Claims
- 1. In a method of control of the operation of a collective packing machine of the type having a first packing machine with a first driving source, and a first main shaft rotated by said first driving source, a second packing machine with a second driving source and a second main shaft rotated by said second driving source, and a clutch placed between said second driving source and the second main shaft of said second packing machine and having an input shaft rotated by said second driving source and an output shaft connected to the second main shaft, and wherein said first packing machine operates continuously to produce plural sets of packed articles one by one, said plural sets of packed articles being delivered one by one with spacings therebetween and being aligned in front of the said second packing machine, and said second packing machine operates for stop waiting operation to pack plural sets (n) of the packed articles aligned in front thereof in each cycle of the operation thereof, said first main shaft and said second main shaft being rotated at a predetermined ratio of speed with respect to each other during operation of said second packing machine, said second packing machine being controlled to start and to stop its operation by connecting and disconnecting said clutch;
- which method comprises the steps of
- controlling, while said second packing machine is in stop waiting state, the speed of revolution of the input shaft of said clutch by comparing the speed of revolution of said first main shaft with the speed of revolution of said input shaft of said clutch so as to maintain the ratio of these two speeds at a predetermined value;
- starting, when operation of said second packing machine is to be started, connection of said clutch earlier by a time increment Ts in advance of rotation of angle 0.degree. of said first main shaft corresponding to rotation angle 0.degree. of said second main shaft in one cycle of said second packing machine, said time increment Ts being selected depending on the speed of revolution of the first main shaft of said first packing machine so as to bring operation of said second packing machine into synchronization with the operation of said first packing machine at the time of completion of connecting said clutch, said time of completion of connecting said clutch being when speed of the output shaft of said clutch coincides completely with rotation of the input shaft of said clutch, said second packing machine completion its operation at the same time as starting of connecting said clutch; and
- maintaining, following the completion of connecting said clutch, the operation of said second packing machine to synchronization with said first packing machine by varying the ratio of speed between said first packing machine and said second packing machine by increasing or decreasing the speed of said second packing machine.
- 2. A method according to claim 1, further including the step of
- disconnecting said clutch when the nth packed article has not delivered on time with first through (n-1)th sets of packed articles aligned in front of said second packing machine, such that inertia revolution of said second main shaft is controlled to bring said second packing machine into said stop waiting state.
Priority Claims (1)
Number |
Date |
Country |
Kind |
58-138607 |
Jul 1983 |
JPX |
|
Parent Case Info
This application is a continuation of application Ser. No. 634,955, filed July 27, 1984, now abandoned.
US Referenced Citations (2)
Number |
Name |
Date |
Kind |
3142948 |
Arnett |
Aug 1964 |
|
3570209 |
Salwasser |
Mar 1971 |
|
Continuations (1)
|
Number |
Date |
Country |
Parent |
634955 |
Jul 1984 |
|