECO. Latches are inherently state-based sequential logic that generally must be driven by at least one clock to function correctly. Latches with scan capability are often found in modern integrated circuit designs, and these circuits include verification steps that require additional clock drivers. Combinatorial logic, in contrast to latches, does not depend on prior states and does not require timing as rigorous as sequential circuits. As a result, extensible extra combinatorial logic can be added to an integrated circuit design, and this extra logic can be reconfigured after manufacturing or in ECO by configuring various gates. The extra combinatorial logic need not consume significant additional power or require significant additional clock buffer size. However, extra latches do require significant power, clock, and scan connections.
Historically, designers have avoided adding latches in ECO because adding latches tends to disturb the load on the clock buffers and the length of the scan chain, which leads to design rule violations. Resolving design rule violations can be time consuming and costly. This can be addressed by retaining all connectivity related to power, clock, and scan for the spare latches. However, increasingly tight design rules and small footprint requirements have meant that reconfigurable combinatorial logic cannot be used to configure latch circuits. Current techniques include leaving all power, clock, and scan connections in place while routing the latch output back to the input, which saves on power dissipation by preventing the latch from switching internally. Current techniques provide for using such a spare latch in ECO by replacing the feedback path from output to input with new logic.
Typically, 2%-3% of the number of originally instantiated latches are added to the design as spares. The inventors have observed and/or recognized that any unused of these spare latches will contribute to overall power dissipation of the design, leakage of power from the transistors inside the latch, and loss of dynamic power from the clock buffers for the spare latches. The inventors have further observed and/or recognized that adding more spare latches would enhance the ECO-compatibility of a given design, however the aforementioned limitations keep the fraction of spare latches low. The inventors have further observed and/or recognized that, in a contemporary multi-million gate design, the number of spare latches is nontrivial and can account for noticeable increases in dynamic and leakage power losses. Thus, the inventors have observed and/or recognized that a power efficient ECO methodology for a reconfigurable latch filler cell that permits the extensible use of spare latches while not significantly affecting clock routing and scan chain routing, would be an improvement to the art. It will be understood that, as used herein, the term “reconfigurable latch filler cell” means a filler cell that is reconfigurable and that is used in a replacement location of a latch, and not, for example, a latch that is reconfigurable and is used as a filler cell. Further, it will be understood that the term “filler cell”, irrespective of whether the filler cell is for a latch or is reconfigurable, means a collection of structures within an integrated circuit that are nonfunctional as-designed, but can be easily converted into a functional cell at a later stage of manufacturing, for example metal-only ECO. It will be recognized, however, that the aforementioned advantages over various prior art techniques will not necessarily all be present in all embodiments of the present invention.
In accordance with the foregoing, and without requiring that any particular embodiment exhibit any particular advantage, the inventors have further observed that embodiments that exhibit some or all of the following features would be advantageous:
Referring now to the invention in more detail,
In the depicted embodiment, the reconfigurable latch filler cell 100 supports various pin connections. Specifically, the node marked d represents the input signal connection site, and the node marked q_b represents the output signal connection site. The node marked scan_in represents the scan input connection site, and the node marked scan_out represents the scan output connection site. The nodes marked l1_q and l2 represent internal nodes of the latch. Three clock signals are depicted at various clock connection sites (i.e., clock pins): l1clk, l2clk, and dclk. Additionally, each clock signal has a corresponding inverted clock signal:
In the depicted embodiment, various clock disconnections 110 are shown at each connection between any circuit element and a clock signal or inverted clock signal. The clock disconnections 110 may be achieved by not describing the connection in the metal-only layers. Similarly, the clock disconnections 110 may be reconnected by describing such a connection in the metal-only layers such that the connection may be made in metal-only ECO.
Referring still to
Referring still to
Referring still to
Referring still to
Thus, another aspect of the invention may include a latch circuit that has been made operational from a reconfigurable latch filler cell, such as the reconfigurable latch filler cell 100, by an engineering change order. More particularly, in such an aspect, at least one of any of the one or more power connection sites and any of the one more clock connection sites include a connection made by connecting a designed disconnection, such as clock disconnection 110 or a power disconnection 112, using a metal-only engineering change order. Similarly, the scan function in such an aspect may be understood such that the latch circuit has been made by removing a short, such as the short 114, from the scan input site to the scan output site using a metal-only engineering change order.
Referring now to
Referring still to the embodiment depicted in
Referring now to
Referring still to the embodiment depicted in
Referring still to the embodiment of
In the depicted embodiment, at step 330, the latch filler cell generation program 201 performs synthesis, placement, and routing on the integrated circuit design to yield a gate-level description, such as the gate-level description 209. The gate-level description initially includes latch standard cells for all of the instantiated spare latches. At step 340, the latch filler cell generation program 201 converts the spare latches in the gate-level description into reconfigurable latch filler cells, such as the reconfigurable latch filler cell 211, to yield a modified gate-level description for the integrated circuit design. Replacing the spare latches with reconfigurable latch filler cells may be achieved by a post process, which may be understood as a subroutine of the latch filler cell generation program 201. Each reconfigurable latch filler cell may be modeled on the reconfigurable latch filler cell 100. In various embodiments, the reconfigurable latch filler cells have an area footprint that is identical to or no larger than that of an operational latch; this ensures that the reconfigurable latch filler cell will not cause any placement overlaps in the gate-level description. In the depicted embodiment, the reconfigurable latch filler cell includes at least one disconnection from a power rail, such as the power disconnections 112. Similarly, the reconfigurable latch filler cell may include at least one disconnection from a clock pin, such as the clock disconnections 110. Thus, the cell may be considered pin-compatible with the various clock signals (in
Referring still to the embodiment depicted in
Referring still to the embodiment of
In some embodiments, the post-route optimizations may take account of the size of the clock buffers for the integrated circuit design. In particular, the latch filler cell generation program 201 may anticipate that disconnecting the reconfigurable latch filler cells from their clock pins will decrease the load on the clock buffers. Clock buffers may be understood as amplifier circuits that are effective to ensure satisfactory clock signal strength throughout the integrated circuit. Various otherwise-standard optimization routines may determine that the clock buffer load is reduced and accordingly downsize size and/or reduce the capacity of the clock buffers as an optimization. The latch filler cell generation program 201 may prevent his by locking the size of the clock buffers in the gate-level description. To achieve the prevention, the latch filler cell generation program 201 may identify one or more clock buffers for the integrated circuit design, determine an optimal clock buffer size for the one or more clock buffers, based on the quantity of spare latches used, and prevent one or more optimization routines from reducing the one or more clock buffers below the optimal clock buffer size. Accordingly, designers may maintain the clock buffer size restriction through until logic is frozen for the integrated circuit design, immediately prior to manufacture: that is, when the possibility of an ECO is closed.
Referring still to the embodiment of
Referring now to
Referring still to the embodiment of
Referring still to the embodiment of
Referring still to the embodiment of
Referring still to the embodiment of
In some embodiments, the ECO latch insertion program 203 may take account of the clock buffers. As described above, the clock buffers may be locked to prevent downsizing during optimization. At ECO, if the design logic is frozen for a particular version of the integrated circuit design, the ECO latch insertion program 203 may unlock the clock buffer sizes, thereby allowing the clock buffer size to be optimized post-ECO. Equivalently, the ECO latch insertion program 203 may identify one or more clock buffers for the integrated circuit design, wherein the one or more clock buffers have been sized for the one or more spare latches, and the ECO latch insertion program 203 may reduce the one or more clock buffers to an optimized clock buffer size, based on the number of instantiated latches in the integrated circuit design, as modified by the ECO. The downsizing may be done both at the design and parent levels.
Referring still to the embodiment of
Referring now to
Referring still to the embodiment of
Referring still to the embodiment of
Referring still to the embodiment of
Referring still to the embodiment of
As depicted, the computer 600 operates over a communications fabric 602, which provides communications between the cache 616, the computer processor(s) 604, the memory 606, the persistent storage 608, the communications unit 610, and the input/output (I/O) interface(s) 612. The communications fabric 602 may be implemented with any architecture suitable for passing data and/or control information between the processors 604 (e.g., microprocessors, communications processors, and network processors, etc.), the memory 606, the external devices 618, and any other hardware components within a system. For example, the communications fabric 602 may be implemented with one or more buses or a crossbar switch.
The memory 606 and persistent storage 608 are computer readable storage media. In the depicted embodiment, the memory 606 includes a random access memory (RAM). In general, the memory 606 may include any suitable volatile or non-volatile implementations of one or more computer readable storage media. The cache 616 is a fast memory that enhances the performance of computer processor(s) 604 by holding recently accessed data, and data near accessed data, from memory 606.
Program instructions for the latch filler cell generation program 201 and/or the ECO latch insertion program 203 may be stored in the persistent storage 608 or in memory 606, or more generally, any computer readable storage media, for execution by one or more of the respective computer processors 604 via the cache 616. The persistent storage 608 may include a magnetic hard disk drive. Alternatively, or in addition to a magnetic hard disk drive, the persistent storage 608 may include, a solid state hard disk drive, a semiconductor storage device, read-only memory (ROM), electronically erasable programmable read-only memory (EEPROM), flash memory, or any other computer readable storage media that is capable of storing program instructions or digital information.
The media used by the persistent storage 608 may also be removable. For example, a removable hard drive may be used for persistent storage 608. Other examples include optical and magnetic disks, thumb drives, and smart cards that are inserted into a drive for transfer onto another computer readable storage medium that is also part of the persistent storage 608.
The communications unit 610, in these examples, provides for communications with other data processing systems or devices. In these examples, the communications unit 610 may include one or more network interface cards. The communications unit 610 may provide communications through the use of either or both physical and wireless communications links. The latch filler cell generation program 201 and/or the ECO latch insertion program 203 may be downloaded to the persistent storage 608 through the communications unit 610. In the context of some embodiments of the present invention, the source of the various input data may be physically remote to the computer 600 such that the input data may be received and the output similarly transmitted via the communications unit 610.
The I/O interface(s) 612 allows for input and output of data with other devices that may operate in conjunction with the computer 600. For example, the I/O interface 612 may provide a connection to the external devices 618, which may include a keyboard, keypad, a touch screen, and/or some other suitable input devices. External devices 618 may also include portable computer readable storage media, for example, thumb drives, portable optical or magnetic disks, and memory cards. Software and data used to practice embodiments of the present invention may be stored on such portable computer readable storage media and may be loaded onto the persistent storage 608 via the I/O interface(s) 612. The I/O interface(s) 612 may similarly connect to a display 620. The display 620 provides a mechanism to display data to a user and may be, for example, a computer monitor.
The programs described herein are identified based upon the application for which they are implemented in a specific embodiment of the invention. However, it should be appreciated that any particular program nomenclature herein is used merely for convenience, and thus the invention should not be limited to use solely in any specific application identified and/or implied by such nomenclature.
The present invention may be a system, a method, and/or a computer program product at any possible technical detail level of integration. The computer program product may include a computer readable storage medium (or media) having computer readable program instructions thereon for causing a processor to carry out aspects of the present invention.
The computer readable storage medium can be a tangible device that can retain and store instructions for use by an instruction execution device. The computer readable storage medium may be, for example, but is not limited to, an electronic storage device, a magnetic storage device, an optical storage device, an electromagnetic storage device, a semiconductor storage device, or any suitable combination of the foregoing. A non-exhaustive list of more specific examples of the computer readable storage medium includes the following: a portable computer diskette, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or Flash memory), a static random access memory (SRAM), a portable compact disc read-only memory (CD-ROM), a digital versatile disk (DVD), a memory stick, a floppy disk, a mechanically encoded device such as punch-cards or raised structures in a groove having instructions recorded thereon, and any suitable combination of the foregoing. A computer readable storage medium, as used herein, is not to be construed as being transitory signals per se, such as radio waves or other freely propagating electromagnetic waves, electromagnetic waves propagating through a waveguide or other transmission media (e.g., light pulses passing through a fiber-optic cable), or electrical signals transmitted through a wire.
Computer readable program instructions described herein can be downloaded to respective computing/processing devices from a computer readable storage medium or to an external computer or external storage device via a network, for example, the Internet, a local area network, a wide area network and/or a wireless network. The network may comprise copper transmission cables, optical transmission fibers, wireless transmission, routers, firewalls, switches, gateway computers and/or edge servers. A network adapter card or network interface in each computing/processing device receives computer readable program instructions from the network and forwards the computer readable program instructions for storage in a computer readable storage medium within the respective computing/processing device.
Computer readable program instructions for carrying out operations of the present invention may be assembler instructions, instruction-set-architecture (ISA) instructions, machine instructions, machine dependent instructions, microcode, firmware instructions, state-setting data, configuration data for integrated circuitry, or either source code or object code written in any combination of one or more programming languages, including an object oriented programming language such as Smalltalk, C++, or the like, and procedural programming languages, such as the “C” programming language or similar programming languages. The computer readable program instructions may execute entirely on the user's computer, partly on the user's computer, as a stand-alone software package, partly on the user's computer and partly on a remote computer or entirely on the remote computer or server. In the latter scenario, the remote computer may be connected to the user's computer through any type of network, including a local area network (LAN) or a wide area network (WAN), or the connection may be made to an external computer (for example, through the Internet using an Internet Service Provider). In some embodiments, electronic circuitry including, for example, programmable logic circuitry, field-programmable gate arrays (FPGA), or programmable logic arrays (PLA) may execute the computer readable program instructions by utilizing state information of the computer readable program instructions to personalize the electronic circuitry, in order to perform aspects of the present invention.
Aspects of the present invention are described herein with reference to flowchart illustrations and/or block diagrams of methods, apparatus (systems), and computer program products according to embodiments of the invention. It will be understood that each block of the flowchart illustrations and/or block diagrams, and combinations of blocks in the flowchart illustrations and/or block diagrams, can be implemented by computer readable program instructions.
These computer readable program instructions may be provided to a processor of a general purpose computer, special purpose computer, or other programmable data processing apparatus to produce a machine, such that the instructions, which execute via the processor of the computer or other programmable data processing apparatus, create means for implementing the functions/acts specified in the flowchart and/or block diagram block or blocks. These computer readable program instructions may also be stored in a computer readable storage medium that can direct a computer, a programmable data processing apparatus, and/or other devices to function in a particular manner, such that the computer readable storage medium having instructions stored therein comprises an article of manufacture including instructions which implement aspects of the function/act specified in the flowchart and/or block diagram block or blocks.
The computer readable program instructions may also be loaded onto a computer, other programmable data processing apparatus, or other device to cause a series of operational steps to be performed on the computer, other programmable apparatus or other device to produce a computer implemented process, such that the instructions which execute on the computer, other programmable apparatus, or other device implement the functions/acts specified in the flowchart and/or block diagram block or blocks.
The flowchart and block diagrams in the Figures illustrate the architecture, functionality, and operation of possible implementations of systems, methods, and computer program products according to various embodiments of the present invention. In this regard, each block in the flowchart or block diagrams may represent a module, segment, or portion of instructions, which comprises one or more executable instructions for implementing the specified logical function(s). In some alternative implementations, the functions noted in the blocks may occur out of the order noted in the Figures. For example, two blocks shown in succession may, in fact, be executed substantially concurrently, or the blocks may sometimes be executed in the reverse order, depending upon the functionality involved. It will also be noted that each block of the block diagrams and/or flowchart illustration, and combinations of blocks in the block diagrams and/or flowchart illustration, can be implemented by special purpose hardware-based systems that perform the specified functions or acts or carry out combinations of special purpose hardware and computer instructions.
| Number | Name | Date | Kind |
|---|---|---|---|
| 5953236 | Hossain et al. | Sep 1999 | A |
| 6446248 | Solomon et al. | Sep 2002 | B1 |
| 7774735 | Sood | Aug 2010 | B1 |
| 7919981 | Irie | Apr 2011 | B2 |
| 8015522 | Wang et al. | Sep 2011 | B2 |
| 8214774 | Nardone | Jul 2012 | B2 |
| 8302038 | Chen | Oct 2012 | B2 |
| 8810280 | Pyapali et al. | Aug 2014 | B2 |
| 8928381 | Goh | Jan 2015 | B1 |
| 20030145297 | Cote et al. | Jul 2003 | A1 |
| 20080301614 | St. Juste et al. | Dec 2008 | A1 |
| 20090172615 | Ortiz et al. | Jul 2009 | A1 |
| 20090288045 | Chien et al. | Nov 2009 | A1 |
| 20100201400 | Nardone | Aug 2010 | A1 |
| 20120066654 | Hopkins | Mar 2012 | A1 |
| 20130191799 | Yasunaka | Jul 2013 | A1 |
| Entry |
|---|
| Datta et al., “Accommodating Engineering Change Orders in Integrated Circuit Design,” U.S. Appl. No. 15/656,077, filed Jul. 21, 2017. |
| List of IBM Patents or Patent Applications Treated as Related, Signed Jul. 21, 2017, 2 pages. |
| “A Technology Independent Methodolgoy for Spare Latch Estimation”, an IP.com Prior Art Database Technical Disclosure, Authors et. al.: Disclosed Anonymously, IP.com No. IPCOM000226870D, IP.com Electronic Publication Date: Apr. 23, 2013, 6 pages. |
| “Design Aware Gate Array Style Spare Latch Planning and Distribution”, an IP.com Prior Art Database Technical Disclosure, Authors et. al.: Disclosed Anonymously, IP.com No. IPCOM000241528D, IP.com Electronic Publication Date: May 8, 2015, 7 pages. |
| Number | Date | Country | |
|---|---|---|---|
| 20170323030 A1 | Nov 2017 | US |