Number | Name | Date | Kind |
---|---|---|---|
5546326 | Tai et al. | Aug 1996 | A |
5612886 | Weng | Mar 1997 | A |
6088626 | Lilly et al. | Jul 2000 | A |
Entry |
---|
Liu et al., “A Methodology for Improving On-Time Delivery and Load Leveling Starts,” IEEE/Semi Advanced Semiconductor Manufacturing Conference, pp. 95-100 (1995). |
Murty et al., “Global Planning at Harris Semiconductor, 1995 International Symposium on Semiconductor Manufacturing”, pp. 18-23. |
Hoitomt et al., “Scheduling a Batch Processing Facility”, Proceedings of the 1992 IEEE International Conference of Robotics and Automation, Nice France, (1992) pp. 1167-1172. |