The invention is generally directed to electric vehicles and energy storage devices, and relates more particularly to the cooperative charging of electric vehicles
With the demand for alternative fueled, environmentally friendly or “green” vehicles are on the rise, electric vehicles and will become the vehicles of choice because of their zero emissions and their efficiency. Each electric vehicle may require a large amount of power to recharge. Many electric vehicle prototypes as of this writing have a storage capacity of 35 kWh or greater. Each electric vehicle may require a recharge within a limited period of time, most likely overnight. In addition, batteries may supply power back into the grid during certain conditions and this interaction must be controlled as well as the charging activities.
As more and more electric vehicles come on line for being charged, this could cause a tremendous strain on existing power grids even if most charging of electric vehicles occurs in off peak hours. The EV load during charging or discharging could approach 75 Amps per vehicle. This level of current draw could overload existing distribution transformers if several vehicles attempt to charge simultaneously in conjunction with other normal loads on the transformer like HVAC etc. Increasing the size of existing transformers to meet this potential demand could prove to be very costly. Also, simultaneous charging across the entire grid could cause overloads higher on feeders or substations higher in the grid hierarchy.
As mentioned, this potentially large electric vehicle charging load would add to the present load on the distribution system. A large contributor to the present load on the electric power distribution system is Heating Ventilation and Air Conditioning (HVAC) systems in addition to other large appliances like electric clothes dryers and electric ranges.
A focus of upgrades to the electric grids could include distribution transformers. Distribution transformers are generally positioned in proximity of homes, which will also house any electric vehicles. Each transformer usually has a limited amount of supply current for charging large loads, like electric vehicles.
Currently, some solutions exist which manage the additional load that electric vehicles may place on existing power grids.
The power grid system 10 functions as a power distribution system/network that connects producers of power with consumers of power. The power grid system 10 may include, but is not limited to, any one of generators, transformers, interconnects, switching stations, and safety equipment. As illustrated in prior art
One of the main problems of this prior art central controller 12 model is that it will require tremendous computing power to manage all of the variables associated with the charging of electric vehicles from a central location. If there are any problems with the central controller 12, such problems could directly impact numerous customers with electric vehicles. In addition to this system 10 having a single point of critical failure, this central controller 12 may require additional infrastructure behind the power grid system 10 itself so that the central controller 12 can communicate with each electric vehicle charger 20. For example, the central controller 12 may require an Internet connection or a wireless network connection in order to communicate with the electric vehicle chargers 20. This is on top of the communications infrastructure needed by the central controller 12 to communicate with monitoring points on the substations 14 and the feeders 16.
Accordingly, there is a need in the art for a system and method that can locally and autonomously manage the demand or load presented by electric vehicles and which does not require significant additional communications infrastructure. There is a need in the art to eliminate single point of failure designs so that groups of electric vehicle chargers may operate independently of one another. Also, such a solution, operating at the transformer level could offer control at the feeder and substation level as well.
A method and system provide for the cooperative charging of electric vehicles. The method and system includes coordinating charging at the transformer or other low level of aggregation in a power grid.
When an electric vehicle is plugged-in for recharging, a charger for the electric vehicle can use a power line communication (PLC) communication module for communicating with other chargers that are being serviced by the same, local distribution transformer. According to one aspect of the method and system, by using power line communications, chargers of the electric vehicles who are serviced by the same distribution transformer can form self-contained local area networks due to the nature of power line communications.
Specifically, the strength of the signals for power line communications are such that usually only chargers coupled to the same distribution transformer can communicate with one another. In other words, chargers coupled to a first transformer will likely not be able to detect or communicate with other chargers who are coupled to a second transformer due to the losses of power in the communication signals when they pass through transformers and are propagated over power lines for significant distances
According to the method and system, after the chargers of the electric vehicles are coupled to one another through power line communications, they can form a communication network, such as a transformer local area network (LAN). Alternatively, or in addition to the power line communications, the chargers can be coupled to conventional computer-based LANs through gateway devices.
Each LAN can support a controlled communication timing system, such as a token ring network. According to this token ring network, a predetermined number of tokens can be assigned within the token ring network. Each token would represent a nominal amount of current (e.g. 30 Amps) that could be used to charge the vehicle. So that could charge at 50 Amps would need to collect two tokens to charge at full current. In one exemplary embodiment, one token may be assigned to a single electric vehicle out of a group of electric vehicles (with corresponding chargers) which are part of the token ring network. But more than one token may be provided, such as a plurality of tokens within a given token ring network, and is within the scope of the invention.
Only chargers with a token may receive energy from the distribution transformer. In this way, a distribution transformer is not overloaded by energy requests and trying to fulfill those energy requests for a plurality of vehicles which may be beyond the capacity of the transformer. In this way, overloading and possible failure of a distribution transformer may be prevented or avoided.
During formation of a token ring network or after all chargers of a particular network have completed their charging, a list can be generated to enumerate the chargers who are part of the network. This list can be stored in each charger's memory. Next, the first token or first set of tokens can be assigned to one or more chargers of electric vehicles within the network. The assignment of the first token or tokens can be made according to predetermined criteria. For example, such predetermined criteria can include an assessment of the permanent serial numbers that may be assigned to each charger. A charger with the highest or lowest serial number may be assigned to the first token. Other criteria beyond serial identification numbers of chargers for assigning the first token or first set of tokens is within the scope of the invention.
The charger assigned with the first token then can determine the priority of the token distribution within the token ring network. The charger assigned with the token can assess many variables associated with the charging of an electric vehicle in order to determine the order in which chargers should receive the token. For example, variables such as desired charge levels, amounts of charge needed for each vehicle, desired energy prices for charging a vehicle, the amount of time available compared to the amount of charge needed, and determining if any of the vehicles within the token ring network desire to upload and/or sell energy from a vehicle to the grid in order to alleviate the load of the distribution transformer.
Once the charger with the first token determines the priority or order in which the token should be passed from one charger to the next, the token is passed to the charger with the highest priority. Next, the charger with the token is able to start or initiate a download of energy from the transformer. While energy is being downloaded, the charger can constantly monitor the status of the energy storage unit which in many cases can be a battery or set of batteries. The charger can also monitor the status of the other chargers who are members of the token ring network. The charger assigned with the token can also monitor other variables in the token ring network.
For example, other variables which can be monitored by the charger assigned with the token ring can include, but are not limited to, monitoring the time of day; determining if there is enough time to charge the remaining vehicles within the time allotted by a vehicle owner; checking the current price for energy transfer to the energy storage units of the vehicles; checking to see if other new vehicles and their corresponding chargers have entered into the local network; determining if there have been updates by vehicle owners for desired time of charge completion; calculating a random time of day in order to initiate the cooperative charging process; checking for reductions in current selected by a charger for charging an energy storage unit and passing a token when a charger makes this selection of reduced current; and determining if some vehicles have extra energy to upload to the grid.
In a manner similar to that described for electric vehicles, other large load appliances besides electric vehicle chargers, such as HVAC units, could be added to the LAN and can run cooperatively with a power control mechanism. Further, the HVAC units along with other appliances, like an electric clothes dryer, could contain a communications processor operating via the HomePlug standard, or equivalent. An application could be run on this processor of the general appliance which enables the device to join a cooperative charging/powering network.
The inventive system can be coordinated with a central controller to further optimize the utilization of grid resources, such as by shifting charging load to a period of time where excess energy from other energy sources, such as from alternate fuel sources like a wind generating supply, is expected. One aspect of the invention is to optimize utilization of existing grid assets while also providing power for all appliances/loads desiring energy.
A method and system provide for the cooperative and coordinated charging and discharging of electric vehicles. By using power line communications, chargers of the electric vehicles who are serviced by the same distribution transformer can form self-contained local area networks due to the nature of power line communications. After the chargers of the electric vehicles are coupled to one another through power line communications, they can form a token ring network. According to this token ring network, a predetermined number of tokens can be assigned within the token ring network for permitting chargers with tokens to charge respective electric vehicles while chargers without tokens must wait until they receive a token to initiate charging. By limiting the number of vehicles who are charging simultaneously, the load on a particular transformer which services several vehicles (households) is restricted to safe levels.
Turning now to the drawings, in which like reference numerals refer to like elements,
The distribution transformer 218 may be coupled to a power line communications (PLC) relay device 205. Further details of the power line communications used with the invention will be described in further detail below. The PLC relay device 205 may be coupled to a central processing unit (CPU) 207 that controls the transformer 218. The CPU 207 may also be designed to control all or issue control signals to each transformer 215.
The power line communications (PLCs) refer to in this description is a system for carrying data on conductors that may also be used for electric power transmission. Electrical power is typically transmitted over high voltage transmission lines, distributed over medium voltage, and used inside buildings at lower voltages. It is well understood to one of ordinary skill in the art that power line communications can be applied at each stage.
PLCs can connect loads between a distribution network and premises wiring for each premises connected to that transformer secondary. The power line communications systems used herein may operate by impressing a high frequency modulated carrier signal on the wiring system. Different types of power line communications can use different frequency bands, depending on the signal transmission characteristics of the power wiring used. Since many power wiring systems are usually intended for only transmission of alternating current power, many power wire circuits usually have a limited ability to carry higher frequencies. This propagation problem can be a limiting factor for power line communications; however, this propagation problem is used advantageously by the cooperative charging system described herein.
Because of the attenuation of power line communications over relatively short distances at higher frequencies, chargers 215 of electric vehicles 245 that are being serviced by the same, local distribution transformer 218 can form self-contained local area networks due to the propagation characteristic noted above. This means that the strength of the signals for power line communications are such that usually only chargers 215 of electric vehicles coupled to the same distribution transformer 218 can communicate with one another. As noted earlier, chargers 215 of electric vehicles 245 coupled to a first transformer 218 will likely not be able to detect or communicate with other chargers 215 who are coupled to a second transformer 218 (not illustrated) due to the losses of RF power in the communication signals when they are propagated over power lines 203 for significant distances and through two or more transformers 218.
Specifically, there is typically high frequency loss through the transformer. And usually, a signal from one house connected to a given transformer secondary would not easily propagate to a second house connected to a second transformer secondary since the high frequency attenuation through the first and second transformers would attenuate the signal from the first transformer.
The cooperative charging system 200 illustrated in
Since the power line communication signals may travel outside of a home 210 to the distribution transformer 218, like many other network standards, the HomePlug power line communication standard includes the ability to set an encryption password. As with many other networking products, most HomePlug devices are “secured by default in which the standard may require that all devices supporting the standard are set to a default out-of-box password, which may be a common one. Users of the devices are encouraged to change this password for obvious reasons.
Devices which support the HomePlug power line communication standard may function as transparent network bridges which may allow computers running on any operating system to use them for network access. The HomePlug communication standard supports the ability to use Ethernet in a bus topology in which it has carrier sense, multiple access and collision detection.
This is achieved by the use of advanced orthogonal frequency division multiplexing (OFDM) that allows co-existence of several distinct data carriers along the same power-supplying wire. Use of OFDM allows turning off (masking) one or more of the subcarriers which overlap previously-allocated radio spectrum in a given geographical region. In North America, some HomePlug standards may only use 917 of an available 1,155 subcarriers.
Referring back to
Alternatively, or in addition to the PLC transceiver 220, each home 210 may have access to a local area network (LAN) and/or a gateway 202A which is coupled to a computer communications network 201. The gateway 202 can work on all seven Open System Interconnection Reference Model (OSI Reference Model or OSI Model) layers. A layer may be defined as a collection of conceptually similar functions that provide services to the layer above it and receives service from the layer below it.
One job of the gateway 202 is to convert protocols among communications networks. The gateway 202 can comprise a router that transfers, accepts and relays packets only across networks using similar protocols. The gateway 202 may also accept a packet formatted for one protocol (e.g. AppleTalk) and convert it to a packet formatted for another protocol (e.g. TCP/IP) before forwarding it. A gateway 202 can be implemented in hardware, software or both, but it is usually implemented by software installed within a router. The gateway 202 can understand the protocols used by each network 201 linked into the gateway 202. The gateway 202 can comprise bridges, switches, and routers.
The gateway 202 can also comprise a network point that acts as an entrance to another network, like the computer communications network 201. On the Internet, a node or stopping point can be either a gateway node 202 or a host (end-point) node.
In enterprise systems, a computer server acting as a gateway node 202 is often also acting as a proxy server and a firewall server. A gateway 202 can also be associated with both a router, which knows where to direct a given packet of data that arrives at the gateway, and a switch, which furnishes the actual path in and out of the gateway for a given packet. Therefore, the gateway 202 can comprise one of a switch and a router.
Meanwhile, the computer communications network 201 may comprise a wide area network (“WAN”), a local area network (“LAN”), the Internet, or a combination of networks. The LAN/Gateway 202 may also couple the computer communications network 201 to each CPU 225 of a respective charger 215. The couplings between devices illustrated in
By coupling each charger to the computer communications network 201, each charger 215 can communicate with the home computers 212 as well as respective, other chargers 215 through the computer communications network 201. Chargers 215 sharing a common secondary transformer 218 can then be interconnected into a LAN by commands from a central controller 12. This central controller 12 can have knowledge of the transformer to home connections from address information or from information received from an automated metering reading system installed in the area. However, these communications over the computer communications network 201 can be in addition (or supplemental) to the communications established by the power lines communication network devices 220A-220B.
The electrical wiring each home 210 may be coupled to a respective electric vehicle charger 215. Each electric vehicle charger 215 can be coupled to one or more electric vehicles 245. Each electric vehicle 245 may further include a central processing unit 225 that may manage operations of the electric vehicle 245, as well as an energy storage unit 240.
The PLC transceivers 220A1, 220B1, home computer 212, and PDA 214 are optional equipment. In alternative exemplary embodiments (not illustrated), each electric vehicle 245 can couple to the distribution transformer 218 automatically without a user adjusting settings for charging the energy storage unit 240 of the electric vehicle 245.
While illustrated as part of the electric vehicle charger 215, the energy storage unit 240 may physically be housed in the electric vehicle 245. The electric charger 215 may also be part of or may be physically housed in the electric vehicle 245. The electric vehicles 245 described herein can include pure electric and hybrid electric vehicles, such as plug-in hybrid electric vehicles (PHEVs), especially vehicles that have significant storage battery capacity and that connect to the power grid for recharging a battery. The electric vehicles 245 described herein typically obtain some or all of their energy for motion and other purposes from the power grid. Each electric vehicle 245 may have an energy storage unit 240. The energy storage unit may comprise batteries, capacitors or some combination thereof, or any other electrical storage mechanisms. Each electric vehicle 245 with its energy storage unit may or may not have the capability to provide power back to the electric grid.
Each electric vehicle charger 215 may be coupled to the wiring of a home 210 by a standard plug which is placed into an outlet of a wall or by a special high current receptacle not shown. Each electric vehicle charger 215 may comprise a power line communications (PLC) transceiver 220A2, 220B2, a central processing unit 225, random access memory (RAM) 230, and non-volatile memory 235. The central processing unit 225 of each electric vehicle charger 215 can be coupled to the PLC transceiver 220, the RAM 230, and the non-volatile memory 235. The CPU 225 can control when power can be drawn from the distribution transformer 218 for storage in the energy storage unit 240. The CPU 225 of each electric vehicle charger 215 can execute or run various program modules which are stored in RAM 230 and non-volatile memory 235. The non-volatile memory 235 may comprise ROMs or EEPROMS. Other hardware configurations for the electric vehicle charger are not beyond this scope of the invention.
In other words, the vehicle charger 215 may comprise firmware code executed on micro-controllers, micro-processors, or digital signal processors or state machines implemented in application specific integrated circuits or programmable logic, or other numerous forms without departing from the spirit of the invention. The electric charger 215 may be provided with computer programs that include machine readable mediums having stored thereon instructions which may be used to perform the processes described below for supporting the cooperative charging of electric vehicles 245. The machine readable medium and each electric vehicle charger 245 may include, but is not limited to, optical disc, CD-ROMs, magneto-optical disc, ROMs, RAMs, EPROMs, EEPROMs, magnet or optical cards, flash memory or other type of media-machine readable medium suitable for storing electronic instructions.
With the cooperative charging system 200 described herein, a first electric vehicle charger 215A can communicate with a second electrical vehicle charger 215B through the wiring of each home 210A, 2108 and along the power lines 203A and 203B which are coupled to the distribution transformer 218. Since the electric vehicle chargers 215A are “intelligent” devices, they can logically control when each electric vehicle charger 215 will draw or supply power along power lines 203 that are coupled to the distribution transformer 218. In this way, as described above, each electric vehicle charger 215 may draw or supply its power at different times relative to other chargers 215 that are coupled to the distribution transformer 218. In this way, overloading and possible failure of the distribution transformer 218 may be prevented or avoided.
Referring now to
The system 260 of software and hardware components can comprise a power line communications (PLCs) communications module 263, a token management module 266, an energy storage unit management 269, energy storage unit hardware 272, and a controller module 275. The power line communications module 263 can comprise programming or instructions that may reside within the PLC transceiver units 220A1, 220A2, 220B1, 220B2 as illustrated in
The token management module 266 can manage the token ring logic and functions as will be described in further details in
The energy storage unit storage management module 269 can also monitor information that may be entered by a user of the electric vehicle 245. Specifically, the energy storage unit management module 269 can receive and manage data from a user who may enter in charge data through the personal digital assistant (PDA) 214, the home computer 212. The energy storage unit management module 269 can support a vehicle charge manager user interface that is described in further detail below in connection with
Referring now to
In addition to supplying distance data 278, 280, a user may also supply price point data 282 in dollars per kilowatt hour (kWh) which the user wishes to pay to purchase the energy to charge the energy storage unit 240. This price point data 282 can be one of the variables that are monitored by each respective electric vehicle charger 215 during the charging process or charging cycle. The user may also enter in upload energy data 284 to indicate whether excess energy that may be available in an energy storage unit 240 such that the electric vehicle charger 215 would upload excess energy in the energy storage unit 240 as appropriate to the distribution transformer 218 so that the energy uploaded is supplied to the grid where it might be used to a charge another electric vehicle 245 that desires to receive energy for completing a charge of its energy storage unit 240. The user may also indicate lowest price date 286 at which the user desires to sell an energy storage unit's excess energy.
Further, the user may also enter time and date data 288 in which the user will need the electric vehicle 245 to be appropriately charged for the estimated distance data inputted into the vehicle charge manager user interface 276. From this time and date data 288, the energy storage unit management module 269 can calculate the amount of time which will be needed to charge an energy storage unit 240 to the desired capacity of the user based on the distance data 280 entered by the user into the charge manager user interface 276. And additionally, a user may also enter an amount of reserve energy 289 that is desired beyond the amount calculated for a particular distance, where the particular distance is also entered by the user in the longest distance data field 280.
Referring now to
Referring now to
That is, for example, after the first vehicle charger 215A has completed a charge of its energy storage unit 240, the token may be passed to the next prioritized electric vehicle charger 215 who is a member of the logical token ring 400. So this means, if a third electric vehicle charger 215C has a higher priority relative to a second electric vehicle charger 215B, then the third electric vehicle charger 215C would receive the next available token before the second electric vehicle charger 215B would receive a token.
Referring now to
Referring now to
Similarly, one of ordinary skill in the art will recognize that the tokens 502 will be distributed along the logical token ring 400 so that some tokens allow electric vehicle chargers 215 to supply power to the distribution transformer 218 while other tokens 502 may allow other electric vehicle chargers 215 to draw power from or through the distribution transformer 218 such that the power from other electric vehicles 245 may be received by the electric vehicle chargers 215 can in turn place the drawn power into the energy storage units 240.
Referring now to
In other words, these steps illustrated in
Certain steps in the processes or process flow described in all of the logic flow diagrams refer to in this specification must naturally precede others for the invention to function as described. However, the invention is not limited to the order of the steps described if such order or sequence does not alter the functionality of the present invention. That is, it is recognized that some steps may perform before, after, or parallel other steps without departing from the scope and spirit of the invention. It is also recognized to one of ordinary skill in the art that some steps could be dropped or not performed at all, and the remaining steps may still be performed relative to the dropped steps.
Further, one of ordinary skill and programming would be able to write such a computer program or identify appropriate hardware at circuits to implement the disclosed invention without difficulty based on the flow charts and associated description in the application text, for example.
Therefore, disclosure of a particular set of program code instructions or detailed hardware devices is not considered necessary for an adequate understanding of how to make and use the invention. The inventive functionality of the claimed computer implemented processes would be explained in more detail in the following description and in conjunction with the remaining figures illustrating other process flows.
Step 705 is the first step of the process 700 in which one or more electric vehicle chargers may be coupled to a power line communications network that can comprise power lines 203 as illustrated in
In Step 720, the assignment of the first token or group of tokens can be made according to predetermined criteria. For example, such predetermined criteria can include an assessment of the permanent serial numbers that may be assigned to each electric vehicle charger 215. An electric vehicle charger 215 with the highest or lowest serial number may be provided with the first token 502. Other criteria beyond serial identification of the electric vehicle chargers 215 for assigning the first token or first set of tokens is within the scope of the invention.
In Steps 725, each of the electric vehicle chargers 215 can record the status of the first token assigned in the logical token ring 400. Next, in Step 730, the first charger such as the first charger 215A as illustrated in
In Step 740, charging of the electric vehicle 245 or the electric vehicle charger 215 with the highest priority can be initiated. In routine 745, the electric vehicle charger 215 with the token 502 can monitor the status of the token ring members as illustrated in
Next, in decision Step 750, it is determined whether the electric vehicle charger 215 has completed a charge for the energy storage unit 240 of a particular electric vehicle 215 and/or if a predetermined threshold or a specific event tracked by the charger 215 has been reached. If the inquiry to decision Step 750 is negative, then the “no” branch is followed back up to routine 745. If the inquiry to decision Step 750 is positive, then the “yes” branch is followed to Step 755.
In Step 755, the token 502 can be passed to the electric vehicle charger 215 with the next highest priority in the token ring list 900 as illustrated in
If the inquiry to decision Step 760 is negative, then the “no” branch is followed back to Step 740 in which charging of the vehicle with the next highest priority is initiated. If the inquiry to decision Step 760 is positive, then the “yes” branch is followed and the process can then end. As noted above, one of ordinary skill in the art recognizes that multiple tokens 502 can be distributed in any given logical token ring network 400. Further, it is recognized by one of ordinary skill in the art that some tokens may be utilized for power consumption while other tokens follow to make allow for energy uploads from a particular energy storage unit 240 of an electric vehicle 245.
Referring now to
In Step 815, the electric vehicle charger 215, which has a token can check the energy price rates for charging each electric vehicle 245 within the logical token ring 400 and the electric vehicle charger 215 with the token may update the order of the token list 900 as needed, depending on the particular energy rate that may be provided by the distribution transformer 218. In other words, as described above, each vehicle owner 245 may input a desired energy price rate at which to charge a user's electric vehicle 245. A user may input this price data in the vehicle charge manager interface 276 as illustrated in
In step 820, a vehicle charger 215 assigned with a token 502 may also check for new vehicles entering the logical token ring 400, and it may update an order of the token list 900 as needed if a new vehicle electric charger 215 has come on board, which has a higher priority in charging relative to other electric vehicle chargers 215 already present in an existing logical token ring 400.
In step 825, a electric vehicle charger 215 with a token 502 can check for updates to desired charge levels for each vehicle 245. Specifically, it is possible that a user of a particular vehicle 245 in a particular logical token ring 400 may decide to change his or her desired charged vehicle time 288 as illustrated in
In step 830, the electric vehicle charger 215 assigned a token can also check for vehicles 245 desiring to upload excess energy in their energy storage units 240 to the distribution transformer 218, also known as a vehicle to grid (V2G) upload. The electric vehicle charger 215 assigned a token can update its transformer token data as needed. One of ordinary skill in the art recognizes that other variables associated with electric vehicle charging may be monitored with an electric charger 215 assigned a particular token without departing from the scope and spirit of the invention.
In step 835, each charger 215 may sense a change in drawn energy (usually electric current) such as when a charger switches from a full charge mode to a trickle charge mode to “top off” the charge and can relinquish the token 502 if the charge current drops below a threshold energy (electric current) value. If the charge current drops below this preset threshold (such as 10 Amps, for example), the charger 215 would relinquish the token 502 and continue to draw the reduced current without the need for the token 502. This allows the token 502 to be allocated earlier to other chargers 215 requiring higher current (e.g. >10 Amps) to charge.
This minimum threshold electric current value at which the token 502 is relinquished by a given charger 215 may be either preset by each charger 215, a single charger 215 within the group, or communicated from the CPU 207 coupled to the distribution transformer 218 by the PLC relay 205. Step 835 addresses those energy storage units 240 or chargers 215 that may charge at a high rate for a period of time and then a low rate at a later period of time, possibly near the end of the charge cycle, at which time the current may be reduced by the charger 215.
Next, in step 840, the charger 215 with the token 502 can check the present time of day to determine if a predetermined time of day has been reached. If the predetermined time of day has been reached, then the charger 215 can initiate the charging of its vehicle 245. It will often be the case that the loading on the transformer 218 will be such that it will not require all night to complete the charging.
Under these circumstances, it is desirable for the charger 215 to recognize the fact that charging of all vehicles 245 will not take the entire evening, so therefore the system, which is usually the first charger 215 selected to initiate the first charge, can pick a random time of day to start the cooperative charging process, as long as this start time allows the charging of all vehicles, with some margin for late additions to the network. This random time of day to initiate charging could be determined locally with the processors 225 on the chargers 215 or it could be communicated from the backend, such as from a central controller 12 and/or from the CPU 207 coupled to the distribution transformer 218 by the PLC relay 205. Next, the routine returns to step 750 of
Referring now to
In the example illustrated in
Referring now to
The control unit 13 may comprise an RF receiver 52, a token management module 266, an RF receiver 52, a PLC communications module 263, a control processor 50, and a PLC 220. Elements labeled similar to those illustrated in
In this exemplary embodiment for the control of powering appliances 26 similar to the electric vehicle chargers 215 discussed above, when the Control Contact 1033 in unit 13 is open, the compressor 26 will be held in an off state. When the Control Contact 1033 is closed, the thermostat 38 will control the compressor as it normally does. In a standard embodiment of control unit 13, the Control Contact state is dictated by remotely received RF commands in RF receiver 52 and the control processor 50 within the unit 13 acting on those commands. For the purpose of this invention, a parallel control mechanism is envisioned that will also control the Control Contact 1033 as dictated by the presence or absence of an enabling token 502 managed by the token management module 266, similar to
One suitable device for the control unit 13 is a Digital Control Unit (DCU) box manufactured by Comverge, Inc. The DCU box is designed to be coupled outside near the air conditioning compressor. The DCU box may additionally be employed for communication through various channels, including through wide area and local area networks to an energy provider. Another suitable device would be a thermostat 38 manufactured by Comverge, Inc. Rather than being disposed on the outside of a building, the thermostat 38 would be placed within the building.
The control unit 13 can comprise a PLC transceiver 220. The control unit 13 can support a token ring network 400, like that illustrated in
Alternative embodiments of the cooperative charging or powering system 200 will become apparent to one of ordinary skill in the art to which the invention pertains without departing from its spirit and scope. Thus, although this invention has been described in exemplary form with a certain degree of particularity, it should be understood that the present disclosure is made only by way of example and that numerous changes in the details of construction and the combination and arrangement of parts or steps may be resorted to without departing from the scope or spirit of the invention. Accordingly, the scope of the present invention may be defined by the appended claims rather than the foregoing description.
The present application is a continuation-in-part of non-provisional patent application entitled “Method and System for Co-Operative Charging of Electric Vehicles,” filed on Dec. 15, 2008 now U.S. Pat. No. 8,106,627, and assigned U.S. application Ser. No. 12/335,009. The entire contents of the non-provisional patent application mentioned above is hereby incorporated by reference.
Number | Name | Date | Kind |
---|---|---|---|
5642270 | Green et al. | Jun 1997 | A |
6724100 | Gabriel | Apr 2004 | B1 |
7402978 | Pryor | Jul 2008 | B2 |
20060152189 | Ambrosio et al. | Jul 2006 | A1 |
20060219448 | Grieve et al. | Oct 2006 | A1 |
20060250902 | Bender et al. | Nov 2006 | A1 |
20070126395 | Suchar | Jun 2007 | A1 |
20070129850 | Miyaji | Jun 2007 | A1 |
20080007202 | Pryor | Jan 2008 | A1 |
20080040296 | Bridges et al. | Feb 2008 | A1 |
Number | Date | Country |
---|---|---|
WO 2008039725 | Apr 2006 | WO |
WO 2006107807 | Oct 2006 | WO |
WO 2008073472 | Jun 2008 | WO |
WO 2008073476 | Jun 2008 | WO |
Number | Date | Country | |
---|---|---|---|
20110109266 A1 | May 2011 | US |
Number | Date | Country | |
---|---|---|---|
Parent | 12335009 | Dec 2008 | US |
Child | 12699019 | US |