This Application claims priority to German Patent Application No. 10 2009 036 335.1, filed Aug. 6, 2009, the entire contents of which are hereby incorporated by reference herein.
The invention relates to a process for producing tubes, in particular for use in heat exchangers, from at least two metallic strips on a rolling mill train.
A production process and a rolling mill train are described in DE 10 2006 033 568 A1. The distances between the predetermined breaking points are determined according to the desired tube lengths. However, there are at least two, preferably even three separate strips. With respect to making the predetermined breaking points coincide, said application proposes that the speed of the strips be matched. When they are deformed to form the corresponding tube part, the strips are subjected to extreme loading, including tensile stresses, which may lead to changes in length in the strips. Since the strips are extremely thin, even temperature fluctuations presumably make themselves noticeable in that the distances between the predetermined breaking points are changed. This may result in tubes with predetermined breaking points that do not match at the ends, and this can lead to unusable tubes if certain permissible tolerances should be exceeded.
The object of the present invention is to improve the above-defined production process with respect to the accuracy of the introduction of the predetermined breaking points into the tubes and the degree to which they coincide on the finished tube.
The invention provides that a master sensing element is assigned to one of the strips which pass through and senses the position of the predetermined breaking points therein, that a slave sensing element senses the positions of the predetermined breaking points in another strip which passes through, that the master sensing element forms a communicating reference system together with the slave sensing element via a computer, and that the positions of the predetermined breaking points in at least two strips are compared and aligned with the positions of the predetermined breaking points of the master sensing element strip. Suitable sensing elements are preferably cameras and corresponding image-processing software, i.e. optical detection systems which can detect and process the predetermined breaking points.
The above mentioned alignment of the positions is preferably carried out by corresponding start signals being triggered earlier or later at devices for introducing the predetermined breaking points, these devices being assigned to the strips. This step is carried out until the positions coincide.
The computer is equipped with regulation software and forms the control center for the entire system. At this control center, measurement data are received and compared and the appropriate commands are triggered. The execution of the commands is monitored. Specific tolerance limits relating to the coincidence of the positions are also predefined, and the process proceeds within these limits in a fully automated manner.
The tube is preferably produced from three strips. The distances between the predetermined breaking points are identical in all three strips since they predefine the tube lengths, it being necessary for the three parts of the tube to lie exactly at one level at the tube ends. The strips also move at identical speeds so that each strip covers the same distance per unit time. It can also be gathered from this that the time intervals between two predetermined breaking points are identical in all strips. However, it is possible to set the time intervals, as well as other parameters, on the computer, for example in order firstly to be able to react to changing external influences and secondly to be able, of course, to configure the rolling mill train for producing tubes for various heat exchanger applications which accordingly have different desirable tube lengths.
The master sensing element strip (master strip) is that strip which is sensed by the master sensing element. This applies correspondingly to the slave sensing element strip. The master strip as it were predefines the cycle. If it is ascertained that the predetermined breaking points in the strip sensed by the slave sensing element trail the predetermined breaking points in the master strip, the start signal, i.e. a pluse, is triggered earlier at the device which produces the predetermined breaking points in the slave strip. Conversely, if the predetermined breaking points in the slave strip precede the predetermined breaking points in the master strip, said pulse is accordingly triggered later. The regulation is accordingly carried out by appropriately shifting the triggering time for producing the predetermined breaking points in the slave strips.
The rolling mill train for carrying out a process for producing tubes from at least two “endless” metallic strips, wherein the rolling mill train is equipped with pairs of rolls and has a device for introducing predetermined breaking points and also has means for making the predetermined breaking points in the strips coincide, is characterized in that the means mentioned consist in at least one sensing element which is connected to a computer, the computer being connected to the device.
This results in individual tubes with tube parts which coincide perfectly at the tube ends, and these tubes are therefore ideal for use as tubes in a heat exchanger.
Processes and systems of the proposed type require high precision, in particular with respect to the setting of the parameters thereof, extensive know-how and qualified monitoring personnel.
The invention will now be described with reference to the accompanying drawings in an exemplary embodiment. The description which follows may contain information, features and advantages that may subsequently prove to be particularly significant.
Since the exemplary embodiment shown refers to three-part tubes (
When parts A, B, C have been joined to form the tube 1, then an endless tube 1 is initially provided (as shown in the cross section in
The three predetermined breaking point devices S1, S2 and S3 (
Furthermore, it can be gathered from the exemplary embodiment shown in
As can also be seen from
Although the system can, but does not have to, register each individual predetermined breaking point S in the strips and convert these into signals, it is entirely sufficient in many cases to register every third or fourth predetermined breaking point and to process the latter as described. A corresponding regulation can be made, for example, depending on the tube lengths to be produced and/or on the speed present.
Furthermore, the system can be designed in such a way that the speeds of the strips A, B, C are also included in the computer system. It is therefore possible for the uniformity of the speeds in the strips to be monitored. If required, the speeds can be appropriately readjusted. For this purpose, the computer R is connected to the drive motors of the rolls of the strips, for example servomotors. In this case, that servomotor which is assigned to the master strip can also be specified as the master servomotor.
As
The belts can be used to transmit a high tearing force and to prevent slippage.
Number | Date | Country | Kind |
---|---|---|---|
102009036335.1 | Aug 2009 | DE | national |