Not applicable
Not applicable
Abandonment Procedure for wells on a platform that has fallen over. There are basically two ways to restore control of the wells on a platform that has fallen over. Abandon the wells completely in the order they are accessed, or remove the bent or broken portion of the well and install a subsea wellhead. However, when removing the bent or broken part of the pipe such piping may still be under pressure such pressure dealt with before removal. Otherwise, a blow out could occur.
The present invention relates to the hot tapping multiple coaxial strings of underwater piping and/or tubing for overturned wells and/or platforms.
Under pressure drilling or hot tapping is the process of drilling into a pressured pipe or vessel using special equipment and procedures to ensure that the pressure and fluids are safely contained when access is made. The most common example of a hot tap is into a pressured pipeline. A typical hot tap assembly consists of a saddle assembly with a doughnut-type elastomer pack off, two outboard full-bore flanged valves, a tee assembly and the hot tapping device.
A conventional hot tap device has a polished rod and pack-off assembly which allows movement in the longitudinal direction, as well as rotation while maintaining a seal. A drill bit is installed on the end of the polished rod to drill into the vessel. The means to turn the polished rod may be manual, or by air or hydraulic-generated torque. A threaded sleeve feeds the polish rod assembly and provides the force to resist the pressure area effect that would tend to blow out the polished rod.
In one embodiment is provided a hot tapping method and apparatus which can hot tap one or more multiple coaxial strings of underwater piping and/or tubing for overturned wells and/or platforms.
In one embodiment is provided a clamping system which has angular adjustment of tapping tool both up and down and side to side, in a spherical manner.
In one embodiment the adjustable angular offset of hot tapping tool in the compression plate (500 and/or 600) can be at least about 0, 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33, 34, 35, 36, 37, 38, 39, 40, 41, 42, 43, 44, and 45 degrees from a perpendicular to compression plate. In one embodiment the adjustable angular offset is between about any two of the above specified angles. In one embodiment the angular offset is changed while the tool is attached to the outermost pipe or tubular. In one embodiment the angular offset is changed while the tool is attached to the outermost pipe or tubular and the clamp housing of the tool is not moved during the rotational adjustment.
In one embodiment the clamping system for the hot tapping tool can have a rotationally adjustable compression opening which can be can be rotationally adjustable in at least 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33, 34, 35, 36, 37, 38, 39, 40, 41, 42, 43, 44, 45, 50, 55, 60, 65, 70, 75, 80, 85, and 90 degree increments. In one embodiment the rotational adjustability is between about any two of the above specified angular increments. In one embodiment the rotational adjustment occurs while the tool is attached to the outermost pipe or tubular. In one embodiment the rotational adjustment occurs while the tool is attached to the outermost pipe or tubular and the clamp housing of the tool is not moved during the rotational adjustment.
In one embodiment one or more openings provide visual access to pipes and the area of hot tapping seal even while hot tapping tool is mounted on the clamp.
In one embodiment hot tapping tool can have one or more viewing windows to optically view the tip of the hot tapping tool even when the clamping system is attached to the clamping system and inserted into one or more nested tubulars. In one embodiment the two, three and four viewing windows are provided on a compression plate.
In one embodiment the hot tapping tool can have a longitudinally adjustable compression plate in which the rotationally adjustable swivel nut is operably attached. In one embodiment the swivel nut can be threadably connected to a hot tapping mandrel or barrel thereby providing two manners of longitudinally applying compression on the hot tapping tip of the hot tap tool (the first being a plurality of bolts and nuts along the circumference of the compression plate and the second being the threaded connection between the swivel nut and the barrel or mandrel).
In one embodiment is provided a method and apparatus where two hot tapping tools 2000, 2000′ are simultaneously connected to a single clamp and two coaxially nested pipes or tubulars are simultaneously hot tapped. In one embodiment each of the hot tapping tools simultaneously tapping nested tubulars are each independently angular adjustable to effect a hot tapping seal.
In one hot tapping system is mounted on a pipe which is substantially out of round in a non-symmetrical manner. In one embodiment, after jetting, system 10 is mounted below the sea floor on a substantially out of round pipe. In one embodiment the sea floor is jetted clear of pipe 30 between 1 and 30, 1 and 25, 1 and 20, 1 and 15, 1 and 14, 1 and and 12, 1 and 11, 1 and 10, 1 and 9, 1 and 8, 1 and 7, 1 and 6, and 1 and 5 feet. In one embodiment the sea floor is jetted clear of pipe 30 between 2 and 30, 2 and 25, 2 and 20, 2 and 15, 2 and 14, 2 and 13, 2 and 12, 2 and 11, 2 and 10, 2 and 9, 2 and 8, 2 and 7, 2 and 6, and 2 and 5 feet.
For a further understanding of the nature, objects, and advantages of the present invention, reference should be had to the following detailed description, read in conjunction with the following drawings, wherein like reference numerals denote like elements and wherein:
When a hurricane separates upper 5 from jacket 4, tubulars 50 can remain under pressure though bent at bends 8 as shown. Often, multiple nested tubulars are present (see
One embodiment includes a method and apparatus 10 for hot tapping a string of a plurality of coaxially pipes or tubing systems. The plurality of pipes can include first pipe 50, second pipe 60, third pipe 70, and fourth pipe or tubing 80. Between first and second pipes is annular space 62. Between second and third pipes is annular space 72. Between third and fourth pipes is annular space 82 (see FIGS. 16 and 60-71).
In one embodiment system 10 can include adjustable clamp 100 (see
One embodiment includes a method and apparatus for hot tapping a string of a plurality of coaxially pipes or tubing systems.
The plurality of pipes can include first pipe 50, second pipe 60, third pipe 70, and fourth pipe or tubing 80. Between first and second pipes is annular space 62. Between second and third pipes is annular space 72. Between third and fourth pipes is annular space 82.
In one embodiment system 10 can include adjustable clamp 100. In one embodiment adjustable clamp 100 can include first and second plates 200, 200′ and are threadably connected to each other and can be frictionally connected to a pipe. In one embodiment first and second plates 200, 200′ are structurally identical to each other and only one will be described below.
In one embodiment first plate 200 can comprise first side 210, second side 220, a main opening 230, and a plurality of openings 240 for supporting a compression plate. Main opening 230 is designed to allow access through first plate 200 (from first side 210 and through second side 220).
Detachably connectable to first plate 200 can be a plurality (and preferably four (4)) support feet 350, 360, 370, 380 (see
In one embodiment one or more of the support feet can be detachably connectable to first plate 200. In one embodiment such detachable connection can be by means of a plurality of fasteners. In one embodiment support feet 350, 360, 370, 380 can respectively be detachably attached to sets of foot support openings 250, 260, 270, 280. In one embodiment support plate 200 includes at least one additional set of support openings 252, 262, 272, 282 to provide adjustability of position of attachment of the particular support feet. In one embodiment two or more additional sets of support openings are provided. In one embodiment a plurality of different sized support feet with differing radii of curvature are also provided. By providing different sized support feet with differing radii of curvature along with provided multiple positioned support openings, attachment of a large range of pipes can be made with first and second plates 200, 200′. In one embodiment the same support plates 200,200′ can be used with multiple sized piping systems.
In one embodiment support feet 350, 360, 370, 380 can be slidingly connected to support plate 200. Although not shown in the drawings, sliding connection can be by means of attachment slots instead of support openings 250,260,270, 280 with fasteners being used to lock in place the desired location.
In one embodiment clamp 100 with support feet 350, 360, 370, 380 and support feet 350′, 360′, 370′, 380′ can be used to attach clamp to a first pipe 50 that is substantially non-symmetrically out of round. In one embodiment the system will be used on pipes 50 that are part of a well or platform that has collapsed or fallen over. Because it has collapsed or fallen over such first or outer pipe can be substantially misshapen. In the prior art system a substantially smooth curved support plate is used which has difficulty attaching to out of round piping systems—especially those that are not symmetrical. However, it is believed that a substantially stable connection can be made when any three of the four support feet 350, 360, 370, 380 contact the outer surface of first pipe 50. In this manner one embodiment of clamp 100 can be used to attach to non-symmetrically out of round piping. In another embodiment support feet 350, 360, 370, 380 can be placed in non-symmetrical positions 250, 262 (instead of 260), 270, 280. In another embodiment support feet 350, 360, 370, 380 can be of differing sizes (e.g., radii of curvature) to accommodate the non-symmetrical out of roundness of first pipe 50.
In one embodiment one or more of the annular spaces 62, 72, and/or 82 can be monitored by the divers operating the system 10. In one embodiment a video of the hot tapping, drilling, and/or cutting operations can be taken including viewing the annular spaces 62, 72, and/or 82 during such hot tapping, drilling, and/or cutting operations thereby allowing remote monitoring of such operations by operators on the surface of the water.
In one embodiment compression plate 500 can be detachably connected to first plate 200 (see
In one embodiment one or more openings provide visual access to pipes and the area of hot tapping seal even while hot tapping tool is mounted on the clamp. In one embodiment hot tapping tool can have one or more viewing windows to optically view the tip of the hot tapping tool even when the clamping system is attached to the clamping system 100 and inserted into one or more nested tubulars (e.g., 50, 60, and/or 70). In one embodiment two, three, and/or four viewing windows are provided on a compression plate 500.
During drilling, cutting, and tapping operations viewing areas 580, 582, 584, and 586 can provide visual access to the space between second side 220 of first plate 200 and exterior of first pipe 50. Additionally, when an opening is made in first pipe 50 visual access can be provided to annular space 62 along with second pipe 60 during drilling, cutting, and tapping operations (without the need to remove/reposition clamp 100). When an opening is made in second pipe 60 visual access can be provided to annular space 72 along with third pipe 70 during drilling, cutting, and tapping operations (without the need to remove/reposition clamp 100). When an opening is made in third pipe 70 visual access can be provided to annular space 82 along with fourth pipe or tubing 80 during drilling, cutting, and tapping operations (without the need to remove/reposition clamp 100). Such visual access can be greatly beneficial during drilling, cutting, and tapping operations.
In one embodiment the hot tapping tool can have a longitudinally adjustable compression plate in which the rotationally adjustable swivel nut is operably attached. In one embodiment the swivel nut can be threadably connected to a hot tapping mandrel or barrel thereby providing two manners of longitudinally applying compression on the hot tapping tip of the hot tap tool (the first being a plurality of bolts and nuts along the circumference of the compression plate and the second being the threaded connection between the swivel nut and the barrel or mandrel).
In one embodiment support plate 200 can include a plurality of threaded fasteners 242 attached to the plurality of openings 240. In one embodiment compression plate 500 can also include a plurality of support openings 530 which are symmetrically radially spaced to fit plurality of threaded fasteners 242. In one embodiment a plurality of nuts can be used to slidingly affix compression plate 500 to support plate 200. Additionally, symmetrically spacing fasteners 242 about a circle allows for rotational/radial adjustment of compression plate 500 relative to support plate 200 (and relative to first pipe 50 when clamp 100 is attached). Such rotational/radial adjustment allows for positional adjustment of main opening 550 where such opening has an offset 552.
In one embodiment (see
In one embodiment the adjustable angular offset of hot tapping tool in the compression plate (500 and/or 600) can be at least about 0, 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33, 34, 35, 36, 37, 38, 39, 40, 41, 42, 43, 44, and 45 degrees from a perpendicular to compression plate. In one embodiment the adjustable angular offset is between about any two of the above specified angles. In one embodiment the angular offset is changed while the tool is attached to the outermost pipe or tubular. In one embodiment the angular offset is changed while the tool is attached to the outermost pipe or tubular and the clamp housing of the tool is not moved during the rotational adjustment.
In one embodiment the clamping system for the hot tapping tool can have a rotationally adjustable compression opening which can be can be rotationally adjustable in at least 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33, 34, 35, 36, 37, 38, 39, 40, 41, 42, 43, 44, 45, 50, 55, 60, 65, 70, 75, 80, 85, and 90 degree increments. In one embodiment the rotational adjustability is between about any two of the above specified angular increments. In one embodiment the rotational adjustment occurs while the tool is attached to the outermost pipe or tubular. In one embodiment the rotational adjustment occurs while the tool is attached to the outermost pipe or tubular and the clamp housing of the tool is not moved during the rotational adjustment.
In one embodiment is provided a method and apparatus where two hot tapping tools 2000, 2000′ are simultaneously connected to a single clamp and two coaxially nested pipes or tubulars are simultaneously hot tapped. In one embodiment each of the hot tapping tools simultaneously tapping nested tubulars are each independently angular adjustable to effect a hot tapping seal.
In one embodiment a drill system can be used to cut enlarged openings the tubulars in between hot tapping each tubular. For example, an articulating drill system 1100 (see
Drill system 1100 and can include first arm 1110, second arm 1120, base 1150, and connection plate 1500. First arm 1110 can be pivotally connected to second arm 1120. Second arm 1120 can be pivotally connected to base 1150. Base 1150 can be pivotally connected to connection plate 1500. Drill 1300 can be attached to base 1150. Drill 1300 can comprise motor 1320 and cutting tip 1400 which is rotationally connected to motor 1320. Longitudinal track system 1160 can allow controlled longitudinal movement (e.g., along the longitudinal direction of base 1150) of drill 1300 such as by a screw and thread system. Track system 1160 can include a quick release/quick lock system which longitudinally locks the position of drill 1300 relative to base 1150. Perpendicular track system 1200 can allow controlled perpendicular movement (e.g., perpendicular to the longitudinal direction of base 1150) of drill 1300 such as by a screw and thread system. Track system 1200 can include a quick release/quick lock system which perpendicularly locks the position of drill 1300 relative to base 1150. Longitudinal and perpendicular track systems 1160 and 1200 can respective longitudinally and perpendicularly adjust the position of drill 1300. Drill system 1100 can be pivotally connected to first plate 200, such as by pin 294. Connection plate 1500 can be used to partially positionally lock drill system 100 relative to first plate 200. Even when partially locked, drill 1300 can be pivoted relative to first plate 200 through pivoting joint 1510. Quick release/quick lock 1550 when unlocked allows for pivoting. However, locking quick release/quick lock 1550 prevents further pivoting movement of drill 1300.
In
In one embodiment an angular adjustment of tapping tool 2000 both up and down and side to side can be made while attached to clamp 100 to effect a hot tapping seal. Such angular adjustment helps contact tip 2010 of hot tapping tool 2000 and making a seal with hot tapping tool.
In one embodiment the adjustable angular offset of hot tapping tool 2000 in the compression plate (500 and/or 600) can be at least about 0, 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33, 34, 35, 36, 37, 38, 39, 40, 41, 42, 43, 44, and 45 degrees from a perpendicular to compression plate. In one embodiment the adjustable angular offset is between about any two of the above specified angles.
In one embodiment compression plate (500 and/or 600) can be rotationally adjustable in at least 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33, 34, 35, 36, 37, 38, 39, 40, 41, 42, 43, 44, 45, 50, 55, 60, 65, 70, 75, 80, 85, and 90 degree increments. In one embodiment the rotational adjustability is between about any two of the above specified angular increments.
In one embodiment two hot tapping tools 2000, 2000′ are simultaneously connected to compression plate 600. In one embodiment each of the hot tapping tools 2000, 2000′ are angularly adjustable as specified with compression plate 500.
Visually Locating Tip of Hot Tap Tool
In one embodiment one or more openings provide visual access to pipe 50, 60, 70, and/or 80 is provided through compression plate 500 even while hot tapping tool 2000 is mounted in main opening 550.
In one embodiment, after jetting, system 10 is mounted on pipe 50 which is substantially out of round in a non-symmetrical manner. In one embodiment system 10 is mounted below the sea floor on a substantially out of round pipe. In one embodiment the sea floor is jetted clear of pipe 50 between 1 and 30, 1 and 25, 1 and 20, 1 and 15, 1 and 14, 1 and 13, 1 and 12, 1 and 11, 1 and 10, 1 and 9, 1 and 8, 1 and 7, 1 and 6, and 1 and 5 feet. In one embodiment the sea floor is jetted clear of pipe 50 between 2 and 30, 2 and 25, 2 and 20, 2 and 15, 2 and 14, 2 and 13, 2 and 12, 2 and 11, 2 and 10, 2 and 9, 2 and 8, 2 and 7, 2 and 6, and 2 and 5 feet.
Hot Tap Procedures
Below an abbreviated procedure for hot tapping is provided in one embodiment.
Abandonment Procedure for Wells on a Platform That Has Fallen over. There are basically two ways to restore control of the wells on a platform that has fallen over. Abandon the wells completely in the order they are accessed. Or remove the bent or broken portion of the well and install a subsea wellhead.
Preliminary Work
(1) Move on location and set up as needed.
(2) Make a review of the platform. Determine at what depths the wells are broken over. Determine whether cutting into the wells conductor pipe will cause the platform to move. Are the wells holding up any weight besides their own? When performing multi string hot tapping, operations go much more efficiently when larger diameter access holes can be taken out of the drive pipe.
(3) Verify that the pipelines have been removed and have no pressure on same.
(4) Mark the well number clearly at several points along their length.
(5) Remove Debris as needed to give divers access to the wells where they are as close to vertical as possible or below where they are broken over. This may entail going below the mud line. Quite often the inner wells are broken over at a lower depth than the outer wells. Make a diagram showing the depth that all the wells are broken over in relation to each other.
(6) Visually attempt to determine if any of the drive pipes 50, 50′, 50″, etc.
have failed or are broken open. If so are any of the inner casing strings broken open.
(7) The personnel in the field must be cognizant of what the operator wishes to accomplish in order to determine at what depth the outer wells will need to be cut off and or tapped into.
(8) Determine a game plan as to what order the wells will be accessed and how the operator wishes to regain control of the wells. This will determine at what depth the wells will need to be hot tapped.
Hot Tap Procedure
(1) Divers have previously gained access to the well and have prepared for themselves a work area.
(2) Determine the depth where the hot tap will be done. Install ropes around the Drive pipe 50 where the pipe is vertical—if there is plenty of room for working—Install the soft line around the pipe approximately 3 feet apart. Take a 2 inch flat chisel and remove all the barnacles from the work area between the ropes.
(3) Once the pipe is clean for work. Measure the pipe 50 with a tape to verify the diameter of same. Use the tape to make a line around the pipe in the middle between the two ropes as straight as possible. Using an imaginary plane cutting the pipe perpendicular to its longitudinal axis, draw four (4) vertical marking lines extending from the top rope to the bottom rope which are radially spaced apart (e.g., preferably 90-degrees radially spaced from each other). In one embodiment these vertical lines will be at: (a) 0 degrees; (b) 90 degrees, (c) 180 degrees; and (d) 240 degrees going in a clockwise manner around the pipe. In this manner the space between the 0 degree and 240 degree lines will provide the most area work.
(4) Verify that the outer drive pipe 50 has no pressure—i.e., it is been broken open, or if not broken has no interior annular pressure. If it can be verified as not being pressurized, use a drill (which can be hydraulically powered and magnetically attached) to drill holes at the radial locations of 0, 90 and 240 degrees. The size of the holes to be drilled will be determined by the drive pipe 50 and the inner casing string (e.g., 60, 70, and/or 80). Once the holes 52 are drilled, remove any annular cement as needed to measure the distance from the outer drive pipe 50 to the inner casing string 60. Once the interior location of the inner casing string 60 is determined relative to the drive pipe 50, the location of tool attachment can be decided upon. When the outer drive pipe cannot be verified to have no pressure inside of it. The outer drive pipe will have to be hot tapped, as is done in this procedure.
(5) Install the saddle clamp tool 100 with the center of the openings 230, 230′ set at the 0 and 180 degree positions as indicated by the 0 and 180 degree vertical lines. The saddle clamp tool 100 can be installed by closing the two bolts on the open side and snugging them down, then backing off the holding nut on the opposite bolts then tightening the tighten nuts on the other two bolts. Finally, going back and tightening the two original nuts.
(6) Install a hot tap barrel 2000 on the saddle clamp tool 100 by sliding it over the top slick bolt, and then lining up the barrel against the drive pipe. Preferably, the barrel includes a properly size tapping tip 2010 which has a curved flexible (e.g., Teflon) seal installed to sealing fit against the drive pipe 50. Tighten the sealing nuts 244 to create a seal between the drive pipe 50 and the hot tap tip 2010. Test the seal against drive pipe 50 to 250 pounds per square inch pressure. Note: the end of the barrel 2050 has a 2 inch 1502 weco connection. The seal test can be done by installing a ¼ inch (or 1½ inch hose) to the back of the barrel 2050 and pressuring up the connection. If pressure is maintained then a seal has been formed.
(7) Remove the pressure test hose and install the Hot Tap Tool to the end of the barrel 2050 using a 2 inch 1502 weco quick connection (by hammering up the quick connect). Run in the hot tap tool 2000 till the ¾″ flat drill 2100 of the hot tap tool 2000 touches the drive pipe 50. Pressure up the barrel 2050 between the 1 inch polished rod and chevron packing on the hot tap tool 2000 and the Teflon seal 2010 against the outer casing to 250 pounds per square inch pressure. Double check the stop setting on the hot tap tool 2000—should be set for the thickness of the diameter size of the outer casing 50 (e.g., the drive pipe 50 diameter=¾ inch+ 1/16 inch extra). Install the drill 2100 on the end of the hot tap tool 2000 and rotate the polished rod to rotate the ¾ inch bit on the end. Advance the polished rod with the wheel with about ¼ inch linear advancement per turn as the diver is drilling the ¾ inch hole. This linear advancement of the drill bit 2110 should be continued until either: (a) pressure change is seen and/or (b) break thru of the drill bit is felt (e.g., the metal/drilling gets easier or the diver hits the stop/makes enough turns on the wheel to have advanced same the proper distance).
(8) Once the hot tap tool 2000 has drilled thru the outer drive pipe 50, the drill 2100 should be removed from the hot tap tool 2000 and the hydraulic hoses disconnected with the hot tap tool 2000 positioned in a nearby location until needed again. Back out the polished rod till it clears the ball valve on the end of the barrel 2050 and close the ball valve. Bleed off any remaining pressure on the hot tap tool 2000 and remove same from the barrel 2050—2 inch 1502 weco hammer union connection. Send the hot tap tool 2000 back to surface until needed again.
(9) If there is any pressure behind the drive pipe 50 (i.e., in the annular space 62 between the interior of the drive pipe 50 and the first inner casing 60), install a 1½ inch pump in line to the end of the barrel 2050—2 inch 1502 weco hammer union connection. Test the line against the ball valve. Open the ball valve opening the annular space 62 to the surface. Perform the necessary actions to remove any pressure and or hydrocarbons from this annular space 62.
(10) Once all pressures and hydrocarbons have been removed from the annular space 62, remove the barrel 2050 and send back to the surface to be redressed for the next casing string 70 by changing the hot tap sealing tip 2010′. In one embodiment the hot tap tool 2000 can be connected to the hot tap clamp 100.
(11) Once the barrel 2050 is removed, measure the linear distance to the exterior of the next interior casing, pipe, and/or tubing 60. Such linear distance can be measured with a measuring probe. In one embodiment there are 20 inch, 30 inch, and 40 inch measuring probes included for such measurements. Cement in the annular space may need to be removed prior to being able to take this measurement. Brushes, chippers, grinders, etc. can be included to assist the divers in clearing it out the annular space 62 for making such measurement.
(12) Once this measurement is taken, a determination can be made regarding the maximum enlarged hole 52 that can be drilled in the exterior casing/pipe 50 to provide operating space and visual access to the next interior casing, pipe, and/or tubing 60. Send the drill 1000 down to the diver. Remove the 1 inch holding pin—straight pick up—from the saddle clamp 100 and line up the drill 1000—drop the pin in holding same. The initial drill 1000 will have the proper size bit 1400 already installed on the drill 1000—on all subsequent drilling events the diver will have to change out the bit 1400′ to the proper size as needed. The drill 1000 sits on a multiple degree of freedom swiveling arm carriage that is held in place by the pin. Swivel the drill bit 1400 into place, lock it down solid by tightening the drill holding nuts. Advance the drill bit 1400 until it touches the drive pipe 50.
Detailed Hot Tap Procedure
Below is a more detailed hot tap procedure which can be used for various embodiments.
Dual plates 200, 200′ will be set up with 8—20 inch Jaws, 4—Pivot Pins (with 8—mount brackets and 4—1 inch pins to hold them in place), 4—Mount Brackets for Clevis's and 4—Clevis's with 1⅞ inch×36 inch Long Bolts & Nuts. The Long Bolts will have inner Nuts on the Closed Side of the DSC preset for 20 inch Drive Pipe.
Depending on how the Clevis Mount Brackets are installed the diver can install drill 1000 on either their right or left side if they have a preference of plate 200 or 200′. Clevis Mount Brackets can be set to allow free movement when Drill Slide 1160 is installed on the Pivot Pin on the right and side of the either Plate 200 or 200′ can still be installed on the Left Pivot Pin.
Clamp 100 can be prepared to be installed on Drive Pipe 50 by first determining the size of drive pipe 50. In one embodiment drive pipe 50 can be 20 inches in diameter. Plates 200 and 200′ can have bolt holes cut out (or open slots) on one side to allow the bolts to be swung into and out of position. Plates 200 and 200′ can also have ½ inch keys welded onto the end of the cut outs to keep the nut and washer from slipping out of position when they are loose. A set of 1 inch×10′—4 part Nylon Slings (length depends on the crane—the longer they are the more easily it will be for the diver to open and close clamp 100.
Lower clamp 100 alongside drive pipe 50 to the desired attachment location. With the diver assisting pulling clamp 100 around pipe 50 via the open side of clamp 100. Once clamp 100 it is in place, the diver will release the tension in the come along just enough to allow plates 200 and 200′ to close around pipe 50. Close the two long clevis bolts on the open side by rotating them into the cut out bolt holes, over the ½ inch stop keys, and tightening down the nuts and washers. The nuts should be tightened hand tight with a hammer wrench.
At this time the diver should take a look at clamp 100 to determine that it is in place and fairly squared up. Look and see if the dies on the jaws 350, 360, 370, and 380 are engaged and that the front and back plates 200, 200′ are in their desired position relative to each other and drive pipe 50. At this time, or at any later time, clamp 100 can be easily moved around drive pipe 50 simply by loosening the nuts on the open side and tightening up on the come along until the dies or jaws 350, 360, 370, and 380 (and 350′, 360′, 370′, and 380′) on the open side become disengaged from pipe 50, then simply rotate clamp 100 to the desired position or have the crane operator lower or raise the clamp 100 as needed.
Once clamp 100 is in place and the open side has been hand tightened, slack off the remainder of the way on the come along making sure it has slack in it and is not holding a bind on clamp 100. Diver should go around to the closed side and back off the two inside nuts, once they are free turn them at least three full rounds to make sure they do not interfere with the outside nuts being tightened. Tighten the two outside nuts on the closed side with the hammer wrench—hand tight.
Once again look at clamp 100 to verify it is in position and is level with drive pipe 50. As long as at least three of the dies (from 350, 360, 350′, and 360′) on the top set of jaws (4 jaws on top with 2 dies each and 4 jaws on bottom with 2 dies each) are making contact with drill pipe 50, clamp 100 will stay firmly in place. Have the crane operator slack off clamp 100 as it will hold its own weight with the outer nuts just snug. Tighten up the 4 outside nuts with a hammer wrench and a one handed sledge hammer until they are tight. There is no need to beat it with a 101b or 121b sledge, you can if you would like—the 2 inch thick plates with the 1⅞ inch bolts will take whatever tightening you would care to give them but the 16—1¼ inch×5⅞ inch Diamond Tooth Tong Dies that are in the jaws are made to hold in every direction.
Once clamp 100 is installed remove the 1 inch×10′ 4 part sling from the top of clamp 100. Prior to running down clamp 100 and installing a “Deer Stand” work platform on drive pipe 50 for the diver to work of, drive pipe 50 area should be cleaned.
Run the end of the bundle of Hydraulic Hoses down to the diver and attach them out of the way but handy. The Hydraulic hose bundle consists of a set of 1 inch hoses (inlet and outlet) used to run drill 1000 and a set of ½ inch hoses used to run all the hand tools. Quick connects are installed on all of the hoses with inlet and outlet having male and female respectively to make sure they cannot be put on backward. Run the ¼ inch 10,000 psi test hose down to the diver and have him secure it out of the way.
Tap the 20 inch Drive Pipe 50 to determine if it has pressure on the inside of same. Compression plate 500 can be used with a 20 inch Mandrel 2050. The 20 inch Mandrel 2050 will have attached to it the Swivel Nut 800, Backing Nut 802, Seal Tip 2010 (with Teflon Seal Installed) on one end and the Ball Valve (with 2 inch 1502 Weco Connection) on the other. The Swivel Nut 800 is screwed onto the mandrel 2050 and allows the center flange 500 to transfer the load to the mandrel 2050. This swivel nut 800 allows for up to 10 to 15 degrees of rotation of the mandrel 2050 thru the flange 500. Backing Nuts for the Mandrel can be installed on its threads as needed if accessories are wanted. For example, there may be a desire to attach a video camera as a camera would allow personnel on the topside (e.g., Dive Supervisor), to be able to see the seal tip 2010 and assist the diver when installing the mandrel 2050. Also, a video camera would allow the dive supervisor to observe the seal tip 2010 to make sure it is level with the pipe (50, 60, 70, and/or 80) prior to energizing the seal or to see any die leaking out around the seal while testing. These backing nuts can be installed on the mandrel 2050 for any reason needed. The Seal Tip 2010 with Teflon Seal Inserted will be for 20 inch pipe 50. The Seal Tip 2010 and seal are cut to the curvature of the pipe (50, 60, 70, and/or 80) to be hot tapped. The Tip 2010 and the mandrel 2050 will have a line drawn on it to show the diver how to line it up with the pipe. The Ball Valve (BV) can be a 2 inch 6,000 pounds per square inch heavy duty type with a 1½ inch ID thru same. The Ball Valve has 2 inch Line Pipe connections on both sides and a 2 inch 1502 Weco Male Connection will be installed on the BV. The BV will be run down to the diver in the open position. The diver will receive the Center Flange 500 with 20 inch mandrel 2050 on a center flange with a 20 inch tip 2010 on one end and ball valve open on the other. The diver will set the flange 500 on the 18 inch stud that is in the 12 O'clock position and remove the strap that holds it. The diver will slide the flange 500 forward on the 18 inch stud until the flange 500 is lined up on the 4—1⅝ inch×12 inch studs in the 2/4/8/10 positions. The diver will install 4—1⅝ inch nuts on the 2/4/8/10 studs until the nuts are completely on the studs but no further. The 20 inch mandrel 2050 and tip 2010 will have a top dead center line run down the length of it. The diver will advance the inch mandrel 2050 by rotating the swivel nut 800 until the Teflon on the tip 2010 is engaged against the 20 inch pipe 50. At that time the diver needs to verify that the mandrel 2050 is perpendicular to pipe 50 and that the line on the mandrel 2050 is on top (i.e., mandrel 2050 should be is lined up properly with pipe 50). In order to get a seal mandrel 2050 should be line up perpendicular to the particular pipe the diver is attempting to seal against.
Once mandrel 2050 is in the proper position, tighten the 4—1⅝ inch nuts with a hammer wrench taking care to tighten one half of a turn at a time when turning by hand then one fourth of a turn at a time when using a hammer, going from nuts 2 to 8; to 4 to 10; then back to nut 2. Preferably nuts are tightened evenly. This tightening compresses the Teflon seal against pipe 50. Once mandrel 2050 is tightened against pipe 50, stop and look at the entire set up and verify that everything looks proper such as whether the line on mandrel 2050 is still top center and the mandrel 2050 is perpendicular to pipe 50 tip 2010 is sealing against.
Test the Teflon seal on the 20 inch drive pipe 50 to 250 pounds per square inch low/1,000 pounds per square inch high for 5 minutes each test. The testing will be done by installing a 2 inch 1502 Female Weco hammer up connection to the 2 inch 1502 male Weco connection on the end of the mandrel. When hammering on and off the 2 inch 1502 Weco connections it is not necessary to use a big hammer and lots of force, please use common sense and caution. Install the ¼ inch test hose, or whatever test hose the operator chooses to use to the ½ inch outlet on the end of the mandrel 2050. When testing, if the operator chooses to do so, Green Dye can be available to be mixed with seawater to assist in seeing any leaks.
Crane to send down the 30 inch stroke Hot Tap Tool 2000 with a 5⅞ inch long×¾ inch Fluted Bit with insert tips 2010 installed on same. In this case we will be using a ¾ inch Flat Tipped Cutting Insert on the Bit. Make up the hot tap tool 2000 to Mandrel 2050 by making up a 2 inch 1502 Weco connection. Throughout the procedure we will be utilizing the 3 inch diameter×30 inch stroke 6,000 pounds per square inch working pressure Hot Tap Tool 2000. In one embodiment both a 30 inch stroke Tool 2000 and a 54 inch Stroke tool 2000′ will be sent out. Both have been designed to be used with this system 10. The 30 inch stroke tool 2000 works with the 20 inch Mandrel 2050. The 54 inch stroke tool 2000′ works with the 30 inch and 40 inch Mandrels (2050′ and 2050″) should an extended reach be needed. The 54 inch stroke tool 2000′ can also be used in conjunction with the 20 inch Mandrel 2050 should something happen to the 30 inch tool 2050′. Along with two Hot Tap Tools spare parts will be sent with each tool including an extra Lower Drilling Rod Assembly for both tools so they can be rebuilt in the field if needed. The Hot Tap Tool 2000 has a 1 inch Drilling Rod that is sealed off against Chevron packing (6 part). The packing retainer on the tools is made in such a way that it can be tightened if the packing starts leaking while drilling or anytime that the hot tap tool 2000 is installed on the well. The diver will be supplied with a special wrench to be able to tighten the packing retainer nut if needed. The 1 inch Rod is attached to the bit with a standard #2 Morris Taper (1¼ inch OD). The Mandrel 2050 has a 1.30 inch ID. The Seal Tip 2010 has a ¾ inch ID that helps to align the ¾ inch bit.
Make up the hot tap tool 2000 on the mandrel 2050. Leave the hot tap tool 2000 hanging from the crane while it is in the water. The hot tap tool 2000 is fairly light+/−150 lb of weight and when using same on a real well it could be hung off from an air bag if it is necessary to remove it from the crane. Test the Teflon seal on the 20 inch drive pipe 50, the packing around the 1 inch rod and the 1502 connection to 250 pounds per square inch low/1,000 pounds per square inch high for 5 minutes each test. Bleed off the pressure. Run in the hot tap tool 2000 by turning the hand wheel. The Drive Rod on the hot tap tool 2000 is a 2 inch OD Course Acme Thread with 4 Turns to the inch or ¼ inch advancement per Revolution of the hand wheel. The 1 inch Drilling Rod runs thru the 2 inch Drive Rod. The hot tap tool 2000 has two stop subs. One on the outside of the Hot tap tool 2000 and another on the threads of the 2 inch Drive Rod. Prior to sending the Hot tap tool 2000 down the Stop Subs on the Hot tap tool 2000 will be preset to not allow the diver to drill more than 1/16 inch past the thickness of the pipe that will be drilled. The hot tap tool 2000 was designed to work in conjunction with the mandrel 2050 to where when the 20 inch Mandrel 2050 is used with the 30 inch stroke Hot tap tool 2000 the inch Hot tap tool 2000 can only drill out approximately 2 inch past the Seal Tip 2010. This allows the diver to close up the Hot tap tool 2000 almost completely prior to starting to do any drilling with same, making it easier on the diver.
After testing. Bleed off the test pressure to Zero pounds per square inch, this allows the diver a better feel for what he is doing. Advance the bit in the Hot tap tool 2000+/−27½ inch until it hits the Teflon seal. The Teflon seal when installed on the seal tip 2010 had a ¾ inch opening. Because the Teflon seal was compressed against the pipe to make a seal it has been compressed or flared on the inside as well as the outside. Once the diver advances the drill bit as far as possible rotate the drill on the Hot tap tool 2000 By hand to cut the Teflon away and advance the bit until the bit makes contact with the pipe. Sometimes the bit, because it is a flat tip, has trouble getting into the ¾ inch ID of the seal tip 2010 (the mandrel 2050 has a 1.30 inch ID). NOTE: It is easy to cut Teflon by hand, it is not as easy to drill metal and the diver can feel the difference. At this time the bit is against the Drive pipe 50. Take the time to double check the Stop Subs by looking at them and verifying they are set for drilling only the thickness of the pipe, in this case 1 inch wall thickness Drive pipe 50, + 1/16 inch only. Pressure up on the Hot tap tool 2000 and seals to 500 pounds per square inch. Send down a hand drill and make it up on the hydraulic hoses.
Drill thru the 20 inch×1 inch Wall Drive Pipe 50 by drilling turning the bit 2110 with a hydraulic hand drill and advancing the bit 2110 with the wheel by hand. Keep track of the rounds turned on the wheel to verify the distance drilled. In this case 1 inch pipe will be 4 complete revolutions. Do not force the bit 2110—when the bit 2110 drills thru the pipe 50 the diver can feel it and there will be a fluctuation in pressure.
Once the diver has drilled thru the pipe 50 stop drilling and check and record the pressure. Advance and retract the bit 2110 thru the hole to make sure it is completely cut out to a ¾ inch opening. Watch for metal shavings getting the bit 2110 in a bind. If that occurs it is often remedied by pumping water into the Hot tap tool 2000 to flush or move the cuttings.
Once you are sure that the hole has been cut in the pipe 50 and there is a full ¾ inch opening. Secure the hand drill. Back out the bit 2110 until it clears the Ball Valve. If the casing is not static, close the Ball valve.
If the Ball valve is closed, bleed off any remaining pressure on the Hot tap tool 2000 and hose.
Disconnect the Test Hose and secure same.
Open the needle valve on the Hot tap tool 2000 to double verify there is no pressure left on it. Remove the Hot tap tool 2000 and send same to surface.
If the casing 50 drilled has pressure on it. Install the 1½ inch Kill Line and test as needed against the ball valve. Open the Ball valve. Deal with the pressure by pumping in or bleeding off as needed until the casing 50 is static. If there was no pressure on the casing the Ball valve was left open.
With the Ball valve Open, remove the Flange Plate 500 by backing out the 4—1⅝ inch nuts and send the Flange Plate 50 and Mandrel 2050 assembly to the surface. Once the mandrel 2050 assembly has been removed, measure the distance with the measuring probe thru the ¾ inch hole to the next casing string 60. Hot tap tool 2000 has 20 inch, 30 inch and 40 inch measuring probes included in each box. Cement may need to be removed prior to being able to take this measurement. If needed send down a hand drill with a ⅝ inch masonry bit.
Normally the next casing string 60 size is known. In this case we have a string of 10¾ inch 45.5 #/ft J-55 casing. When taking the measurement it is never known for sure if you are on a collar or not.
Care should be taken here when getting these measurements and selecting the size of core bit 1400 to drill out of casing 50. When drilling into any casing string a balance must be maintained between getting as big a hole as possible and not having the casing that is being drilled to fail or collapse. As a general rule the size of the hole being drilled should not exceed 50% of the casing 50 you are drilling. The Hot tap tool 2000 supervisor will be able to calculate that and look at the different size holes that can be drilled depending on outer casing size versus inner casing size and the distance between them. Calculate the maximum size hole that can be drilled without drilling into the next casing or tubing string. Prior to starting you also need to consider what size of hole you would like to have in the production casing. In this case the production casing is 7⅝ inch therefore the maximum hole size that can be drilled is +/−4 inch (+/−50% of 7⅝ inch), to be able to drill a 4 inch hole on the 7⅝ inch, you must drill at least a 4½ inch hole (½ inch bigger minimum) on the 10¾ inch casing, which means we must have at least a 5 inch hole on the 20 inch. So 5 inch can be the minimum size you can start with on the 20 inch Drive pipe 50. The Hot tap tool 2000 Saddle Clamp 100 has an 11½ inch Opening but the biggest hole recommended to start with is 10 inch.
Have the diver remove the Cotter Pin from the bottom of the 1½ inch Pivot Pin. Send down the articulating drill assembly 1000 attached on the crane. Line up the aluminum arm 1110 on same with the pivot pin on plate 200 and drop the Pivot Pin into place. Install the cotter pin on the pivot pin. Remove the crane straps or slings from drill assembly 1000. Send slings to surface.
20 inch Drive pipe 50×10¾ inch inner casing string (centered)=10 inch bit. The initial 10 inch bit 1400 will have been already installed on drill 1000—on all subsequent drilling events the diver will have to change out the bit 1400 to the proper size as needed. Rotate the DS into place in the front of clamp 100, the bottom five bolts can be used for the DS. It has been our experience that only two 1⅝ inch nuts will be needed to hold the Articulating drill 1000 in place on the Clamp 100 while drilling therefore on the bottom of the Clamp 100 two 1⅝ inch×8 inch long studs were installed for the Articulating drill 1000 on at the #5 and #7 positions. Tighten up the 2×1⅝ inch nuts installing the Articulating drill 1000 into place on the Clamp 100. Install 1 inch Hydraulic Hoses to the Drill 1000. Advance the drill until the bit 1400 touches the drive pipe 50. Start the drill 1000 and make sure it is turning properly. Cut out the 10 inch coupon being careful not to cut into the 10¾ inch casing 60.
Remove the 10 inch coupon.
Remove the 10 inch bit 1400 and send to the top.
Remove the two 1⅝ inch nuts and rotate the Articulating drill 1000 back out of the way and secure same. If possible leave the Hydraulic Hoses mounted to the drill. If not remove and secure same.
Clean out any cement between the 20 inch×10¾ inch annulus. Verify that there is not a collar in the way. During this test we know there is no cement in this annulus or a collar, but the 10¾ inch casing will have to be cleaned off where we will be installing the seal tip 2010. Send down tools as needed to clean off same.
If there is a collar on the inner casing string 60, a decision will have to be made to either move the Clamp 100 up or down to get away from it and starting over. Or, the Hot tap tool 2000 system has not only Center Flanges 500 but offset flanges 500′ that allow movement of the Mandrel 2050 in a circle about inches in radius (up or down vertically from center), and to still be perpendicular to the inner casing string 60 for tapping purposes. Consideration should be given to whether this should be done on the basis of how many more inner strings will have to be dealt with and whether part of the collar can be cut out without sacrificing structural integrity of the pipe after it is tapped to gain access to the inner strings.
Next the diver needs to determine where the centerline of the inner casing string 60 lies in relation to the Clamp 100. In order to get a seal—the seal tip 2010 is preferably set on the centerline of the pipe 60 and the mandrel 2050 lined up perpendicular to pipe 60 attempting to be sealed against. One advantage of the method and apparatus is the flexibility allowed when lining up on the inner casing strings (60, 70, and 80). The hot tap tool 2000 swivel nut 800 is primarily used to allow the mandrel 2050 to be perpendicular to the inner casing string (60, 70, or 80) where there is a difference in angle from vertical between the Drive Pipe 50 and the inner casing strings (60, 70, or 80). This allows the new system some ability to get on Drive pipe 50 that is not only out of round but also still not vertical. The Offset Flange 500 with offset 552 allows the mandrel 2050 to be moved up and down as well as right and left (e.g., up to 4 inches). Extreme caution must be exercised when attempting to utilize the Swivel Nut 800 to make up for fact that the inner casing strings (60, 70, or 80) are more than 10 Degrees to the left or right of the centerline of the Clamp 100. When the 1⅝ inch nuts are tightened against the flange 500 to effect a seal, they move the flange 500 in the direction of the centerline of the Clamp 100 (and not in the direction mandrel 2050 is pointed when mandrel 2050 is offset). If the centerline of any subsequent inner string (60, 70, or 80) is encountered where it is more than 10 Degrees to the left or right of the Clamp 100 centerline then the Clamp 100 is preferably rotated on drive pipe 50 to line up Clamp 100 with the inner strings (60, 70, or 80).
Because casing 60 is found to be centered, 10¾ inch casing 60 will be tapped to determine if it has pressure on the inside of same, utilizing the Center Flange 500 with the 20 inch Mandrel 2050 assembly. The diver will receive the Center Flange 500 with 20 inch mandrel 2050 with a 10¾ inch tip 2010. The diver will set the flange 500 on the 18 inch stud that is in the 12 O'clock position and remove the strap that holds it. The diver will slide the flange 500 forward on the 18 inch stud till the flange 500 is lined up on the 4—1⅝ inch×12 inch studs in the 2/4/8/10 positions. The diver will install 4—1⅝ inch nuts on the 2/4/8/10 studs till the nuts are completely on the studs but no further. The 20 inch mandrel 2050 and tip 2010 will have a top dead center line run down the length of it. The diver will advance the 20 inch mandrel 2050 by rotating the swivel nut 800 until the Teflon on the tip 2010 is engaged against the 10¾ inch pipe 60. At that time the diver needs to verify that the Seal tip 2010 is on the centerline of the pipe and the mandrel 2050 is perpendicular to pipe 60 and that the line on the mandrel 2050 is on top (i.e., that the mandrel 2050 is lined up properly with the pipe 60). In order to get a seal—seal tip 2010 should be set on the centerline of the pipe 60 and the mandrel 2050 lined up perpendicular to the pipe 60 attempted to be sealed against. Once the mandrel 2050 is in the proper position, tighten the 4—1⅝ inch nuts with a hammer wrench taking care to tighten a ½ turn at a time when turning by hand then a ¼ turn at a time when using a hammer, going from 2 to 8 to 4 to 10 then back to 2. It is preferable that they are tightened evenly. This tightening compresses the Teflon seal against the pipe 60. Once the mandrel 2050 is tightened against the pipe 60 stop and look at the entire set up and verify that everything looks proper (i.e., the line on the mandrel 2050 is still top center and the mandrel 2050 is perpendicular to the pipe 60 it is sealing against).
Test the Teflon seal on the 10¾ inch casing 60 to 250 pounds per square inch low/1,500 pounds per square inch high for 5 minutes each test. The testing will be done by installing a on the end of the mandrel 2050. Install the ¼ inch test hose, pressure gauge and bleed off valve. After performing the test bleed off the pressures and remove the hose and connection.
Crane to send down the 30 inch stroke Hot tap tool 2000′ with a 5⅞ inch long×¾ inch Fluted Bit with a ¾ inch Flat Tipped Cutting Insert on the Bit. Make up the Hot tap tool 2000′ on the mandrel 2050. Install the ¼ inch test hose to the ½ inch Needle Valve with a pressure gauge and bleed off valve. Test the Hot tap tool 2000 against the Teflon seal on the 10¾ inch casing to 250 pounds per square inch low/1,500 pounds per square inch hi for 5 minutes each test. Bleed off the pressure.
Prior to sending the Hot tap tool 2000′ down the Stop Subs on the Hot tap tool 2000′ will be preset to not allow the diver to drill more than 1/16 inch past the thickness of the pipe that will be drilled. In this case 10¾ inch 45.5 #/ft casing is 9.95 inch ID=0.4 inch thick. Please note: the drift=9.794 inch therefore the casing could be up to 9.95 inch-9.794 inch/2=2.5/64 inch extra thick therefore the 1/16 inch extra will make up for it.
Advance the bit in the Hot tap tool 2000′+/−27½ inch until it hits the Teflon seal. Once the diver advances the drill bit as far as possible rotate the drill on the Hot tap tool 2000′ by hand to cut the Teflon away and advance the bit until the bit makes contact with the pipe 60. Double check the Stop Subs.
Pressure up on the Hot tap tool 2000′ and 10¾ inch seal to 1,000 pounds per square inch. Send down a hand drill and make it up on the hydraulic hoses.
Drill thru the 10¾ inch×0.4 inch Wall Casing 60 by drilling turning the bit with a hydraulic hand drill and advancing the bit with the wheel by hand. Keep track of the rounds turned on the wheel to verify the distance drilled. In this case 0.4 inch pipe+ 1/16 inch=0.0625 inch=0.4625 inch therefore it will be a little less than 2 complete revolutions. Do not force the bit. When the bit drills thru the pipe the diver can feel it and there will be a fluctuation in pressure.
Once the diver has drilled thru the pipe 60, stop drilling. Check and record the pressure and advance and retract the bit thru the hole to make sure it is completely cut out to a ¾ inch opening. Watch for metal shavings getting the bit in a bind. If that occurs it is often remedied by pumping water into the Hot tap tool 2000′ to flush or move the cuttings.
Once you are sure that the hole has been cut in the pipe 60 and there is a full ¾ inch opening. Secure the hand drill. Back out the bit until it clears the Ball Valve. If the casing 60 is not static, close the Ball valve. If the Ball valve is closed, bleed off any remaining pressure on the Hot tap tool 2000′ and hose. Disconnect the Test Hose and secure same.
Open the needle valve on the Hot tap tool 2000′ to double verify there is no pressure left on it. Remove the Hot tap tool 2000′ and send same to surface.
If the casing 60 drilled has pressure on it install the 1½ inch Kill Line and test as needed against the ball valve. Open the Ball valve, deal with the pressure by pumping in or bleeding off as needed until the casing 60 is static. If there was no pressure on the casing the Ball valve was left open.
With the Ball valve Open, remove the Flange Plate 500 by backing out the 4—1⅝ inch nuts and send the Flange Plate 500 and Mandrel 2050 assembly to the surface.
Once the mandrel 2050 assembly has been removed, measure the distance with the measuring probe thru the ¾ inch hole to the next casing string 70. Cement may need to be removed prior to being able to take this measurement. If needed send down a hand drill with a ⅝ inch masonry bit. In this case there is no cement between the casing strings so we will not have any to drill out.
Normally the next casing string 70 size is known. In this case we have a string of 7⅝ inch 33.7 #/ft N-80 Casing. When taking the measurement it is never known for sure if you are on a collar or not.
Care must be taken here when getting these measurements and selecting the size of core bit to drill out of the casing. The Hot tap tool 2000 supervisor will be able to calculate that and look at the different size holes that can be drilled depending on outer casing size versus inner casing size and the distance between them. Always calculate the maximum size hole that can be drilled without drilling into the next casing or tubing string.
10¾ inch casing×7⅝ inch inner casing string 70 is found to be centered. Rotate the Articulating drill 1000 into place in the front of the Clamp 100. Install two 1⅝ inch nuts on the #5 and #7 position studs. Tighten up the 2×1⅝ inch nuts installing the Articulating drill 1000 into place on the Clamp 100. Hydraulic Hoses were previously installed to the Drill 1000. Advance the drill bit 1400 until the drill bit touches 10¾ inch casing/pipe 60. At this time the diver must make sure that the drill bit 1400 is lined up on the centerline of the inner string of casing 60. In one embodiment drill bit 1400 is adjustable in multiple directions (advanced in and out along with adjustment to be able to go right or left, along with the ability to pivot). Drill bit 1400 can be turned up to 5, 10, 15, 20, 25, and 30 degrees to the left or right of the centerline of the Clamp 100 in order to line up the drill bit 1400 on the centerline of any subsequent inner string (70 or 80) without having to rotate the complete Clamp 100 on the drive pipe 50 and starting over. However, should the diver be unable to line up the drill bit 1400 to the centerline of the inner casing strings 70 or 80 the diver should move the Clamp 100 and start over again.
Start the drill bit 1400 and make sure it is turning properly. Cut out and remove the coupon being careful not to cut into the 7⅝ inch casing 70.
Remove drill bit 1400 and send to the top.
Remove the two 1⅝ inch nuts and rotate the Articulating drill 1000 back out of the way and secure same. If possible leave the Hydraulic Hoses mounted to the drill 1000. If not remove and secure same.
Clean out any cement between the 10¾ inch×7⅝ inch annulus 72. Verify that there is not a collar in the way.
Next, the 7⅝ inch Production casing 70 will be tapped to determine if it has pressure on the inside of same. The Center Flange 500 will be used with a 20 inch Mandrel 2050 assembly.
Test the Teflon seal on the 7⅝ inch casing to 250 pounds per square inch low/3,500 pounds per square inch high for 5 minutes each test. The testing will be done by installing a on the end of the mandrel 2050. Install the ¼ inch test hose, pressure gauge and bleed off valve. After performing the test to everyone's satisfaction bleed off the pressures and remove the hose and connection.
Crane to send down the 30 inch stroke Hot tap tool 2000′ with a 5⅞ inch long×¾ inch Fluted Bit with a ¾ inch Flat Tipped Cutting Insert on the Bit.
Make up the Hot tap tool 2000′ on the mandrel 2050. Install the ¼ inch test hose to the ½ inch Needle Valve with a pressure gauge and bleed off valve. Test the Hot tap tool 2000 against the Teflon seal on the 7⅝ inch casing to 250 pounds per square inch low/3,500 pounds per square inch hi for 5 minutes each test. Bleed off the pressure.
Prior to sending the Hot tap tool 2000′ down the Stop Subs on the Hot tap tool 2000′ will be preset to not allow the diver to drill more than 3/32 inch past the thickness of the pipe that will be drilled. In this case 7⅝ inch 33.7 #/ft casing is 6.765 inch ID=0.43 inch thick. Please note: the drift=6.640 inch therefore the casing could be up to 6.765 inch-6.640 inch/2= 1/16 inch extra thick therefore the 3/32 inch extra will make up for it. NOTE: Normally we only use 1/16 inch extra—in this case we used 3/32 inch. Common sense will have to be used at all times when working on these wells.
Advance the bit in the Hot tap tool 2000′+/−27½ inch until it hits the Teflon seal. Once the diver advances the drill bit as far as possible rotate the drill on the Hot tap tool 2000′ by hand to cut the Teflon away and advance the bit until the bit makes contact with the pipe 70. Double check the Stop Subs.
Pressure up on the Hot tap tool 2000′ and 7⅝ inch seal 2010 to 1,500 pounds per square inch. Send down a hand drill and make it up on the hydraulic hoses.
Drill thru the 7⅝ inch×0.43 inch Wall Casing 70 by drilling turning the bit with a hydraulic hand drill and advancing the bit with the wheel by hand. Keep track of the rounds turned on the wheel to verify the distance drilled. In this case 0.43 inch pipe+ 3/32 inch extra=0.09375 inch=0.52375 inch will be about 2 complete revolutions. Do not force the bit. When the bit drills thru the pipe the diver can feel it and there will be a fluctuation in pressure.
Once the diver has drilled thru the pipe 70 stop drilling. Check and record the pressure. Advance and retract the bit thru the hole to make sure it is completely cut out to a ¾ inch opening. Watch for metal shavings getting the bit in a bind. If that occurs it is often remedied by pumping water into the Hot tap tool 2000 to flush or move the cuttings.
Once you are sure that the hole has been cut in the pipe 70 and there is a full ¾ inch opening. Secure the hand drill. Back out the bit until it clears the Ball Valve. If the casing 70 is not static, close the Ball valve. If the Ball valve is closed, bleed off any remaining pressure on the Hot tap tool 2000 and hose. Disconnect the Test Hose and secure same.
Open the needle valve on the Hot tap tool 2000 to double verify there is no pressure left on it. Remove the Hot tap tool 2000′ and send same to surface.
If the casing 70 drilled has pressure on it. Install the 1½ inch Kill Line and test as needed against the ball valve. Open the Ball valve. Deal with the pressure by pumping in or bleeding off as needed until the casing is static. If there was no pressure on the casing the Ball valve was left open.
With the Ball valve Open, remove the Flange Plate 500 by backing out the 4-1⅝ inch nuts and send the Flange Plate 500 and Mandrel 2050 assembly to the surface.
Once the mandrel 2050 assembly has been removed, measure the distance with the measuring probe thru the ¾″ hole to the tubing string 80.
Normally the OD of the tubing string is known. In this case we have a 2⅜″ 4.7 #/ft N-80 tubing. When taking the measurement it is never known for sure if you are on a collar or not.
Care must be taken here when getting these measurements and selecting the size of core bit to drill out the tubing. The Hot Tap Tool 2000 Supervisor will be able to calculate that and look at the different size holes that can be drilled depending on the inner versus outer size pipes and the distance between them. Always calculate the maximum size hole that can be drilled without drilling into the next casing or tubing string.
7⅝″ casing 70×2⅜″ tubing 80 is found to be centered. Install the bit on the Articulating drill 1000. Rotate the Articulating drill 1000 into place in the front of the Clamp 100. Install two 1⅝″ nuts on the #5 and #7 position studs. Tighten up the 2×1⅝″ nuts installing the Articulating drill 1000 into place on the Clamp 100. Hydraulic Hoses were previously installed to the Drill 1000. Advance the drill bit 1400 until the bit touches the 7⅝″ casing 70. At this time the diver must make sure that the drill bit 1400 is lined up on the centerline on the inner string 70 of casing. In one embodiment drill bit 1400 is adjustable in multiple directions (advanced in and out along with adjustment to be able to go right or left, along with the ability to pivot). Drill bit 1400 can be turned up to 5, 10, 15, 20, 25, and 30 degrees of centerline of clamp 100 in order to line up the drill bit 1400 on the centerline of any the tubing string 80 without having to rotate the complete clamp 100 on the drive pipe 50 and starting over. However, should the diver be unable to line up the drill bit 1400 to the centerline of the inner string 80 the diver should move the Clamp 100 and start over.
Start the drill bit 1400 and make sure it is turning properly. Cut out the coupon being careful not to cut into the 2⅜″ tubing 80. At this time the well will look like
Remove the drill bit 1400 and send to the top.
Remove the 2—1⅝″ nuts and rotate the Articulating drill 1000 back out of the way and secure same.
The 2⅜″ tubing 80 will have to be tapped to determine if it has any pressure inside of same. The center flange 500 will be used with a 20 inch mandrel assembly 2050. When attempting to effect a seal against the tubing 80 it may be necessary to put a back up seal tip 2010′ against same to keep the tubing 80 from moving as in
Test the Teflon seal on the 2⅜″ tubing to 250 pounds per square inch low/3,500 pounds per square inch High for 5 minutes each test. The testing will be done by installing a ¼″ test hose on the end of mandrel 2050 with a pressure gauge and bleed off valve. After performing the test to everyone's satisfaction bleed off the pressures and remove the hose and connection.
Crane to send down the 30 inch stroke hot tap tool 2000′ with a 5⅞″×¾″ Bit with a ¾″ cutting insert in the bit.
Make up Hot Tap Tool 2000′ on the mandrel 2050. Install the ¼″ test hose to the ½″ needle valve with a pressure gauge and bleed off valve. Test the hot tap tool 2000 against the Teflon seal on the 2⅜″ tubing to pounds per square inch low/3,500 pounds per square inch High for 5 minutes each test. Bleed off the pressure.
Advance the bit in the hot tap tool 2000′+/−27½″ until it hits the Teflon seal. Drill out the seal by hand until it makes contact with the pipe 80. Pressure up on the hot tap tool 2000′ and the 2⅜″ tubing seal 2010 to 1,500 pounds per square inch. Send down a hand drill and make up the hydraulic hoses to same.
Drill thru the 2⅜″ tubing 80. When the drill bit goes thru the tubing the diver will feel it and there will be a fluctuation in the pressure.
Check and record pressure. Advance and retract the bit to make sure it is cut out clean. Secure the hand bit. Back out the bit until it clears the Ball Valve. If the tubing 80 is not static close the ball valve. Bleed off any pressure.
Remove clamp 100 and the well is finished.
The following is a list of Reference numerals which are used in this application.
All measurements disclosed herein are at standard temperature and pressure, at sea level on Earth, unless indicated otherwise. All materials used or intended to be used in a human being are biocompatible, unless indicated otherwise.
The foregoing embodiments are presented by way of example only; the scope of the present invention is to be limited only by the following claims.
This application claims priority of U.S. Provisional patent application Ser. No. 61/165,475, filed 31 Mar. 2009, and said application is incorporated herein by reference.
Number | Name | Date | Kind |
---|---|---|---|
4332272 | Wendell | Jun 1982 | A |
4369845 | Henson et al. | Jan 1983 | A |
5217073 | Bruns | Jun 1993 | A |
5400492 | Hodgson et al. | Mar 1995 | A |
7021325 | Maichel et al. | Apr 2006 | B2 |
7082960 | Kim et al. | Aug 2006 | B2 |
7552742 | Dole | Jun 2009 | B2 |
7938137 | Cenac et al. | May 2011 | B2 |
8069874 | Overstreet | Dec 2011 | B2 |
8333211 | McGraw et al. | Dec 2012 | B2 |
20100243072 | McGraw et al. | Sep 2010 | A1 |
Number | Date | Country |
---|---|---|
WO 2006041307 | Apr 2006 | WO |
WO 2008021792 | Feb 2008 | WO |
Number | Date | Country | |
---|---|---|---|
20100243072 A1 | Sep 2010 | US |
Number | Date | Country | |
---|---|---|---|
61165475 | Mar 2009 | US |