Claims
- 1. A method of comparing a first characteristic with predetermined characteristics of a technical system, which comprises:
defining at least two comparison methods, each capable of carrying out a comparison of a Boolean function of the first characteristic with Boolean functions of the predetermined characteristics of the technical system; and processing the at least two comparison methods in a predetermined sequence until a result of the comparison is defined.
- 2. The method according to claim 1, which comprises defining the result of the comparison as one of equality of and a difference between the first characteristic and the predetermined characteristics of the technical system.
- 3. The method according to claim 2, which comprises verifying the first characteristic by the technical system on the basis of the equality.
- 4. The method according to claim 1, which comprises selecting the at least two comparison methods from the group of comparison methods consisting of:
SAT comparison method; simulation method; BDD method; ATPG method; and methods based on internal equivalence points.
- 5. The method according to claim 4, wherein the BDD method is an ROBDD method.
- 6. The method according to claim 5, which comprises carrying out the ROBDD method with respect to leaves or with respect to sectional planes in a graph representing the Boolean functions.
- 7. The method according to claim 1, which comprises defining a circuit as the technical system.
- 8. The method according to claim 1, which comprises defining an electrical circuit as the technical system.
- 9. The method according to claim 1, which comprises defining a finite automatically controlled device as the technical system.
- 10. The method according to claim 1, which comprises representing the first characteristic as a Boolean function.
- 11. The method according to claim 1, wherein the first characteristic describes a behavior of the technical system over a predetermined time interval.
- 12. The method according to claim 1, which comprises defining a threshold value with respect to one of resources to be provided and time to be afforded for processing each comparison method, and terminating the respective comparison method as being unsuccessful if the threshold value is exceeded.
- 13. The method according to claim 1, which comprises adapting a sequence of the comparison methods to be carried out, and calling first the comparison method that has been able to solve most comparisons.
- 14. The method according to claim 1, which comprises adapting or controlling at least one technical system based on the result of the comparison.
- 15. The method according to claim 1, which comprises simplifying the comparison by way of side effects from comparison methods already having been called.
- 16. A configuration for comparing a first characteristic with predetermined characteristics of a technical system, comprising a processor unit configured
with at least two comparison methods, each comparison method allowing a Boolean function of the first characteristic to be compared with Boolean functions of the predetermined characteristics of the technical system; and to process the at least two comparison methods in a predetermined sequence until a result of the comparison can be defined.
Priority Claims (1)
| Number |
Date |
Country |
Kind |
| 19850669.4 |
Nov 1998 |
DE |
|
CROSS-REFERENCE TO RELATED APPLICATION
[0001] This application is a continuation of copending International Application No. PCT/DE99/03486, filed Nov. 2, 1999, which designated the United States.
Continuations (1)
|
Number |
Date |
Country |
| Parent |
PCT/DE99/03486 |
Nov 1999 |
US |
| Child |
09848584 |
May 2001 |
US |