Claims
- 1. A method of recycling carpet forming components from waste carpet, said forming components comprising backing material and fibrous material, said method comprising:
- collecting waste carpet;
- shredding and granulating said waste carpet to separate said fibrous material from said backing material;
- collecting said separated fibrous material and backing material into respective collectors; and
- delivering said separated backing material from said respective collectors directly into a backing molding operation;
- whereby, said backing material is recycled into carpeting as backing material.
- 2. The method of claim 1 including providing that said waste carpet comprise carpet scraps and seconds.
- 3. The method of claim 1 including providing that said backing material is a polymeric material which comprises a primary backing and a secondary backing.
- 4. The method of claim 3 including providing that said primary backing consist of one of unfilled polyethylene and ethylene vinyl acetate.
- 5. The system of claim 3 including providing that said secondary backing comprises a filled moldable thermoplastic.
- 6. The method of claim 5 including providing that said filled thermoplastic consist of one of ethylene vinyl acetate and polyethylene filled with a mineral filler.
- 7. The method of claim 1 including providing that said waste carpet comprises automotive molded carpeting.
- 8. A method of recycling carpet forming components from waste carpet, said carpet forming components including fibrous material and backing material, said method comprising:
- feeding pieces of said waste carpet to a shredder for providing shredded, small waste carpet pieces;
- subjecting said small waste carpet pieces to a granulating process wherein said small waste carpet pieces are ground into separated fibrous material and separated backing material;
- conveying said separated fibrous material and said separated backing material in a common airstream to a separator;
- separating said fibrous material from said backing material in said separator by providing a second airstream containing generally only said fibrous material and a third airstream containing generally only said backing material;
- directing said second airstream to deliver said separated fibrous material to a fiber storage for subsequent processing; and
- directing said third airstream containing said backing material to deliver said backing material for further processing.
- 9. The method of claim 8 including directing said third airstream to deliver said backing material to a further grinding process and further separating process to further separate any remaining fibrous material from said backing material; and
- conveying said remaining fibrous material in a fourth airstream to said fiber storage.
- 10. The method of claim 9 including conveying said further ground and separated backing material to said backing material storage.
- 11. The method of claim 10 feeding said backing material from said backing material storage into a main feed stream containing virgin backing material;
- combining said reclaimed backing material and said virgin backing material and applying said combined backing materials as new carpet backing.
- 12. The method of claim 8 including providing that said fiber material delivered to said fiber storage unit contains no more than ten percent of said backing material.
Parent Case Info
This is a divisional of application Ser. No. 08/268,296 filed Jun. 30, 1994.
US Referenced Citations (10)
Divisions (1)
|
Number |
Date |
Country |
Parent |
268296 |
Jun 1994 |
|