The present invention relates to a technology of effectively using generated electricity.
Conventional Electric Vehicles (hereinafter abbreviated as EVs) start to be charged in response to a user connecting the EV with a dedicated charge stand and providing an instruction to start charge through manual operation or simultaneously with connection of a power cable to the EV.
Some EVs use electric power generated with renewable energy such as sunlight, water power, and wind power.
In conventional configurations, the charge of EVs is started at the time when the power cable is connected to the EV or when a user performs the operation for start. The charge is thus performed regardless of the state of a power system or the status of power generation with renewable energy.
The amount of power generated by the renewable energy cannot be controlled, and excess power (hereinafter referred to as an overload as required) may be produced in the power system. A possible approach to stabilizing the power system is to store the overload in a large-capacity mounted battery. The large-capacity battery, however, is expensive and cannot be mounted easily.
It is an object of the present invention to provide a technology of effectively using supplied electric power through adjustment of a charge schedule period of an EV.
A charge period adjusting apparatus according to embodiments includes an acquiring section and a control section. The acquiring section is configured to acquire a power supply schedule amount of an electric system including a charger connected during charge of an electric vehicle. The control section is configured to set a charge period such that the electric vehicle is charged in a time frame in which the power supply schedule amount acquired by the acquiring section exceeds a threshold value.
A charge system according to embodiments includes a predicting apparatus and a charge period adjusting apparatus. The predicting apparatus is configured to calculate a power supply amount scheduled to be supplied from renewable energy. The charge period adjusting apparatus is configured to include the power supply amount calculated in the predicting apparatus, to acquire a power supply schedule amount of an electric system including a charger connected during charge of an electric vehicle, and to set a charge period such that the electric vehicle is charged by the charger in a time frame in which the power supply schedule amount exceeds a threshold value.
[
[
[
[
[
[
[
[
[
[
[
In each embodiment below, the future status of power generation with renewable energy is predicted, and a charge start time and a charge end time defining a charge period are adjusted such that charge of an EV is performed to coincide with a time frame in which an overload is present. This can eliminate the need to mount a large-capacity battery and can charge the EV with excess power, if produced.
In each embodiment below, description is made of a distribution center responsible for managing a use start time and a use end time of the EV, and a running distance during use, including their schedules. Aspects of the present invention are not limited thereto, and a general user who uses the EV may implement the aspect of each embodiment.
The renewable energy producing apparatus 2 is an apparatus such as a facility for power generation with sunlight, a hydroelectric power generation facility, and a wind power generation facility which produces electric power by using renewable energy such as sunlight, water power, and wind power. The renewable energy producing apparatus 2 may be an apparatus which generates power by using other natural energy such as geothermal heat.
The power generation amount collecting apparatus 3 collects an amount of power generation (in KWs) produced by renewable energy producing apparatus 2 in hours and calculates the past results. Although the past results can be given in watts per hour (KW/h) in the present embodiment, watts per minute or per second may be used.
The predicting apparatus 4 acquires information about weather forecast, prediction of water power amount, and prediction of wind power amount from outside. The predicting apparatus 4 calculates a future power supply amount with the renewable energy in hours from the acquired information about weather forecast, prediction of water power amount, and prediction of wind power amount based on the correlation between the past results of power generation amounts calculated by the power generation amount collecting apparatus 3 and the weather conditions, water power amounts, and wind power amounts at the times when the past results were obtained.
The input terminal apparatus 5 is a personal computer or a mobile terminal device and is a terminal apparatus for allowing a user who manages the EV 9 to input information. The user inputs information about a use schedule period of the EV 9 (scheduled time of use start and scheduled time of use end) and information about a scheduled running distance of the EV 9 to the input terminal apparatus 5. The scheduled running distance may be information about a destination. In this case, the input terminal apparatus 5 or the charge control apparatus 1 calculates a round-trip distance between the distribution center and the destination based on a conventional technology.
The power-system monitor system 6 monitors and controls, for example, power generation amounts in thermal power generation and water power generation managed by an electric power company, and provides a future supply power amount in the power system including the charge stand 8 (the amount of power supplied by thermal power generation and water power generation). The power-system monitor system 6 provides the past results and future prediction information in watts per hour (KW/h) for the charge control apparatus 1. The prediction information provided by the power-system monitor system 6 does not include a power generation schedule amount in the renewable energy producing apparatus 2. The power-system monitor system 6 also provides information about a time frame in which the power system is scheduled to stop power supply due to construction or the like (start schedule time and end schedule time of the stop).
The charge control apparatus 1 acquires the information about the future power generation amount with the renewable energy from the predicting apparatus 4 and acquires the information about the future power amount from the power-system monitor system 6. Each of the prediction amounts is a power schedule amount to be supplied into the power system including the charge stand 8 and is a predicted power amount per hour (KW/h) in the present embodiment. The charge control apparatus 1 also acquires the information about the use start time and use end time of the EV 9 and the information about the scheduled running distance during the use from the input terminal apparatus 5. The charge control apparatus 1 calculates an amount of charge with which the EV 9 can run over the scheduled running distance. The charge control apparatus 1 acquires a remaining battery level from the EV 9 (although wireless communication is used for a communication means, wired communication is possible), and calculates a period required to reach the calculated charge amount.
The charge control apparatus 1 uses the acquired information and calculated information to set the charge start time and end time of the EV 9 (each is a scheduled time). Specifically, the charge control apparatus 1 uses the predicted power generation amount with the renewable energy and the future predicted power amount obtained from the power-system monitor system 6 to determine the charge period such that charge is performed in a time frame in which more renewable energy can be used or a time frame in which a system load is higher, and stores the determined charge period in a storage section or the like.
The start/end control apparatus 7 requests the charge stand 8 to start or end charge at the time indicated by the charge control apparatus 1. The charge stand 8 includes a charger 81 and starts or ends charge of the EV 9 at the time indicated by the start/end control apparatus 7. The charge stand 8 performs charge on condition that it is connected to the EV 9. When it is not connected to the EV 9 at the charge start time, a notification may be provided by the charge control apparatus 1, the start/end control apparatus 7, or the charge stand 8.
The EV 9 is an electric vehicle which includes a battery and an electric motor and runs by driving the motor with electric power supplied from the battery. The EV 9 has a mechanism which can communicate with the charge control apparatus 1 via a network. The EV 9 periodically transmits information about its remaining battery level to the charge control apparatus 1. The transmission is performed through a communicating means according to a conventional technology.
The processor 11 is a computing apparatus such as a Central Processing Unit (CPU) and loads programs stored in the ROM 13 and the HDD 14 into the memory 12 to perform computing. This allows the processor 11 to achieve various types of processing in accordance with the programs. The memory 12 is a volatile main storage. The ROM 13 is a non-volatile storage for permanent storing and has a Basic Input Output System (BIOS) for system start-up or the like previously stored therein. The HDD 14 is an auxiliary storage for permanent storing. Data and programs used by the user and an operating system are stored in the HDD 14.
The input apparatus 15 is an apparatus which receives input of information from the user to the charge control apparatus 1, and includes a keyboard, a mouse or the like. The output apparatus 16 is an apparatus which notifies the user of the details or results of processing in the charge control apparatus 1, and includes a monitor, a printer or the like. The network I/F 17 is a unit responsible for communication with equipment external to the charge control apparatus 1, and includes a Local Area Network (LAN) board, a unit and a mechanism for controlling near field communication. The communication of the network I/F 17 with external equipment may be wired or wireless. The network I/F 17 may include a terminal compliant with Universal Serial Bus (USB) specifications such that an external HDD or a USB memory can be connected to allow input and output of information. Although the information from the predicting apparatus 4, the input terminal apparatus 5, the power-system monitor system 6, and the EV 9 is obtained via the network I/F 17, some or all of the information may be provided through manual input by the user with the input apparatus 15.
Next,
The charge control apparatus 1 calculates a total prediction amount by adding the renewable energy prediction amount to the system load prediction amount. The total prediction amount is shown by a curved line with white triangles in
Although the vertical axis in
The network I/F 17 of the charge control apparatus 1 periodically receives, from the predicting apparatus 4, the renewable energy prediction amount (KW/h) scheduled to be produced in the renewable energy producing apparatus 2 (S001). The renewable energy prediction amount is a power prediction amount from the renewable energy to be supplied to the power system including the charge stand 8 (charger 81). Although the prediction amount for three days is received in this example, the present invention is not limited thereto. This depends on the accuracy of weather forecast and the like. The processor 11 stores the renewable energy prediction amount in the memory 12 or the HDD 14.
The network I/F 17 receives, from the input terminal apparatus 5, the information about the use schedule period of the EV (scheduled time of use start and scheduled time of use end) and about the scheduled running distance (S002). The input terminal apparatus 5 transmits the use schedule period and the scheduled running distance at any time when the user inputs the information. The processor 11 stores the information in the memory 12 or the HDD 14. It should be noted that the network I/F 17 may receive the information about the destination instead of the distance information and calculate the round-trip distance between the distribution center and the destination. When the user performs manual input, the input apparatus 15 acquires the information about the use schedule period and the scheduled running distance or the information about the destination, and the processor 11 stores the information in the memory 12 or the HDD 14.
The network I/F 17 of the charge control apparatus 1 periodically receives, from the power-system monitor system 6, the system load prediction amount (KW/h) of the power system including the charge stand 8 (charger 81) and information about a time at which charge becomes impossible (S003). The system load prediction amount obtained from the power-system monitor system 6 does not include the amount of power produced with the renewable energy as described above. The non-chargeability information is information indicating a time at which power supply becomes impossible due to construction or the like within the power system including the charge stand 8. The processor 11 stores the system load prediction amount and the non-chargeability information in the memory 12 or the HDD 14.
The network I/F 17 periodically receives the operation status of an EV of interest (the EV 9 in this case) and the remaining battery level from the EV 9 (S004). The processor 11 stores the obtained information in the memory 12 or the HDD 14. The processor 11 calculates a period required to charge the EV from the scheduled running distance of the EV 9 provided by the input terminal apparatus 5 and the remaining battery level (S005). Specifically, the processor 11 calculates how much power is consumed for running over the scheduled running distance, and calculates the period required to charge the EV 9 from the consumption amount and the remaining battery level. The period required for charge is a charge period in the charger 81 necessary to reach a charge amount with which the scheduled running distance can be completed.
The processor 11 of the charge control apparatus 1 determines and sets a scheduled time of charge start and a scheduled time of charge end by taking account of the future use start time and use end time of the EV 9 and the future time at which charge becomes impossible (S006). When the chargeable time frame of the EV 9 (see
The processor 11 compares the chargeable time frame (see
When the period required for charge can be secured (Yes at S007), the processor 11 sets a charge schedule to be close to the beginning of the chargeable time frame such that charge is started and ended at the earliest possible time (S009). Specifically, the processor 11 sets a charge start time at the use end time of the EV 9 and calculates a charge end time by adding the period required for charge to that charge start time. Step S009 is performed in the normal case (Case 1 in
The processor 11 calculates the total prediction amount based on the renewable energy prediction amount and the system load prediction amount (S010). Although the total prediction amount is calculated by adding the renewable energy prediction amount to the system load prediction amount as shown in
The processor 11 determines whether or not there is a time frame (overload time frame) in which the total prediction amount exceeds the threshold value (S011). If no overload time frame is present (No at S011), the processing proceeds to S013. If any overload time frame is present (Yes at S011), the processor 11 changes the charge schedule such that charge is performed in that overload time frame with a higher priority (S012). The details of the processing at step S012 are described later.
The processor 11 outputs the scheduled time of charge start and the scheduled time of charge end set up to this point to the network I/F 17 for transmission to the start/end control apparatus 7. The network I/F 17 transmits the charge start and end times of the EV 9 to the start/end control apparatus 7 (S013). The start/end control apparatus 7 controls the start and end of charge in the charge stand 8 in accordance with the charge start and end times.
Next, description is made of the setting of the charge period when any non-chargeable time frame appears in the chargeable time frame at step S006 with reference to
First, the processor 11 initializes the variable n to zero (S101).
The processor 11 acquires the period required for charge and substitutes it for Tn (which represents the remaining charge period and is T0 at this point). The processor 11 also acquires the use end time of the EV 9 and acquires a start time and an end time of the non-chargeable period (S102).
The processor 11 matches a charge start time (which is represented as TSn and is TS0 at this point) to the use end time of the EV 9 such that charge is performed close to the beginning of the chargeable time frame (S103). Next, the processor 11 calculates a charge end time (which is represented as TEn and is TE0 at this point) by adding T0 to TS0 (S104).
The processor 11 determines whether or not the calculated TE0 reaches the start time of the non-chargeable period (S105). In this case, it is determined whether or not the charge can be completed before the start time of the non-chargeable period. If TE0 does not reach or equals the start time of the non-chargeable period (Yes at S105), the following adjustment is not required since the charge can be completed before the start time of the non-chargeable period. The processor 11 determines (sets) TS0 and TE0 and ends the processing.
If TE0 exceeds the start time of the non-chargeable period (No at S105), the processor 11 resets the charge end time (TE0) to the start time of the non-chargeable period (S106). Next, the processor 11 calculates a remaining charge period (T1) at present by subtracting (TE0−TS0) from T0 (S107). If the determination result at step S105 is negative, the charge operation is temporarily ended at the start time of the non-chargeable period, but at that point, the EV is not charged to the extent that the scheduled running distance can be completed, and additional charge is needed. At step S107, the processor 11 calculates how long charge period is further required.
The processor 11 increments the variable n by one (S108).
The processor 11 matches a next charge start time (which is TS1 since n is incremented) to the end time of the non-chargeable time frame (S109). The processor 11 calculates a next charge end time TE1 by adding T1 to TS1 (S110).
The processor 11 determines whether or not a next (at this point, second) non-chargeable time frame is present (S111). A plurality of non-chargeable time frames may be present at time intervals, and the determination at step S111 is performed for dealing with such a case. If the second non-chargeable time frame is not present (No at S111), the processor 11 determines the charge start times (TS0, TS1) and the charge end times (TE0, TE1) calculated up to this point (S112) and ends the processing. If the second non-chargeable time frame is present (Yes at S111), the processing proceeds to S105.
If TE1 does not reach a start time of the second non-chargeable time frame (Yes at S105), the processor 11 determines the charge start times (TS0, TS1) and the charge end times (TE0, TE1) calculated up to this point (S112). If the determination result at S105 is negative (No at S105), the processor 11 resets the charge end time TE1 to the start time of the second non-chargeable time frame (S106), calculates a remaining charge period T2 (S107), and increments n to set n=2 (S108). The processor 11 sets a charge start time TS2 to an end time of the second non-chargeable period (S109) and calculates a charge end time TE2 by adding T2 to TS2 (S110).
The processor 11 determines whether or not a next (third) non-chargeable time frame is present (S111). If not (No at S111), the processor 11 determines the charge start times (TS0, TS1, TS2) and the charge end times (TE0, TE1, TE2) calculated up to this point (S112) and ends the processing. If the next (third) non-chargeable time frame is present (Yes at S111), the processing proceeds to S105.
Then, the processing from step S105 to step S111 is repeatedly performed with the variable n incremented by one. At step S112, the charge start times (TS0, TS1, . . . TSn) and charge end times (TE0, TE1, . . . TEn) are determined in accordance with the number of occurrences of the non-chargeable time frame. The processor 11 may permanently save the determined time data in the HDD 14.
Next,
The processor 11 initializes the variable n to zero (S201). The processor 11 acquires the period required for charge and substitutes it for Tn (which is T0 at this point). The processor 11 acquires the use end time of the EV 9 transmitted from the input terminal apparatus 5 and acquires a start time and an end time of the overload time frame (S202). The processor 11 matches a charge start time (which is represented as TSn and is TS0 at this point) to the start time of the overload time frame (S203), and calculates a charge end time (which is represented as TEn and is TE0 at this point) by adding T0 to TS0 (S204).
The processor 11 determines whether or not the charge end time (TE0) reaches the end time of the overload time frame (S205). At step S205, it is determined whether or not the charge can be completed within the overload time frame. If the charge can be completed within the overload time frame, additional charge is not required and thus the processing proceeds to end. If the charge cannot be completed, an additional charge period needs to be secured, and additional processing is performed.
If the charge end time (TE0) does not reach or equals the end time of the overload time frame at step S205 (Yes at S205), the processor 11 sets and determines the charge start time (TS0) and the charge end time (TE0) by saving them in the HDD 14 (S214) and ends the processing.
If the charge end time (TE0) exceeds the end time of the overload time frame (No at S205), the processor 11 resets TE0 to the end time of the overload time frame (S206). Then, the processor 11 sets the result calculated by subtracting (TE0−TS0) from T0 to a remaining charge period (T1) (S207). At this point, the charge period is not sufficient, and charge is needed for the remaining period T1.
The processor 11 increments the variable n by one (S208).
The processor 11 determines whether or not a next (second) overload time frame is present (S209). This is performed to deal with the case where a plurality of overload time frames are present. If the second overload time frame is not present (No at S209), the processor 11 sets the remaining period T1 close to the beginning of the chargeable time frame. Specifically, the processor 11 sets TSn (which is TS1 at this point) to the use end time of the EV 9 (S210) and calculates TEn (TE1 at this point) by adding T1 to TS1 (S211).
The processor 11 determines whether or not TEn (which is TE1 at this point) exceeds the start time of the overload time frame (S212). The determination is equal to determination of whether the remaining period T1 falls within the period from the use end time of the EV9 to the start time of the overload time frame. If TEn (which is TE1 at this point) does not exceed the start time of the overload time frame (No at S212), the processing proceeds to S214, and the processor 11 sets and determines the charge start times and the charge end times by saving them in the HDD 14 (S214). If TEn (TE1) exceeds the start time of the overload time frame (Yes at S212), the processor 11 adjusts the schedule such that charge for a period corresponding to the excess is performed after the end time of the overload time frame (S213), and proceeds to step S214.
At step S213, the adjustment when n=1 is performed as shown in the following steps S213-1 to S213-5. At n=2 and afterward, the operations from steps S213-1 to S213-5 are performed in accordance with the value of the variable n. After step S213, the processing proceeds to step S214, and the processor 11 determines the charge start times and the charge end times calculated up to that point.
(S213-1) Set TE1 to the start time of the overload time frame.
(S213-2) Determine T2 by calculating T2=T1−(TS1−TE1).
(S213-3) Increment the variable n to set n=2.
(S213-4) Set TS2 to the end time of the overload time frame.
(S213-5) Calculate TE2 by adding T2 to TS2.
When TE2 reaches the next overload time frame, the processor 11 performs the steps S213-1 to S213-5 in the case where n=2.
Description is returned to the determination at step S209. If the next (second) overload time frame is present (Yes at S209), the processing proceeds to step S203 to perform processing for the second overload time frame in the case where n=1. Then, the processing is repeatedly performed in accordance with the value of the variable n. The values of TS0, TS1, . . . , TSn are calculated and the values of TE0, TE1, . . . , TEn are calculated in accordance with the value of the variable n.
If both the non-chargeable time frame and the overload time frame are present, the non-chargeable time frame is treated as the use time frame of the EV 9, and each step described in
In the present embodiment, the following advantages are expected.
(1) The charge of the EV is concentrated in the overload time frame to allow stabilization of the system without mounting an expensive large-capacity mounted battery.
(2) The charge of the EV is performed in the time frame in which the renewable energy such as sunlight, wind power, and water power is produced in large amount to allow preferential use of the renewable energy, thereby achieving effective use of the renewable energy and reduced use of power in conventional thermal power generation and water power generation.
Embodiment 2 is an example of implementation in which load can be further reduced by using either a fast charger or a normal charger as appropriate.
A processor 11 determines, at step S007, whether or not a charge period of the EV 9 can be secured by comparing a chargeable time frame (see
If not (No at S301), the processor 11 notifies a user that the EV 9 cannot be used (S008). If Yes at S301, the use of the fast charger is set and the processing proceeds to step S009. When the determination at step S301 is performed, the following processing operations are performed assuming that the fast charger 82 is used.
At step S012 in
If the results of both the determinations at step S302 are positive (Yes at S302), the processor 11 changes the schedule such that the fast charger 82 is used in the overload time frame (S303). The processor 11 performs the processing described in
Thus, the charge time frame can be included easily in the overload time frame and the amount of power consumption from charge can be increased to reduce the excessive supply power. When the determination result at step S302 is negative (No at S302), the processing proceeds to step S013.
Although each of the embodiments described above employs the scheduling with no margin for time such as the setting of the start of charge immediately after the use end time of the EV, the scheduling may be changed to have a margin of 15 to 30 minutes, for example.
Although each of the embodiments described above is configured to acquire the system load prediction amount from the power-system monitor system 6, the aspects are not limited thereto. The system load prediction amount may not be acquired from the power-system monitor system 6. In this case, only the renewable energy prediction amount can be used to realize each of the embodiments by adjusting the threshold value for determining the overload to a lower level. When the system load prediction amount cannot be obtained, the charge control apparatus 1 may determine the system load prediction amount from the past results.
The charge control apparatus 1 may be provided as a charge period adjusting apparatus. A control section corresponds to the processor 11. The processor 11 extracts a charge period adjusting program stored previously in the HDD 14 or the ROM 13 to the memory 12 and executes the program to provide the respective functions of each of the embodiments in cooperation with hardware. An acquiring section corresponds to the network I/F 17 of each of the embodiments. When the user manually inputs information, the acquiring section corresponds to the input apparatus 15.
Although each of the embodiments has been described in the case where the functions for implementing the aspects of the embodiments are previously recorded within the apparatus, the present invention is not limited thereto, and similar functions may be downloaded to the apparatus via a network, or a recording medium having similar functions stored thereon may be installed on the apparatus. The recording medium may take any form such as a CD-ROM that allows storage of programs and read-out by the apparatus. The functions obtained previously through the installation or downloading may be implemented in cooperation with the operation system (OS) or the like in the apparatus.
The embodiments allow effective use of supplied power.
Although some embodiments of the present invention have been described, those embodiments are illustrative and are not intended to limit the scope of the present invention. The novel embodiments can be implemented in various other forms, and various omissions, substitutions, and modifications can be made thereto without departing from the spirit or scope of the present invention. These embodiments and their variations are encompassed within the spirit or scope of the present invention and within the invention set forth in the claims and the equivalents thereof.
Filing Document | Filing Date | Country | Kind |
---|---|---|---|
PCT/JP2013/001573 | 3/11/2013 | WO | 00 |
Publishing Document | Publishing Date | Country | Kind |
---|---|---|---|
WO2014/141315 | 9/18/2014 | WO | A |
Number | Name | Date | Kind |
---|---|---|---|
8803480 | Muto | Aug 2014 | B2 |
20100017045 | Nesler et al. | Jan 2010 | A1 |
20110202221 | Sobue et al. | Aug 2011 | A1 |
20120007563 | Muto et al. | Jan 2012 | A1 |
20120277923 | Tsuchiya | Nov 2012 | A1 |
20130009599 | Yukizane | Jan 2013 | A1 |
20130093393 | Shimotani | Apr 2013 | A1 |
20140006137 | Melen | Jan 2014 | A1 |
Number | Date | Country |
---|---|---|
2010 98793 | Apr 2010 | JP |
2011 83165 | Apr 2011 | JP |
2011-188729 | Sep 2011 | JP |
2011-188731 | Sep 2011 | JP |
2012-100453 | May 2012 | JP |
2012 235541 | Nov 2012 | JP |
2013 17268 | Jan 2013 | JP |
WO 2010042550 | Apr 2010 | WO |
WO 2010109888 | Sep 2010 | WO |
Entry |
---|
International Search Report dated May 28, 2013 in PCT/JP13/001573 Filed Mar. 11, 2013. |
Japanese Office Action dated Apr. 21, 2015 in a corresponding Application No. JP 2014-536057. |
Number | Date | Country | |
---|---|---|---|
20160028253 A1 | Jan 2016 | US |