Claims
- 1. A process of forming a stepped tapered pavement ramp comprising the steps of:forming a highly compacted step on the edge of a first pavement mat, the step having a substantially vertical face; and forming a highly compacted tapered portion extending away from the vertical face of the step.
- 2. The process of claim 1, wherein the step of forming a highly compacted step includes vertically compacting an edge of a top surface of the first pavement mat and horizontally compacting the substantially vertical face.
- 3. The process of claim 1, wherein step of forming a highly compacted tapered portion includes compacting an upper portion of the tapered portion.
- 4. The process of claim 1, wherein the step of forming includes compacting the highly compacted step and the highly compacted tapered portion between 85% and 93% of complete compaction.
- 5. The process of claim 1, wherein the steps of forming includes compacting the edge of the first pavement mat with an edger having:a first compaction surface to compact a top surface of the step, a second compaction surface to compact the tapered portion, and a substantially vertical third compaction surface to compact the vertical face.
- 6. The process of claim 1, wherein the step of forming a highly compacted tapered portion includes forming another step at a distal end of the highly compacted tapered portion from the vertical face.
- 7. The process of claim 1, further comprising the step of forming a pavement joint by laying a second pavement mat adjacent the first pavement mat such that an edge of the second pavement mat abuts the vertical face, and compacting the second pavement mat.
- 8. The process of claim 7, wherein the step of compacting includes compacting the step, tapered portion and second pavement mat up to approximately 98% of complete compaction.
- 9. The process of claim 7, wherein the step of laying a second pavement mat includes leveling the second pavement mat with a screed.
- 10. The process of claim 1, wherein the forming steps are preceded by the leveling of the first pavement mat.
- 11. The process of claim 1, wherein the forming steps follow the leveling of the first pavement mat.
- 12. An asphalt ramp on an edge of a pavement mat and adapted to accommodate vehicle traffic thereover, the ramp comprising:a step on the edge of the pavement mat and a tapered portion extending away from a vertical face of the step, the step and at least a section of the tapered portion being compacted between 85% and 93% of complete compaction of the asphalt.
- 13. The asphalt ramp of claim 12, further comprising another step at a lower portion of the tapered portion.
Parent Case Info
This application is a continuation-in-part of Provisional Application No. 60/125,602, filed Mar. 19, 1999.
US Referenced Citations (12)
Foreign Referenced Citations (3)
Number |
Date |
Country |
990565 |
Jun 1976 |
CA |
2 113 358 |
Sep 1972 |
DE |
0 027 164 |
Apr 1981 |
EP |
Non-Patent Literature Citations (1)
Entry |
Public Works, “Hazards of Pavement Edge Dropoff,” Public Works Journal Corporation, vol. 125, No. 13 p. 38, Dec. 1994. |
Provisional Applications (1)
|
Number |
Date |
Country |
|
60/125602 |
Mar 1999 |
US |