Claims
- 1. A system for controlling a train's approach on a right-of-way to a grade crossing, having a gate, such that a uniform time warning is ensured comprising:a communication based train control scheme, including a computer, situated on the train, the scheme providing a uniform time line; means situated at a wayside location for detecting the presence of a train at a first control point on the right-of-way, and for determining the train's speed thereat; means for detecting any acceleration in train speed at variable locations of the train beyond the first control point, including means, responsive to detecting the acceleration for controlling the train speed in selected bands to preclude violating minimum warning times required at the grade crossing.
- 2. A system, as defined in claim 1, further comprising:means for applying a selected speed band based on the train's entrance speed at the first control point; wherein the means for detecting any acceleration includes means for continuously monitoring the location an speed of the train as it approaches a gate crossing; means for determining whether the train is within the uniform time warning line; means for activating the gate at a grade crossing if the train is within the uniform time warning line.
- 3. A system, as defined in claim 1, further including:means responsive to the means for controlling train speed for automatically adjusting the location of the point on the right-of-way at which the gate is activated by the control scheme based on an enforced top speed.
- 4. A method of controlling a train's approach on a right-of-way to a grade crossing, having a gate, such that a uniform time warning is ensured comprising the steps of:detecting the presence of the train at a first control point on the right-of-way with a communication based control scheme; including a computer situated on the train, the scheme providing a uniform time warning line; determining the train's speed at the first control point; activating the gate at the ate crossing when the train is at a second control point on the right-of-way, wherein the second control point is selectively based on the determined speed such that a uniform time warning is provided.
- 5. A method, as defined in claim 4, further comprising the steps of:detecting any acceleration in train speed at variable locations of the train beyond the first control point, and controlling the train's speed in selected bands to preclude violating minimum warning times required at the gate crossing.
- 6. A method, as defined in claim 5, further comprising the steps of:applying a selected speed based based on the train's entrance speed at the first control point; wherein the means for detecting any acceleration in train speed includes means for continuously monitoring the location and speed of the train as it approaches a gate crossing; means for determining whether the train is within the uniform time warning line, and means for activating the gate at a grade crossing if the train is within the uniform time warning line.
- 7. A method, as defined in claim 5, further comprising the steps of:automatically adjusting the location of the second control point on the right-of-way at which the gate is activated by the control scheme based on an enforced top speed.
Parent Case Info
This Application claims the benefit of Provisional Application No. 60/263,440, filed Jan. 23, 2001.
US Referenced Citations (14)
Provisional Applications (1)
|
Number |
Date |
Country |
|
60/263440 |
Jan 2001 |
US |