The subject matter herein generally relates to a cooling system and a cooling method for controlling the cooling system.
Generally, the continuity and stability of a cooling system are important for cooling a data center. When power is turned off, the cooling system cannot cool the data center.
Implementations of the present disclosure will now be described, by way of embodiments, with reference to the attached figures.
It will be appreciated that for simplicity and clarity of illustration, where appropriate, reference numerals have been repeated among the different figures to indicate corresponding or analogous elements. Additionally, numerous specific details are set forth in order to provide a thorough understanding of the embodiments described herein. However, it will be understood by those of ordinary skill in the art that the embodiments described herein can be practiced without these specific details. In other instances, methods, procedures and components have not been described in detail so as not to obscure the related relevant feature being described. The drawings are not necessarily to scale and the proportions of certain parts may be exaggerated to better illustrate details and features. The description is not to be considered as limiting the scope of the embodiments described herein.
Several definitions that apply throughout this disclosure will now be presented.
The term “coupled” is defined as connected, whether directly or indirectly through intervening components, and is not necessarily limited to physical connections. The connection can be such that the objects are permanently connected or releasably connected. The term “comprising” means “including, but not necessarily limited to”; it specifically indicates open-ended inclusion or membership in a so-described combination, group, series and the like.
Referring to
A first pump A is provided at the inlet of the chiller unit 30. A second pump B is provided at the inlet of the data center 20. A third pump C is provided at the outlet of the cooling tower 40. The inlet of the data center 20 is provided with a temperature sensor 50, and the outlet of the data center 20 is provided with a temperature sensor 60. The inlet of the chiller unit 30 is provided with a flow sensor 70, and the outlet of the data center 20 is provided with a flow sensor 80. The temperature sensors 50, 60 and flow sensors 70, 80 are used to determine whether a load of the data center 20 reaches a set load. The first cooling water storage tank I is provided with a multipoint thermometer 91, and the second cooling water storage tank II is provided with a multipoint thermometer 92. The multipoint thermometers 91, 92 are used to measure the temperature at different levels to determine whether the overall water temperature has reached a set water temperature.
In one embodiment, the cooling system α includes a plurality of pipelines.
A first pipeline 100 connects the inlet of the chiller unit 30 and the outlet of the data center 20;
A second pipeline 200 connects the outlet of the chiller unit 30 and the inlet of the data center 20;
A third pipeline 300 connects the outlet and the inlet of the first cooling water storage tank I, and connects the outlet and the inlet of the first cooling water storage tank I to the inlet and the outlet of the chiller unit 30, respectively;
A fourth pipeline 400 connects the outlet of the first cooling water storage tank I to the inlet of the data center 20 and to the second pipeline 200;
A fifth pipeline 500 connects the inlet of the first cooling water storage tank I to the second pipeline 200, and connects the inlet and the outlet of the second cooling water storage tank II;
A sixth pipeline 600 connects the fifth pipeline 500 and the first pipeline 100;
A seventh pipeline 700 connects the inlet of the second cooling water storage tank II and the third pipeline 300;
An eighth pipeline 800 connects the outlet of the second cooling water storage tank II and the fourth pipeline 400;
A ninth pipeline 900 connects the inlet and the outlet of the data center 20;
A tenth pipeline 1000 connects the seventh pipeline 700 and the outlet of the data center 20;
An eleventh pipeline 1100 connects an intersection of the sixth pipeline 600 and the second pipeline 200 and an intersection of the second pipeline 200 and the fourth pipeline 400 for connecting the fourth pipeline 400 and the second pipeline 200.
In one embodiment, the control device α1 further includes a plurality of valves.
A first valve 1 is provided on the sixth pipeline 600.
A second valve 2 is provided on the fifth pipeline 500 and located between the sixth pipeline 600 and the third pipeline 300.
A third valve 3 is provided on the outlet of the first cooling water storage tank I and located between the fourth pipeline 400 and the third pipeline 300.
A fourth valve 4 is provided on the third pipeline 300 and located between the outlet and the inlet of the first cooling water storage tank I.
A fifth valve 5 is provided on the second pipeline 200 and located between the intersection of the eleventh pipeline 1100 and the second pipeline 200 and the intersection of the second pipeline 200 and the fourth pipeline 400.
A sixth valve 6 is provided on the fourth pipeline 400 and located between the intersection of the eleventh pipeline 1100 and the fourth pipeline 400 and the intersection of the second pipeline 200 and the fourth pipeline 400.
A seventh valve 7 is provided on the eighth pipeline 800.
An eighth valve 8 is provided on the fifth pipeline 500 and located between the outlet and the inlet of the second cooling water storage tank II.
A ninth valve 9 is provided on the seventh pipeline 700 and located between the inlet of the second cooling water storage tank II and the intersection of the tenth pipeline 1000 and the seventh pipeline 700.
A tenth valve 10 is provided on the fourth pipeline 400 and located between the outlet of the first cooling water storage tank I and the intersection of the fourth pipeline 400 and the eighth pipeline 800.
An eleventh valve 11 is provided on the first pipeline 100 and located at an intersection of the sixth pipeline 600, the tenth pipeline 1000, and the first pipeline 100.
A twelfth valve 12 is provided on the second pipeline 200 and located at an intersection of the fifth pipeline 500, the eleventh pipeline 1100, and the second pipeline 200.
A thirteenth valve 13 is provided on the seventh pipeline 700 and located between the intersection of the seventh pipeline 700 and the third pipeline 300 and the intersection of the seventh pipeline 700 and the tenth pipeline 1000.
A fourteenth valve 14 is provided on the fifth pipeline 500 and located between the intersection of the sixth pipeline 600 and the fifth pipeline 500 and the intersection of the inlet of the second cooling water storage tank II and the fifth pipeline 500.
A fifteenth valve 15 is provided at the inlet of the second cooling water storage tank II and located between the intersection of the eighth pipeline 800 and the inlet of the second cooling water storage tank II and the intersection of the inlet of the second cooling water storage tank II and the fifth pipeline 500.
A sixteenth valve 16 is located at the outlet of the chiller unit 30.
A seventeenth valve 17 is provided on the third pipeline 300 and located between the inlet and the outlet of the chiller unit 30.
An eighteenth valve 18 is provided between the fourth pipeline 400 and the first pipeline 100 and located between the inlet and the outlet of the data center 20.
The first pump A is located at the inlet of the chiller unit 30.
The second pump B is provided on the second pipeline 200 and located between the intersection of the eleventh pipeline 1100 and the second pipeline 200 and the intersection of the second pipeline 200 and the fourth pipeline 400.
The third pump C is located at the outlet of the cooling tower 40.
In the first mode β1, the chiller unit 30 is controlled to directly supply cold water to the data center 20 when the cooling system α is initially started or when the load of the data center 20 suddenly increases.
In the second mode β2, the chiller unit 30 is controlled to supply cold water to the data center 20, the first cooling water storage tank I, and the second cooling water storage tank II at the same time.
In the third mode β3, operations of the data center 20, the first cooling water storage tank I, and the second cooling water storage tank II are maintained when the first cooling water storage tank I and the second cooling water storage tank II are filled.
In the fourth mode β4, the first cooling water storage tank I and the second cooling water storage tank II are controlled to alternately supply cold water to the data center 20, and the chiller unit 30 is controlled to refill the first cooling water storage tank I and the second cooling water storage tank II when the corresponding first cooling water storage tank I and the second cooling water storage tank II is empty.
In the fifth mode β5, the third mode β3 is switched to the fourth mode β4.
In the sixth mode β6, the fourth mode 4 is switched to the first mode β1.
In the seventh mode β7, the first cooling water storage tank I is repaired. Under the fourth mode β4, if the first cooling water storage tank I is abnormal, the seventh mode β7 is implemented for manual repair of the first cooling water storage tank I.
In the eighth mode β8, the second cooling water storage tank II is repaired. Under the fourth mode β4, if the second cooling water storage tank II is abnormal, the eighth mode β8 is implemented for manual repair of the second cooling water storage tank II.
In one embodiment, an execution method of the cooling method β includes:
The steps of the fourth mode β4 are:
If the current state is state A, the cooling tower 40 and the third pump C are turned on, and the first valve 1, the second valve 2, the third valve 3, the sixteenth valve 16, and the seventeenth valve 17 are turned on (for maintaining system stability to avoid temperature fluctuations in the second cooling water storage tank II); after stabilization, the first pump A and the chiller unit 30 are turned on; after stabilization, the eleventh valve 11 and the twelfth valve 12 are opened, and the first valve 1, the second valve 2, and the third valve 3 are closed (or the seventh valve 7 and the ninth valve 9 are closed); after stabilization, the sixth valve 6 is opened, the second pump B is turned off, and the fifth valve 5 and the eighteenth valve 18 are closed;
If the current state is state B, the eleventh valve 11 and the twelfth valve 12 are opened; after stabilization, the first valve 1, the second valve 2, and the third valve 3 are closed (or the seventh valve 7 and the ninth valve 9 are closed); after stabilization the sixth valve 6 is opened, the second pump B is turned off, and the fifth valve 5 and the eighteenth valve 18 are closed;
If the current state is state C, the cooling tower 40 and the third pump C are turned on, and the first valve 1, the fourteenth valve 14, the fifteenth valve 15, the sixteenth valve 16, the seventeenth valve 17 are opened (for maintain system stability and avoiding temperature fluctuations in the first cooling water storage tank I); after stabilization, the first pump A and the chiller unit 30 are turned on; after stabilization, the eleventh valve 11 and the twelfth valve 12 are opened, and the first valve 1, the fourteenth valve 14, and the fifteenth valve 15 are closed (or the tenth valve 10 and the thirteenth valve 13 are closed); after stabilization the sixth valve 6 is opened, the second pump B is turned off, and the fifth valve 5 and the eighteenth valve 18 are closed;
If the current state is state D, the eleventh valve 11 and the twelfth valve 12 are opened; after stabilization, the first valve 1, the fourteenth valve 14, and the fifteenth valve 15 are closed (or the tenth valve 10 and the thirteenth valve 13 are closed); after stabilization the sixth valve 6 is opened, the second pump B is turned off, and the fifth valve 5 and the eighteenth valve 18 are closed.
It can be understood that, in other embodiments, there may be other numbers of cooling water storage tanks, and the number of valves, pumps, and multipoint thermometers needs to be increased accordingly. The data center 20 may also be another device that needs to be cooled.
Compared with the related art, the cooling system α and the cooling method β alternately cool the data center 20 through the chiller unit 30, the first cooling water storage tank I, and the second cooling water storage tank II. The cooling water storage tank I and the second cooling water storage tank II provide cold water to the data center 20, so as to maintain the operation of the data center 20 even when the power is shut off, thereby achieving the purpose of increasing the stability and continuity of the cooling system.
The embodiments shown and described above are only examples. Even though numerous characteristics and advantages of the present technology have been set forth in the foregoing description, together with details of the structure and function of the present disclosure, the disclosure is illustrative only, and changes may be made in the detail, including in matters of shape, size and arrangement of the parts within the principles of the present disclosure up to, and including, the full extent established by the broad general meaning of the terms used in the claims.
Number | Date | Country | Kind |
---|---|---|---|
202010600949.0 | Jun 2020 | CN | national |
This application is a divisional application of U.S. application Ser. No. 17/148,831 filed on Jan. 14, 2021.
Number | Date | Country | |
---|---|---|---|
Parent | 17148831 | Jan 2021 | US |
Child | 18987049 | US |