This application is the US National Stage of International Application No. PCT/EP2014/066220 filed 29 Jul. 2014, and claims the benefit thereof. The International Application claims the benefit of German Application No. DE 102013215456.9 filed 6 Aug. 2013. All of the applications are incorporated by reference herein in their entirety.
The invention relates to a once-through steam and to a method for operating a once-through steam generator.
The invention relates specifically to once-through or forced-flow steam generators for power plant facilities, having a burning chamber of rectangular cross section, each burning chamber wall of which comprises substantially vertically arranged evaporator tubes which are connected to one another in a gastight manner via tube webs and can be flowed through by a flow medium from the bottom to the top. Here, the heating of said evaporator tubes which form the burning chamber walls leads to complete evaporation of the flow medium in one pass. Here, in principle, the evaporator tubes of the once-through steam generator can be arranged partially or over the entire length in a vertical or perpendicular and/or helical or spiral manner. Here, once-through steam generators can be designed as forced-flow steam generators, the flow of the flow medium being forced here by a feed pump.
Essential advantages of a pure vertical evaporator tube concept are simple construction of the burning chamber suspension means, low manufacturing and assembly outlay and relatively great ease of maintenance. In comparison with a burning chamber wall with spiral tubes, the investment costs can be reduced considerably in this way. Owing to the design, however, the temperature imbalances of evaporator tube concepts of this type with perpendicular tubes are substantially greater in comparison with burning chambers with spiral tubes. Whereas the evaporator tubes in a spiral winding run through virtually all the heating zones of the burning chamber and a satisfactory heating equalization can therefore be achieved, the individual burning chamber tubes of the perpendicular tubes remain in the respective heating zone from the upstream evaporator inlet header to the downstream evaporator outlet header. Therefore, tubes in greatly heated burning chamber regions, for example in the vicinity of the burners or else in the middle wall region of burning chambers with a rectangular cross section, experience continuous additional heating over the entire tube length. Tubes in weakly heated burning chamber regions, in particular the corner wall tubes of the burning chamber with a rectangular cross section, experience less heating over the entire tube length in contrast. In designs with spiral evaporator tubes, the additional and lesser heating of individual tubes or tube groups lies in the low single-digit percent range. In the case of designs with perpendicular tubes, in contrast, considerably greater additional and lesser heating in relation to the mean heat absorption of an individual evaporator tube is known. Accordingly, the essential challenge in the case of burning chamber walls with perpendicular tubes lies in the ability to control said great heating imbalances between individual evaporator tubes.
A way of solving the above-described problem which is very effective and has already been disclosed in DE 4 431 185 A1 is a design of the perpendicular tubes according to what is known as the “low mass flux” design. In this approach, lowest possible mass flow densities which result in a positive throughput characteristic of the individual evaporator tubes are aimed for in the perpendicular tubes. Specifically, this means that tubes with more heating have a higher throughput and tubes with less heating have a lower throughput. Therefore, the occurrence of impermissibly high temperature imbalances can be counteracted effectively solely by way of a targeted application of the laws of physics. Since, however, the requirements with regard to the degree of efficiency of the facilities have risen constantly in the last years and therefore the live steam temperature and pressure have likewise increased continuously and, in addition, ever greater load ranges also have to be covered by way of the power plant facility, there is a necessity to further develop said “low mass flux” design.
The use of newly developed materials and the ability to manage them during processing and during operation of the power plant facility additionally make it necessary to reduce possible temperature imbalances still further.
It would be obvious to divide the mass flow distribution to individual burning chamber wall regions and therefore different groups of evaporator tubes and then to manipulate this in a targeted manner. Specifically, this means that wall regions with high heating are in particular to have comparatively great throughflow rates and wall regions with low heating are to have correspondingly lower throughflow rates. For this purpose, the burning chamber has to be divided into representative wall regions in order to take different heating zones into consideration. This takes place by way of a segmentation of the inlet and outlet headers. Here, each header segment is assigned to a wall region with the representative heating. In the inlet region, each header segment is provided with a dedicated feed water supply line. By way of the selection of a suitable geometric configuration of said supply lines, or by way of the installation of additional orifice plates in the region of said supply lines, the division of the entire feed water mass flow to the individual header segments can be performed in a targeted manner depending on the respective heating situation.
Supply lines or orifice plates which are adapted to one another geometrically have the decisive disadvantage, however, that their throttling action changes with the load. Therefore, the mass flow distribution in the evaporator and the associated temperature imbalances at the evaporator outlet can be optimized only for a defined load range owing to the system. Moreover, both the supply lines and the orifice plates can be designed in a targeted manner and adapted to one another only in the case of precise knowledge of the heat distribution over the burning chamber circumference. If the heat distribution which occurs then differs during operation of the power plant facility from the distribution which is used in the design calculations of the supply lines or orifice plates, the temperature imbalances can even rise in the most unfavorable case. The idea of further securing the design via the geometric adaptation of the supply lines with or without orifice plates is therefore even reversed in some circumstances.
It is therefore an object of the invention to provide an improved once-through steam generator and a corresponding method for operating a once-through steam generator of this type.
This object is achieved by way of a once-through steam generator and a method having the features of the independent claims.
An advantage of the present invention is that evaporator tubes of the burning chamber walls are combined in accordance with their degree of heating by inlet headers which are arranged upstream in each case to form more heated tube groups and less heated tube groups, and at least one control valve is provided in the region of the corresponding feed water supply for the controlled throttling of the mass flow of the feed water and therefore of the flow medium which flows through the evaporator tubes, and temperature measuring means for measuring outlet temperatures of the flow medium from the evaporator tubes are provided in the region of outlet headers which are arranged downstream in order to determine a control variable for the at least one control valve, temperature imbalances of a burning chamber with perpendicular tubes can thus be minimized effectively with low outlay in the entire load range of the power plant facility, even in the case of a virtually unchanged design of the once-through evaporator. In the most favorable case, only one additional control valve as control fitting and a corresponding control concept are to be provided for this purpose. Here, the method according to the invention for operating a once-through steam generator of this type provides that the feed water supply of the less heated tube groups is reduced by way of throttling of the at least one control valve to such an extent that the outlet temperatures of the more heated tube groups are equalized to those of the less heated tube groups or are at a similar level.
Each of the more heated tube groups and less heated tube groups are advantageously assigned in each case to one of the inlet headers and an outlet header, and each of the outlet headers has one of the temperature measuring means. Here, the temperature measuring means are advantageously installed in the lines which emanate from the outlet headers, since a mixing temperature is measured here.
Specifically in the case of substantially rectangular burning chambers which have pronounced less heated tube groups in the corner wall regions, it can be advantageous if each of the four corner wall regions has a dedicated feed water supply line with in each case one dedicated control valve. Further equalization of the temperature distribution at the outlet of the evaporator wall, having perpendicular tubes, of a once-through steam generator can be achieved by way of said upgrade which can also be carried out in a modular manner if required. Under these circumstances, it is even conceivable to equip the once-through steam generator with tubes in a complete pass from the inlet to the outlet, with the result that reversing headers which have been provided up to now can be dispensed with. The pressure equalization which is possibly required for the dynamic stability might be realized here by way of a far less expensive pressure equalization header.
Further advantageous developments of the once-through steam generator according to the invention or of the forced-flow once-through steam generator can be gathered from the further subclaims.
The invention is now to be explained by way of example using the following figures, in which:
The present invention is based on the concept of segmenting the mass flow distribution of the flow medium which flows through the evaporator tubes in a burning chamber 1 into more heated tube groups 10 and less heated tube groups 11 and to then manipulate their throughflow rates in a targeted manner. In specific terms, this means that wall regions with high heating should have comparatively great throughflow rates and wall regions with low heating should have correspondingly lower throughflow rates. For this purpose, as shown by way of example in
In the cross section (shown diagrammatically in
By means of temperature measuring means which are provided in the region of outlet headers which are arranged downstream in order to measure the outlet temperatures of the flow medium, the feed water supply 20 of the less heated tube groups 11 can be reduced by way of throttling of the control valve R to such an extent that the outlet temperatures of the less heated tube groups 11 are equalized to those of the more heated tube groups 10, and therefore the entire temperature profile at the outlet of the once-through steam generator is homogenized. Impermissibly high temperature imbalances can be prevented effectively and without great outlay in this way, since wall regions with low heat absorption then have lower throughflows and wall regions with great heat absorption have a high throughflow in a manner which is dependent on the measured temperatures.
Here, advantageously, at the evaporator outlet, the temperature measuring means of the more heated tube groups 10 from the middle wall regions can be combined as a “highly heated” system and the temperature measuring means of the less heated tube groups 11 from the corner wall regions can be combined as a “lowly heated” system. If the measured temperature of the system which is combined as “highly heated” is too great, the throughflow through the corner wall regions can be reduced by way of additional throttling of the control valve and the throughflow in the middle wall regions can be raised conversely, with the result that the mean temperature of the middle wall regions is lowered to the desired level.
In order to keep the additional costs and the outlay on control technology manageable or to limit them, the maximum number of individual header segments including associated control valves should be as limited as possible. Here, as shown in
If imbalances between the individual corner wall regions E1 to E4 (and possibly additionally also between the individual middle wall regions M1 to M4) among one another are also to be taken into consideration and equalized, a minimum of four control valves R1 to R4 are to be installed in each of the feed water supply lines S1 to S4, as shown in
Combinations of the above-described exemplary embodiments and further additions are conceivable against the background of increasing requirements made of the flexibility during the operation of a power plant facility, and are also included in the invention. For instance, imbalances of the individual middle wall regions M1 to M4 among one another and in relation to the corner wall regions E1 to E4 can additionally also be taken into consideration and equalized if corresponding feed water supply lines and control valves for throttling said highly heated middle wall regions are provided. If dedicated control valves in the supply lines of the tube groups of the corner wall regions E1 to E4 were dispensed with at the same time, the throughflow through the corner wall regions could be limited in this special case in advance, for example by means of fixedly installed throttles, to such an extent that control of the feed water mass flow of the middle wall regions is made possible in the first place. It is only in said circumstances, in the case of a fully open control fitting in the supply lines of the highly heated middle wall systems, that their throughput would be so great that, despite higher heating, the middle wall systems would have lower outlet temperatures in comparison with the corner tube systems. By way of additional throttling of the control valves of the middle wall systems, the throughput through the middle wall systems which has then become too great might be reduced again, in order to homogenize the outlet temperatures of all systems.
In addition to the projected design of the once-through steam generator in order to compensate for temperature imbalances, faulty designs of the distributor system of the feed water supply can also be absorbed comfortably by way of the design according to the invention of the once-through steam generator and the method according to the invention. In addition, heating imbalances which were not taken into consideration during the design of the burning chamber can be handled reliably by way of the present invention without negative consequences. In addition, in some circumstances, fuel combinations can be used which were previously not possible, because heating imbalances can be reacted to flexibly. All in all, the present invention increases the uptime of the once-through steam generator and therefore of the entire power plant facility.
Number | Date | Country | Kind |
---|---|---|---|
10 2013 215 456 | Aug 2013 | DE | national |
Filing Document | Filing Date | Country | Kind |
---|---|---|---|
PCT/EP2014/066220 | 7/29/2014 | WO | 00 |
Publishing Document | Publishing Date | Country | Kind |
---|---|---|---|
WO2015/018686 | 2/12/2015 | WO | A |
Number | Name | Date | Kind |
---|---|---|---|
3172396 | Kane | Mar 1965 | A |
3192908 | Schroedter et al. | Jul 1965 | A |
3297004 | Midtlyng | Jan 1967 | A |
3344777 | Gorzegno | Oct 1967 | A |
3548788 | Altman | Dec 1970 | A |
3818872 | Clayton et al. | Jun 1974 | A |
4178881 | Pratt | Dec 1979 | A |
4290389 | Palchik | Sep 1981 | A |
4473035 | Gorzegno | Sep 1984 | A |
5560322 | Fitzgerald | Oct 1996 | A |
5979370 | Franke | Nov 1999 | A |
5983639 | Kral et al. | Nov 1999 | A |
6189491 | Wittchow | Feb 2001 | B1 |
7958853 | Ruchti | Jun 2011 | B2 |
20020000208 | Franke et al. | Jan 2002 | A1 |
20110239961 | Bauver, II et al. | Oct 2011 | A1 |
20130205784 | Brodesser | Aug 2013 | A1 |
Number | Date | Country |
---|---|---|
1155326 | Jul 1997 | CN |
1239540 | Dec 1999 | CN |
1330751 | Jan 2002 | CN |
102906498 | Jan 2013 | CN |
103154611 | Jun 2013 | CN |
2132454 | Jan 1973 | DE |
2428381 | Jan 1975 | DE |
4431185 | Mar 1996 | DE |
19528438 | Feb 1997 | DE |
19651678 | Jun 1998 | DE |
102010038883 | Feb 2012 | DE |
1374835 | Nov 1974 | GB |
Entry |
---|
CN Office Action dated Sep. 28, 2016, for CN application No. 201480044832.1. |
Number | Date | Country | |
---|---|---|---|
20160178190 A1 | Jun 2016 | US |