The present disclosure pertains to building control systems, the system's mechanical, electrical and sensing equipment and particularly to HVAC equipment. More particularly, the disclosure pertains to conditions of the equipment and its control.
The present disclosure reveals an approach to monetize the performance of building system equipment such as HVAC or lighting equipment. Expected and actual performance curves may be obtained for the system as a whole and its equipment. Differences between the performance curves may indicate excessive energy consumption. The excessive energy consumption may be monetized using demand variable rate prices. The monetization may include degradation that occurs when the equipment deteriorates, incurs a fault or has a natural loss of performance as accrued over time. Monetization may incorporate maintenance, overall system sustainability, and capital risk exposure. Monetization may feature a conversion of equipment analysis to money in real-time. Performance monitoring of the equipment may incorporate predictive trending which may lead to fault prognosis and preventive maintenance. Automation of the conversion may result in immediate actionable information and feedback to customers and service personnel. The information may be stored for historical purposes and future analyses.
a, 3b, 3c and 3d are graphs illustrating fault isolation and/or root cause identification of an HVAC system. Faults in a lighting subsystem could be similarly identified;
The commercial issue is an understanding in monetary terms exactly how much money building equipment faults and degradation is costing when a fault occurs or degradation is detectable, as accrued over time, and in terms of maintenance backlog and capital risk exposure. The technical issue may be an advanced analysis and correlation of large and complex data sets over time with an understanding of the building and equipment operational context. Results of an analysis may need to then be converted to money in real-time and stored for historical purposes. An input to this calculation may incorporate a cost of energy, variable fuel rates, and so forth. Automation of these conversions may result in immediate feedback to the customer and to a company (e.g., Honeywell International Inc.) service organization.
A measurement and verification (M&V) business may perform many of the monetization tasks through a manual analysis process. Much of the potential analysis value cannot necessarily be captured and the results of the analysis may often be delayed from several months to a year.
Financial decisions related to the system may be made immediately resulting in retrofit and re-commissioning activities that are both manual and can be automated to some degree. After corrections are made, the anticipated results may be validated and the promised energy usage savings realized. Also events that prevent the total realization of savings from occurring may be identified through continuous monitoring.
The present approach may encapsulate the fortunate convergence of many technologies and analysis approaches. These may incorporate combining the probabilistic identification of anomalies with detailed modeling of equipment behavior, equating certain equipment performance characteristics with wasted energy usage and multiplying the wasted energy amount against an energy rate, having a large set of equipment and system performance data available to test the equipment models, and having experienced energy analysts to help prioritize the savings opportunities.
The present approach may be realized in a building optimization services solution. The solution may be achieved through the integration of several sub-systems and services. They may incorporate building management service, building usage profiles, occupant comfort metrics, data acquisition, data normalization in a data warehouse, models for the data, data relationships, equipment models, advanced field device diagnostics and a costing engine based on probabilistic findings.
The present disclosure may relate to an HVAC (heating, ventilation and air conditioning) and lighting diagnostics program. Remote diagnostics of a building's energy system performance may fit into a business optimization service. “Remote” means that the diagnostics may run on a remote server or at any other place where virtually all necessary data are available. There may be algorithms for automated fault detection and diagnostics (AFDD), anomaly detection and localization, degradation detection and measurement, and possible fault isolation.
Performance monitoring of HVAC equipment may incorporate performance predictive trending that can lead to fault prognosis.
Practical aspects may be addressed. There may be scenarios for different levels of instrumentation (e.g., available sensors). Lost equipment performance may be translated to a cost of degradation in terms of energy usage and equipment lifetimes.
Various types of HVAC faults may occur. There may be hardware faults due to human errors. For instance, design faults may involve incorrect sizing of coils and duct work, inappropriate location of sensors, incorrectly specified control logic, and so on. Construction and assembly faults may involve erroneous wiring, reverse rotational direction of a fan, and so on. Operational and maintenance faults may involve faulty manual settings, opened windows, poor servicing, and so on.
There may be control system faults and incorrect strategy. An example of system faults may involve incorrect PID (proportional, integral and derivative) controller parameters. Incorrect strategy may involve wrong set points, sequencing logic, incorrect point assignments, and so on.
Hardware faults may incorporate abrupt faults such as component failure, malfunction, and the like. An example of degradation faults may involve performance deterioration. Sensor faults may result from broken connections, external noise, sensor drift caused by ageing, and so on.
An output from the suggested optimal control strategy at symbol 13 and an output from actual control strategy at symbol 14 may go to a symbol 21 representing deviations monitoring. An output from the deviations monitoring at symbol 21 may be fed back to the suggested optimal control strategy at symbol 13. Outputs from the actual control strategy at symbol 14 and the expected strategy at symbol 15 may go to a symbol 22 representing deviations monitoring. An output from system observation at symbol 16 may go to a symbol 23 representing fault reasoning. Outputs from actual performance at symbol 17 and expected performance at symbol 18 may go to deviations monitoring at symbol 24. The outputs from symbols 21, 22, 23 and 24, representing deviations monitoring, deviations monitoring, fault reasoning and deviations monitoring, respectively, may go via a results integration represented by symbol 25 to control improvements monetization at symbol 26, control inefficiencies monetization at symbol 27, operational risks monetization at symbol 28 and performance degradation monetization at symbol 29, respectively. Integration results at symbol 25 may have the data required to perform systemic results analysis driven by a set of rules. There may be a correlation of control and equipment findings in the context of their interconnection. Results integration may involve prioritization. Outputs from operational risks monetization at symbol 28 may go to control inefficiencies at symbol 27 and performance degradation monetization at symbol 29. The control improvements monetization at symbol 26, control inefficiencies monetization at symbol 27, operation risks monetization at symbol 28 and performance degradation monetization at symbol 29 may overall provide for control optimization, control monitoring, hardware faults detection and performance degradation, respectively.
Hardware faults may be reviewed. Mechanical faults may involve inefficiencies caused by an equipment malfunction. A malfunction may be detected in the data stream of sensor readings and control signals that are automatically processed by a service (e.g., fault detection and diagnosis) running on equipment or a control device. Instances may involve a leaking cooling coil, stuck cooling coil, stuck heating coil, leaking heating coil, general heating failure, general cooling failure, stuck economizer damper, communication failure, fan failure, stuck fuel valve, burner fan malfunction, undersized boiler, oversized boiler, controller error, wrong synchronization, wrong fan/pump interlock, marginal ballast, and so forth.
A process for fault detection may incorporate measured data points (system observation) that define a system state (mostly rules-based). Faults may be isolated from system states (observations) through fault reasoning. Fault relevance may be provided for each fault. Detection may depend on available data points. Fewer data points may mean fewer detectable faults.
NiagaraAX™ may provide automated fault detection and diagnostics for an AHU (air handling unit). This may relate to
Fault-isolation and root-cause identification (fault reasoning) 23 is illustrated by graphs in
For reporting purposes, results may be archived over a significant time period. Fault isolation of an AHU may be shown in terms of fault relevance development over time which may be visualized with a graph 46 in
Operational risks 28 may be reported. Operational risks are not necessarily directly detected, but may be derived from detected faults based on expert knowledge. An example of a symptom may be a ChW (chilled water) pump is unnecessarily cycling ON and OFF while the compressor is OFF. A detected fault may be a wrong interlock of compressor and chilled water pumps. An explanation or consequence is that repeated frequent ChW pump cycling may shorten the pump's life. An impact may be high operational cost and a high operational risk.
Another example of a symptom may be that the chiller pump is operating without a load. The detected fault may be a wrong interlock of compressor and chilled water pumps. An explanation may be that the chiller is operating without a load and thus damage to the compressor may result. The impact may be high operational cost and a high operational risk. Similarly, based on expert knowledge, maintenance actions may also be recommended.
Performance degradation 29 may be looked at. Equipment performance monitoring may aid in determining degradation. Equipment performance measures may be continuous numerical metrics that allow an assessment of current equipment performance, a comparison of the performance with an “ideal performance” (i.e., a model) that can correspond, e.g., to the maximum design performance determined by the vendor of the equipment.
Examples of performance measures may include coefficient of performance (COP), energy efficiency ratio (EER), boiler efficiency, chiller efficiency, heating and cooling coil fouling factors, and pressure drop on the air filter. The fouling factors may be in terms of h*ft2° F./Btu units or m2*° C./W units. Heat transfer efficiency may be noted.
Performance measures 18 may slowly deteriorate in time as a result of equipment degradation caused, e.g., by degradation mechanisms like particle fouling, clogging, animal or insect invasion, or mechanical wearing. If a performance measure reaches specific threshold, maintenance actions should be applied, e.g., cleaning or repair. A difference between actual and ideal performance measures may be translated to a cost of degradation.
There may various types of performance measures. Performance measures (PM) may be defined at 1) a component level, e.g., heating or cooling coil fouling rate, equipment level, e.g., coefficient of performance (COP), or energy efficiency ratio (EER), and 3) zone, floor, building or other level.
A reference behavior (model) 19 may be considered. It may be defined by a manufacturer which could be applicable for some equipment only. A rigorous performance measure may be based on first principles (e.g., thermodynamic laws, mass and energy balances) and the equipment should be adequately instrumented since much data are likely to be needed. This approach appears to be the most accurate way to assess equipment performance.
An empirical performance measure 19 may be based on empirical relations among key equipment parameters. Usually less data may be needed for calculation. Such performance measure may incorporate benchmarking, base-lining, and the like. It may also incorporate best known behavior (typically commissioning).
Performance measures of, for example, AHU coils of varying different complexity may be reviewed. One performance measure may be supply air temperature (t) which can be directly measured. A formula used in calculating such measurement may be tsuppLy=f (tMIXED, UCC). “u” may be a heat transfer coefficient. Sensors and parameters needed may be for two temperatures and a valve control signal.
Another performance measure may be heat transfer efficiency. The measurement may involve an empirical NTU (number of transferred units) approach. A formula used in calculating the measurement may be ε=(tair,in−tair,out)/(tair,in−Twater, in). The sensors and parameters needed may be for three temperatures (t).
A first principle related to an AHU performance measure may incorporate a heat transfer coefficient or fouling resistance. A calculation approach would be a first principle model of a heat exchanger. The formulas used in calculating a measurement may be Q=UAΔTln, Q=mScP (tC−tM), Q=mCWcP,CW (tOUT,CW−tIN,CW) and Rf=(1/Ua)−(1/Uc). The sensors and parameters needed may be four temperatures, and two flow rates in the heat exchange area. The accuracy, computational complexity and sensor/data requirements may increase with the progression of the three noted examples for performance measurements.
Boiler efficiency degradation may be illustrated by a graph 48 in
An average economizer effectiveness index may be 0.28 for the first year and 0.18 for the third year resulting in a degradation of 36 percent. The average savings due to the economizer may be $139.7 per day for the first year and $110.7 per day for the third year resulting in a degradation loss of $29 per day.
A graph 58 in
Monetization of faults may be looked at according to type. If the fault type is a complete failure, then the impact on costs and replacement may be a one time cost for repair or replacement and the comfort level may be unsatisfactory for some time. Approaches here may involve reliability engineering and evaluation of operational risks.
If the fault type is a mechanical or control system one, then the HVAC system may operate less efficiently resulting in higher operating costs. Also, once the fault is detected and diagnosed, it may cause a one time cost for repair or replacement. The comfort level may depend on the ability of the system to compensate that fault. An approach may incorporate fault detection and diagnosis. Monetization may be difficult on the component level. However, global performance measures may be used.
If the fault type is performance degradation, the HVAC may operate less efficiently with operating costs slowly increasing. There may be a one time cost for maintenance, servicing and/or cleaning. The comfort level may depend on the ability of the system to compensate for that degradation. Typically, comfort may not necessarily be affected. An approach may be historical performance monitoring. Monetization may involve using equipment/component specific performance measures.
Diagnostic plots 16 may be used to illustrate typical dependencies among key variables and parameters. Plots may be used to assess behavior of equipment, its components, and associated control loops. The plots may be equipment-specific (i.e., focused on, e.g., AHU), and possibly be also component-specific (i.e., focused on an economizer, a mixing box, and so forth). Fault detection and diagnosis may be done manually. Examples of plots are shown in
Detected results may be visualized in a clear and concise way. An example of a visualization may be shown as a relational diagram 69 in
The colors may indicate a fault status probability. The estimated energy waste in terms of money may be indicated by text in the equipment boxes. The size of the colored box in this tree map indicates energy consumption in money or relevant units associated with the equipment type.
Control inefficiency monetization 27 may be automatically computed from monitoring actual control behavior, comparing this to expected behavior and optimal behavior if the context is modeled. Control may be affected by equipment degradation. This may incorporate operational risk and control. Costs of an inefficient system may be equivalent to money=(energy wasted)*(energy price). Energy price may be money/kWh (Btu, or other unit) at $0.1/kWh. Total energy wasted may be represented by a shaded area under a curve 77 in a graph 76 of
Energy loss (E) (i.e., energy transferred to air) may be calculated as E=(tchilled
Control degradation must take into account equipment configuration, flow control device performance, equipment sizing with reference to HVAC system supply and demand, system organization, distribution system interconnections and operational schedule.
Control improvement monetization is computed by comparing the actual control performance against a model of optimized control performance. The difference as could be visualized in
Valve characteristics are usually not linear, but should be known or determined.
A graph 84 in
A simplified estimate of energy may be made with an assumption of a linear valve and a constant chilled water temperature increase across the cooling coil. There may be a 60 ton chiller, COP=4, 1 ton˜3.517 kW, 1 kWh=$0.1; 100% cooling coil to 60 ton=(60/4)*3.517 kW (electricity)=$5.28/hour; 50% cooling coil to 30 ton=(60/4)*1.76 kW (electricity)=$2.64/hour; and 10% cooling coil to 6 ton=(60/4)*0.35 kW (electricity)=$0.53/hour. If the range of integration shows a 2 h 13 m (133 min) time interval and its size is 54.9 (integrating percents), it may be interpreted that the unit runs 54.9/133=41.3% from 2 h 13 m=54.9 min at 100% cooling output which may cost 54.9*$5.28/60=$4.83 and was off. Otherwise, it may be $4.83 per 2 h 13 m is $2.17/hour of operation. The actual behavior may be very likely different especially with a non-linear valve, so it should not necessarily be interpreted as indicated.
An internal cross check may be made with the assumptions stated as 100% cooling coil to 60 ton=60*3.517 kW (electricity)=211 kW (chilled water), 50% cooling coil to 30 ton=60*1.76 kW (electricity)=105.6 kW (chilled water), and 10% cooling coil to 6 ton=60*0.3517 kW (electricity)=21.1 kW (chilled water). For this example, one may observe (54.9/60)*211 kW=193 kW of cooling effect. The cross check involving a sum over the 2 h13 m interval of the formula “(chilled_water_return(t)−chilled_water_supply(t))*chilled_water mass_flow(t)*water spec_capacity” should give about 193 kW.
A table 91 of data from a Trane™ information sheet for an example 60 Hz water cooled scroll chiller performance data in metric units is shown in
A recap may ensue.
Monetizing the difference may incorporate converting the difference into a quantity of energy consumption, and determining a cost of the quantity of energy consumption. The cost of the quantity of energy consumption may be the quantity of energy consumption multiplied by a cost per quantity unit of energy as the cost per quantity unit of energy varies over time. The quantity of energy consumption may be for a time period of the actual performance curve of the building system equipment. The building system equipment may be HVAC equipment.
The expected performance curve may be for a first time period, and the actual performance curve may be over a second time period. A length of the first time period may be equal to a length of the second time period.
Monetizing the difference may incorporate a converting the difference into a quantity of energy consumption, and determining a cost of the quantity of energy consumption. The cost of the quantity of energy consumption may be the quantity of energy consumption multiplied by a cost per quantity unit of energy. The quantity of energy consumption may be for a time period of the second actual performance curve of the building system equipment.
The first performance curve may be for a first time period, the second performance curve may be for a second time period, and a length of the first time period may be approximately equal to a length of the second time period.
The system may further incorporate an equipment monitor connected to the data interface, a fault reasoning module connected to the equipment monitor, and a risk monetizer connected to the equipment monitor. The equipment monitor may be for detecting operational risks of the building system equipment.
The system may further incorporate an expected control strategy module connected to the data interface, an actual control strategy module connected to the data interface, a first control strategy deviation monitor connected to the expected control strategy module and the actual control strategy module, and a control inefficiencies monetizer connected to the control strategy deviation monitor.
The system may further incorporate a suggested optimal control strategy module connected to the actual control strategy module, a second control strategy deviation monitor connected to the actual control strategy module and the suggested optimal control strategy module, and a control improvements monetizer connected to the second control strategy deviation monitor.
The system may further incorporate an equipment observation module connected to the data interface, and an operational risk monetizer connected to the equipment observation module.
The system may further incorporate an expected control strategy module connected to the data interface, an actual control strategy module connected to the data interface, a control strategy deviation monitor connected to the expected control strategy module and the actual control strategy module, and a control inefficiencies monetizer connected to the control strategy deviation monitor, a control improvements monetizer, and a results integrator. The results integrator may be connected to the performance degradation monetizer, the operational risk monetizer, the control inefficiencies monetizer, and the control improvements monetizer.
The system may further incorporate an equipment observer module connected to the data interface, an operational risk monetizer connected to the equipment observer module, an expected control strategy module connected to the data interface, an actual control strategy module connected to the data interface, a first control strategy deviation monitor connected to the expected control strategy module and the actual control strategy module, and a control inefficiencies monetizer connected to the first control strategy deviation monitor.
The system may further incorporate a suggested optional control strategy module connected to the actual control strategy module, a second control strategy deviation monitor connected to the actual control strategy module and the suggested optimal control strategy module, a control improvements monetizer connected to the second control strategy deviation monitor, and a results integrator connected to the performance degradation monetizer, the operational risk monetizer, the control inefficiencies monetizer, and the control improvements monetizer.
In the present specification, some of the matter may be of a hypothetical or prophetic nature although stated in another manner or tense.
Although the present system and approach has been described with respect to at least one illustrative example, many variations and modifications will become apparent to those skilled in the art upon reading the specification. It is therefore the intention that the appended claims be interpreted as broadly as possible in view of the prior art to include all such variations and modifications.