Web page: htp://www.sytsma.com/tqmtools/ewma.html□□“Exponentially Weighted Moving Average Charts”, Jun. 9, 1999.* |
Bakhodir A Ergashev, “An Analytical Approach for Studying EWMA Control Charts”, University of World Economy and Diplomacy, 1998.* |
Resende, Mauricio Guilherme De Carvalho “Shop Floor Scheduling of Semiconductor Wafer Manufacturing,” Dissertation, University of California, Berkeley, 1987. |
Shen, W. and D. Norrie, “An Agent-Based Approach for Dynamic Manufacturing Scheduling,” Proceedings of Workshop on Agent-Based Manufacturing, 1998, pp. 117-128. |
Sikora, R. and M.J. Shaw, “Coordination Mechanisms for Multi-Agent Manufacturing Systems: Applications to Integrated Manufacturing Scheduling,” IEEE Transactions on Engineering Management, vol. 44, 1997, pp. 175-187. |
Sousa, P. and C. Ramos, “A Dynamic Scheduling Holon for Manufacturing Orders,” Journal of Intelligent Manufacturing, vol. 9, 1998, pp. 107-112. |
Upton, D.M., M.M. Barash, and A.M. Matheson, “Architectures and Auctions in Manufacturing,” International Journal of Computer Integrated Manufacturing, vol. 4, 1991, pp. 23-33. |
Vaario, J. and K. Ueda, “An Emergent Modelling Method for Dynamic Scheduling,” Journal of Intelligent Manufacturing, vol. 9, 1998, pp. 129-140. |
Weber, Alan, “Material Traceability—The Missing Link in TAP Systems,” Presentation of the Test, Assembly and Packaging Automation and Integration '99 Conference. |
Weber, Alan “APC Framework: Raising the Standard for FAB Automation and Integration,” Presentation of the Equipment Automation Conference 1st European Symposium on Semiconductor Manufacturing, Apr. 19, 1999. |
Wein, Lawrence, M., “Scheduling Semiconductor Wafer Fabrication,” IEEE Transactions on Semiconductor Manufacturing, vol. 1, No. 3, Aug. 1998, pp. 115-130. |
Wellman, M.P., W.E. Walsh, P.R. Wurman, J.K. MacKie-Mason, “Auction Protocols for Decentralized Scheduling,” http://www-personal.engin.umich.edu/˜wew/Papers/mb-scheduling-extended.ps.Z, University of Michigan, Ann Arbor, 1998. |
Axtell, Robert and Epstein, Joseph, “Distributed Computation of Economic Equilibria via Bilateral Exchange” Brookings Institute and Sante Fe Institute, Mar. 1997. |
U.S. patent application Ser. No. 60/347,680 filed Oct. 23, 2001, entitled “Lot Start Agent that Determines Delta VWIP for Each Bottleneck Stations in the Semiconductor Manufacturing Process” and naming Larry D. Barton, Steven C. Nettles and Yiwei Li as inventors. |
U.S. patent application Ser. No. 09/825,255, filed Apr. 3, 2001 entitled Starvation Avoidance Lot Start Agent (SALSA) and naming Larry D. Barto, Steven C. Nettles and Yiwei as inventors. |
U.S. patent application Ser. No. 09/881,936, filed Jun. 15, 2001 entitled “Lot Start Agent that Calculates Virtual WIP Time in a Multi-Product and Multi-Bottleneck Manufacturing Environment” and naming Larry D. Barto, Steven C. Nettles and Yiwei as inventors. |
U.S. patent application Ser. No. 10/113,671, filed Apr. 1, 2002 entitled “Lot Start Agent that Determines Delta Virtual WIP Time for Each Bottleneck in a Multi-Product and Multi-Bottleneck Manufacturing Environment” and naming Larry D. Barto, Steven C. Nettles and Yiwei Li as inventors. |
U.S. patent application Ser. No. 10/154,902, filed on May 23, 2002, entitled Lot Start Agent that Determines Quantity and Timing for Lot Starts and naming Larry D. Barto, Steven C. Nettles and Yiwei Li as inventors. |
U.S. patent application Ser. No. 10/132,961, filed on Apr. 26, 2002, entitled “Lot Start Agent that Determines Virtual WIP Time Including Calculating a Lead Time” and naming Larry D. Barto, Steven C. Nettles and Yiwei Li as inventors. |
Baumgärtel, H., S. Bussman, and M. Klosterberg, “Combining Multi-Agent Systems and Constraint Techniques in Production Logistics,” Proceedings of Artificial Intelligence, Simulation, and Planning in High Autonomous Systems, 1996. |
Bonvik, Asbjoern M, “Performance Analysis of Manufacturing Systems Under Hybrid Control Policies,” Doctoral Thesis Proposal, Sep. 22, 1995, pp. 1-15. |
Bonvik, Asbjoern M, “Performance Analysis of Manufacturing Systems Under Hybrid Control Policies,” Doctoral Thesis Proposal, Oct. 3, 1995, pp. 1-15. |
“Agent Enhanced Manufacturing System Initiative,” Technologies for the Integration of Manufacturing Applications (TIMA) (Oct. 1997), NIST Advanced Technology Program http://jazz.nist.gov/atpcf/pjbriefs/pjbrief.cfm ProjectNumber=97-05-0018, Sep. 6, 1999. |
“Factory Integration,” The National Roadmap for Semiconductors: Technology Needs, 1997 Edition http://notes.sematech.org/ntrs/PubINTRS.nsf/pages/97melec.htm. |
Axtell, Robert and Joshua Epstein, “Distributed Computation of Economic Equilibria via Bilateral Exchange,” Brookings Institution of Sante Fe Institute, Mar. 1997. |
Bonvik, Asbjoern M., Christopher Couch, Stanley B. Gershwin, “Improving a Kanban Controlled Production Line Through Rapid Information Dissemination,” Jul. 10, 1995. |
Burke, P. and P. Prosser, “The Distributed Asychronous Scheduler,” Intelligent Scheduling, Morgan Kaufman Publishers, Inc., San Francisco, 1994 pp. 309-322. |
Butler, J. and H. Ohtsubo, “ADDYMS: Architecture for Distributed Dynamic Manufacturing Scheduling,” Artificial Intelligence Applications in Manufacturing, AAAIPress/The MIT Press, Menlo Park, CA, 1992, pp. 199-214. |
Ehteshami, Babak, Raja G. Petrakian and Phyliss M. Shabe, “Trade-Offs in Cycle Time Management Hot Lots,” IEEE Transactions on Semiconductor Manufacturing, vol. 5, No. 2, pp. 101-106. |
Fordyce, K. and G.G. Sullivan, “Logistics Management System (LMS): Integrating Decision Technologies for Dispatch Scheduling in Semiconductor Manufacturing,” Intelligent Scheduling, Morgan Kaufman Publishers, Inc., San Francisco, 1994 pp. 309-322. |
Fordyce, Kenneth, “Logistics Management System (LMS): An Advanced Decision Support System for Fourth Decision Tier-Dispatch or Short Interval Scheduling,” pp. 1-58. |
Gere, William S. Jr., “Heuristics in Job Shop Scheduling,” Management Science, vol. 13, No. 3, Nov. 1966, pp. 167-191. |
Glassey, C. Roger and Maruricio G. C. Resende, “Closed-Loop Job Release Control for VLSI Circuit Manufacturing,” IEEE Transactions on Semiconductor Manufacturing, vol. 1, No. 1, Feb. 1988. |
Hynyen, J.E., “BOSS: An Artificially Intelligent System for Distributed Factor Scheduling,” Computer Applications in Production and Engineering, Elsevier, 1989, pp. 667-677. |
Interrante, L. and S. Goldsmith, “Emergent Agent-Based Scheduling of Manufacturing Systems,” Proceedings of Workshop on Agent-Based Manufacturing, 1998, pp. 47-57. |
Juba, Robert C., Paul N. Keller, Alton F. Verity, “Production Improvements Using a Forward Scheduler,” Undated. |
Li, Shu, Tom Tang, Donald W. Collins, “Minimum Inventory Variability Schedule With Applications in Semiconductor Fabrication,” IEEE Transactions on Semiconductor Manufacturing, vol. 9, No. 1, Feb. 1996, pp. 145-149. |
Lin, G.Y.J and J. Solberg, “Integrated Shop Floor Control Using Autonomous Agents,” IIE Transactions, 24(3):57-71, 1992. |
Lu, Steve C.H., Depa Ramaswamy, P.R. Kumar, “Efficient Scheduling Policies to Reduce Mean and Variance of Cycle-Time in a Semiconductor Manufacturing Plants,” IEEE Transactions Semiconductor Manufacturing, :vol. 7, No. 3, Aug. 1994, pp. 374-388. |
Martin-Vega, Louis A., Mark Pippin, Elaine Gerdon and Randy Burcham, “Applying Just-in-Time in a Wafer Fab: A Case Study,” IEEE Transactions on Semiconductor Manufacturing, vol. 2, No. 1, Feb. 1999, pp. 16-22. |
Murthy, S., R. Akkiraju, J. Rachlin, and F. Wu, “Agent-Based Cooperative Scheduling,” Proceedings of AAAI Workshop on Constraints and Agents, AAAI Press, 1997 pp. 112-117. |
“ObjectSpace Fab Solutions Semiconductor Product Development Overview,” Presented at SemiCon Southwest, 1998. |
Parunak, Van and Larry Barto, “Agents Do It In Time, Experiences with Agent-Based Manufacturing Scheduling,” Presentation, Conference Proceeding “Embracing Complexity,” Sponsored by Earnest & Young, Jul. 27, 1999. |
Parunak, Van, “Agent Based Models and Manufacturing Processes, Presentation,” Conference Proceeding “Embracing Complexity,” Sponsored by Earnest & Young, Jul. 1999. |
Radin, Dan—Presenter, “Agent Enhance Manufacturing Systems Initiative (AEMSI) Project,” Presentation of the Workshop on Industrial Agents ERIM CEC, Nov. 12-13, 1998. |
Ramos, C., Almeida, A. and Vale, Z. “Scheduling Manufacturing Tasks Considering Due Dates: A New Method Based on Behaviors and Agendas”, International Conference on Industrial and Engineering Applications of Artificial Intelligence Expert Systems, Melbourne, Australia, 1995, pp. 745-751. |