In communication systems, a first radio may transmit a talk group call through a channel to a second radio, thereby occupying the channel. Because the channel is occupied, the second radio, or other radios, may not be able to communicate through the channel.
In some situations, it may be useful to permit high priority call to override other calls. For example, while a first radio is occupying a channel to communicate with a second radio, it may be desirable to allow another radio may to communicate with the first, second (or other) radios, for example, if the other radio needs to communicate an emergency. Upon such an emergency, it may therefore be desirable to stop (“de-key”) the first radio from the talk group call such that the other radio can use the channel to transmit. Since the first radio is occupying the channel, the channel may be unusable to instruct the first radio to de-key. Therefore, current systems lack the ability to, while the first radio is transmitting, instruct the first radio to de-key such that the channel can be used for a high-priority call.
Disclosed herein are communication systems that solve this and other problems with prior communication systems, allowing, for example, the first radio to be interrupted, such that the other radio can use the channel for a high priority call, such as in an emergency.
In some example communication systems, a communication system may include a fixed network equipment (FNE). The FNE may be operable to receive a talk group call from a first radio. The FNE may be operable to transmit the talk group call to a second radio. The FNE may be operable to receive a request for a high priority call. The communication system may include a gateway. The gateway may be operable to transmit an interrupt signaling message through a broadband channel to the first radio. The interrupt signaling message may include instructions to de-key from the talk group call.
In some example communication systems, the FNE may be operable to, in response to the request for the high priority call, instruct the gateway to transmit the interrupt signaling message. The interrupt signaling message may instruct the first radio to accept the high priority call. The interrupt signaling message may instructs the first radio to not accept the high priority call.
In some example communication systems, the communication system may receive the request for the high priority call from a third radio.
In some example communication systems, the FNE may be operable to communicate on a first dedicated frequency with the first radio and communicate on a second dedicated frequency with the second radio.
In some example communication systems, the talk group call may be a trunked talk group call. In some example communication systems, the talk group call may be a unit-to-many call.
In some example communication systems, the communication system may include a first radio and a second radio. The first radio may be operable to transmit a talk group call to an FNE. The second radio may be operable to receive the talk group call from the FNE. The first radio may be operable to receive an interrupt signaling message through a broadband channel. The interrupt signaling message may include instructions to de-key from the talk group call.
In some example communication systems, the first radio may be operable to accept the high priority call in response to the interrupt signaling message.
In some example communication systems, the communication system may include a third radio. The third radio may be operable to transmit a request for the high priority call to the FNE.
In some example communication systems, the first radio may be operable to communicate on a first dedicated frequency and the second radio may be operable to communicate on a second dedicated frequency.
In some example communication systems, the talk group call may be a trunked talk group call. The talk group call may be a unit-to-many call.
In some example communication systems, a communication system may include a first radio. The first radio may be operable to communicate with a second radio in a talk group call. The communication system may include a gateway. The gateway may be operable to receive a request for a high priority call. The gateway may be operable to transmit an interrupt signaling message through a broadband channel to the first radio. The interrupt signaling message may include instructions to make a high priority call decision.
In some example communication systems, the high priority call decision may include de-keying from the talk group call. The high priority call decision may include moving to a new frequency.
In some example communication systems, the talk group call may be a trunked talk group call. The talk group call may be a unit-to-many call.
In some example communication systems, the first radio may be operable to accept the high priority call in response to the interrupt signaling message.
The accompanying figures, where like reference numerals refer to identical or functionally similar elements throughout the separate views, together with the detailed description below, are incorporated in and form part of the specification, and serve to further illustrate embodiments of concepts that include the claimed invention and explain various principles and advantages of those embodiments.
Skilled artisans will appreciate that elements in the figures are illustrated for simplicity and clarity and have not necessarily been drawn to scale. For example, the dimensions of some of the elements in the figures may be exaggerated relative to other elements to help to improve understanding of embodiments of the present invention.
The components have been represented where appropriate by conventional symbols in the drawings, showing only those specific details that are pertinent to understanding the embodiments of the present invention so as not to obscure the disclosure with details that will be readily apparent to those of ordinary skill in the art having the benefit of the description herein.
Disclosed herein are communication systems and methods with interrupt capabilities. For example, during communication in a talk group, a radio may be transmitting, occupying the channel used by talk group call, such that other radios cannot transmit in the talk group. Other radios may need to transmit a high priority call, such that it would be desirable to override the currently transmitting radio. Since the currently transmitting radio is occupying the channel by transmitting the talk group call, other radios or other components of a communication system cannot use the talk group to instruct the currently transmitting radio to stop occupying the channel by transmitting the talk group call (to “de-key”). Some example communication systems and methods disclosed herein allow for interrupting the radio such that another radio can transmit the high priority call. The other radio may transmit the high priority call using to the radios in the talk group or may use the channel previously occupied by the transmitting radio to transmit to other radios or other talk groups.
In some situations, it may be useful to permit high priority call to override other calls. For example, while a first radio is occupying a channel, transmitting a talk group call to communicate with a second radio, it may be desirable to allow another radio to communicate with the first, second (or other) radios. For example, it may be desirable to allow the other radio to communicate in the case of an emergency. Upon such an emergency, it may therefore be desirable to de-key the first radio from occupying channel and transmitting the talk group call, permitting the other radio to transmit. Since the first radio is occupying the channel, the channel may be unusable to instruct the first radio to de-key.
The FNE 102 is transmitting the talk group call 106 to a second radio 108. The first radio 104 and the second radio 108 may be said to be part of a talk group, allowing communication between the two radios. Other radios may be included in the talk group simultaneously, at other times, or both. The talk group call 106 may occupy a channel of the FNE 102, the first radio 104, or both. A third radio 110 may need to transmit a high priority call to the FNE 102 using the channel occupied by the talk group call 106 or another resource of the FNE 102.
The second radio 108 is receiving the talk group call 106 from the FNE 102. Because the first radio 104 and the FNE 102 are currently transmitting the talk group call 106, the channel used by the FNE 102 and the first radio 104 to transmit the talk group call 106 may be occupied, meaning that the second radio 108 cannot transmit in the talk group. Accordingly, the FNE 102 may not be able to use the channel occupied by the talk group call 106 to transmit the request for a high priority call 112.
To allow the transmission of a high priority call, the communication system 100 includes a gateway 114. The third radio 110 transmits to the FNE 102 a request for a high priority call 112. The gateway 114 may be any device used to connect radios to a network. So that the high priority call can be transmitted, the gateway 114 facilitates the de-keying of the first radio 104 as follows. The FNE 102 receives the request for the high priority call 112, which may be sent with a high priority call. The FNE 102 is operable to receive the request for the high priority call 112 from the third radio 110. In response to the request for the high priority call 112, the FNE 102 is operable to send a gateway instruction 116 to instruct the gateway 114 to transmit an interrupt signaling message 118.
The gateway 114, upon receiving the gateway instruction 116, is operable to transmit the interrupt signaling message 118 to the first radio 104. The gateway 114 may be operable to transmit the interrupt signaling message 118 through a broadband channel to the first radio 104. The first radio 104 is operable to receive the interrupt signaling message 118 through the broadband channel. The gateway 114 may be operable to transmit the interrupt signaling message 118 through other channels.
The interrupt signaling message 118 may include instructions to de-key from the talk group call 106. The first radio, upon receiving the interrupt signaling message 118, may be operable to de-key from the talk group call 106, thereby freeing the FNE 102 to transmit the high priority call through the channel previously occupied by the talk group call 106.
The first radio 104 may be an intended recipient of the high priority call. The interrupt signaling message may instruct the first radio 104 to accept the high priority call. The first radio 104 may be operable to accept the high priority call in response to the interrupt signaling message. The first radio 104 may not be an intended recipient of the high priority call. The interrupt signaling message may instruct the first radio to not accept the high priority call.
The first radio 202 and the second radio 206 may be said to be part of a talk group, allowing communication between the two radios 202 and 206. Other radios may be included in the talk group simultaneously, at other times, or both. The second radio 206 may need to transmit a high priority call using the channel occupied by the talk group call 204 or another resource.
The second radio 206 is receiving the talk group call 204 from the first radio 202. Because the first radio 202 is transmitting the talk group call 204, the channel used by the first radio 202 to transmit the talk group call 204 may be occupied. Accordingly, the second radio 206 may not be able to use the talk group to transmit a request for a high priority call 208.
To allow the transmission of the high priority call, the communication system 200 includes a gateway 210. The second radio 206 transmits the request for the high priority call 208 to the gateway 210. The gateway 210 may be any device used to connect radios to a network. So that the high priority call can be transmitted, the gateway 210 facilitates the de-keying of the first radio 202 as follows. The gateway 210 receives the request for the high priority call 208 from the second radio 206. In response to the request for a high priority call 208, the gateway 210 is operable to transmit an interrupt signaling message 212 to the first radio 202.
The gateway 210 may be operable to transmit the interrupt signaling message 208 through a broadband channel to the first radio 202. The first radio 202 is operable to receive the interrupt signaling message 212 through the broadband channel. The gateway 210 may be operable to transmit the interrupt signaling message through other channels.
The interrupt signaling message 212 may include instructions to de-key from the talk group call. The interrupt signaling message 212 may include instructions to make a high priority call decision. The high priority call decision may include de-keying from the talk group call. Therefore, the first radio 202, upon receiving the interrupt signaling message 212, may be operable to de-key from the talk group call 204, thereby permitting the second radio 206 to use the channel previously occupied by the talk group call 204. The high priority call decision may include moving to a new frequency. The second radio 206 may then transmit a talk group call to the first radio 202, other radios, or both.
The first radio 202 may be an intended recipient of the high priority call. The interrupt signaling message 212 may therefore instruct the first radio 202 to accept the high priority call. The first radio 202 may be operable to accept the high priority call in response to the interrupt signaling message 212. The first radio 202 may not be an intended recipient of the high priority call. The interrupt signaling message 212 may instruct the first radio 202 to not accept the high priority call.
“Radio” as used herein may include any subscriber unit operable to transmit electromagnetic waves. “First”, “second,” “third” and like terms as used herein are used solely for the purposes of clarity in discussion. They do not describe any particular type of element. Aspects of any one or more figures may be combined with or substituted for aspects of any one or more figures.
In the foregoing specification, specific embodiments have been described. However, one of ordinary skill in the art appreciates that various modifications and changes can be made without departing from the scope of the invention as set forth in the claims below. Accordingly, the specification and figures are to be regarded in an illustrative rather than a restrictive sense, and all such modifications are intended to be included within the scope of present teachings.
The benefits, advantages, solutions to problems, and any element(s) that may cause any benefit, advantage, or solution to occur or become more pronounced are not to be construed as a critical, required, or essential features or elements of any or all the claims. The invention is defined solely by the appended claims, including any amendments made during the pendency of this application and all equivalents of those claims as issued.
Moreover, in this document, relational terms such as first and second, top and bottom, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. The terms “comprises,” “comprising,” “has,” “having,” “includes,” “including,” “contains,” “containing,” or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or device that comprises, has, includes, contains a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or device. An element proceeded by “comprises . . . a,” “has . . . a,” “includes . . . a”, “contains . . . a” does not, without more constraints, preclude the existence of additional identical elements in the process, method, article, or device that comprises, has, includes, contains the element. The terms “a” and “an” are defined as one or more unless explicitly stated otherwise herein. The terms “substantially,” “essentially,” “approximately,” “about,” or any other version thereof, are defined as being close to as understood by one of ordinary skill in the art, and in one non-limiting embodiment the term is defined to be within 10%, in another embodiment within 5%, in another embodiment within 1% and in another embodiment within 0.5%. The term “coupled” as used herein is defined as connected, although not necessarily directly and not necessarily mechanically. A device or structure that is “configured” in a certain way is configured in at least that way, but may also be configured in ways that are not listed.
It will be appreciated that some embodiments may be comprised of one or more generic or specialized processors (or “processing devices”) such as microprocessors, digital signal processors, customized processors and field programmable gate arrays (FPGAs) and unique stored program instructions (including both software and firmware) that control the one or more processors to implement, in conjunction with certain non-processor circuits, some, most, or all of the functions of the method and/or device described herein. Alternatively, some or all functions could be implemented by a state machine that has no stored program instructions, or in one or more application specific integrated circuits (ASICs), in which each function or some combinations of certain of the functions are implemented as custom logic. Of course, a combination of the two approaches could be used.
Moreover, an embodiment can be implemented as a computer-readable storage medium having computer readable code stored thereon for programming a computer (e.g., comprising a processor) to perform a method as described and claimed herein. Examples of such computer-readable storage mediums include, but are not limited to, a hard disk, a CD-ROM, an optical storage device, a magnetic storage device, a ROM (Read Only Memory), a PROM (Programmable Read Only Memory), an EPROM (Erasable Programmable Read Only Memory), an EEPROM (Electrically Erasable Programmable Read Only Memory) and a Flash memory. Further, it is expected that one of ordinary skill, notwithstanding possibly significant effort and many design choices motivated by, for example, available time, current technology, and economic considerations, when guided by the concepts and principles disclosed herein will be readily capable of generating such software instructions and programs and ICs with minimal experimentation.
The Abstract of the Disclosure is provided to allow the reader to quickly ascertain the nature of the technical disclosure. It is submitted with the understanding that it will not be used to interpret or limit the scope or meaning of the claims. In addition, in the foregoing Detailed Description, it can be seen that various features are grouped together in various embodiments for the purpose of streamlining the disclosure. This method of disclosure is not to be interpreted as reflecting an intention that the claimed embodiments require more features than are expressly recited in each claim. Rather, as the following claims reflect, inventive subject matter lies in less than all features of a single disclosed embodiment. Thus the following claims are hereby incorporated into the Detailed Description, with each claim standing on its own as a separately claimed subject matter.
Number | Name | Date | Kind |
---|---|---|---|
5251327 | Lenchik | Oct 1993 | A |
5463617 | Grube et al. | Oct 1995 | A |
6999438 | Nounin et al. | Feb 2006 | B2 |
7266382 | Noel | Sep 2007 | B2 |
7515541 | Sandhu | Apr 2009 | B2 |
7551612 | Kobayashi | Jun 2009 | B2 |
7606261 | Salovuori | Oct 2009 | B2 |
7626984 | Napierala | Dec 2009 | B2 |
7738392 | Walter | Jun 2010 | B2 |
8078209 | Chowdhary | Dec 2011 | B2 |
8144846 | Gilbert | Mar 2012 | B2 |
8189460 | Shaffer | May 2012 | B2 |
8271009 | Bohn | Sep 2012 | B2 |
8355355 | Liao | Jan 2013 | B2 |
8711732 | Johnson | Apr 2014 | B2 |
8977310 | Logalbo | Mar 2015 | B2 |
9001703 | Kuehner | Apr 2015 | B2 |
9232522 | Khoo | Jan 2016 | B2 |
9319851 | Yu | Apr 2016 | B2 |
9497768 | Jeng | Nov 2016 | B2 |
9872137 | Lee | Jan 2018 | B2 |
9961516 | Proctor | May 2018 | B1 |
10051442 | Proctor | Aug 2018 | B2 |
10117083 | Sabatino | Oct 2018 | B1 |
10178708 | Gan | Jan 2019 | B1 |
10257740 | McDonald | Apr 2019 | B2 |
10264623 | Lee | Apr 2019 | B2 |
10271370 | Atarius | Apr 2019 | B2 |
10278158 | Rudolf | Apr 2019 | B2 |
10425776 | Bestor | Sep 2019 | B2 |
10532739 | Atarius | Jan 2020 | B2 |
20020077136 | Maggenti | Jun 2002 | A1 |
20020196781 | Salovuori | Dec 2002 | A1 |
20030030561 | Yafuso | Feb 2003 | A1 |
20050032538 | Noel | Feb 2005 | A1 |
20050032539 | Noel | Feb 2005 | A1 |
20050254440 | Sorrell | Nov 2005 | A1 |
20060058052 | Plestid | Mar 2006 | A1 |
20060105793 | Gutowski | May 2006 | A1 |
20070088553 | Johnson | Apr 2007 | A1 |
20070124144 | Johnson | May 2007 | A1 |
20070197248 | Reich | Aug 2007 | A1 |
20070206533 | Wiatrowski et al. | Sep 2007 | A1 |
20080069006 | Walter | Mar 2008 | A1 |
20080101360 | Napierala | May 2008 | A1 |
20080146203 | Khawand | Jun 2008 | A1 |
20080153432 | Zhu | Jun 2008 | A1 |
20090261943 | Jana | Oct 2009 | A1 |
20100151895 | McDonald | Jun 2010 | A1 |
20110075599 | Liao | Mar 2011 | A1 |
20110117835 | Bohn | May 2011 | A1 |
20120172083 | Logalbo | Jul 2012 | A1 |
20140031019 | Qi | Jan 2014 | A1 |
20140133318 | Kuehner | May 2014 | A1 |
20140148115 | Ibbotson | May 2014 | A1 |
20140192790 | Samuel | Jul 2014 | A1 |
20150023227 | Khoo | Jan 2015 | A1 |
20150079921 | Johnson | Mar 2015 | A1 |
20150117335 | Jeng | Apr 2015 | A1 |
20150271649 | Tran et al. | Sep 2015 | A1 |
20160135024 | Vaisanen | May 2016 | A1 |
20160183156 | Chin | Jun 2016 | A1 |
20170094457 | Lee | Mar 2017 | A1 |
20170142756 | Lee | May 2017 | A1 |
20170230939 | Rudolf | Aug 2017 | A1 |
20170238359 | Atarius | Aug 2017 | A1 |
20170310761 | Enomoto | Oct 2017 | A1 |
20180077208 | Li | Mar 2018 | A1 |
20180181656 | Proctor | Jun 2018 | A1 |
20180184257 | Proctor | Jun 2018 | A1 |
20180317063 | Sabatino | Nov 2018 | A1 |
20180359654 | McDonald | Dec 2018 | A1 |
20190082304 | Bestor | Mar 2019 | A1 |
20190239193 | Rudolf | Aug 2019 | A1 |
20190241179 | Atarius | Aug 2019 | A1 |
20190280760 | Xu | Sep 2019 | A1 |
20200139961 | Atarius | May 2020 | A1 |
Number | Date | Country |
---|---|---|
1148721 | May 2004 | CN |
2025101 | Aug 2018 | EP |
0106491 | Jan 2001 | WO |