The present invention generally relates to manufacturing systems including automated material handling systems and, more particularly, to the management of move requests from a factory system to an automated material handling system.
Systems which handle material, such as manufacturing facilities, often employ automated material handling systems to move various materials from one location to another location within the system. The materials may include raw materials, finish product materials, or any materials inbetween. One example of such a manufacturing facility is a semiconductor fabrication facility.
A typically semiconductor fabrication facility includes multiple factory tools interconnected by one or more paths, such as conveyor belts. Factory tools may include storage tools, such as stockers or WIP racks, and processing tools, for example. Each of the processing tools is used to carry out a particular process step on the semiconductor wafers. Exemplary processing tools include photolithography tools, chemical mechanical polishing tools and chemical vapor deposition tools, for example. The wafers are typically stored in and moved about through fabrication facility using material carriers, such as cassettes. The wafers are typically divided into identifiable lots each of which undergo a particular processing sequence. Each of the cassettes or material carriers also includes an identification tag for identification.
A typical semiconductor fabrication facility usually includes a factory system for generating wafer lot move requests and an automated material handling system (AMHS) for handling the move requests. The factory system typically stores a processing sequence for each wafer lot and sends requests to move the wafer lot to the AMHS based on the position of the wafer lot within its fabrication sequence. The AMHS typically includes a controller associated with each of the storage tools, for example. Typically the move requests from the factory system identify a particular wafer lot and a destination tool for the wafer lot. The move request is forwarded to the controller associated with the present factory tool of the wafer lot. This controller then handles the movement of the wafer lot to its destination tool. This typically includes reserving a place in the destination factory tool for a cassette carrying the wafer lot and placing the cassette carrying the wafer lot onto one or more paths for transportation of the wafer lot to the destination tool.
As semiconductor wafers increase in complexity, the manufacture of such materials also increases. For example, different types of fabrication sequences may be employed and thus a higher number of wafer lots may be processed in a factory and a larger number of cassettes may be used in the factory. The additional wafer lots and cassettes increase the complexity of the fabrication process and place additional burdens on the AMHS. This increases the propensity of the wafers and wafer carriers back up or “log jam”. These log jams severely reduce the throughput of semiconductor wafers. As less throughput is of high concern for manufacturers, method and systems which reduce log jams are in continual need.
The present invention generally relates to the management of move requests from a factory system to an automated material handling system (AMHS). In one embodiment, a method is provided which includes receiving a move request from the factory system and selectively passing the move request to the AMHS based on a comparison of the move request with one or more conditions of the AMHS. The move request may be selectively passed to the AMHS by, for example, passing the move request to the AMHS without modification, changing a destination tool identified in the move request and/or delaying the move request, or canceling the move request.
A manufacturing system in accordance with one embodiment of the invention includes an AMHS which moves material around a factory and a factory system for generating move requests for moving material. The manufacturing system further includes a broker system coupled to the factory system and the AMHS for receiving a move request from the factory system and selectively passing the move request to the AMHS based on a comparison of the move request with one or more conditions of the AMHS. By selectively passing the move request based on conditions of the AMHS, move requests can more efficiently be managed and the throughput of the automated material handling system can be increased.
The above summary of the present invention is not intended to describe each illustrated embodiment or every implementation of the present invention. The figures and the detailed description which follow more particularly exemplify these embodiments.
The invention may be more completely understood in consideration of the following detailed description of various embodiments of the invention in connection with the accompanying drawings, in which:
While the invention is amenable to various modifications and alternative forms, specifics thereof have been shown by way of example in the drawings and will be described in detail. It should be understood, however, that the intention is not to limit the invention to the particular embodiments described. On the contrary, the intention is to cover all modifications, equivalents, and alternatives falling within the spirit and scope of the invention as defined by the appended claims.
The present invention generally provides systems and methods for managing move requests from a factory system to an automated material handling system (AMHS). The AMHS and factory system may be tailored for the fabrication of semiconductor wafers. While the invention is not so limited, a more detailed understanding of the invention will be gathered from a description of exemplary embodiments which follows.
The factory system 110 typically stores a processing sequence for each wafer lot. Each processing sequence typically defines a sequence of processing steps which are performed on a given wafer lot for fabrication. The factory system 110 typically maintains a table of the processing steps and maps each processing step to a tool for the wafer lot necessary for processing. For example, for a given processing step, the factory system 110 may identify a particular storage tool for holding the wafer lot prior to processing. The factory system 110 typically generates move requests for moving the wafer lots around the factory in accordance with the particular processing sequence for a wafer lot. The factory system 110 typically receives updates from the AMHS 120 when a tool 128 performs an event on a wafer lot. For example, a storage tool controller 122 may ask the factory system 110 how to handle a wafer lot which has just been received at its input port. In response, the factory system 110 may generate a move request for the tool, requesting that the lot be moved to a destination tool, such as another stocker. The destination tool may be determined by the factory system 110 based on the table and mapping discussed above. Each of the move requests typically identifies a wafer lot and a destination tool for the wafer lot. In many applications, wafer lots are also given a priority (e.g., a value indicating the wafer lot's priority relative to other wafer lots).
The AMHS 120 typically handles move requests received from the factory system 110 via the broker 130. As will be discussed below, the AMHS 120 may also receive move requests from the factory system 110 which effectively bypass the broker 130. The example AMHS 120 includes a plurality of controllers 122 connected to a network 124. Each of the controllers 122 controls the operation of one or more factory tools 128. While illustrated separately, most or all of the functionality of a controller typically resides on an associated tool. An equipment interface (EI) 126 is typically provided between the network 124 and one or more controllers 122. Each EI 126 typically handles the exchange of messages, including move requests, between its controller(s) and the broker 130 and factory system 110. This typically includes translating messages into proper format for the factory system 110 and the controller 122.
Each controller 122 typically receives move requests via an EI 126 and handles the move requests. Handling of a move request by a controller 122 may include, for example, reserving a space in a destination tool identified in a move request, identifying the wafer carrier associated with the wafer lot identified in the move request, and handling the transfer of the wafer carrier to the destination tool. The latter step typically includes scheduling and transferring the wafer carrier onto one or more paths or tracks which carry the wafer carrier to the destination tool. The illustrated AMHS 120 is provided by way of example only. Operation of the AMHS may be changed without departing from the scope of the invention. For example, the EIs may be omitted and/or their functionality incorporated into the controllers 122.
The AMHS conditions database 230 may include a wide variety of information related to the AMHS. The database 230 may, for example, store the following conditions: a value indicating that a factory tool is down or inoperable; a value indicating length of time for which a tool will be down or inoperable; a value indicating the capacity of a tool, a value indicating the number of active requests for a particular EI; a value indicating that a particular track is full. The AMHS conditions stored by the broker 200 may be provided in a number of different manners. For example, AMHS conditions may be automatically provided from the AMHS or may be input by an operator or system administrator. In the former case, an AMHS tool may determine its condition and update the AMHS conditions database 210 accordingly. Systems, which may be external to the AMHS, may also provide AMHS conditions. For instance, an external particle may provide data related to the quantity or rate of certain particles in an area associated with a tool, such as a stocker. This data may be stored as an AMHS condition related to the stocker and used in move request management.
The move request queues 240 typically include an active queue and a pending queue for each tool with which the broker is associated. In the example embodiment an active queue and pending queue are maintained for each EI. In other embodiments, these queues may be maintained on an individual tool/controller basis. The active queue for each EI typically includes move requests that have been or are in the process of being communicated to the associated EI for handling the requested move. The pending queue for each EI typically serves as a buffer for storing move requests waiting to be moved to the active queue. While the invention is not so limited, the active queues may be first-in-first-out (FIFO) queues and the pending queues may be dynamic queues. The use of dynamic pending queues can, as discussed below, allow the reordering of pending requests.
The broker 200 typically maintains an active queue limit for each EI. When the active queue limit for a particular EI is reached, subsequent move requests for the EI are placed in the EI's pending queue. The active queue limit for a particular EI is typically set by a system administrator or operator and may vary from EI to EI. For example, EI's associated with a large number of tools and/or which may process a higher rate of move requests, typically have a larger active queue limit.
If the broker is associated with the EI identified in the move request, the broker then checks the AMHS conditions related to the destination tool identified in the move request, as indicated at block 308. The broker may, for example, query the AMHS database 210 to determine if the destination tool is down or inoperable, the length of time with which it will be down, if the destination tool is full, if the active queue of the designated EI exceeds a particular threshold, and/or if a track to the tool is full.
The broker then selectively passes the move request to the AMHS based on the comparison of the move request to the one or more conditions of the AMHS as indicated at block 310. The broker may also take into consideration the priority of the lot identified in the move request. The broker may selectively pass a move request in a number of different manners. The broker may selectively pass the move request by passing the move request to the AMHS without modification. For example, if a destination stocker is not full and the track to the stocker is not full, the move request may pass without modification. The broker may selectively pass the move request by modifying the move request and passing the modified move request to the AMHS. Modifying may, for example, include changing the destination tool identified in the move request and/or delay the passing of the move request to the AMHS for a period of time. For example, where the broker determines that a destination stocker is full, the broker may change the destination tool to another stocker. In such a case, the broker may store the original move request and, after a period of time, send the original move request to the AMHS. As another example, if a check of the AMHS conditions reveals that a track to the desired location is currently full, the broker may change the destination tool to a tool associated with a different track and/or delay the passing of the move request to the AMHS for a period of time to enable the bubble in the track to ease. The broker may also selectively pass the move request by canceling the move request. Such a technique may, for example, be beneficial where the AMHS conditions reveal that the current location of the wafer lot is optimal.
Passing a move request to the AMHS typically includes sending the original or a modified move request (hereinafter a move request) to the identified EI. In accordance with a further aspect of the invention, selective passing of a move request further includes storing the move request in a move request queue for the identified EI.
A broker may also respond to changes in the priority of a wafer lot. For instance, in some cases, the priority of a particular wafer lot may be changed by the factory system during processing. The broker may respond to such a change by determining whether the particular wafer lot is associated with a pending request and, if so, the broker may reorder the pending queue holding the pending request. For example, if a move request for a certain wafer lot is in a pending queue at position 10 and the priority of the lot changes from normal to high, the broker may reorder the move request in the pending queue to increase the priority of the move request (e.g., to position 1–9).
As noted above, the broker may also delay a move request to a particular destination tool.
Using the above processes, move requests from a factory system to an AMHS may be efficiently managed. The above systems and methods allow for the incorporation of AMHS conditions in a determination of whether, when and/or how a move request may be forwarded to the AMHS from a factory system. This can, for example, reduce log jams in the AMHS and increase throughput. Layering of a broker between the AMHS and a factory system can, for example, also facilitate the implementation and operation of the broker. For instance, such layering can allow for modification of the functionality of the broker or AMHS with little, if any, modification of the other system. The ability to selectively use a broker with particular EI's or tools further contributes to the ease of operation and modularity of the broker.
As noted above, the present invention is applicable to a number of different factory systems and automated material handling systems. Accordingly, the present invention should not be considered limited to the particular examples described above, but rather should be understood to cover all aspects of the invention as fairly set out in the attached claims. Various modifications, equivalent processes, as well as numerous structures to which the present invention may be applicable will be readily apparent to those of skill in the art to which the present invention is directed upon review of the present specification. The claims are intended to cover such modifications and devices.
This is a continuation of Ser. No. 09/247,659, filed on Feb. 10, 1999 now U.S. Pat. No. 6,662,076, to which Applicant claims priority under 35 U.S.C.§120.”, to which priority is claimed under 35 U.S.C. §120 for common subject matter and which is fully incorporated herein by reference.
Number | Name | Date | Kind |
---|---|---|---|
4829445 | Burney | May 1989 | A |
5551830 | Watanabe et al. | Sep 1996 | A |
5658123 | Goff et al. | Aug 1997 | A |
5696689 | Okumura et al. | Dec 1997 | A |
5751581 | Tau et al. | May 1998 | A |
5838566 | Conboy et al. | Nov 1998 | A |
5838572 | Hofstetter et al. | Nov 1998 | A |
5892979 | Shiraki et al. | Apr 1999 | A |
5924833 | Conboy et al. | Jul 1999 | A |
5972727 | Ryan et al. | Oct 1999 | A |
5975740 | Lin et al. | Nov 1999 | A |
6035245 | Conboy et al. | Mar 2000 | A |
6038490 | Dimitri et al. | Mar 2000 | A |
6108585 | Ryan et al. | Aug 2000 | A |
6131052 | Ban et al. | Oct 2000 | A |
6157866 | Conboy et al. | Dec 2000 | A |
6240335 | Wehrung et al. | May 2001 | B1 |
6336204 | Jevtic | Jan 2002 | B1 |
6411859 | Conboy et al. | Jun 2002 | B1 |
6662076 | Conboy et al. | Dec 2003 | B1 |
20020138172 | Bahri et al. | Sep 2002 | A1 |
Number | Date | Country | |
---|---|---|---|
Parent | 09247659 | Feb 1999 | US |
Child | 10238573 | US |