Membership
Tour
Register
Log in
Placing by using several means simultaneously
Follow
Industry
CPC
E02D7/26
This industry / category may be too specific. Please go to a parent level for more data
Parent Industries
E
FIXED CONSTRUCTIONS
E02
Hydraulic engineering
E02D
FOUNDATIONS EXCAVATIONS, EMBANKMENTS UNDERGROUND OR UNDERWATER STRUCTURE
E02D7/00
Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
Current Industry
E02D7/26
Placing by using several means simultaneously
Industries
Overview
Organizations
People
Information
Impact
Please log in for detailed analytics