Amada Windows Unfold: Manual for Cadkey , Table of Contents, pp. 1-35, and Index, U.S. Amada Ltd., Buena Park, CA (Nov. 1995). |
Bourne, David A.,Intelligent Manufacturing Workstations, Knowledge-Based Automation of Processes , Session at the 1992 ASME Winter Annual Meeting (Nov. 1992). |
Wang, Cheng-Hua, “A Parallel Design System For Sheet Metal Parts”, Mechanical Engineering Report , presented at the Mechanical Engineering Department, Carnegie Mellon University, Pittsburgh, PA (May 1992). |
Wysong Literature, The Perfect Forming Touch: New PH PLUS Series , DNC Press Brakes, Cat. PHP-1, Wysong and Miles Company, Greensboro, NC (1993). |
Bourne et al., David A., “Feature Exchange Language Programmer's Guide”, Robotics Institute, Carnegie Mellon University (Jan. 1994). |
Bourne, et al., David A., “The Operational Feature Exchange Language”, Technical Report CMU-RI-TR-90-06 , The Robotics Institute, Carnegie Mellon University (Mar. 1990). |
Amacom: AP40 Literature , Version 4, Amada Company, Ltd. Japan (Jul. 1996). |
Amacom: AP60 Literature , Amada Company, Ltd. Japan (Jul. 1996). |
Amacom: AP200 Literature , Amada Company, Ltd. Japan (Jul. 1996). |
“Bending Soft”, Literature on the AMACOM AP40, No. 9112-01, Amada Company, Ltd., Japan (Date Unknown). |
Bourne, et al., David A. “Using The Feature Exchange Language In The Next Generation Controller”, Technical Report CMU-RI-TR-90-19 , The Robotics Institute, Carnegie Mellon University (Aug. 1990). |
Numao et al., “Scheplan-a scheduling expert for steel-making process”, IEEE A1 '88; pp. 467-472 May 1988.* |
Uckun et al., “Managing genetic search in job shop scheduling”; IEEE Expert; pp. 15-24 Oct. 1993.* |
Gopalakrishnan et al.; “Product design for manufacturing: the use of knowledge based systems in concurrent engineering”; IEEE Int. Conf. Systems, Man and Cybernetics; pp. 566-568. Nov. 1990.* |
Jain et al.; “Expert Simulation for on-line scheduling”; IEEE 1989 Winter Sim. Conf.; pp. 930-935 Dec. 1989.* |
Nomura et al.; “A heuristics guided scheduling framework for domains with complex conditions”; IEEE 6th Int. Conf. Tools Art. Intell.; pp. 752-755. Nov. 1994.* |
Arbon et al.; “Auto-MPS: an automated master production scheduling system for large volume manufacturing”; IEEE 10th Conf. Art. Intell. Applicat.; pp. 26-32 Mar. 1994.* |
Levner et al.; “A tandem expert system for batch scheduling in a CIM system based on group technology concepts”; 95 INRIA/IEEE Symp. Emerg. Tech. and Factory Automat.; pp. 667-674. Oct. 1995.* |
Niew at al.; “Knowledge based master production scheduler”; IEEE 1st. Int. Conf. Expert Planning Sys.; pp. 88-93 1990.* |
Readdie; “A prototype Al-based tool for production scheduling”; IEE Coll. Art. Intell. in Planning for Product. Control; pp. 2/1-2/4 1988.* |
Ohkura et al.; “Semiconductor process line scheduling expert system”; IEEE/UCS/SEMI Int. Symp. Semi. Manufact.; pp. 89-92 Sep. 1995.* |
Tomastik et al.; “Optimization-based scheduling of flexible manufacturing systems for apparel production”; 34th IEEE Conf. Decision and Control; pp. 3152-3157 Dec. 1995. |