The present invention relates to a method implemented by computer, for determining the structure of an electricity transmission grid, an associated computer program and a system for determining the structure of the electricity transmission grid.
In the field of electricity transmission, it is known to provide electricity transmission to a plurality of electricity consumers via an electricity transmission grid comprising an electricity transformer station, the station comprising electrical feeders for supplying electrical power to electricity consumers. The transformer station is, for example, a high voltage/medium voltage (HV/MV) or medium voltage/low voltage (MV/LV) transformer station and the electrical feeders are medium or low voltage feeders.
High voltage corresponds to a voltage greater than 50 kVolts (kV), medium voltage corresponds to a voltage between 1 kV and 50 kV and low voltage corresponds to a voltage less than 1 kV.
In such electricity transmission grids, the consumers are supplied either in three-phase, or in single-phase, and the transformer station is configured for distributing the electrical power that it receives between the various electrical feeders.
However, the structure, and more precisely the mapping, of the electricity transmission grids supplying the electricity consumers is generally poorly known. But knowledge of the structure of such grids has become essential for meeting the constraints that national regulators impose on electricity transmission firms, notably in terms of quality of electricity supply.
Indeed, national regulators impose quality of service objectives on electricity transmission firms, and these must be measurable. Electricity transmission firms henceforth therefore need to be better acquainted with the structure of electricity transmission grids, notably for locating possible faults or failures on the grid or for identifying the feeders of the transformer station most contributing to electrical losses.
Thus a method is known from EP 2 458 340 A2 for determining the structure of an electricity transmission grid from specific calculation means and information relating to the electrical power consumed by each electricity consumer connected to the grid and relating to the electrical power delivered by each feeder from the transformer station.
However, the speed of execution, accuracy, and reliability of such a method remain to be improved.
The object of the invention is therefore to provide a robust method for determining the structure of an electricity transmission grid making it possible to determine the structure of the electricity transmission grid in a safer, more reliable and faster way. Such a method notably makes it possible to overcome errors, e.g. related to inaccuracies in measuring the power consumed and/or delivered or to the absence of some energy measurements.
For this purpose, the subject matter of the invention is a method for determining the structure of an electricity transmission grid, the method being implemented by computer, the transmission grid comprising a power supply station comprising one or more feeders for supplying electrical power to a plurality of electricity consumers and comprising the following steps:
characterized in that the method further comprises the following steps:
Thanks to the invention, the steps of selecting the first set of classes of data on the basis of the first selection criteria calculated and of determining the connection parameters from the first selected set make it possible to determine the structure of the electricity transmission grid in a more reliable and faster way.
According to other advantageous aspects of the invention, the method of determination further comprises one or more of the following features, taken in isolation or according to all the technically acceptable combinations:
where n is the number of electricity consumers, j is a feeder index varying from 1 to m, m being the number of feeders, i is an electricity consumer index varying from 1 to n,
with
and A comprising m*n columns and m*w rows;
such that
where
with ε between 0 and 0.5;
The subject matter of the invention is also a computer program comprising software instructions, which when they are executed by a computer, implement the method as defined above.
The subject matter of the invention further relates to a system for determining the structure of an electricity transmission grid, the transmission grid comprising a power supply station comprising one or more feeders for supplying electrical power to a plurality of electricity consumers, the system comprising:
characterized in that said determining system further comprises:
The invention will be better understood and other advantages thereof will appear more clearly in the light of the following description, given solely as a non-restrictive example, and referring to the drawings, in which:
In
The electricity consumer index i varies from 1 to n, where n is the number of electricity consumers 16i and the feeder index j varies from 1 to m, where m is the number of electrical feeders 18j. In the example of
The determining system 12 comprises, for each electrical consumer 16i, a first sensor 20i for measuring power and a module 21, for transmitting the power measurements performed by the corresponding first sensor 20i.
The determining system 12 comprises, for each feeder 18j, a second sensor 22j for measuring power.
The determining system 12 also comprises an information processing unit 24 formed, for example, from a processor 26 and a memory 28 associated with the processor 26.
The power supply station 14 is, for example, a medium voltage/low voltage transformer station connected between a medium voltage grid, not represented, and a low voltage grid 30 corresponding to the electricity consumers 16i.
The power supply station 14 includes, at each feeder 18j, the corresponding second sensor 22j.
The electricity consumers 16i are connected to the power supply station 14 via the feeders 18j. More precisely, in the example of
The electricity consumers 16i are either three-phase and supplied with power by the corresponding feeder 18j via four electrical conductors 32j, 34j, 36j, 38j, i.e. three electrical phase conductors 32j, 34j, 36j and a neutral electrical conductor 38j, or single-phase and supplied with power by the corresponding feeder 18j via two electrical conductors: i.e., for example, a phase conductor 32j, 34j or 36j, and the neutral conductor 38j.
In the example in
Each electricity consumer 16i includes the corresponding one of the first sensors 20i and the corresponding one of the transmission modules 21i.
Each electricity consumer 16i is, for example, a communicating electricity consumption meter, appropriate for measuring the first data ECi relating to the electrical power consumed by the electricity consumer 16i, via the corresponding first sensor 20i, and transmitting the first data ECi to the processing unit 24 via the corresponding transmission module 21i.
Each feeder 18j is a three-phase feeder and comprises the corresponding three phase conductors 32j, 34j, 36j and the corresponding neutral conductor 38j. As a variant, not represented, the electrical feeders are single-phase and comprise one phase conductor and one neutral conductor. According to yet another variant, not represented, some feeders are single-phase and others are three-phase.
Each first sensor 20i is appropriate for measuring the first data ECi(tl) relating to the electrical power consumed by the corresponding electricity consumer 16i, during various time intervals tl.
More generally, the first sensors 20i are configured for measuring the first data ECi(tl) during the same time intervals tl, the first data ECi(tl) measured at each electricity consumer 16i being measured synchronously.
Each transmission module 21i is appropriate for transmitting the first data ECi(tl) measured by the corresponding first sensor 20i to the processing unit 24.
Advantageously, each transmission module 21i is appropriate for transmitting with the first data ECi(tl) a first item of information relating to the time interval during which the first data were measured.
Each second sensor 22j is appropriate for measuring the second data EDj(tl) relating to the electrical power delivered by the corresponding feeder 18j, during the various time intervals tl.
The first ECi(tl) and second EDj(tl) data measured are then synchronized in the direction in which they are measured during identical time intervals tl.
Each second sensor 22j is also configured for transmitting, via a respective electrical link 40j, the second data EDj(tl) that it measures to the processing unit 24.
Advantageously, each second sensor 22j is configured for transmitting with the second data EDj(tl) a second item of information relating to the time interval tl during which the second data EDj(tl) were measured.
The first ECi(tl) and second EDj(tl) data are, for example, active power measurements.
More precisely, in the rest of the description, it is considered that the first ECi(tl) and second EDj(tl) data are active power measurements.
As a variant, the first ECi(tl) and second EDj(tl) data are reactive energy measurements, apparent energy measurements, active power measurements, reactive power measurements, apparent power measurements or even current measurements.
The processor 26 is configured for running software comprised in the memory 28.
The memory 28 comprises software 41 for acquiring the first ECi(tl) and second EDj(tl) data, software 42 for generating a plurality of different classes of data Jel from the first data ECi(tl) and the second data EDj(tl) acquired in a same time interval tl and software 44 for calculating a first selection criterion C1, for each class of data Jel.
The memory 28 also comprises software 46 for selecting a first set En1 of classes of data Jel, on the basis of the first selection criteria C1l calculated by the calculation software 44 and software 48 for determining connection parameters aij, said connection parameters comprising for each electricity consumer 16i an identifier of the feeder 18j to which it is connected.
The acquisition 41, generation 42, calculation 44, selection 46 and determination 48 software correspond to software instructions and form a computer program capable of being run by a computer. The computer corresponds, for example, to the processing unit 24.
The acquisition software 41 is appropriate, for example, for transmitting to each electricity consumer 16i and notably to each first sensor 20i an order to measure first data ECi(tl) and an order to transmit first data ECi(tl), in order to retrieve the first data.
Similarly, the acquisition software 41 is, for example, configured for transmitting to each feeder 18j and notably to each second sensor 22j an order to measure second data EDj(tl) and an order to transmit second data EDj(tl), in order to retrieve the second data EDj(tl).
Advantageously the orders to measure first ECi(tl) and second EDj(tl) data are transmitted simultaneously to all the feeders 18j and all the consumers 16i.
The generation software 42 is configured for generating classes of data Jel which are each associated with one of the time intervals tl and which comprise the first ECi(tl) and second EDj(tl) data associated with said time interval tl. In other words, the generation software 42 selects the first ECi(tl) and second EDj(tl) data measured during the various time intervals tl, for creating the classes of data Jel.
The calculation software 44 is suitable for calculating, for each class of data Jel, the first selection criterion C1l, which is chosen from an overall rate of electrical power losses between the feeders 18j and the electricity consumers 16i and a difference in consumption of electrical power between the various consumers 16i. The electrical power losses include both ‘technical’ losses, e.g. losses linked to Joule losses during the flow of the current between the feeders 18j and the consumers 16i, and ‘non-technical’ losses, which are, for example, linked to electricity theft, owing to the fact that consumers are connected to the transmission grid 10 without the information processing unit 24 being informed thereof and to defective first sensors 20i.
If the first selection criterion C1l is, for example, the overall rate of electrical power losses between the feeders 18j and the consumers 16i, the first selection criterion C1l is calculated from the following formula:
where l is a class of data index and varies from 1 to r, r being the number of classes of data generated by the generation software 42, tl is the time interval associated with the class of data of index I, ECi(tl) is the electrical power consumed by the electricity consumer of index i during the time interval tl and EDj(tl) is the electrical power delivered by the feeder of index j during the time interval tl.
If the first selection criterion C1l is, for example, the relative difference in consumption of electrical power between the various consumers 16i, the first selection criterion C1l is calculated from the following formula:
C1l=Var(EC1(tk), . . . , ECn(tk)), (2)
where Var is the variance function.
As a variant, if the first selection criterion C1l is, for example, the difference in consumption of electrical power between the various consumers, the first selection criterion C1l is calculated from the following formula:
where Moy is a mean function, such as an arithmetic, geometric, quadratic, etc. mean.
The selection software 46 is configured for selecting the first set En1 of classes of data from the classes of data Jel generated by the generation software 42, on the basis of the first selection criteria C1l calculated. The selection software 46 is, for example, configured for comparing the first criteria C1l with a first predetermined variable V1 and for selecting the classes of data Jel for which the first criterion C1l is less than the first predetermined variable V1.
The determination software 48 is configured for determining the connection parameters aij from the first selected set En1.
The determination software 48 is, for example, configured for establishing or determining an equation system to be solved from a premise of conservation of electrical power for each feeder 18j, according to which the power delivered by the feeder 18j is substantially equal to the sum of the power consumed by the electricity consumers 16i connected to the feeder 18j and the electrical losses.
The equation system is, for example, defined from the following equation:
where n is the number of electricity consumers, j is a feeder index varying from 1 to m, m being the number of feeders, i is an electricity consumer index varying from 1 to n,
The equation system is then written, for example, in matrix form as follows:
A*z=B, (5)
where
Iw*m representing the unity matrix of size w*m, with
and D comprising m*n columns and m*w rows.
The determination software 48 is then configured for solving the equation system from an optimization algorithm verifying:
such that
where
fT corresponding to a cost function of the optimization algorithm and z to an objective vector defined above and where,
Iz being of dimension m*n+2*w*m and comprising m*n times the value −ε and 2*w*m times the value 0 and
uz being of dimension m*n+2*w*m and comprising m*n times the value (1+ε) and 2*w*m times the value +∞, with ε between 0 and 0.5, preferably between 0 and 0.1, preferably still equal to 0.05.
The optimization algorithm is appropriate for determining the objective vector z and therefore the connection parameters for which the function fT.z is minimized. More precisely, the determination software 48 is configured for starting from an initial vector solution
chosen randomly and for iteratively converging towards a solution. At each iteration, the adjustment variables ∂1jk, ∂2jk and the function fT.z are calculated and can be used to decide the next vector solution X.
More precisely, at each iteration, the optimization algorithm balances the power differences with the adjustment variables ∂1jk, ∂2jk so that the equalities of the equation system are verified. Thus, if the power delivered on a feeder of index j shows a surplus, the corresponding adjustment variable ∂1jk is increased and if this power shows a deficit, the corresponding variable ∂2jk is increased. Thus, the more the connection parameters aij comply with the principle of conservation of power, the lower the adjustment variables are. The objective is to minimize the adjustment variables, resulting in the objective function
The matrices lz and uz bound the connection parameters aij between −ε and 1+ε and the adjustment variables ∂1jk and ∂2jk between 0 and +∞. More precisely, during the application of the optimization algorithm, the connection parameters aij are real numbers allowing the constraints to be relaxed. Then, following the application of the optimization algorithm, the determination software 48 is configured for setting the values of the connection parameters aij to 0 or to 1 on the basis of their value following the application of the optimization algorithm. The value 0 indicates a non-connection of the consumer of index i to the feeder of index j, while the value 1 indicates a connection of the consumer of index i to the feeder of index j.
The determination software 48 is, for example, configured for determining the values of the connection parameters following the application of the optimization algorithm via the following equation:
Thus, according to equation (7) above, each consumer 16i is connected to a single feeder 18j.
In addition, the processing unit 24 is configured for identifying, on the basis of the connection parameters determined and from, for example, identification software, not represented, comprised in the memory 28, subsets of consumers, with each subset of consumers that corresponds to the set of consumers 16i connected to a same feeder 18j.
As a variant, the determination software 48 is configured for determining the connection parameters separately for each feeder and independently of the second data relating to the electrical power acquired for the other feeders.
According to this variant, an optimal equation system is determined for each feeder, and the optimization algorithm is applied to each optimal equation system. Thus m optimal equation systems are obtained, solved independently via the optimization algorithm.
Thus, for the feeder of index 1, the corresponding optimal equation system verifies:
A1*z1=B1, (8)
where
with
Then, according to this variant, the determination software 48 is, for example, appropriate for determining the values of the connection parameters via equation (7).
According to another variant, the determination software 48 is configured for determining the connection parameters for each electrical phase conductor 32j, 34j, 36j and not simply for each feeder 18j. According to this other variant, the equation system then comprises as many equations as electrical phase conductors 32j, 34j, 36j and the variables described above and relating to a specific feeder j then relate to a specific phase conductor. Thus, the second sensors 22j measure the electrical power delivered by each phase conductor 32j, 34j, 36j and not each feeder 18j, the connection parameters aij are determined for each phase conductor 32j, 34j, 36j and the adjustment variables are determined for each phase conductor 32j, 34j, 36j. According to this other variant, each electrical conductor is identified, for example, by an index and the variable j, set out in the equations above, then corresponds to an electrical phase conductor index varying from 1 to u, with u the number of electrical phase conductors which is equal to 3*m, or 6 in the example of
Several embodiments of a method for determining the structure of the electricity transmission grid 10, implemented via the processing unit 24, and more generally via the determination system 12, will now be described.
According to a first embodiment described below with reference to
Subsequently, during a generating step 102, the generation software 42 generates a plurality of different classes of data Jel, each associated with one of the time intervals tl and which comprise the first ECi(tl) and second EDj(tl) data associated with said time interval tl.
Then, during a calculating step 104, the calculation software 44 calculates the first selection criterion C1l for each class of data Jel. The first selection criterion C1l is, for example, the overall rate of electrical power losses between the feeders 18j and the consumers 16i.
Subsequently, during a selecting step 106, the selection software 46 selects the first set En1 on the basis of the first selection criteria C1l calculated. The first set En1 is selected from the classes of data generated in step 102. In the course of the selecting step 106, the selection software 46 compares, for example, the first criteria C1l with the first predetermined variable V1, the value of the first predetermined variable V1 being defined, for example, during the acquiring step 100. The selection software 46 then selects the classes of data Jel for which the first criterion C1l is less than the first predetermined variable V1.
Finally, during a determining step 108, the connection parameters are determined via the determination software 48 and from the first selected set En1.
More precisely, the determination software 48 determines the equation system to be solved from, for example, equation (4), as set out above. Then, as set out above during the description of the determining system 12 and equation (5), the optimization algorithm is applied to the equation system in order to determine the connection parameters aij.
As a variant, during the determining step, the determination software 48 determines the optimal equation systems, as set out above via equation (8), and applies the optimization algorithm to each optimal equation system. The speed of determining the connection parameters aij is then improved, since the optimal equation systems comprise a limited number of equations.
In the first embodiment, the fact of selecting classes of data Jek eliminates the classes of data Jel for which the losses are the greatest, since these classes of data risk leading to an erroneous determination of the connection parameters aij.
Thus, according to the first embodiment, the determined connection parameters aij, are determined with more certainty compared with the methods known in the prior art and the reliability of the method of determination is improved.
In addition, the optimization algorithm used enables any number of classes of data Jek to be used during the determining step 108, even if it is preferable that the number of classes of data of the first set is greater than or equal to the total number n of consumers 16i.
According to a second embodiment of the invention described below with reference to
Thus, during step 204, each first criterion C1l is, for example, the overall rate of loss relating to the corresponding class of data Jel and each second criterion C2l is the difference in electrical consumption relating to the corresponding class of data Jel, and is calculated via equation (2) or equation (3).
Then, in the course of the selecting step 206, the selection software 46 selects the first set En1 on the basis of the first selection criteria C1l and the second selection criteria C2l calculated. The first set En1 is selected from the classes of data generated in step 202. In the course of the selecting step 206, the selection software 46 compares, for example, the first criteria C1l with the first variable V1 and the second criteria C2l with a second predetermined variable V2. The value of the second predetermined variable V2 is, for example, defined during the acquiring step 200. The selection software 46 then selects the classes of data for which the first criterion C1l is less than the first predetermined variable V1 and the second criterion C2l is less than the second predetermined variable V2.
Finally, in the course of the determining step 208 the connection parameters are determined via the determination software 48 and from the first selected set En1.
The second embodiment makes it possible to refine the selection of the classes of data compared with the first embodiment and thus to select classes of data from which the risk of error in determining the connection parameters aij is minimized. The accuracy, speed and reliability of the method of determination are thus improved.
According to a third embodiment of the invention described below with reference to
In the third embodiment, each first criterion C1l is, for example, the overall rate of loss relating to the corresponding class of data generated in step 302 and each second criterion C2k is the difference in electrical consumption relating to the corresponding class of data of the first set En1.
Following the calculating step 307, during a selecting step 308, a second set En2 of classes of data is selected from the first set En1. Then, the first set En1 is, for example, set equal to the second selected set En2 for performing the determining step 310 on the basis of the second selected set En2.
The third embodiment makes it possible to refine the selection of the classes of data compared with the first embodiment and thus to select classes of data from which the risk of error in determining connection parameters aij is minimized. The accuracy, speed and reliability of the method of determination are thus improved.
According to a fourth embodiment of the invention described below with reference to
Then, following the selecting step 406, the method comprises a step 408 for determining the connection parameters. More precisely, during step 408, the method comprises a first substep 408A for pseudo-randomly selecting a third set En3 of classes of data included in the first set En1.
Subsequently, during a calculating substep 408B, a repetition parameter R1 is calculated. The repetition parameter R1 corresponds to a number of iterations of the selecting substep 408A.
Then, during a determining substep 408C, intermediate connection indices bij, indicating for each consumer 16i the feeder 18j to which it is connected, are determined from the third selected set En3. More generally, the intermediate indices bij comprise for each electrical consumer 16i an identifier of the feeder 18j to which it is connected. The determining substep 408C is similar to the determining step 108 of the first embodiment, but is performed from the third set En3.
Subsequently, during a storing substep 408D, the intermediate connection indices bij are stored by the memory 28.
Then, in the course of a calculating substep 408E, performed for each consumer 16i and for each feeder 18j, an assignment number NAij relating to the number of times that the stored intermediate connection indices indicate that the consumer 16i is connected to the feeder 18j is calculated.
The assignment number NAij is, for example, calculated via the following formula:
where N(bij=1) corresponds to the number of times that the stored intermediate indices bij are equal to 1 for the consumer 16i of index i and the feeder 18j of index j and NT corresponds to a total number of iterations of the selecting substep 408 A. Advantageously, the total number of iterations NT is initialized to 0 prior to the execution of the selecting substep 408A and incremented by 1 for each execution of the selecting substep.
It should be noted that the number of intermediate connection indices stored for a given electricity consumer 16i and a given feeder 18j is equal to the number of iterations of the selecting substep 408A.
Advantageously, the assignment numbers calculated are stored following the calculating substep 408E.
Then, during a comparing substep 408F, the repetition parameter R1 is compared to a predetermined repetition criterion CR1. The predetermined repetition criterion CR1 is, for example, initialized during the acquiring step 400.
The repetition criterion CR1 is, for example, a minimum number of iterations of the selecting substep 408A.
If during the comparing substep 408F, the repetition parameter is less than the repetition criterion, then the steps of selecting 408A, calculating 408B, determining 408C, storing 408D, calculating 408E and comparing 408F are repeated.
If during the comparing substep 408F, the repetition parameter R1 is greater than the repetition criterion CR1, then a substep 408G is performed for determining the connection parameters aij.
During the determining substep 408G, the connection parameters aij are determined from the third selected set or sets En3, and more precisely on the basis of the intermediate connection indices bij stored during the storing substep 408D, and more precisely on the basis of the assignment numbers NAij calculated at the last iteration of the substep 408E. More precisely, for each electricity consumer 16i, the feeder index j corresponding to the largest assignment number NAij is identified, and the connection parameter aij corresponding to said consumer 16i and to said feeder 18j is set equal to 1, the other connection parameters aij relating to said consumer being set equal to 0.
Advantageously, if during the determining substep 408G all the assignment numbers relating to a consumer 16i are less than a first predetermined threshold S1, e.g. equal to 0.6, then an error in identifying the connection for said consumer 16i is identified.
As a variant, if the number of iterations of the substep 408A is greater than 2, then, during the calculating substep 408E, and at each iteration of the substep 408E, a first mean of the assignment numbers NAij, calculated at each iteration of the substep 408E, for each consumer 16i and for each feeder 18j, is calculated. Then, a second mean of the assignment numbers NAij, calculated at the last iteration, for each consumer 16i and for each feeder 18j, is calculated. Subsequently, during the substep 408 E, a difference between the first mean and the second mean is calculated.
The first and the second mean are, for example, arithmetic, geometric, or quadratic, etc. means.
According to this variant, during the comparing substep 408F, the absolute value of the last difference calculated is compared to a second predetermined threshold S2, e.g. equal to 0.1. Then, if during the comparing substep 408F, the repetition parameter R1 is greater than the repetition criterion CR1 and the absolute value of the last difference calculated is less than the second threshold S2, then the substep 408G is performed. Else, steps 408A, 408B, 408C, 408D, 408E and 408F are reiterated.
The fourth embodiment makes it possible, notably when the number of iterations of the substep 408A is greater than 2, to determine the connection parameters aij from third sets En3 of different classes of data. Thus, the accuracy and reliability of the method of determination are improved.
In addition, the fourth embodiment advantageously makes it possible to identify each consumer 16i for which the associated feeder 18j is determined with a good index of confidence and each consumer 16i for which the associated feeder 18j is undetermined or determined with a poor index of confidence. Indeed, as described above, if during the determining substep 408G all the assignment numbers relating to a consumer 16i are less than the first predetermined threshold S1, e.g. equal to 0.6, then an error in identifying the connection for said consumer 16i is identified and the feeder 18j to which the consumer 16i is connected is undetermined. In the same way, if during the determining substep 408G an assignment number relating to a consumer 16i is greater than a third predetermined threshold S3, e.g. equal to 0.95, then the connection of the consumer 16i to the corresponding feeder 18j is identified with a good index of confidence.
Advantageously again, the fourth embodiment makes it possible to associate, with each connection parameter aij, set equal to 1 during the determining substep 408G, an index of confidence representing the probability that the determined connection is correct. The index of confidence is, for example, equal to the corresponding assignment number NAij.
The embodiments and variants envisaged above are appropriate for being combined with each other, according to all technically acceptable combinations, for giving rise to other embodiments of the invention.
Thus, the second embodiment is appropriate for being combined with the fourth embodiment and the third embodiment is also appropriate for being combined with the fourth embodiment.
Number | Date | Country | Kind |
---|---|---|---|
15 53646 | Apr 2015 | FR | national |