Claims
- 1. A method for restructuring a railway roadbed comprising the steps of:
- (a) removing ballast from beneath the rails and crossties of said roadbed;
- (b) admixing said ballast with a structural slurry;
- (c) depositing said admixture beneath the rails and crossties of said roadbed to form a structured layer; and thereafter
- (d) providing at least about 4 inches of ballast between said structured layer and said crossties.
Parent Case Info
This is a continuation of application Ser. No. 904,337, filed May 9, 1978, now abandoned Feb. 22, 1982.
US Referenced Citations (10)
Continuations (1)
|
Number |
Date |
Country |
| Parent |
904337 |
May 1978 |
|