The present invention relates to a screw pile and to a method for installing it in conjunction with injection of grout.
Screw piles have long been commonly used in connection with foundation underpinning, pipeline tie-downs and in other applications.
In one known embodiment, the screw pile comprises:
A screw pile will be characterized by load-carrying and lateral deflection capacities, once implanted in the ground.
The load-carrying capacity of a screw pile can be increased by increasing its length and/or diameter or increasing the number of helixes. However these changes will require that greater torque be applied by the drive head assembly in order to rotate the pile into place at the desired landed depth. There are finite limits on the amount of torque that can be applied to the pile and on the capability of the drive head assembly to deliver it.
In addition, the nature of the ground into which the pile is implanted will also affect the load-carrying capacity of the pile.
It is known to inject grout, such as cement slurry, at low pressure, down through the bore of the hollow shaft and out, through ports in its side wall, into the sub-surface formation or stratum in which the pile has been landed, to thereby increase the stiffness of the formation and enhance the load capacities of the pile.
The present invention is concerned in one aspect with providing a modified screw pile and in another aspect with providing a method of installation, which have the objective of increasing the load capacities of an implanted pile.
In a preferred embodiment, a screw pile is provided having one or more internal grout pipes extending down into the bore of the tubular shaft. Each grout pipe is connected at its lower end with a side-opening port extending through the shaft side wall. The grout pipe and port combine to provide a grout conduit. The grout conduits each have a small diameter selected with the objective of promoting high pressure grout injection—that is, injection at a pressure greater than about 200 psi. The ports are suitably located so that, when the pile is at landed depth, the ports will be positioned opposite a target formation into which the grout has been injected.
In an alternative embodiment, a small diameter shaft, having side-opening ports in its lower end, can be used. The grout is injected into the target formation at high pressure through the bore of the shaft and the ports.
In the course of installation, grout is injected as the pile is being rotated into the target formation, to thereby distribute the grout through a vertical interval of the formation.
By combining high pressure grout injection and injecting while rotating the pile into the target formation, it has been demonstrated that the load capacities of the screw pile may be increased relative to a non-grouted pile and relative to a pile which has been grouted, but only when stationary and in place at total depth.
In one aspect, the invention is therefore concerned with a method for installing a load-bearing pile in the ground, comprising: providing a screw pile comprising a tubular shaft having a side wall forming an internal longitudinal bore, the side wall having a lower end portion carrying at least one externally mounted helix, the end portion forming at least one side-opening port extending therethrough; rotationally driving the screw pile into the ground to penetrate a sub-surface formation in which the end portion is to be landed at a total depth; and injecting grout into the formation through the shaft and ports at high pressure as the screw pile is rotated into the formation.
Having reference to
The screw pile 1 comprises an open-ended tubular steel shaft 2 whose side wall 3 forms an internal bore 4 extending longitudinally therethrough. The shaft side wall 3 further forms side-opening ports 5 at spaced intervals along the length of the lower end section 6 of the shaft 2.
A plurality of small diameter grout pipes 7 extend down through the bore 4 and connect with the ports 5 to form internal grout conduits 8.
By way of example, the shaft 2 and grout conduits 8 may have diameters of 10¾″ and ½ ″ respectively.
A plurality of helixes 9 are externally mounted to the lower section 6 of the shaft 2.
The shaft 2 may include one or more upwardly extending, tubular extensions 34 connected with the lower end section 6.
The shaft 2 and helixes 9 combine to form a screw pile that can be rotatively screwed into the ground 11 to land the lower end section 6 in a subterranean target formation 12. The implanted screw pile 1 then serves to support and/or anchor an applied load.
The grout conduits 8 provide sealed passageways 13 through which streams of grout may be pumped at high pressure (preferably at least 200 psi) by grout pump assembly 29 from ground surface 14, thereby injecting the grout into the target formation 12.
Having reference to
The head assembly 15 comprises an apertured bulkhead plate 17, positioned in the top end 16 of the shaft bore 4. The bulkhead plate 17 receives the upper ends of the internal grout pipes 7 and seals around them and between them and the shaft side wall 3.
The head assembly 15 further comprises an open-bottomed, tubular drive can 19. The drive can 19 is adapted to slide over the top end 16 of the shaft side wall 3. The drive can 19 has pin holes 20 extending through its side wall 21 for registering with pin holes 22 formed through the top end 16 of the shaft side wall 3. Drive pins 18 may be inserted into the holes 22, 20 to lock the drive can 19 to the shaft top end 16. The drive can 19 comprises internal O-rings (not shown) for sealing against the outer surface 23 of the shaft 2.
The head assembly 15 also includes a swivel 24, connected with the upper end of the drive can 19. The swivel 24 has an inlet 25 for connection with a hose 26 and grout pump 27. The grout pump 27, mixing tanks 28 and hose 26 provide an assembly 29 for supplying cement grout, pumped at high pressure. The swivel 24 enables the grout to enter the internal chamber 30 of the drive can 19 from the stationary hose 26, when the drive can is rotating.
The head assembly 15 further comprises a kelly adapter 31 connected to the swivel 24. The kelly adapter 31 is connectable with the kelly joint 32 of a conventional drive head 33 which functions to rotatively drive the drive can 19 and screw pile 1. The drive head 33 is shown attached to the boom of a mobile installation unit 34.
In the method for installing the screw pile 1, the following steps are practised:
In an alternative embodiment, the invention may be practised by injecting the grout at high pressure through the bore 50 of a rotating, small diameter (e.g. 3½″ diameter) screw pile 51 (shown in
This example demonstrates the benefit in pile load capacity obtained by injecting grout at high pressure while rotating a screw pile into the ground.
Three screw piles A, B and C were prepared as follows:
Number | Name | Date | Kind |
---|---|---|---|
3206936 | Moor | Sep 1965 | A |
4533279 | van den Elzen et al. | Aug 1985 | A |
5304016 | Kunito | Apr 1994 | A |
5575593 | Raaf | Nov 1996 | A |
5707180 | Vickars et al. | Jan 1998 | A |
5919005 | Rupiper | Jul 1999 | A |
5934836 | Rupiper et al. | Aug 1999 | A |
Number | Date | Country |
---|---|---|
60156821 | Aug 1985 | JP |
01039416 | Feb 1989 | JP |
Number | Date | Country | |
---|---|---|---|
20080031695 A1 | Feb 2008 | US |