The present invention relates to a liquefied natural gas (LNG) fueling station and an LNG fueling method, and more particularly, to an LNG fueling station and an LNG fueling method capable of supplying liquefied natural gas more conveniently and safely to a remote place.
In general, there are two typical methods for supplying natural gas to consumers, as follows. In the first method, natural gas is directly supplied to consumers through a piping network, and in the second method, liquefied natural gas (LNG) is supplied to consumers through a tank lorry. In relation to this, as LNG vehicles or LNG fuel ships have been developed, the supply of LNG has also been drawing much attention. So far, the second method using a tank lorry is generally employed to supply LNG.
However, the second method has several problems that will be described below in detail. First, in the second method, a fixed storage tank should be separately installed at a remote place in order to store and supply LNG. However, the installation of the fixed storage tank is very costly. Also, it is difficult, with the fixed storage tank, to effectively respond to the cases in which LNG is temporarily required to be supplied, or more LNG is required to be supplied. Further, when the fixed storage tank is filled with liquefied natural gas, there is a risk of fire. In addition, in order to supply LNG to an LNG vehicle or LNG fuel ship, a fueling apparatus should be installed separately, which causes the same problem arising during installation of the fixed storage tank.
In order to address the foregoing problems, the present invention provides an LNG fueling station and an LNG fueling method, which are capable of supplying liquefied natural gas to a remote place more conveniently and safely.
An LNG fueling station according to the present invention includes an installation part on which an LNG tank container is installed, and a supply part for supplying liquefied natural gas from the LNG tank container installed on the installation part to an object for supply. The LNG tank container can be transported and installed while storing the liquefied natural gas, and the LNG tank container is transported to the installation part and then installed on the installation part.
Also, an LNG fueling method according to the present invention includes transporting an LNG tank container to an installation part, on which the LNG container is installed, through a transporting means, unloading the LNG tank container from the transporting means to the installation part and installing on the installation part, and supplying liquefied natural gas to an object for supply from the LNG tank container installed on the installation part.
An LNG fueling station and an LNG fueling method according to the present invention have effects in that liquefied natural gas can be directly supplied to a remote consumer in more convenient and safe way by only transporting an LNG tank container to an installation part and installing on the installation part.
Preferred embodiments of the present invention will be described below in more detail with reference to the accompanying drawings. However, it is to be understood that the invention is not limited to the embodiments described below.
First, the installation part 110 will be described. The installation part 110 means a structure which is installed on the ground and on which an LNG tank container T transported thereto is mounted. That is, the LNG tank container T is transported to the installation part 110 and then installed on the installation part 110. After installed on the installation part 110 as such, the LNG tank container supplies liquefied natural gas to an LNG fuel ship or an LNG vehicle (through a supply part to be described later) while being installed on the installation part 110.
Since this installation part 110 is sufficient to simply mount the LNG tank container T to install the LNG tank container T, the structure thereof is very simple. Thus, the installation part 110 may be installed at a required place with a lower cost, and may be not only easily removed after installation but also easily re-installed at another place.
For reference, in order to install the LNG tank container T on the installation part 110, the LNG tank container T may be simply unloaded onto the installation part 110. That is, after being transported to the installation part 110 through a transporting means V, such as a trailer truck, the LNG tank container T may be simply unloaded onto the installation part 110.
After being transported to the installation part 110 through the transporting means V, the LNG tank container T may be carried to the installation part 110 through a crane part 130. The crane part 130 lifts and carries the LNG tank container T to the installation part 110. As such, the LNG tank container T may be carried to the installation part 110 through the crane part 130 to be installed on the installation part 110.
This crane part 130 may be installed on the installation part 110. For this, the installation part 110 may be provided with a base 112 which is installed on the ground to mount the LNG tank container T, a vertical frame 114 vertically installed from the base 112, and a horizontal frame 116 horizontally installed while being supported by the vertical frame 114. Here, the crane part 130 may be installed on the horizontal frame 116 of the installation part 110 to be moved along the horizontal frame 116.
It is preferable that the horizontal frame 116 extends longer to the outside than the base 112 as illustrated in
For reference, in this example, the supply capacity of liquefied natural gas may be adjusted through the number of LNG tank containers T installed on the installation part 110. For example, when several LNG tank containers T are mounted in a horizontal direction on the base 112, or the LNG tank containers T are repeatedly stacked thereon, the supply capacity of the liquefied natural gas may be increased. As such, the installation of the LNG tank containers T in the horizontal or vertical directions may be accomplished through the crane part 130. When several LNG tank containers T are installed as the above, the respective LNG tank containers T may be connected to each other through a pipe 152.
Next, the supply part 150 will be described. The supply part 150 means a structure which supplies the liquefied natural gas from the LNG tank container T installed on the installation part 110 to an object for supply. Here, the object for supply means an object to which the liquefied natural gas is supplied. For example, the object for supply may be an LNG fuel ship or an LNG vehicle which uses the liquefied natural gas as a fuel.
More specifically, the supply part 150 may basically include a main pipe 152 connected to the LNG tank containers T. The liquefied natural gas in LNG tank containers T may be supplied to the object for supply through the main pipe 152. This main pipe 152 may be branched into a plurality of pipes as illustrated in
Also, the supply part 150 may further include a main valve 154 which is provided in the main pipe 152 to open/close the main pipe 152. Also, the supply part 150 may further include a fueling part 156 which is connected to the main pipe 152 to fuel the liquefied natural gas to the object for supply. Here, the fueling part 156 may include a LNG pump (not shown) for a pressurized transfer of the liquefied natural gas, and a flow meter (not shown) for measuring the amount of the liquefied natural gas. However, when the liquefied natural gas is supplied by using a pressure difference, the LNG pump may not be required.
This supply part 150 may be integrally provided with the installation part 110. When the supply part is integrally provided as the above, all the components for supplying the liquefied natural gas may be installed at a consumer place by only installing the installation part 110. Accordingly, the fueling system may not only be easily installed at a consumer place through the installation of the installation part 110, but also easily removed from the consumer place through a removal of the installation part 110 in the case in which the fueling system is not required any more.
Also, the supply part 150 may further include a vaporizer (not shown) which receives liquefied natural gas from the LNG tank containers T and vaporize the liquefied gas to generate natural gas, and a compressor (not shown) which receives the natural gas from the vaporizer, and compresses the natural gas to generate compressed natural gas (CNG). In this case, the supply part 150 may supply the compressed natural gas to the object for supply. Here, the object for supply may be a CNG vehicle using the compressed natural gas as a fuel.
For reference, the supply part 150 may have a pipeline for supplying liquefied natural gas and a pipeline for supplying compressed natural gas, which are separately installed. That is, the main pipe 152 is branched into two portions, in which one portion may be used as a line for supplying liquefied natural gas, and the other portion may be used as a line in which liquefied natural gas is vaporized and then compressed to supply compressed natural gas.
As described above, the LNG fueling station according to the present invention is basically characterized in that: the LNG tank containers T is transported to the installation part 110 and installed then on the installation part 110; and the LNG tank containers T supplies liquefied natural gas to the object for supply after installed on the installation part as the above while being installed on the installation part 110.
The LNG fueling station according to this example, due to this characteristic, may conveniently supply liquefied natural gas also to a place to which no pipe network is connected or a place to which a pipe network is hard to be connected. That is, when the LNG fueling station according to this example is installed at a place to which no pipe network is connected or a place to which a pipe network is hard to be connected, the liquefied natural gas may be conveniently supplied to such places by only transporting the LNG tank containers T to the installation part 110 and installing the LNG tank containers T on the installation part 110.
Also, since the LNG fueling station according to this example uses an LNG tank container T which may be installed while liquefied natural gas is stored therein, the LNG tank container T may be used as a storage apparatus, and thus a fixed storage tank is not required to be separately installed as a storage apparatus. For example, the LNG fueling station according to this example uses an LNG tank container T manufactured to have a predetermined specification according to related provisions such as International Organization for Standard (ISO) tank container, but since such an LNG tank container may be directly used as a storage apparatus, it is unnecessary to separately install a fixed storage tank as in the typical arts. (It is sufficient to install an LNG tank container on the installation part.)
Moreover, since the LNG fueling station according to this example does not fuel liquefied natural gas to a storage apparatus by means of a tank lorry, there is no loss or danger caused by the fueling. That is, contrary to a typical tank lorry which only simply transports liquefied natural gas to a consumer place, the LNG tank container T according to this example transports liquefied natural gas to a consumer place and is also installed on an installation part 110 located in the consumer place to take part in the supply of the liquefied gas. Therefore, there is no loss or danger caused by the fueling as in typical arts.
Also, when the above-mentioned LNG fueling station is used, the liquefied gas may be more conveniently and safely supplied to an object for supply. That is, first, the LNG tank container T is transported through a transporting means V to the installation part 110 on which the LNG tank container T is installed. Then, the LNG tank container T is unloaded from the transporting means V to the installation part 110 and installed on the installation part 110. Finally, the liquefied natural gas is supplied from the LNG tank container T installed at the installation part 110 to the object for supply, and thus the liquefied gas may be more conveniently and safely supplied to an object for supply.
An LNG fueling station according to this example is basically characterized in that an LNG tank container T is unloaded through a sliding-type method. That is, in the LNG fueling station according to this example, the LNG tank container T is unloaded by pulling the LNG tank container T from a transporting means V to an installation part 210, or is loaded by pushing the LNG tank container T from the installation part 210 to the transporting means V. More specifically, as illustrated in
Hereinafter, a configuration for implementing such a sliding-type method will be described with reference to
An LNG fueling station according to this example includes a movable part 220 to unload the LNG tank container T through a sliding-type method. The movable part 220 reciprocates in a direction D in which the LNG tank container T is unloaded from a transporting means V. Also, the movable part 220 is detachably fixed to the LNG tank container T and moves together with the LNG tank container T. Through this, the movable part 220 may move the LNG tank container T loaded on the transporting means V to an installation part 210 and move the LNG tank container T loaded on the installation part 210 to the transporting means V.
In this example, the installation part 210 includes a base 212 which is mounted on the ground and on which the LNG tank container T is loaded, and a guide 214 which is provided on the base 212 and guides the movable part 220 in the above-mentioned direction D. Here, the guide 214 may be a kind of groove as illustrated in
More specifically, the movable part 220 may include a movable base 222 and a movable lifter 224 provided on the movable base 222. The movable part 220 is movably installed on the installation part 210 and reciprocates in the above-mentioned direction D along the guide 214. Also, the movable lifter 224 is detachably fixed to the LNG tank container T and lifts the LNG tank container T. Accordingly, the LNG tank container T may be moved, while being lifted by the movable lifter 224, in the above-mentioned direction D by the movable base 222. As such, when the LNG tank container T is moved while being lifted, the LNG tank container T may be more easily moved through a sliding-type method. For reference, the movable lifter 224 may be implemented as a hydraulic apparatus. A support lifter 234 to be described later is the same as the movable lifter.
The LNG fueling station according to this example may further include a support part 230 in addition to the movable part 220. The support part 230 is detachably fixed to the LNG tank container T and moves together with the movable part 220 outside the installation part 210 while supporting the LNG tank container T. In comparison with moving the LNG tank container T only by the movable part 220, it is safer to move the LNG tank container T while supporting the LNG tank container T by the movable part 220 and the support part 230 together. More specifically, as illustrated in
This support part 230 may include a support base 232 which moves together with the movable part 220 outside the installation part 210 (via the LNG tank container), and a support lifter 234 which is provided on the support base 232 and is detachably fixed to the LNG tank container T to lift the LNG tank container T. Through such a configuration, the LNG tank container T may be lifted by both the movable part 220 and the support part 230, and the LNG tank container T may be more stably moved by moving the LNG tank container T while being lifted by both.
In this example, the LNG tank container T is basically moved by the movable part 220. Contrary to this, it is sufficient for the support part 230 to support the LNG tank container T. That is, it is sufficient for the support part 230 to be moved by the movable part 220 while supporting the LNG tank container T. Accordingly, the movable part 220 is required to include a driving means such as a motor, but the support part 230 does not necessarily include a driving means. However, if necessary, the support part 230 may also include a driving means and may move the LNG tank container T by itself.
In this example, the supply capacity of liquefied natural gas may be adjusted through the number of the installation parts 210. For example, as illustrated in
In this example, it is the same as the above-mentioned example that the supply part 150 includes a main pipe 152, a main valve 154, and a fueling part 156, and is capable of supplying liquefied natural gas to an object for supply. Also, as illustrated in
Hereinafter, operations of an LNG fueling station according to this example will be described in more detail with reference to
Then, as illustrated in
Then, as illustrated in
More specifically, the LNG tank container T is pulled to the base 212 of the installation part 210, and then the lifter 224 of the movable part 220 and the lifter 234 of the support part 230 are driven to mount the LNG tank container T on the base 212 of the installation part 210. Here, the movement of the base 222 of the movable part 220 is guided by a guide 214 of the installation part 210, and the movement of the base 232 of the support part 230 is guided by a support part guide 238.
Then, the LNG tank container T is connected to a fueling part 156 through a pipe 152. (The fueling part may be integrally provided with the installation part.) Then, according to a consumer request, liquefied natural gas is supplied from the LNG tank container T to an object for supply through the fueling part 156 after opening a main valve 154. Finally, when the liquefied natural gas in the LNG tank container T is exhausted, the LNG tank container T is loaded from the installation part 210 to the transporting means V through a reverse process to the above-described process. The liquefied natural gas may be continuously supplied to the object for supply by repeating the above processes of unloading and loading.
An LNG fueling station according to this example is also provided with a movable part 320 and a support part 330. More specifically, the movable part 320 includes a base 322 and a lifter 324 and the support part 330 also includes a base 332 and a lifter 334. Here, the movable part 320 and the support part 330 are connected through a connection part 370. The movable part 320 and the support part 330 may be more stably moved by being connected as such.
The present invention relates to an LNG fueling station and an LNG fueling method capable of more conveniently and safely supplying liquefied natural gas, and is applicable to the industry.
Number | Date | Country | Kind |
---|---|---|---|
10-2013-0087391 | Jul 2013 | KR | national |
This application a National Stage of International Application PCT/KR2013/010891 filed on Nov. 28, 2013, which claims the benefit of filing dates of Korean Patent Application No. 10-2013-0087391 filed on Jul. 24, 2013. The entirety of all applications is hereby incorporated by reference.
Filing Document | Filing Date | Country | Kind |
---|---|---|---|
PCT/KR2013/010891 | 11/28/2013 | WO | 00 |