Abstract
Methods are provided for assessing reliability of a power system of a utility company. At least one main overview display is obtained. Violation markers are displayed on the one main overview display. A monitored elements tab is updated with a list of monitored elements.
Description
BACKGROUND OF THE INVENTION

Field of the Invention


This invention relates generally systems and methods that improve energy management, and more particularly to systems and methods for the utility market.


Description of the Related Art


The modern electric power grid begins as the primary circuit leaves the generating sub-station, is transported via transmission line, distributed via distribution feeders, and ends as the secondary service enters the customers meter socket. This invention relates to the management of the transmission system, from a control center, which purpose is to maintain ail equipment within operating limits and to ensure the provision of electricity at a reliability rate greater than 99.999%.


To manage the grid, electric utilities rely on Energy Management Systems (EMS) which are mission critical information system that collect data from the field and can control protection devices from the control center via a Supervisory Control and Data Acquisition system (SCADA).


The EMS are more sophisticated today with advanced algorithms and increasing volume of data coming from smarter grids that are equipped with intelligent electronic devices (IED).


However, intelligent grids and sophisticate power system algorithms that process field data will not suffice to prevent human errors in control centers. Operators continuously train to adapt to new system conditions and react to emergency situations. This general aptitude to master complex information and make correct decisions is referred to as “situation awareness”.


Catastrophic failures of a power system are relatively uncommon, but they are spectacular when they happen. Twenty-five million people in the northeastern United States lost electric power for 12 hours in 1965. Another blackout shut down New York City for several days in 1977. And in 2003, the largest power failure in North American history left 40 million people in an area in the United States stretching from Massachusetts, Connecticut, New York and New Jersey west to Ohio and Michigan, and 10 million people in eastern Canada, without power. The lack of adequate situational awareness at multiple levels was one of the root causes of the Aug. 14, 2003 massive power blackout in North America.


Designing tools for adequate Situation Awareness (SA) includes that: the following factors be kept in mind; so-called “enemies of situational awareness”; attention tunneling, requisite memory trap; data overload; misplaced salience; complexity creep, errant, mental models, out-of-the-loop syndrome; workload, anxiety, fatigue, and other stress factors.


There is a need for methods that assess reliability of power systems of a utility company. There is a further need for methods that assess reliability of power systems of a utility company with violation markers that are displayed on a main overview display.


SUMMARY OF THE INVENTION

Accordingly, an object of the present invention is to provide methods for assessing reliability of power systems of a utility company.


Another object of the present invention is to provide methods for assessing reliability of power systems of a utility company with viola Don markers that are displayed on a main overview display.


A further object of the present invention is to provide methods for assessing reliability of power systems of a utility company with violation markers


and showing only those violations associated for a selected violated element on a monitored elements tab.


Yet another object of the present invention is to provide methods for assessing reliability of power systems of a utility company with violation markers and showing vital data related to violations selected on an overview display.


These and other objects of the present invention are achieved in a method of assessing reliability or a power system of a utility company. At least one main overview display is obtained. Violation markers are displayed on the one main overview display. A monitored elements tab is updated with a list of monitored elements.





DESCRIPTION OF THE DRAWINGS


FIG. 1 is a block diagram illustrating one embodiment of an energy management system of the present invention that provides real time awareness of a potential energy management failure.



FIG. 2 is a block diagram illustrating one embodiment of an energy management system of the present invention which has situational dashboard panels.



FIG. 3 is a flow chart illustrating one application of the FIG. 2 system.



FIG. 4 illustrates one embodiment of a custom dashboard of the present invention sourced from three different displays.



FIG. 5 is a flow chart illustrating one embodiment of a method of the present invention that assesses potentially compromising situations of a utility company.



FIG. 6 illustrates one embodiment of a fly-out and a pod of the present invention.



FIG. 7 illustrates one embodiment of a geographical overview with a background layer representing the aerial view of an area of the present invention.



FIG. 8 is a flow chart illustrating one embodiment of a method of the present invention that creates dynamic lists from selected areas of a power system of a utility company using rubber-banding or lassoing.



FIG. 9 illustrates one embodiment of area selection that can be used with the flow chart of FIG. 8.



FIG. 10 illustrates one embodiment of vital signs for a selected element that can be utilized with the flow chart of FIG. 8.



FIG. 11 is a flow chart illustrating one embodiment of a method of the present invention for managing high and low voltage conditions from selected areas of a power system of a utility company.



FIG. 12 illustrates one embodiment of a MVAR Reserve dashboard that is automatically calculated based on the selected area and can be associated with the FIG. 11 flow chart.



FIG. 13 illustrates a 3D view of the available MVARs using the positive and negative reactive reserves toolbar buttons, and can be associated with the FIG. 11 flow chart.



FIG. 14 is a flow chart illustrating one embodiment of a method of the present invention for assessing reliability of a power system of a utility company.



FIG. 15 is associated with the FIG. 14 flow chart and illustrates that if a new violation appears following the execution of the State Estimator (SE), an alert is displayed of the viewport.



FIG. 16 is associated with the FIG. 14 flow chart and shows a selected branch.



FIG. 17 is associated with the FIG. 14 flow chart and shows how markers associated with the monitored elements in post contingency violations are displayed.



FIG. 18 is associated with the FIG. 14 flow chart and shows that to drill down into a particular violation, the operator can select a violation marker for an Alarm on branch.



FIG. 19 is associated with the FIG. 14 flow chart and illustrates that when a contingent element creates a violation, a square marker can be provided.



FIG. 20 is associated with the FIG. 14 flow chart and illustrates that selecting a contingent element marker can cause a display all violations that a particular contingent element creates.



FIG. 21 is associated with the FIG. 14 flow chart and shows a Contingency Tab in a control panel.





DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENT

In various embodiments, the present invention provides a system and methods for enhance situational awareness for a control center of a utility company for improved energy management, to drill down on potential conditions that effect the distribution of power, and mitigates these potential conditions before catastrophic failures occur, provide a real time application of advanced graphics to display the current status of a power system of one or more utility companies, and the like. The present invention represents a new and improved way to design user interface, independently of the underlying application to display a 3D view of the available MVARs using the positive and negative reactive reserves toolbar buttons, as shown in FIG. 13.


The present invention represents a new and improved way to design user interface, independently or the underlying applications, algorithms, or databases. The main display is therefore targeted at a specific operator's task which may span several applications. Traditionally, a operator had to navigate among different user interfaces to achieve the same objective, albeit with much less productivity and slower reaction time.


The present invention is designed for mission critical systems that deal with large volume of data refreshed in real-time every seconds. These information systems cannot fail and must be available at a minimum 99.95% of the time.


The present invention is also designed to re-use most of the existing software applications already in place within the control center. Low cost of maintenance is achieved with automatic generation of displays and re-use of existing assets (software and hardware).


The systems and methods of the present invention can be used by utility companies that have a system including but not limited to power systems. The present invention can also be used by water management systems, petro-chemical systems, transportations systems, and the like. The power system is managed to bring energy to an end user and includes generation, transmission and distribution system. With the present invention, satellite maps can be utilized.


As illustrated in FIG. 1, one embodiment of the present invention has an energy management system that includes: a control center at a utility company; logic resources coupled to the power system that provide a real time notice of conditions which effect energy management of the utility company; and at least one user interface at the control center coupled to the logic resources. The user interfaces provide real time situation awareness of a potential energy management failure. The conditions can be one or more of energy, distribution, generation, transmission and energy market systems.


With the use of situation awareness of the present invention, a real time notice of conditions can be provided prior to an occurrence of, a catastrophic failure of power delivery, catastrophic power generation, catastrophic transmission and energy market systems and the like.


Situation awareness is perception and/or comprehension and is auditory and/or visual. Situational awareness, (i) improves energy management, facilitates drilling down on conditions that can effect energy management (ii) facilitates distribution of power, generation of power, transmission and energy market systems, (iii) mitigates the effects of conditions that can create failures in energy management and (iv) mitigates conditions that can create failures including best not limited to, delivery of power, generation of power, transmission and energy market systems.


The logic resources and the user interface are coupled to the power or distribution system of the utility company. The logic resources uses an overview of the majority of the utility system and drills down to more detailed views of the utility system.


The logic resources can be configured to re-use at least a portion of data and configurations from pre-existing software applications already in place in the control center. As a non-limiting example, the pre-existing software applications can include information of, system 1 lines, 1 line diagrams and/or asset information. The user interfaces provide a specific operator's task that can scan one or several utility company applications without navigating between different user interfaces of the control center.


The user interfaces include graphics that display one or more of, current status, mitigating factors and recommendations of the power system for one or more utility companies. The user interfaces can include advanced graphics that display a current: status of power generation, power generation, transmission and/or energy market systems. The user interfaces can be independent of an energy management application. In one embodiment, the user interfaces are automatically generated in response to data and configuration from pre-existing software or pre existing software applications and also uses its own. The user interfaces can be a model drivers overview, where the model driven overview combines coordinate system based on a geographical coordinate system including but not limited to GIS and the like.


One or more context panels can be provided with context data relative to a given situation facing the utility company. One or more information systems can also be provided that are refreshed in real-time. By way of non-limiting examples, the information system can be refreshed in a time period of from 1 second to 15 minutes, depending on the information and the situation.


In another embodiment of the present invention, illustrated in FIGS. 2 and 3, situational dynamic dashboards are created graphically and dynamically by operators. The situational dashboards can be built on-the-fly by combining subsets of, different displays, tabulars, one-lines, regional schematic and/or geographic overviews. The logic resources enable the operators to create their own dashboards from large geographical overviews, regional schematic displays and station one-line displays to assist operators in assessing a potentially compromising situation of the electric power system. Portions of the displays that are dropped onto a situational dashboard display can continue to be updated in real-time with live data.


As a non-limiting example, the potentially compromising situation can be, system violations of type branch, low voltage, high voltage and/or delta voltage, low or high voltage situation in a given area of the system, actual or potential system violations as a result of megawatts or megavars, and the like. The situational dashboards can be built on-the-fly by combining subsets of different displays, tabulars, one-lines, schematic, geographic overviews and the like, onto a dashboard area. The dashboards are saveable and reuseable, and are useful for identifying potentially compromising situations.



FIG. 4 shows an example of a custom dashboard of the present invention sourced from three different displays. The operator selects the displays of interest. Snippets from the original displays are selected by rubber-banding, the selected area is cut (initiated by the operator “drag” operation) and then pasted, initiated by the operator “drop” operation, into the dashboard. The portions of the displays that are dropped onto a dashboard display continue to be updated in real-time. The result is a new dashboard display. Once created, a dashboard can be saved and recalled later just as any other display in the system and is refreshed with live data. The benefits of a dynamically created dashboard, which is created to specifically address a situation, is that it allows the operator to select only the information that is relevant to the situation which the operator is facing. This reduces the workload on the operator since the operator needs to focus only on what is relevant not a collection of displays which have vast amount of information on it which may not be relevant. The concept is simple: provide the operator with only the information he needs to do the job, not all the data that the system has and letting the operator constantly review the data and extract what is needed. One the dynamic dashboards are created they can be saved and re-used should the situation present itself, thus eliminating setup time.


In one embodiment, a fly-out or data tensing is provided. A fly-out is an effective, way to dynamically select, an area of a large overview display of the power system, or any display for that matter to direct the operator attention to where or what in the power system needs attention without loosing perspective of the whole power system which is being monitored and controlled.


The operator selects an area of the overview which it wishes to focus on by rubber-banding or lasso the area. The selected area of interest is cut and pasted into a fly-out. The fly-out cars be moved and resized by dragging and resting the fly-out border to enhance the usability of the fly-out.


As illustrated in FIG. 5, projection lines are can be drawn from the source display to the fly-out to maintain reference to toe source such that the operator always knows about the reference source of the fly-out. The projection lines can be used with multiple fly-outs, and can track multiple situations at the same time. This is important because an operator may be tracking multiple situations at the same time and must be aware of the context of each of the situations from the multiple situations. The projection lines provide the operator with an awareness of a context of situations and information about a reference source of the fly-out.


A pod is a fly-out that has been un-pinned from the source display. Pods can be organized as additional windows to monitor specific information such as overload condition on a power line or a low voltage condition. FIG. 6 shows an example of a fly-out and a pod. Situation awareness principles can be utilized with the fly-out. The use of a fly-out allows an operator to generate informational displays without ever leaving the main overviews in order to accomplish a goal. This reinforces the goal of providing a use case based application. The operator is provided with only what it needs to the job and nothing else that can distract the operator from the task that the operator has been asked to do.



FIG. 7 shows an example of a geographical overview with a background layer representing the aerial view of an area. Other types of operator selected backgrounds, such as jpegs and bitmaps, can be used. In one embodiment, geographic satellites are used to obtain the geographical overview. The operator can then pan and zoom, with different tiles coming up on the display.


Depending on the portion of the overview which is visible and the zoom level, the corresponding tile for the matching background is obtained from the site. Once it is obtained it is locally cached for performance improvement and displayed as the background layer. As the operator pans and the zooms the display new tiles are retrieved and displayed. For efficiency only, the required tiles are loaded into memory and visible in the background.


For optimal visibility depending on the display and control room lighting, the operator can adjust the opacity of the background image using a dialog which is available for invocation from an icon on the toolbar.



FIG. 7 also shows a navigation window and a magnifier in use.


In another embodiment of the present invention, illustrated in FIG. 8, a method is provided for creating dynamic lists from selected areas of the power system of the utility company. The energy management system is used to access one or more source displays of a site. One or more of the source displays are then rubber-banded or lassoed to create the selected areas from at least a portion of the source displays. Lists, which can be in tabular form, are dynamically created that display operator defined information for each network element type in a list of network elements from the selected areas that have been rubber-handed or lassoed. By way of illustration, and without limitation, the network elements can include one or more of, substations, lines, generators, capacitors, loads, transformers. Static Var Compensators and inductors, and the like. These lists are dynamically created for an operator selected area of the power system to quickly obtain vital signs for the system within the selected area.


In this embodiment the operator selects an area by rubber-banding or lassoing an area on the display using a device such as a mouse. All the network elements in the selected area of interest are identified.


The selected area is dragged into a new control panel tab and dropped into the tab. The action of “drag and drop” constitutes the creation of a new list of elements the operator wants to obtain vital information for vital signs. The new list of elements is created by identifying network elements within a perimeter of the selected area. As a non-limiting example, the network elements can be each station and each line within the boundary of the selected area.


The information, which makes up the vital signs, is operator definable. As a non-limiting example, the vital information can be one or more of, the state of the line, energization status of the lines, MegaWatt flows, MegaVar flows of the line, station load, station generation in MegaWatt and MegaVars and the like. The present invention takes care of retrieving, from the energy management system, the most recent data associated with this selection, and automatically keeps it up to date. Once the new list is created it can be saved and recalled for future use.


An area selection is shown in FIG. 9. Vital signs for a selected element are shown in FIG. 10.


In one embodiment, the system of the present invention automatically populates the list and receives vital data for all of the elements in this list. The custom list can be given a name and saved for future use.


The control panel can have a special tab, called “Lists,” which contains the names of all the custom-created areas. In one specific embodiment, the control panel has a MVAr Reserve tab that contains names of dynamically created MVar Reserve areas for a selected geographic representation of the power system.


Referring now to FIG. 11, the present invention also provides an operator with knowledge about where and how much VAR Reserves are available. This is particularly useful for operators facing high or low voltage situations. In a such a situation the operator needs to know if there are sufficient Vars in the area where the low or high voltage condition manifests itself so that they can be injected info or removed from the power system.


In another embodiment of the present invention, a method is provided for managing high or low voltage conditions from selected areas of a power system of a utility company using VAR reserves. Selected geographic are rubber banded or lassoed and potential low or high voltage situations are identified. The control panel can include a context menu. The context menu can be used to show VAR reserves. Once the area is selected, the operator selects the option “Show Reserves” from the context menu to display the MVAR Reserves available within the area. For the selected area, all network elements are identified and a query is generated to obtain the MVAR Reserves associated with the identified network elements. Geographic displays are overlayed with superimposed VAR reserves to create overlayed geographic displays that are used to identify potential low or high voltage instances in the selected geographic areas


In one embodiment, voltage contours are used to identify the potential low or high voltage instances. The overlayed geographic displays can be used to provide power flow information of the power system which can be in real time as well as to determine available VAR reserves. The geographic displays can be used to determine if there are sufficient VARS in portions or all of the selected geographic areas where low or high voltage conditions are manifest.


The location and amount of available VAR reserves is determined, and real time information relative to location and amount of available VAR reserves can be provided.


The available VAR reserves can be displayed as a summary for injection into the system and for absorption out of the system by device type, e.g., generation units, capacitor banks, reactor banks, and static Var systems). FIG. 12 shows the MVAR Reserve dashboard, which is automatically calculated based on the selected area A query can be generated to obtain MVAR reserves associated with the identified network elements.


The injection/absorption reactive reserve is calculated based on the following rules:


Generation Units: Considers only units that are not open or removed. The injection reactive reserve is (MVAR MAX−MVAR Out) and the absorption reactive reserve is (MVAR Out−MVAR Min).


Capacitor Banks: Considers only caps that are not removed from the system. The injection reactive reserve is the summation of nominal MVAR of caps that are open or disconnected. The absorption reactive reserve is the summation of nominal MVAR of caps that are closed.


Reactor Banks: Considers only reactors that are not removed from the system. The injection reactive reserve is the summation of nominal MVAR of caps that are closed. The absorption reactive reserve is the summation of nominal MVAR of caps that are open or disconnected.


Static VAR Systems: Considers only SVS that are not open or removed from the system. The injection reactive reserve is (MVAR MAX−MVAR Out) and the absorption reactive reserve is (MVAR Out−MVAR).


A stacked bar chart provides detailed information about the MVARs availability on a per-station basis and on a per-device-type, associated with the station basis. The height of the bar above the horizontal axis represents the amount or MVARs available to inject into the system from the station. The height of the bar below the horizontal axis represents the amount of MVARs available to absorb (remove) from the system at the station. For each station, the amount of MVARs that can be injected or absorbed is shown below the chart, injected/absorbed.


The chart is sorted from the station with the most available injection to the station with the least available injection. Clicking on the bar will cause the corresponding substation's one-line display to be called into the dashboard area. The operator can therefore rapidly identify which device needs to be operated on, using a familiar SCADA diagram. (Note: No control actions are allowed, the one-lines are read-only displays.)


With the present invention, it is also possible to display a 3D view of the available MVARs using the positive and negative reactive reserves toolbar buttons, as shown in FIG. 13.


The selected area can be saved in the reserves tab in the control panel and recalled for future use. Once recalled the display is automatically restored to the state when it was saved and the MVAR Reserves are updated throughout the system using the most recent real-time values.


In another embodiment of the present invention, illustrated in FIG. 14, an operator can detect and analyze a base case violation using a Reliability Assessment module. If a new violation appears following the execution of the State Estimator (SE), an alert is displayed of the viewport as shown in FIG. 15.


If the letters “SE” are visible, the State Estimator has detected one or more new violations. To begin analyzing base case Violations, the operator selects the Base Case Alert button on the Alert Panel. The main Overview display is updated to show violation markers. A voltage contour at the highest KV level for which there am voltage violations is displayed. The Monitored Elements tab is updated with the list of Monitored Elements in the Alarm, Violation, or Warning State. Round Markers are used to represent violations in an overview display. The branch violation marker is presented on the center of the branch. The voltage violation markers and transformer violation markets are presented on the related substation. By way of illustration, and without limitation, examples of markers are shown below:



custom character Red marker, with label “183.2N”, representing a branch alarm for a MW value that exceeds the normal limit by 183.2% (v−limit=limit×1.832)



custom character Red marker, with label “0.9N” on white background, representing a voltage alarm for a voltage value that exceeds the normal limit by 0.9% (v−limit=0.09×limit)



custom character Orange marker, with label (Δ41.9E) on white background, representing a voltage drop violation for a voltage drop value that exceeds the emergency limit by 41.3% (v−limit=0.419×limit).



custom character Red marker, with no label and white background, representing multiple violations with different violation types and at least one alarm.


The marker symbol is defined as follows:


Marker Color to represent the Violation severity threshold (warning=yellow, violation=orange, alarm=red).


Marker Fill: White background for voltage violation and/or multiple violations that have different violation types.


Label xxxS: The suffix S represents the limit being referenced (“N” for Normal, “E” for Emergency and “L” for Loadshed) and the number represents the violation percentage over this reference limit if there is a prefix with Δ, it is a voltage drop violation.


If a new violation is detected relative to the previous run, a halo is presented around the marker. The operator can now drill-down on a particular violation by selecting a violation marker. Only the selected one will appear on the display and all other violation markers will disappear. The same happens in the Monitored Element tab in the control panel, which will only show the violations associated with the current selected marker.



FIG. 16 shows a selected branch Alarm on the branch DOUGLAS-HANOVER. The control panel on the left is automatically open on the list of monitored elements and positioned on this branch. The control panel monitored element list shows the vital data related to all violations selected in the overview display. For each monitored element, the name and the highest percent over the limit value being violated is displayed on the top line.


By way of illustration, and without limitation, details for each violation can include;


The limit value, displayed as “Lxxx.xx”


The current value, displayed as “Vxxx.xx”


The percentage over the limit it violates.


In case of a branch, there might be two entries, one for each end of the branch.


There can be two icons for each Monitored element in violation: one for locating the element on the overview displays and one for calling the associated line display in a dashboard tab to obtain more information.


In one embodiment of the present invention, an operator can detect and analyze a contingency case violation using a Reliability Assessment module. If a new violation appears following the execution of the Contingency Analysis (CA), an alert is displayed on the top right corner as shown in FIG. 15. The operator selects the contingency alert button to begin analyzing Post Contingency Violations, Elements in Alarm, Violation, or Warning States as calculated by CA. The Contingent Tab in the Control Panel is updated with the list of contingencies impacting Monitored Elements in violations.


The material presented on the Overview display is very similar for the base case with the addition of being able to:


display contingency-related information, and


visualize and assess the relationship between monitored elements and contingencies.


Using combinations of the Overview display, the Control Panel, and the Violation toolbar filters, the operator can drill down the Post Contingency Case violations in both a graphical and a list format.


As shown in FIG. 17, markers associated with the monitored elements in post contingency violations are displayed.


The violation markers associated with the monitored elements on the overview display in the post contingency case have the same meaning as the marker in lie base case.


To drill down into a particular violation, the operator selects a violation marker, as shown in FIG. 18 below, for the Alarm on branch DOUGLAS-HANOVER.


The control panel shows the element monitored with the following information:


Name of the monitored element;


Type of violation;


Base Case Value (letter “V” in front of the value);


Post Contingency Value (letter “P” in front of the value);


Limit Value associated with the Alarm, Violation, or Warning being presented; and


Percent over the limit (N: Normal, E: Emergency, L: Loadshed).


A contingent element is a power system element that represents a defined contingency in the CA application. When this contingent element creates a violation, a square marker, as shown in FIG. 19, appears on the branch or substation. The same principles as for violation markers apply:


As shown, color can be used to represent a violation's severity (worst created by the contingent element in case of multiple violations), as follows:


White background: Voltage violation; and


No background: Branch violation.


Labe describes the worst violation in the same way as on a Violation marker.


As shown in FIG. 20, selecting a contingent element marker will display all violations that this particular contingent element creates. The Contingency tab will be automatically opened and show a list of contingencies that are impacting the monitored elements in Alarm, Violation, or Warning states (refer to the Monitored Elements tab).



FIG. 21 shows the Contingency Tab in the control panel.


In one embodiment, for each contingency in the tab, the name is presented as a tab item. Two icons are next to the name. One icon locates the contingent element(s) on the overview display, and the other icon calls an associated display in a dashboard tab. You can obtain detailed information related to the contingency by expanding the tree (i.e., click on the “+” sign to the left of the name). The expanded contingent item will display a list of monitored elements it impacts. They are sorted using the same criteria as the monitored elements in the Monitored Elements Tab.


Other embodiments of the invention will be apparent to those skilled in the an from consideration of the specification and practice of the invention disclosed herein. It is intended that the specification and examples be considered as exemplary only, with a true scope and spirit of the invention being indicated by the following claims.

Claims
  • 1. A method, comprising: rubber-banding selected geographic areas-of-interest from an electronic display, wherein low and high voltage conditions of the selected geographic areas-of-interest are desired to be managed using volt ampere reactive (VAR) reserves available;determining, by a system comprising a processor, locations and amounts of the VAR reserves available in a power generating system within the selected rubber-banded geographic area, the locations and amounts of VAR reserves available being for generation units, capacitor banks, reactor banks, and static VAR systems of the power generating system; andgenerating at least one user interface that includes the selected rubber-banded geographic areas-of-interest, the interface comprising elements indicating the locations and the amounts of the VAR reserves available in the power generating system;wherein the selected rubber-banded geographic areas-of-interest are presented at the user interface as a background layer representing the physical geography of the area-of-interest and wherein the amounts of VAR reserves are superimposed over the background layer.
  • 2. The method of claim 1, wherein the determining the amounts of the VAR reserves comprises determining an amount of VAR reserves available in the power generating system for a generation unit, and wherein the determining the amount of the VAR reserves for the generation unit comprises determining an injection reactive reserve of the generation unit that is a mega VAR (MVAR) maximum of the generation unit minus a MVAR output of the generation unit, and determining an absorption reactive reserve of the generation unit that is the MVAR output of the generation unit minus a MVAR minimum of the generation unit.
  • 3. The method of claim 1, wherein the determining the amounts of the VAR reserves comprises determining an amount of VAR reserves available in the power generating system for a capacitor bank, and wherein the determining the amount of the VAR reserves for the capacitor bank comprises determining an injection reactive reserve of the capacitor bank that is a first summation of nominal mega VAR (MVAR) of capacitors of the capacitor bank that are open or disconnected, and determining an absorption reactive reserve of the capacitor bank that is a second summation of nominal MVAR of capacitors of the capacitor bank that are closed.
  • 4. The method of claim 1, wherein the determining the amounts of the VAR reserves comprises determining an amount of VAR reserves available in the power generating system for a reactor bank, and wherein the determining the amount of the VAR reserves for the reactor comprises determining an injection reactive reserve of the reactor bank that is a first summation of nominal mega VAR (MVAR) of capacitors of the reactor bank that are closed, and determining an absorption reactive reserve of the reactor bank that is a second summation of nominal MVAR of capacitors of the reactor bank that are open or disconnected.
  • 5. The method of claim 1, wherein the determining the amounts of the VAR reserves comprises determining an amount of VAR reserves available in the power generating system for a static VAR system, and wherein the determining the amount of the VAR reserves the static VAR system comprises determining an injection reactive reserve of the static VAR system that is a mega VAR (MVAR) output of the static VAR system minus a MVAR minimum of the static VAR system, and determining an absorption reactive reserve of the static VAR system that is a MVAR maximum of the static VAR system minus a second MVAR output of the static VAR system.
  • 6. The method of claim 1, wherein the locations and the amounts of the VAR reserves available in the power generating system are determined in real-time during operation of the power generating system for generating power.
  • 7. The method of claim 1, further comprising applying highlighting to the at least one user interface on geographic areas having insufficient VAR reserves.
  • 8. A system, comprising: a memory that stores executable components; anda processor, communicatively coupled to the memory, that executes or facilitates execution of the executable components to perform operations, comprising:receiving selected rubber-banded geographic areas-of-interest, wherein low and high voltage conditions of the selected geographic areas-of-interest are desired to be managed using volt ampere reactive (VAR) reserves available;determining locations and amounts of the VAR reserves available in a power generating system within the selected rubber-banded geographic areas-of-interest, the locations and amounts of VAR reserves available being for generation units, capacitor banks, reactor banks, and static VAR systems of the power generating system; andgenerating at least one user interface that includes the selected rubber-banded geographic areas-of-interest, the interface comprising elements indicating the locations and the amounts of the VAR reserves available in the power generating system;wherein the selected rubber-banded geographic areas-of-interest are presented at the user interface as a background layer representing the physical geography of the area-of-interest and wherein the amounts of VAR reserves are superimposed over the background layer.
  • 9. The system of claim 8, wherein the determining the amounts of VAR reserves comprises determining an amount of VAR reserves available in the power generating system for a generation unit, and wherein the determining the amount of VAR reserves for the generation unit comprises determining an injection reactive reserve of the generation unit that is a mega VAR (MVAR) maximum of the generation unit minus a MVAR output of the generation unit, and determining an absorption reactive reserve of the generation unit that is the MVAR output of the generation unit minus a MVAR minimum of the generation unit.
  • 10. The system of claim 8, wherein the determining the amounts of VAR reserves comprises determining an amount of VAR reserves available in the power generating system for a capacitor bank, and wherein the determining the amount of VAR reserves for the capacitor bank comprises determining an injection reactive reserve of the capacitor bank that is a first summation of nominal mega VAR (MVAR) of capacitors of the capacitor bank that are open or disconnected, and determining an absorption reactive reserve of the capacitor bank that is a second summation of nominal MVAR of capacitors of the capacitor bank that are closed.
  • 11. The system of claim 8, wherein the determining the amounts of VAR reserves comprises determining an amount of VAR reserves available in the power generating system for a reactor bank, and wherein the determining the amount of VAR reserves for the reactor bank comprises determining an injection reactive reserve of the reactor bank that is a first summation of nominal mega VAR (MVAR) of capacitors of the reactor bank that are closed, and determining an absorption reactive reserve of the reactor bank that is a second summation of nominal MVAR of capacitors of the reactor bank that are open or disconnected.
  • 12. The system of claim 8, wherein the determining the amounts of VAR reserves comprises determining an amount of VAR reserves available in the power generating system for a static VAR system, and wherein the determining the amount of VAR reserves for the static VAR system comprises determining an injection reactive reserve of the static VAR system that is a mega VAR (MVAR) output of the static VAR system minus a MVAR minimum of the static VAR system, and determining an absorption reactive reserve of the static VAR system that is a MVAR maximum of the static VAR system minus a second MVAR output of the static VAR system.
  • 13. The system of claim 8, wherein the locations and the amounts of the VAR reserves available in the power generating system are determined dynamically during operation of the power generating system for generating power.
  • 14. The system of claim 8, the operations further comprising highlighting the at least one user interface at geographic areas having insufficient VAR reserves.
  • 15. A non-transitory computer-readable medium having instructions stored thereon that, in response to execution, cause a system including a processor to perform operations comprising: receiving selected rubber-banded geographic areas-of-interest, wherein low and high voltage conditions of the selected geographic areas-of-interest are desired to be managed using volt ampere reactive (VAR) reserves available;determining locations and amounts of the VAR reserves available in a power generating system within the selected rubber-banded geographic areas-of-interest, the locations and amounts of VAR reserves available being for generation units, capacitor banks, reactor banks, and static VAR systems of the power generating system; andgenerating at least one user interface that includes the selected rubber-banded geographic areas-of-interest, the interface comprising element indicating at least one location of the locations and at least one amount of the amounts of the VAR reserves available in the power generating system;wherein the selected rubber-banded geographic areas-of-interest are presented at the user interface as a background layer representing the physical geography of the area-of-interest and wherein the amounts of VAR reserves are superimposed over the background layer.
  • 16. The non-transitory computer-readable medium of claim 15, wherein the determining the amounts of VAR reserves comprises determining an amount of VAR reserves available in the power generating system for a generation unit, and wherein the determining the amount of VAR reserves for the generation unit comprises determining an injection reactive reserve of the generation unit that is a mega VAR (MVAR) maximum of the generation unit minus a MVAR output of the generation unit, and determining an absorption reactive reserve of the generation unit that is the MVAR output of the generation unit minus a MVAR minimum of the generation unit.
  • 17. The non-transitory computer-readable medium of claim 15, wherein the determining the amounts of VAR reserves comprises determining an amount of VAR reserves available in the power generating system for a capacitor bank, and wherein the determining the amount of VAR reserves for the capacitor bank comprises determining an injection reactive reserve of the capacitor bank that is a summation of nominal mega VAR (MVAR) of capacitors of the capacitor bank that are open or disconnected, and determining an absorption reactive reserve of the capacitor bank that is a summation of nominal MVAR of capacitors of the capacitor bank that are closed.
  • 18. The non-transitory computer-readable medium of claim 15, wherein the determining the amounts of VAR reserves comprises determining an amount of VAR reserves available in the power generating system for a reactor bank, and wherein the determining the amount of VAR reserves for the reactor bank comprises determining an injection reactive reserve of the reactor bank that is a summation of nominal mega VAR (MVAR) of capacitors of the reactor bank that are closed, and determining an absorption reactive reserve of the reactor bank that is a summation of nominal MVAR of capacitors of the reactor bank that are open or disconnected.
  • 19. The non-transitory computer-readable medium of claim 15, wherein the determining the amounts of VAR reserves comprises determining an amount of VAR reserves available in the power generating system for a static VAR system, and wherein the determining the amount of VAR reserves for a static VAR system comprises determining an injection reactive reserve of the static VAR system that is a mega VAR (MVAR) output of the static VAR system minus a MVAR minimum of the static VAR system, and determining an absorption reactive reserve of the static VAR system that is a MVAR maximum of the static VAR system minus a second MVAR output of the static VAR system.
  • 20. The non-transitory computer-readable medium of claim 15, wherein the locations and the amounts of the VAR reserves available in the power generating system are determined on the fly during operation of the power generating system for generating power.
CROSS-REFERENCE TO RELATED APPLICATION

This application is a continuation of, and claims priority to each of, U.S. patent application Ser. No. 13/590,321 filed Aug. 21, 2012, and entitled “METHODS FOR ASSESSING RELIABILITY OF A UTILITY COMPANY'S POWER SYSTEM”, which is a continuation of U.S. patent application Ser. No. 12/139,194 filed Jun. 13, 2008, and entitled “METHODS FOR ASSESSING RELIABILITY OF A UTILITY COMPANY'S POWER SYSTEM”, now issued as U.S. Pat. No. 8,321,804, which claims the benefit of U.S. Provisional Patent Application No. Ser. No. 60/952,021 filed Jul. 26, 2007, and entitled “METHODS FOR ASSESSING RELIABILITY OF A UTILITY COMPANY'S POWER SYSTEM”. The entireties of the foregoing applications are hereby incorporated by reference herein.

US Referenced Citations (277)
Number Name Date Kind
1156131 Braddock Oct 1915 A
3932735 Giras Jan 1976 A
4075699 Schneider et al. Feb 1978 A
4078260 Chen et al. Mar 1978 A
4125782 Pollnow, Jr. Nov 1978 A
4181950 Carter, II Jan 1980 A
4204127 Carter, II May 1980 A
4264960 Gurr Apr 1981 A
4341345 Hammer et al. Jul 1982 A
4347575 Gurr et al. Aug 1982 A
4347576 Kensinger et al. Aug 1982 A
4398141 Brennen Aug 1983 A
4455614 Martz et al. Jun 1984 A
4551812 Gurr et al. Nov 1985 A
4560835 Bourgonje Dec 1985 A
4760531 Yasui et al. Jul 1988 A
4804938 Rouse et al. Feb 1989 A
4876854 Owens Oct 1989 A
5136497 Coe et al. Aug 1992 A
5185886 Edem et al. Feb 1993 A
5384697 Pascucci Jan 1995 A
5414640 Seem May 1995 A
5422561 Williams Jun 1995 A
5444618 Seki et al. Aug 1995 A
5467265 Yamada et al. Nov 1995 A
5568019 Mason Oct 1996 A
5594659 Schlueter Jan 1997 A
5598566 Pascucci et al. Jan 1997 A
5655136 Morgan Aug 1997 A
5729731 Yajima et al. Mar 1998 A
5796628 Chiang et al. Aug 1998 A
5798939 Ochoa et al. Aug 1998 A
5904727 Prabhakaran May 1999 A
5933355 Deb Aug 1999 A
5937414 Souder et al. Aug 1999 A
5963457 Kanoi et al. Oct 1999 A
5974403 Takriti et al. Oct 1999 A
6021402 Takriti Feb 2000 A
6084565 Kiya Jul 2000 A
6169981 Werbos Jan 2001 B1
6178362 Woolard et al. Jan 2001 B1
6259972 Sumic Jul 2001 B1
6289267 Alexander et al. Sep 2001 B1
6313752 Corrigan Nov 2001 B1
6353847 Maruyama et al. Mar 2002 B1
6388684 Iwamura et al. May 2002 B1
6492801 Sims Dec 2002 B1
6512966 Lof et al. Jan 2003 B2
6528957 Luchaco Mar 2003 B1
6549880 Willoughby et al. Apr 2003 B1
6577962 Afshari Jun 2003 B1
6591255 Tatum et al. Jul 2003 B1
6620327 Haddock Sep 2003 B2
6671585 Lof et al. Dec 2003 B2
6681154 Nierlich et al. Jan 2004 B2
6681156 Weiss Jan 2004 B1
6741485 Runkle et al. May 2004 B1
6804255 Zheng et al. Oct 2004 B1
6813525 Reid et al. Nov 2004 B2
6833844 Shiota et al. Dec 2004 B1
6885915 Rehtanz et al. Apr 2005 B2
6901347 Murray et al. May 2005 B1
6924628 Thompson Aug 2005 B2
6925385 Ghosh et al. Aug 2005 B2
6927503 Enis et al. Aug 2005 B2
6961641 Forth et al. Nov 2005 B1
6963802 Enis et al. Nov 2005 B2
6965454 Silverbrook et al. Nov 2005 B1
7058522 Chen Jun 2006 B2
7067937 Enish et al. Jun 2006 B2
7085660 Mansingh et al. Aug 2006 B2
7089089 Cumming Aug 2006 B2
7127327 O'Donnell et al. Oct 2006 B1
7177727 Chu et al. Feb 2007 B2
7177728 Gardner Feb 2007 B2
7194338 Schlueter et al. Mar 2007 B2
7233843 Budhraja et al. Jun 2007 B2
7274975 Miller Sep 2007 B2
7283930 Flynn Oct 2007 B2
7305282 Chen Dec 2007 B2
7308361 Enis et al. Dec 2007 B2
7313465 O'Donnell Dec 2007 B1
7343226 Ehlers et al. Mar 2008 B2
7343360 Ristanovic et al. Mar 2008 B1
7349765 Reaume et al. Mar 2008 B2
7430534 Lof et al. Sep 2008 B2
7444189 Marhoefer Oct 2008 B1
7454270 Mansingh et al. Nov 2008 B2
7454717 Hinckley et al. Nov 2008 B2
7509190 Emery et al. Mar 2009 B2
7519438 Barbour et al. Apr 2009 B2
7558703 Stoupis et al. Jul 2009 B2
7610214 Dwarakanath et al. Oct 2009 B1
7626497 Mollenkopf Dec 2009 B2
7627453 Keefe Dec 2009 B2
7689323 Mansingh et al. Mar 2010 B2
7689394 Furem et al. Mar 2010 B2
7693670 Durling et al. Apr 2010 B2
7774307 Ju et al. Aug 2010 B2
7783390 Miller Aug 2010 B2
7831569 Bestgen et al. Nov 2010 B2
7873442 Tsui Jan 2011 B2
7953519 Hamilton, II et al. May 2011 B2
7974742 Enis et al. Jul 2011 B2
8019445 Marhoefer Sep 2011 B2
8019697 Ozog Sep 2011 B2
8041467 Black et al. Oct 2011 B2
8090556 Keefe Jan 2012 B2
8126685 Nasle Feb 2012 B2
8131401 Nasle Mar 2012 B2
8222765 Collins et al. Jul 2012 B2
8280799 Bing Oct 2012 B2
8396572 Torzhkov et al. Mar 2013 B2
8401710 Budhraja et al. Mar 2013 B2
8442698 Fahimi et al. May 2013 B2
8463450 Martin Jun 2013 B2
8494685 Shaffer Jul 2013 B2
8494774 Pasken et al. Jul 2013 B2
8540020 Stone et al. Sep 2013 B2
8600571 Dillon et al. Dec 2013 B2
8866334 Donnelly et al. Oct 2014 B2
9207993 Jain Dec 2015 B2
10122166 Zhou et al. Nov 2018 B2
20010045949 Chithambaram et al. Nov 2001 A1
20020019802 Malme et al. Feb 2002 A1
20020029097 Pionzio et al. Mar 2002 A1
20020032535 Alexander et al. Mar 2002 A1
20020042789 Michalewicz et al. Apr 2002 A1
20020046157 Solomon Apr 2002 A1
20020085326 Kim et al. Jul 2002 A1
20020103745 Lof et al. Aug 2002 A1
20020198629 Ellis Dec 2002 A1
20030036820 Yellepeddy et al. Feb 2003 A1
20030050738 Masticola et al. Mar 2003 A1
20030055776 Samuelson Mar 2003 A1
20030056126 O'connor et al. Mar 2003 A1
20030115306 Hagarty et al. Jun 2003 A1
20030158631 Masuda et al. Aug 2003 A1
20030171851 Brickfiled et al. Sep 2003 A1
20040020206 Sullivan et al. Feb 2004 A1
20040031059 Bialk et al. Feb 2004 A1
20040044442 Bayoumi et al. Mar 2004 A1
20040093124 Havlena May 2004 A1
20040117330 Ehlers et al. Jun 2004 A1
20040139038 Ehlers et al. Jul 2004 A1
20040158360 Garland et al. Aug 2004 A1
20040162675 Moon Aug 2004 A1
20040220702 Matsubara et al. Nov 2004 A1
20040220869 Perera Nov 2004 A1
20040225648 Ransom et al. Nov 2004 A1
20040225649 Yeo et al. Nov 2004 A1
20040246643 Chen Dec 2004 A1
20040249775 Chen Dec 2004 A1
20040257858 Mansingh et al. Dec 2004 A1
20040260430 Mansingh et al. Dec 2004 A1
20040260489 Mansingh et al. Dec 2004 A1
20040267466 Enis et al. Dec 2004 A1
20050033481 Budhraja et al. Feb 2005 A1
20050034023 Maturana et al. Feb 2005 A1
20050039787 Bing Feb 2005 A1
20050049757 Funakura et al. Mar 2005 A1
20050055330 Britton et al. Mar 2005 A1
20050071124 Komatsu Mar 2005 A1
20050090995 Sonderegger Apr 2005 A1
20050096964 Tsai May 2005 A1
20050165511 Fairlie Jul 2005 A1
20050169743 Hicks Aug 2005 A1
20050197742 Scott et al. Sep 2005 A1
20050234600 Boucher et al. Oct 2005 A1
20050240381 Seiler et al. Oct 2005 A1
20050240539 Olavson Oct 2005 A1
20060005738 Kumar Jan 2006 A1
20060072271 Jones et al. Apr 2006 A1
20060072828 Silverbrook et al. Apr 2006 A1
20060085363 Cheng et al. Apr 2006 A1
20060089805 Enis et al. Apr 2006 A1
20060092177 Blasko May 2006 A1
20060120282 Carlson et al. Jun 2006 A1
20060156248 Chaudhri et al. Jul 2006 A1
20060167591 McNally Jul 2006 A1
20060174209 Barros Aug 2006 A1
20060174211 Hoellerer Aug 2006 A1
20060200308 Arutunian Sep 2006 A1
20060206240 Tsui Sep 2006 A1
20060238364 Keefe Oct 2006 A1
20060238379 Kimchi et al. Oct 2006 A1
20060259199 Gjerde et al. Nov 2006 A1
20060276938 Miller Dec 2006 A1
20070005192 Schoettle et al. Jan 2007 A1
20070083821 Garbow et al. Apr 2007 A1
20070097143 Ii et al. May 2007 A1
20070143046 Budike Jun 2007 A1
20070156291 Curt et al. Jul 2007 A1
20070165050 Baar Jul 2007 A1
20070203860 Golden et al. Aug 2007 A1
20070213956 Nasle et al. Sep 2007 A1
20070236507 Tigges Oct 2007 A1
20070244604 McNally Oct 2007 A1
20070266332 Jubinski Nov 2007 A1
20070276547 Miller Nov 2007 A1
20070282495 Kempton et al. Dec 2007 A1
20070285079 Nasle Dec 2007 A1
20080077368 Nasle Mar 2008 A1
20080133313 Bateni et al. Jun 2008 A1
20080154693 Bateni et al. Jun 2008 A1
20080167756 Golden et al. Jul 2008 A1
20080172279 Enis et al. Jul 2008 A1
20080174564 Kim et al. Jul 2008 A1
20080189656 Abanami et al. Aug 2008 A1
20080195255 Lutze et al. Aug 2008 A1
20080215263 Flohr Sep 2008 A1
20080249665 Emery et al. Oct 2008 A1
20080263469 Nasle et al. Oct 2008 A1
20080272934 Wang et al. Nov 2008 A1
20080278311 Grange Nov 2008 A1
20080300698 Havekost et al. Dec 2008 A1
20080301565 Abhyanker Dec 2008 A1
20090047564 Touvard Feb 2009 A1
20090048716 Marhoefer Feb 2009 A1
20090048718 Richard et al. Feb 2009 A1
20090062969 Chandra et al. Mar 2009 A1
20090073191 Smith et al. Mar 2009 A1
20090075663 Wilson Mar 2009 A1
20090093916 Parsonnet et al. Apr 2009 A1
20090118873 Cheng et al. May 2009 A1
20090121923 Mainds et al. May 2009 A1
20090187284 Kreiss et al. Jul 2009 A1
20090192655 Ichikawa et al. Jul 2009 A1
20090216387 Klein Aug 2009 A1
20090234511 Ouchi et al. Sep 2009 A1
20090240431 Chau et al. Sep 2009 A1
20090254396 Metcalfe Oct 2009 A1
20090265568 Jackson Oct 2009 A1
20090284542 Baar et al. Nov 2009 A1
20090292402 Cruickshank, III Nov 2009 A1
20090299537 Rea et al. Dec 2009 A1
20090319090 Dillon et al. Dec 2009 A1
20100076835 Silverman Mar 2010 A1
20100100250 Budhraja et al. Apr 2010 A1
20100179704 Ozog Jul 2010 A1
20100191385 Goodnow et al. Jul 2010 A1
20100191489 Zolot Jul 2010 A1
20100198421 Fahimi et al. Aug 2010 A1
20100217642 Crubtree et al. Aug 2010 A1
20100217651 Crubtree et al. Aug 2010 A1
20100222935 Forbes et al. Sep 2010 A1
20100223577 Bennett et al. Sep 2010 A1
20100247067 Gratton Sep 2010 A1
20100253142 Votoupal et al. Oct 2010 A1
20100274402 Shaffer Oct 2010 A1
20100281405 Whattam Nov 2010 A1
20100282460 Stone et al. Nov 2010 A1
20100292856 Fujita Nov 2010 A1
20100298998 Hamilton, II et al. Nov 2010 A1
20110029141 Sun et al. Feb 2011 A1
20110029142 Sun et al. Feb 2011 A1
20110029147 Sun et al. Feb 2011 A1
20110035071 Sun et al. Feb 2011 A1
20110046801 Imes et al. Feb 2011 A1
20110066258 Torzhkov et al. Mar 2011 A1
20110071690 Sun et al. Mar 2011 A1
20110071692 D'Amato et al. Mar 2011 A1
20110093123 Alexanian Apr 2011 A1
20110101779 Patel et al. May 2011 A1
20110173109 Synesiou et al. Jul 2011 A1
20110184604 Franke et al. Jul 2011 A1
20110202467 Hilber et al. Aug 2011 A1
20110231028 Ozog Sep 2011 A1
20110282508 Goutard et al. Nov 2011 A1
20110282982 Jain Nov 2011 A1
20110296865 Yuan et al. Dec 2011 A1
20110307109 Sri-Jayantha Dec 2011 A1
20120136775 Cotton May 2012 A1
20130024710 Jackson Jan 2013 A1
20150255983 Sum et al. Sep 2015 A1
20160041575 Tadano Feb 2016 A1
20170359418 Sustaeta et al. Dec 2017 A1
Foreign Referenced Citations (1)
Number Date Country
101478157 Jul 2009 CN
Non-Patent Literature Citations (144)
Entry
European Office Action dated Jul. 26, 2017 for European Application No. 08782097.3, 3 pages.
European Office Action dated Aug. 28, 2017 for European Application No. 08782095.7, 3 pages.
Office Action dated Dec. 29, 2016 for U.S. Appl. No. 14/231,387, 38 pages.
Notice of Allowance dated Mar. 17, 2017 for U.S. Appl. No. 14/231,387, 26 pages.
Office Action dated Feb. 17, 2012 for U.S. Appl. No. 12/830,004, 32 pages.
Office Action dated Aug. 2, 2012 for U.S. Appl. No. 12/830,004, 32 pages.
Office Action dated Jun. 25, 2012 for U.S. Appl. No. 12/830,019, 42 pages.
Office Action dated Dec. 3, 2012 for U.S. Appl. No. 12/830,019, 35 pages.
Office Action dated Nov. 20, 2014 for U.S. Appl. No. 12/830,049, 14 pages.
Office Action dated Sep. 10, 2015 for U.S. Appl. No. 12/830,004, 33 pages.
Final Office Action dated Dec. 8, 2014 for U.S. Appl. No. 12/830,004, 43 pages.
Office Action dated Jun. 6, 2014 for U.S. Appl. No. 12/830,004, 58 pages.
Office Action dated Jul. 14, 2014 for U.S. Appl. No. 12/830,004, 38 pages.
Office Action dated Sep. 4, 2014 for U.S. Appl. No. 12/830,019, 6 pages.
Office Action dated Jan. 28, 2015 for U.S. Appl. No. 12/830,019,9 pages.
Final Office Action dated Dec. 17, 2015 for U.S. Appl. No. 12/830,004, 55 pages.
Office Action dated Mar. 7, 2016 for U.S. Appl. No. 12/830,011, 52 pages.
Office Action dated Sep. 13, 2016 for U.S. Appl. No. 12/830,004, 39 pages.
Office Action dated Jan. 9, 2017 for U.S. Appl. No. 14/601,838, 69 pages.
K. W. Cheung and R. Rios-Zalapa, “Smart dispatch for large grid operations with integrated renewable resources,” ISGT 2011,Hilton Anaheim, CA, 2011, pp. 1-7.
K. Cheung, Xing Wang, But-Chung Chiu, Ying Xiao and R. Rios-Zalapa, “Generation dispatch in a smart grid environment,” 2010 Innovative Smart Grid Technologies (ISGT), Gaithersburg, MD, 2010, pp. 1-6.
Non-Final Office Action received for U.S. Appl. No. 12/830,038 dated Oct. 29, 2012, 70 pages.
Final Office Action received for U.S. Appl. No. 12/830,038 dated Mar. 1, 2013, 28 pages.
Non-Final Office Action received for U.S. Appl. No. 12/830,038 dated Sep. 5, 2013, 362 pages.
Signet al., “Load Modelling for Real Time Monitoring of Power Systems”, 1977, IEEE, pp. 1908-1914.
Tabari et al., “Maintenance Schedule Aided by a Comprehensive Mathematical Model in Competive Environments”, 2004, IEEE,pp. 1774-1779.
Wiedman,T.E., “A Transmission Owner's Perspective on the Future Roles and Responsibilities of Transmission ExpansionPlanning”, 2002, IEEE,pp. 1054-1056.
Yadav et al., “Autocorrelation Based Weighing Strategy for Short-Term Load Forecasting with the Self-Oranizing Map”, 2010,IEEE, pp. 186-192.
Hobbs et al., “Analysis of the Value for Unit Commitment of Improved Load Forecasts”, 1999, IEEE,pp. 1342-1348.
Liu et al., “Combining Multi Wavelet and Multi NN for Power Systems Load Forecasting” Institute of Electrification & Automation,Southwest Jiaotong University, Chengdu, 2008, pp. 666-673.
Lazarevic-A., “Autonomous Grid Scheduling Using Probabilistic Job Runtine Forecasting”, PhD dissertation, 2008, 245 pages.
Final Office Action received for U.S. Appl. No. 12/830,038 dated Mar. 13, 2014, 75 pages.
Barton et al., “Energy Storage and Its Use With Intermittent Renewable Energy”, IEEE, 2004, pp. 441-448.
Kobayashi et al., “Electrical Load Forecasting using Scatter Search Based Weighted Average Weather Conditions”, IEEE, 2006,International Joint Conference on Neural Networks, Jul. 16-21, 2006, pp. 3754-3759.
Mu et al., “Short-term Load Forecasting Using Improved Similar Days Method”, IEEE, Mar. 2010, pp. 28-31.
Non-Final Office Action received for U.S. Appl. No. 12/830,038 dated Jul. 18, 2014, 39 pages.
Non-Final Office Action received for U.S. Appl. No. 12/830,038 dated Nov. 10, 2014, 34 pages.
Non-Final Office Action received for U.S. Appl. No. 14/743,958 dated Aug. 7, 2017, 211 pages.
Final Office Action received for U.S. Appl. No. 14/743,958 dated Mar. 21, 2018, 13 pages.
Non-Final Office Action received for U.S. Appl. No. 15/011,844 dated Oct. 19, 2018, 67 pages.
Non-Final Office Action received for U.S. Appl. No. 15/659,770 dated Jul. 12, 2018, 95 pages.
Non-Final Office Action for U.S. Appl. No. 15/790,599 dated Jan. 14, 2019, 69 pages.
Final Office Action for U.S. Appl. No. 15/659,770 dated Nov. 23, 2018, 69 pages.
Non-Final Office Action for U.S. Appl. No. 15/822,291 dated Apr. 2, 2019, 68 pages.
Advisory Action for U.S. Appl. No. 15/659,770 dated Feb. 13, 2019, 60 pages.
Communication pursuant to Article 94(3) EPC received for European Application Serial No. 08796333.6 dated Oct. 22, 2012, 3 pages.
The extended European search report received for European Application Serial No. 08796333.6 dated Feb. 13, 2012, 5 pages.
The extended European search report received for European Application Serial No. 08796327.8 dated Apr. 23, 2012, 5 pages.
Communication pursuant to Article 94(3) EPC received for European Application Serial No. 08782095.7 dated Oct. 19, 2012, 4 pages.
Communication pursuant to Article 94(3) EPC received for European Application Serial No. 08796334.4 dated Oct. 22, 2012, 3 pages.
The extended European search report received for European Application Serial No. 08796334.4 dated Feb. 13, 2012, 5 pages.
Communication pursuant to Article 94(3) EPC received for European Application Serial No. 08782097.3 dated Oct. 19, 2012, 4 pages.
Communication pursuant to Article 94(3) EPC received for European Application Serial No. 08782097.3 dated May 22, 2018, 4 pages.
The extended European search report received for European Application Serial No. 08782097.3 dated Feb. 13, 2012, 6 pages.
Tomsovic, et al. Designing the Next Generation of Real-Time Control, Communication and Computations for Large Power Systems, Proceedings of the IEEE (Special Issue on Infrastructure Systems), 93(5), May 2005.
Overbye, et al., “Visualization of Power Systems and Components: Final Report.” 2005. University of Illinois at Urbana-Champaign. Power Systems Engineering Research Center (PSERC) Publication 05-065.
Ray Klump, et al., “An advanced visualization platform for real-time power systems operations”. Power Systems Computation Conference (PSCC), Sevilla, Spain, Jun. 2002, 8 pages.
Pathalawaththa, et al., “A power system CAD package for the workstation and personal computer environment.” IEEE Transactions on Power Systems. vol. 6, No. 1, pp. 400-406, Feb. 1991.
CERTS Real-Time Voltage Monitoring and VAR Management System, California Energy Commission, Oct. 2003, P500-03-087F, 20 pages.
A.P. Sakis Meliopoulos, Power System Modeling, Analysis and Control, Georgia Institute of Technology, 2002.
Wu, et al., Power System Control Centers; Past, Present, and Future. Proceedings IEEE, 2005, vol. 93; NUMB 11, pp. 1890-1908.
Vilcahuaman, Volt/Var Control with Interactive Graphics Interface on Distribution Systems. Publication and date presently unknown. [Retreived Apr. 9, 2010]. Downloaded from the Internet: ,url.http://www.iansa.com.pe/volt_var_control.pdf.
Rasmussen, “Increasing data center efficiency by using improved high density power distribution”, American Power Conversion, pp. 1-10, (2008).
Techsmith. “Snagit”, published online at [http://www.techsmith.com/snagit-featue.html], retrieved on Oct. 28, 2011, 2 pages.
Wikipedia. “Snagit”, published online at [http://en.wikipedia.org/wiki/snagit] retrieved on Oct. 28, 2011, 3 pages.
International Search Report dated Oct. 9, 2008 for International Patent Application No. PCT/US08/70526, 3 pages.
International Search Report dated Oct. 9, 2008 for International Patent Application No. PCT/US08/70537, 3 pages.
International Search Report dated Oct. 8, 2008 for International Patent Application No. PCT/US08/70544, 3 pages.
International Search Report dated Oct. 9, 2008 for International Patent Application No. PCT/US08/70547, 3 pages.
International Search Report dated Oct. 10, 2008 for International Patent Application No. PCT/US08/70551, 3 pages.
International Search Report dated Oct. 10, 2008 for International Patent Application No. PCT/US08/70552, 3 pages.
Examination Report dated May 2, 2013 for European Patent Application No. 08796334.4-1806, 3 pages.
Examination Report dated May 2, 2013 for European Patent Application No. 08782095.7-1806, 3 pages.
Examination Report dated Mar. 15, 2013 for European Patent Application No. 08796327.8-1806, 3 pages.
Examination Report dated May 2, 2013 for European Patent Application No. 08782097.3-1806, 3 pages.
Examination Report dated May 2, 2013 for European Patent Application No. 08796333.6-1806, 62 pages.
Extended European Search Report dated Oct. 2, 2013 for European Patent Application 08782090.8-1806, 6 pages.
Examination Report dated Sep. 26, 2013 for European Patent Application No. 08 782 095.7-1806, 3 pages.
Office Action dated Jul. 17, 2013 for U.S. Appl. No. 12/139,159, 28 pages.
European Office Action dated Jun. 11, 2014 for European Application Serial No. 08796334.4, 3 pages.
European Office Action dated Jun. 6, 2014 for European Application Serial No. 08782090.8, 4 pages.
European Office Action dated Jul. 8, 2014 for European Application Serial No. 08782097.3, 4 pages.
Non-Final Office Action dated Mar. 13, 2015 for U.S. Appl. No. 13/590,321, 51 pages.
Final Office Action dated Oct. 15, 2015 for U.S. Appl. No. 13/590,321, 31 pages.
Non-Final Office Action dated Aug. 13, 2015 for U.S. Appl. No. 13/658,489, 46 pages.
European Office Action dated Aug. 9, 2015 for European Application Serial No. 08782095.7, 4 pages.
European Office Action dated Aug. 24, 2015 for European Application Serial No. 08782097.3, 4 pages.
European Office Action dated Aug. 21, 2015 for European Application Serial No. 08796334.4, 3 pages.
European Office Action dated Aug. 21, 2015 for European Application Serial No. 08782090.8, 4 pages.
https://www.techsmith.com/snagit.html, 7 pages (Last accessed: Apr. 18, 2016).
https://en.wikipedia.org/wiki/Snagit, 3 pages (Last accessed: Apr. 18, 2016).
Non-Final Office Action dated Jun. 21, 2016 for U.S. Appl. No. 14/231,387, 66 pages.
European Office Action dated Aug. 4, 2016 for European Application Serial No. 08782095.7, 3 pages.
European Office Action dated Aug. 4, 2016 for European Application Serial No. 08782097.3, 3 pages.
Office Action for U.S. Appl. No. 15/091,552 dated Apr. 6, 2018, 57 pages.
Office Action for U.S. Appl. No. 15/091,552 dated Aug. 28, 2018, 17 pages.
Non-Final Office Action received for U.S. Appl. No. 12/139,111 dated Jul. 23, 2009, 19 pages.
Final Office Action received for U.S. Appl. No. 12/139,111 dated Mar. 24, 2010, 19 pages.
Non-Final Office Action received for U.S. Appl. No. 12/139,111 dated Oct. 29, 2010, 21 pages.
Final Office Action received for U.S. Appl. No. 12/139,111 dated Jul. 8, 2011, 22 pages.
Non-Final Office Action received for U.S. Appl. No. 12/139,159 dated Jun. 23, 2011, 41 pages.
Final Office Action received for U.S. Appl. No. 12/139,159 dated Nov. 30, 2011, 28 pages.
Non-Final Office Action received for U.S. Appl. No. 12/139,194 dated Jul. 20, 2011, 27 pages.
Final Office Action received for U.S. Appl. No. 12/139,194 dated Nov. 7, 2011, 25 pages.
Non-Final Office Action received for U.S. Appl. No. 12/139,167 dated Nov. 23, 2011, 27 pages.
Final Office Action received for U.S. Appl. No. 12/139,167 dated Jan. 25, 2012, 18 pages.
Non-Final Office Action received for U.S. Appl. No. 12/139,167 dated May 29, 2012, 15 pages.
Non-Final Office Action received for U.S. Appl. No. 15/091,552 dated Jan. 10, 2019, 20 pages.
Non-Final Office Action received for U.S. Appl. No. 12/139,189 dated Apr. 20, 2010, 39 pages.
Final Office Action received for U.S. Appl. No. 12/139,189 dated Jan. 4, 2011, 36 pages.
Non-Final Office Action received for U.S. Appl. No. 12/139,118 dated Mar. 7, 2011, 20 pages.
Final Office Action received for U.S. Appl. No. 12/139,118 dated Dec. 20, 2011, 25 pages.
Non-Final Office Action received for U.S. Appl. No. 12/830,028 dated Apr. 20, 2012, 23 pages.
Final Office Action received for U.S. Appl. No. 12/830,028 dated May 10, 2012, 19 pages.
Non-Final Office Action received for U.S. Appl. No. 12/830,028 dated Feb. 27, 2013, 25 pages.
Non-Final Office Action received for U.S. Appl. No. 14/012,853 dated May 19, 2014, 55 pages.
Final Office Action received for U.S. Appl. No. 14/012,853 dated Oct. 10, 2014, 43 pages.
Non-Final Office Action received for U.S. Appl. No. 14/012,853 dated Feb. 23, 2015, 18 pages.
Non-Final Office Action received for U.S. Appl. No. 14/012,853 dated Sep. 21, 2015, 46 pages.
Final Office Action received for U.S. Appl. No. 14/012,853 dated Aug. 31, 2016, 47 pages.
Non-Final Office Action received for U.S. Appl. No. 14/012,853 dated Jan. 9, 2017, 38 pages.
Notice of Allowance received for U.S. Appl. No. 14/012,853 dated Aug. 15, 2017, 95 pages.
Office Action dated Sep. 11, 2013 for U.S. Appl. No. 12/830,011, 42 pages.
Office Action dated Oct. 7, 2011 for U.S. Appl. No. 12/830,023, 22 pages.
Office Action dated Feb. 9, 2012 for U.S. Appl. No. 12/830,023, 19 pages.
Office Action dated Sep. 27, 2013 for U.S. Appl. No. 12/830,023, 38 pages.
Office Action dated Apr. 6, 2012 for U.S. Appl. No. 12/380,042, 26 pages.
Office Action dated May 11, 2012 for U.S. Appl. No. 12/380,042, 16 pages.
Office Action dated Dec. 14, 2012 for U.S. Appl. No. 12/380,042, 20 pages.
Office Action dated Apr. 8, 2013 for U.S. Appl. No. 12/380,042, 19 pages.
Office Action dated Feb. 16, 2012 for U.S. Appl. No. 12/830,011, 33 pages.
Office Action dated Mar. 6, 2014 for U.S. Appl. No. 12/830,023, 37 pages.
Office Action dated Mar. 7, 2014 for U.S. Appl. No. 12/830,042, 26 pages.
Office Action dated May 15, 2014 for U.S. Appl. No. 12/830,023, 41 pages.
Office Action dated Aug. 5, 2014 for U.S. Appl. No. 12/830,042, 29 pages.
Office Action dated Nov. 20, 2014 for U.S. Appl. No. 12/830,042, 12 pages.
Office Action dated Mar. 25, 2015 for U.S. Appl. No. 12/830,042, 14 pages.
Office Action dated Feb. 26, 2015 for U.S. Appl. No. 12/830,011, 45 pages.
Final Office Action dated Jul. 1, 2015 for U.S. Appl. No. 12/830,011, 48 pages.
Office Action dated Mar. 16, 2012 for U.S. Appl. No. 12/830,049,23 pages.
Office Action dated Dec. 20, 2012 for U.S. Appl. No. 12/830,049, 27 pages.
Office Action dated Nov. 18, 2013 for U.S. Appl. No. 12/830,049, 16 pages.
Office Action dated Mar. 21, 2014 for U.S. Appl. No. 12/830,049, 19 pages.
Office Action dated Aug. 5, 2014 for U.S. Appl. No. 12/830,049, 19 pages.
Related Publications (1)
Number Date Country
20160328199 A1 Nov 2016 US
Provisional Applications (1)
Number Date Country
60952021 Jul 2007 US
Continuations (2)
Number Date Country
Parent 13590321 Aug 2012 US
Child 15151984 US
Parent 12139194 Jun 2008 US
Child 13590321 US