Embodiments described herein relate generally to a technique of managing the energy balance of a customer such as a home.
A lot of demonstrations and experiments associated with smart energy management have been conducted against the background of recently increasing awareness of environmental preservation and anxiety about shortages in the supply of electricity. An example is an experiment of demand response using an electricity rate system (real time pricing) that changes the electricity rate depending on the time zone.
A HEMS (Home Energy Management System) has also received a great deal of attention. The HEMS can connect distributed power supplies (to be generically referred to as new energy devices hereinafter) such as a PV (PhotoVoltaic power generation) unit, a battery device, and an FC (Fuel Cell) and existing household electric appliances to a network and collectively manage them. A patent application has been made for a related art.
In Japan, the FIT (Feed-In Tariff) scheme for renewable energy took effect on Jul. 1, 2012. Under this scheme, a customer who makes an agreement on double power generation with an electric company can increase the sold electricity amount derived from a PV system by covering the energy demand at the time of PV power generation by discharge of a battery device. Double power generation is a form in which a private power generation facility or the like (battery device or the like) is installed in addition to the PV system. That is, in the double power generation mode, the sold electricity amount push up effect can be expected by discharging the private power generation facility or the like.
To pursue reduction of the heat and electricity cost under this condition, a charge and discharge strategy considering the push up effect needs to be obtained for the battery device. To create the charge and discharge strategy, the estimated values of the energy demand and the PV power generation amount of the customer and the like need to be taken into consideration. In many cases, however, the estimated values and values (actual values) in an actual operation are different, and it may be impossible to reduce the heat and electricity cost as expected.
In general, according to an embodiment, an energy management system manages energy of a customer, including a power generation device configured to generate power derived from renewable energy and a battery device capable of being charged and discharged. The energy management system includes an estimation unit, a creation unit, and a control unit. The estimation unit estimates the demand of the energy of the customer to obtain a demand estimated value, and estimates the power generation amount of the power generation device to obtain a power generation amount estimated value. The creation unit creates the charge and discharge schedule of the battery device, which can minimize an electricity purchase cost using the push up effect of an electricity selling profit by discharge of the battery device, based on the demand estimated value and the power generation amount estimated value. The control unit controls the battery device based on the charge and discharge schedule.
Systems for managing energy are generically called EMSs (Energy Management Systems). EMSs are classified into several groups in accordance with the scale and the like. There are, for example, a HEMS (Home Energy Management System) for an ordinary household and a BEMS (Building Energy Management System) for a building. There also exist a MEMS (Mansion Energy Management System) for an apartment house, a CEMS (Community Energy Management System) for a community, and a FEMS (Factory Energy Management System) for a factory. Good energy optimization control is implemented by causing these systems to cooperate.
According to these systems, an advanced cooperative operation can be performed between the existing power plants, the distributed power supplies, the renewable energy sources such as sunlight and wind, and the customers. This makes it possible to produce a power supply service in a new and smart form, such as an energy supply system mainly using a natural energy or a customer participating-type energy supply/demand system by bidirectional cooperation of customers and companies.
The client system includes a home server 7 installed in the home 100. The home server 7 can communicate with the cloud 300 via a communication line 40 on, for example, an IP network 200. The IP network 200 is, for example, the so-called Internet or a VPN (Virtual Private Network) of a system vendor. The home server 7 is a client apparatus capable of communicating with the cloud 300. The home server 7 transmits various kinds of data to the cloud 300, and receives various kinds of data from the cloud 300.
Referring to
The distribution switchboard 20 supplies, via distribution lines 21, power to household electric appliances (for example, lighting equipment, air conditioner, and heat pump water heater (HP)) 5 and a power conditioning system (PCS) 104 connected to the distribution switchboard 20. The distribution switchboard 20 also includes a measuring device for measuring the electric energy of each feeder.
The home 100 includes electrical apparatuses. The electrical apparatuses are apparatuses connectable to the distribution lines 21 in the home 100. An apparatus (load) that consumes power, an apparatus that generates power, an apparatus that consumes and generates power, and a storage battery correspond to the electrical apparatuses. That is, the household electric appliances 5, a PV unit 101, a storage battery system 102, and a fuel cell (to be referred to as an FC unit hereinafter) 103 correspond to the electrical apparatuses. The electrical apparatuses are detachably connected to the distribution lines 21 via sockets (not shown) and then connected to the distribution switchboard 20 via the distribution lines 21.
The PV unit 101 is installed on the roof or wall of the home 100. The PV unit 101 is an energy generation apparatus that produces electric energy from renewable energy. A wind power generation system or the like also belongs to the category of energy generation apparatuses. If surplus power derived from renewable energy occurs, the surplus power can be sold to the power grid 6.
The storage battery system 102 converts AC power from the power grid 6 or the distribution line 21 into DC power and accumulates it. If there is a necessity to cover the demand of the customer, the power accumulated in the storage battery system 102 is converted into AC power and supplied to the distribution line 21.
The PCS 104 includes a converter (not shown). The PCS 104 converts AC power from the distribution lines 21 into DC power and supplies it to the storage battery system 102. The PCS 104 also includes an inverter (not shown). The PCS 104 converts DC power supplied from the PV unit 101 or the storage battery system 102 into AC power and supplies it to the distribution lines 21. The electrical apparatuses can thus receive power supplied from the PV unit 101 or the storage battery system 102 as well.
That is, the PCS 104 has the function of a power converter configured to transfer energy between the distribution lines 21 and the PV unit 101 or the storage battery system 102. The PCS 104 also has a function of controlling to stably operate the storage battery system 102. Note that
A home network 25 such as a LAN (Local Area Network) is formed in the home 100. The home server 7 is detachably connected to both the home network 25 and an IP network 200 via a connector (not shown) or the like. The home server 7 can thus communicate with the watt-hour meter 19, the distribution switchboard 20, the PCS 104, and the household electric appliances 5 connected to the home network 25. Note that the home network 25 is either wireless or wired.
The home server 7 includes a communication unit 7a as a processing function according to the embodiment. The communication unit 7a is a network interface that transmits various kinds of data to the cloud 300 and receives various kinds of data from the cloud 300.
The home server 7 is connected to a terminal 105 via a wired or wireless network. The functions of a local server can also be implemented by the home server 7 and the terminal 105. The terminal 105 can be, for example, a general-purpose portable information device, personal computer, or tablet terminal as well as a so-called touch panel.
The terminal 105 notifies the customer (user) of the operation state and power consumption of each of the household electric appliances 5, the PV unit 101, and the storage battery system 102 by, for example, displaying them on an LCD (Liquid Crystal Display) or using voice guidance. The terminal 105 includes an operation panel and accepts various kinds of operations and settings input by the customer or the user.
The demand estimation unit 71 estimates the demanded quantity of energy (to be referred to as a demand hereinafter) of the customer and obtains a demand estimated value. The demand estimation unit 71 estimates the demand of the next day using, for example, the past demand history of the home 100. The demand estimation of the next day can be obtained using, for example, the demand of the same day of the previous week.
Alternatively, the demand estimation unit 71 estimates the demand from a certain time of the estimation day of interest from the demand up to that time. To obtain the demand estimated value from the certain time of the day of interest, a demand curve similar to the demand curve up to that time is searched for from the past history. Then, the demand estimated value is obtained based on the matching curve from the time. The demand can be obtained by various methods other than the above-described one. The demand estimated value can be corrected using meteorological information or the like.
Let D(t) be the time series of the demand estimated value. In this case, t is a variable representing a time in one day. For example, when one day (reference period) is expressed as a set of minutes (unit periods), t takes a value of 0 to 1439.
The PV estimation unit 72 estimates power production (to be referred to as a power generation amount hereinafter) of the PV unit 101 and obtains the estimated value of the power generation amount (PV estimated value). The time series of the PV estimated value is represented by PV(t).
The PV estimated value can be calculated based on, for example, the past track record data value of the power generation amount or a weather forecast. For example, a method of estimating an amount of insolation from a weather forecast every three hours is described in literature Shimada & Kurokawa, ‘Insolation Forecasting Using Weather Forecast with Weather Change Patterns’, IEEJ Trans. PE, pp. 1219-1225, Vol. 127, No. 11, 2007.
The scheduler 73 creates the charge and discharge schedule of the storage battery system 102 based on the demand estimated value, PV estimated value, electricity tariff, and the like, and controls the storage battery system 102 based on the schedule. That is, the scheduler 73 generates a charge and discharge command to control the storage battery system 102 based on the calculated charge and discharge schedule. Based on the charge and discharge command, the storage battery system 102 is charged or discharged, or holds the charge amount at a predetermined value without charging or discharging.
The discharge value calculation unit 1 calculates the time series of a discharge value DisCHGval(t) based on the following equations (1) to (4).
PVOVD(t) in equation (1) is a series that is the difference between the PV estimated value PV(t) and the demand estimated value D(t) in a case in which the former exceeds the latter or 0 when the former is equal to or smaller than the latter.
DOVPV(t) in equation (2) is a series that is the difference between the demand estimated value D(t) and the PV estimated value PV(t) in a case in which the former exceeds the latter or 0 when the former is equal to or smaller than the latter.
PVpush(t) in equation (3) is the smaller one of PV(t) and D(t). PVpush(t) indicates the series of the power generation amount capable of pushing up the sold PV power amount by covering the demand estimated value D(t) by discharged power of the storage battery system 102.
The discharge value DisCHGval(t) is given by equation (4). In equation (4), PriceBuy(t) is the electricity rate at the time t, and PriceSell(t) is the PV purchase price at the time t.
The first term of the right-hand side of equation (4) represents the purchase price of the pushed up PV power generation amount, and indicates the estimated value of the electricity selling profit based on the power generation amount of the PV unit 101. The second term of the right-hand side indicates the cancel amount of the electricity purchase loss when the demand estimated value is covered by discharge of the storage battery system 102. The discharge value DisCHGval(t) indicates a value obtained by discharge in D(t) at the time t.
The charge value calculation unit 2 calculates the time series of a charge value CHGval(t) based on the following equations (5) to (8).
Equations (5) and (6) are the same as equations (1) and (2). CHGamount(t) in equation (7) is the time series of power that can be accumulated from the power grid 6 in the storage battery system 102. Note that the upper limit of the contract demand to the power grid 6 is represented by Limit.
The charge value CHGval(t) is given by equation (8). CHGval(t) is represented as the sum of the value paid for charge in CHGamount(t) at the time t and a loss that occurs when the PV power generation amount that can be sold becomes 0.
The hold value calculation unit 3 calculates the time series of an electricity rate Val(t) when the charge and discharge function of the storage battery system 102 is not used based on equations (9) to (11). Val(t) will be referred to as a hold value hereinafter.
Equations (9) and (10) are the same as equations (1) and (2). The hold value Val(t) in equation (11) represents the balance of electricity rate when the storage battery system 102 is neither charged nor discharged, that is, the state of charge is held.
The optimization unit 4 creates the charge and discharge schedule of the storage battery system 102 based on the calculated discharge value, charge value, and hold value and the charge amount and discharge amount of the storage battery system 102. The optimization unit 4 stores a charge and discharge value table 4a and a charge and discharge amount table 4b in a memory (not shown) or the like.
The programs include instructions and the like to communicate with the cloud 300, calculate the operation schedules of the household electric appliances 5, the storage battery system 102, and the FC unit 103, request the cloud 300 to do these calculations, and reflect a customer's or user's intention on system control. The CPU functions based on various kinds of programs, thereby implementing various functions of the home server 7.
That is, the functional blocks of the home server 7 can be implemented by causing the CPU of the computer to execute the programs stored in the memory. The home server 7 can be implemented by installing the programs in the computer. Alternatively, the home server 7 may be implemented by storing the programs in a storage medium such as a CD-ROM or distributing the programs via a network and installing them in the computer.
As shown in
In particular, the home server 7 may include a power conditioning system in addition to the functional blocks shown in
The function of the above-described arrangement will be described next. Optimizing the charge and discharge schedule of the storage battery system 102 will be examined. The charge and discharge schedule defines one of charge, discharge, and hold for each time. For example, in a case in which the charge and discharge schedule is set at one-minute intervals, one of charge, discharge, and hold is assigned every minute. However, the charge and discharge cannot be assigned at random because the lower limit and upper limit of the charge amount of the storage battery system 102 need to be met. An algorithm for assigning charge and discharge for each time will be explained based on this condition.
Next, the optimization unit 4 sequentially extracts the element s from the set S, and calculates the cost (for example, heat and electricity cost) (step S2). When calculating the cost, the contents managed by the charge and discharge value table 4a and those managed by the charge and discharge amount table 4b are referred to. The optimization unit 4 calculates the SOC (State Of Charge) of the storage battery system 102 corresponding to each element s. The optimization unit 4 determines whether the calculated SOC falls between the upper limit and the lower limit of the capacity of the storage battery system 102 (step S4). If the SOC falls outside of the limitations (NO), the element s is regarded as unrealistic and discarded (step S5). The upper limit and lower limit of the capacity of the storage battery system 102 are limitations based on the specifications of the storage battery system 102.
The procedure of steps S2 to S5 is repeated for all elements s included in the set S (step S6). When the procedure is completed for all combinations, the optimization unit 4 selects an element having the minimum cost out of the elements remaining without being discarded (step S7). The optimization unit 4 outputs a charge and discharge schedule corresponding to the selected element s (step S8).
As described above, according to the first embodiment, parameters (charge value, discharge value, and hold value) representing the value of three states of charge, discharge, and hold assumed for the storage battery system 102 are calculated. In addition, the cost and SOC are calculated for all combinations of charge, discharge, and hold. A sequence of minimum cost is selected as the charge and discharge schedule out of the sequences whose SOC meets the limitations.
This makes it possible to create the charge and discharge schedule of the storage battery system 102, which is optimized in consideration of not only the discharge but also charge and a case in which neither charge nor discharge is performed. That is, depending on the weather condition, time zone, or unit price of electricity selling (electricity purchase), it is sometimes more advantageous in terms of cost when the is not used, or it is advantageous when charging is done intentionally.
In the first embodiment, it is possible to create a charge and discharge schedule comprehensively considering such a situation. That is, it is possible to create a schedule that can be expected to further reduce the cost when the charge and discharge of the storage battery system 102 are repeated. This makes it possible to provide an energy management system capable of operating a battery device under an advantageous charge and discharge strategy, an energy management method, and a program.
In the first embodiment, all combinations of charge and discharge sequences are listed, and a combination that meets the charge and discharge constraints and has the minimum cost is selected. However, since the number of combinations geometrically increases as the time intervals become finer, calculation may be unable to end within a practical time. In the second embodiment, an algorithm called a 3-ary tree (ternary search tree) is used to shorten the processing time. An optimization method based on this algorithm is represented by the following pseudo codes.
In this pseudo code sequence, calc_price is a function of calculating the cost when the charge and discharge strategy is executed in the time order and the SOC for each time. Character strings “CHG”, “DIS”, and “NON” indicate charge, discharge, and hold (neither charge nor discharge is performed), respectively. The function is described in the form of recursive call, and calc_price is called assuming a case in which charge, discharge, and hold are executed at the respective times. The return values are the sum of costs from the time of interest and the sequence of the charge and discharge strategy. If the time is tmax, the cost at the time tmax is calculated, and the return value is returned without recursively calling the function. val returns the value when act is executed at the time t. Note that the pseudo code sequence describes a sequence based on a breadth-first search method. A solution may be searched by a depth-first search.
In the first embodiment, one cost is calculated for a case of one minute. In the second embodiment, however, calculation is performed only once for the common portion from the top in a branch. That is, the optimum solution can be obtained without calculating all cases. It is therefore possible to greatly shorten the calculation time.
In the second embodiment, a solution is generated by the 3-ary tree method. In the third embodiment, a solution is searched by applying a branch and bound method to the 3-ary tree method. The algorithm will be described below.
This algorithm adds processing of determining the magnitude relationship between the provisional solution and the optimum solution and reducing the solution search space based on the result to the algorithm of the second embodiment. This processing is called bounding.
As shown in
The optimum solution is calculated as the difference between an amount obtained when discharge is done up to the demand for all remaining times and an amount calculated assuming that charge is performed at the lowest price in the remaining time zone if the demand cannot be covered by the current value of the SOC.
The provisional solution is sequentially updated using the solution calculated by the algorithm. However, if the provisional solution close to the optimum solution cannot be calculated at an early stage, the number of steps in the solution search procedure increases, and a long calculation time is necessary. An example of a method of calculating the provisional solution closet to the optimum solution will be described below.
Next, the optimization unit 4 creates the charge schedule of a storage battery system 102 (step S13). To minimize the electricity purchase loss, such a charge schedule that completes charge in a time as short as possible in a time zone where the electricity rate is low is obtained. Let Te be the end time of the time zone where the electricity rate is minimum. The optimization unit 4 generates a schedule that fully charges the storage battery system 102 at the time Te.
Referring back to
Equations (12), (13), and (14) are the same as equations (1), (2), and (3). The right-hand side of equation (15) is the same as that of equation (4). That is, Value(t) indicates the value obtained when discharge is done in D(t) at the time t.
When calculating V(t) shown in
Referring back to
Efficiency(t)=Value(t)/D(t) (16)
Next, the optimization unit 4 sorts the time indices t in descending order of E(t). For the same E(t), the time t of larger D(t) is ranked high (step S16). The optimization unit 4 accumulates D(t) in the order of sorted t (step S17), and calculates a time tth at which the cumulative value of D(t) exceeds the total discharge amount (charge amount or dischargeable amount) of the storage battery system 102 for the first time (step S18).
That is, the optimization unit 4 specifies the time tth at which the sum of D(t) is equal to or larger than the total discharge amount of the storage battery system 102 in one day when the demand estimated value D(t) is added sequentially from the time t with the high discharge value rate E(t). E(t) at the time tth is defined as Etth. In the example of
In the third embodiment, the calculated Etth is set as the initial value of the provisional solution. When this provisional solution is given to the 3-ary tree, bounding from the initial stage of the algorithm progresses, and the solution can be converged at an early stage. According to the third embodiment, it is therefore possible to reduce the solution search space and largely increase the processing speed.
The cloud 300 includes a server computer SV and a database DB. The server computer SV can include a single or a plurality of server computers. The databases DB can be either provided in the single server computer SV or distributively arranged for the plurality of server computers SV. The home server 7 can communicate with the server computer SV via an IP network 200 or transmit/receive data to/from a database DB.
In the fourth embodiment, functional objects of the energy management system are arranged in the cloud 300, and the interface between the cloud 300 and the home server 7 is defined. That is, the charge and discharge schedule is created in the cloud 300, and the home server 7 is notified of the charge and discharge schedule via a communication line 40. Information necessary for creation of the charge and discharge schedule is actively acquired by the cloud 300 or sent from the home server 7 to the cloud 300 via the communication line 40.
According to this form, the enormous calculation resources of the cloud computing system can be used. For example, in some cases, PV estimation or demand estimation requires calculations of heavy load. According to the fourth embodiment, however, an estimated value can be calculated accurately in a short time. By using an accurate PV estimated value or demand estimated value, the validity of the charge and discharge schedule can further be increased, as a matter of course.
Hence, according to the fourth embodiment as well, it is possible to provide an energy management system capable of operating a battery device under an advantageous charge and discharge strategy, an energy management method, and a program.
While certain embodiments have been described, these embodiments have been presented by way of example only, and are not intended to limit the scope of the inventions. Indeed, the novel embodiments described herein may be embodied in a variety of other forms; furthermore, various omissions, substitutions and changes may be made without departing from the spirit of the inventions. The accompanying claims and their equivalents are intended to cover such forms or modifications as would fall within the scope and spirit of the inventions.
Number | Date | Country | Kind |
---|---|---|---|
2013-046782 | Mar 2013 | JP | national |
This application is a Continuation Application of PCT Application No. PCT/JP2013/084464, filed Dec. 24, 2013 and based upon and claiming the benefit of priority from prior Japanese Patent Application No. 2013-046782, filed Mar. 8, 2013, the entire contents of all of which are incorporated herein by reference.
Number | Date | Country | |
---|---|---|---|
Parent | PCT/JP2013/084464 | Dec 2013 | US |
Child | 14170152 | US |