The present invention relates to a piling apparatus and a process for installation of the pile assembly which can be used in the reinforcement of weak grounds, laying the foundations for the structures having different loads from low to high such as low buildings, skyscrapers, plants, bridges, seaports, airports, etc. The piling apparatus and the process of installation of the pile assembly will provide a piling comprising at least two sections of material, which have been inserted into the earth separately, wherein, the first section of material is partially disposed inside the walled pipe, the material sections other than the first ones are pressed inside the walled pipe against the ground, using the friction between the walled pipe and the ground as a counterpoise. The term “pile” as used herein should be understood as a kind of material or a combination of at least two kinds of material, which are mechanically connected to each other, being overally disposed vertically, obliquely, or horizontally and being mechanically connected to the ground.
Laying the foundations of the structures in principal, means installation into the earth one or more kinds of different substances and/or materials in order to supplement or replace the existing soil, which itself does not satisfy the loading requirements for such structures. The substances and materials can react with or connect with the ground mechanically, chemically or both.
The introduction of the material into the earth depend on the technique which can be performed by the piling apparatus without replacing the ground, such as methods of piling or pressing the materials, or with replacing the ground such as drilling, scrapping, digging, etc. In both two cases, the replacement and the addition of the ground is always carried out by the assistance of the external forces, originated from diesel, petroleum or electric engines and therefore a counterbalance is always required to balance those forces. The counterbalance may be the apparatus' weight, the loads on it, or the friction with the ground. Those processes always result in a certain mechanical output, represented by the ratio of the minimum required energy to the actual energy of the specific apparatus and/or technique employed. When using those processes, one should consider those factors such as environmental influence, the complicatedness of the operation, the viality stability, cost-effectiveness, etc.
Among the currently existing technologies that have been used for pressing a certain material against the ground, such as các loi concrete piles, stainless steel, wooden, loose material such as sand, stone, soft material such as plastic pipe, absorbable rush, one of the popular methods is to use a counterbalance, usually the device's weight or the concrete blocks in order to balance the pressing force, the method has the following disadvantages:
The followings are some popular applications of foundation pilings of the engineering and constructions structures:
1. Filling-Drilling Piles
Filling-drilling piles are indepth foundations sâu, are currently widely used as foundations for structures such as skyscrapers, bridges, seaports, plants, etc., and gradually are replaced for other foundations such as driving piles.
Filling-drilling piles are widely applied because of the following advantages:
However, besides the above advantages, the filling-drilling piles also have some disadvantages as the followings:
2. Pressing Piles
Pressing piles are pre-cast piles composed of different materials such as reinforced concrete, stainless steel, wood, or combination thereof.
Pressing piles are inserted based on the principle of using certain required pressing force, together with the necessary counterbalance formed by heavy blocks or by anchoring to the ground, which presses on one end of the pile or on the pile body.
The construction of pressing piles by pressing has the following advantages:
However, the construction of pressing piles by pressing also has the following disadvantages:
The objective of the invention is to provide a piling apparatus for pile assembly to overcome the above disadvantages of the known construction methods for installation of pile assembly, in particular to provide an apparatus to insert a walled pipe into the ground, then using the friction of the walled pipe with the ground as a counterpoise, pressing another material into the ground via the interior of the walled pipe; and then link the pressed material to the material partially disposed inside the walled pipe. The resulting pile can be either partially ground-replaced or non-ground-replaced pile.
Another objective of the invention is to provide a process of installation of pile assembly to overcome the above disadvantages of the known construction methods for installation of pile assembly.
To achieve the above objectives, the piling apparatus pile assembly according to the invention comprises at least one walled pipe, a clamping frame having a clamping mechanism to link to the walled pipe which has been inserted into the ground, pressing stand linked to the clamping frame, pressing cylinders having one end linked to the base of the pressing stand, the other end linked to a holding clamp, the holding clamp serves to clamp material tightly, and to press at least one material to travel throughout the interior of the walled pipe by using the friction between the walled pipe which has been inserted into the ground with the ground served as a counterpoise, components of the apparatus are constructed to press a pressing force against material, formed by pressing cylinders applied to material by means of the holding clamp, and a reactive force transferred via the pressing stand, clamping mechanism, clamping frame to the walled pipe and balanced by the friction between the walled pipe and the ground.
In one aspect of the invention, the present piling apparatus pile assembly has a walled pipe inserted into the ground by pressing or driving.
In yet another aspect of the invention, the piling apparatus pile assembly comprises the walled pipe inserted into the ground by vibrating in combination with pressing.
In yet another aspect of the invention, the piling apparatus pile assembly comprises the walled pipe inserted into the ground by rotating in combination with pressing.
In yet another aspect of the invention, the piling apparatus pile assembly comprises the walled pipe with two open ends.
In yet another aspect of the invention, the piling apparatus pile assembly comprises the walled pipe with one closed end.
In yet another aspect of the invention, the piling apparatus pile assembly comprises the walled pipe having cross-section unchanged along its length.
In yet another aspect of the invention, the piling apparatus pile assembly comprises the walled pipe having cross-section changed along its length.
In yet another aspect of the invention, the piling apparatus pile assembly comprises a pressing stand fixed, perpendicular to the clamping frame.
In yet another aspect of the invention, the piling apparatus pile assembly comprises a pressing stand slidable on the clamping frame by means of pushing mechanisms so as to insert a plurality of walled pipes upon one position of the clamping frame.
In yet another aspect of the invention, the piling apparatus pile assembly comprises hydraulic cylinders to adjust the angle of pressing stand, thereby to press material in a desired direction.
In yet another aspect of the invention, the piling apparatus pile assembly comprises a holding clamp clamping over the body of material by means of a wedging mechanism driven by hydraulic cylinders.
In yet another aspect of the invention, the piling apparatus pile assembly comprises a holding clamp clamping against the top of the material.
In yet another aspect of the invention, the piling apparatus pile assembly comprises material over which the holding clamp directly clamps being solid such as pre-cast concrete piles, shaped stainless steel piles, wooden piles.
In yet another aspect of the invention, the piling apparatus pile assembly comprises a holding clamp clamping over one immediate force-transferred pipe so as to transfer material being soft materials such as plastics, fabrics or loose material such as sand, macadam, and stone against the ground.
In yet another aspect of the invention, the piling apparatus pile assembly comprises a clamping frame being elongated and thereby the centers of the walled pipes are arranged on a straight line.
In yet another aspect of the invention, the piling apparatus pile assembly comprises a clamping frame of non-elongated shape and thereby the centers of the walled pipes, in the case there are not less than three walled pipes, are not arranged in a straight line.
In yet another aspect of the invention, the piling apparatus pile assembly comprises at least one walled pipe, a clamping frame having clamping mechanism to link to the walled pipe which has been inserted into the ground, a pressing stand linked to the clamping frame, pressing cylinders having one end linked to the base of the pressing stand, another end linked to a rotating end clamping over the walled pipe and the holding clamp, the rotating end clamping over the walled pipe having a wedging mechanism rotated by a hydraulic engine and a gear mechanism so as to produce a torque, tightly clamping over the walled pipe with hydraulic cylinders, with the holding clamp tightly clamping over the material, so as to force at least one material to travel throughout the interior of the walled pipe by using the friction between the walled pipe which has been inserted into the ground with the ground served as a counterpoise, components of the apparatus are constructed to press a pressing force against material, which has been formed by pressing cylinders and can be transferred to material by means of the holding clamp, and a reactive force transferred via the pressing stand, the clamping mechanism, the clamping frame to the walled pipe and balanced by the friction between the walled pipe and the ground.
The invention is further to provide an installation process for pile assembly comprising the steps of:
inserting at least one walled pipe into the ground, linking the walled pipes with the clamping frame of the walled pipe in a manner that the material pressing force is transferred via the components of the apparatus to the walled pipe and balanced by the friction between the walled pipe and the ground,
inserting the materials into the interior of the walled pipe,
pressing the materials to desired depth or calculated force,
filling up the gap between the materials and the walled pipe with loose materials.
In yet another aspect of the invention, in the installation process for pile assembly the insertion of the walled pipe is carried out by using an independent apparatus such as driving hammer, pressing machine, vibrating hammer for pressing the material.
In yet another aspect of the invention, in the installation process for pile assembly the insertion of the walled pipe is carried out by means of pressing rotation.
In yet another aspect of the invention, in the installation process for pile assembly the friction of one walled pipe only is used to press at least one material to travel throughout said walled pipe.
In yet another aspect of the invention, in the installation process for pile assembly the friction of more than one walled pipe is used to press at least one material to travel throughout at least one of those walled pipes.
In yet another aspect of the invention, in the installation process for pile assembly, the material filling up the gap inside the walled pipe has been introduced before pressing of the material.
In yet another aspect of the invention, in the installation process for pile assembly the material filling up the gap inside the walled pipe has been introduced after pressing of the material.
The apparatus according to the present invention can install and/or insert a kind of pile assembly combined from the filling-drilling and pressing piles, wherein the friction between the walled pipe and the ground is used in the insertion of the filling-drilling piles as a counterpoise for insertion of the pressing piles, thereby to produce an effective installation process for pile assembly, and excellent pilings regarding the load-bearing ability.
When compared with the currently existing piles and piling apparatus, the piling apparatus of the invention has the following advantages:
More particularly, the laying of foundations by using pile assembly are inserted by means of the apparatus according to the invention has the following advantages when compared with the known filling-drilling piles and pressing piles:
According to the drawings from
The interior of the walled pipe 26 was emptied, by using the walled pipe with one open end, or in the case of the walled pipe with two open ends, by using of the apparatus such as driller, pump, digging bucket to remove the dirt from inside the walled pipe 26.
Pile 12, was precast by concrete, stainless steel, wood, or being an intermediate force transferring pipe such as
The hydraulic oil from the hydraulic source 1 was transferred via tuyeres 2 and 3 to a distribution unit 32. From the distribution unit 32 the hydraulic oil was distributed via tuyeres 5 and 6 to be transferred to splitter 8.
From the distribution unit 32, the oil was transferred to cylinder 35 by means of tuyere 34 causing cylinder 35 carrying the pressing stand 24 to move along rail 31 (fixedly mounted on the clamping frame 29) by means of wheel 22, carrying the pressing stand 24 to the position of the walled pipe 26.
From the distribution unit 32, the hydraulic oil was supplied to cylinder 4 via tuyere 33 causing cylinder 4 carrying the sliding frame of the pressing stand 13 to rotate about the base of the pressing stand 24, until reaching the pile pressing angle 12 as designed.
From splitter 8, the hydraulic oil was distributed via tuyere 10 to the tuyere flange 14. Then the oil was continuously supplied to the clamping cylinder 17 fixed on the force-resistant flange 15. Cylinder 17 moved upwards and downwards carrying the holding clamp 18 in order to tightly clamp (or to loosen) pile 12.
From splitter 8, the hydraulic oil was supplied to cylinder 7 by means of tuyere 9 causing the cylinder 7 to move upwards and downwards. Cylinder 7 carrying a sliding clamp 30 moved upwards and downwards along a sliding arm 11 fixedly mounted on the sliding frame 13. The sliding clamp 30 carrying a connecting arm 25, a reinforcing unit 23, a supporting flange 20, a supporting frame 19, a holding clamp 18, a clamping cylinder 17, a force-resistant frame 16, a force-resistant flange 15, a tuyere flange 14 moved together upwards and downwards, causing the pile 12 to move downwardly (when being pressed), or upwardly (when being drawn) in accordance with a specific direction, specific co-ordinates to the designed depth or pressing/drawing force.
From the distribution unit 32, the hydraulic oil was supplied to the clamping cylinder 27 causing the clamping cylinder 27 to move outwardly (to tightly clamp) or inwardly (to loosen) the walled pipe 26.
According to the drawings from
The interior of the walled pipe 62 was emptied, by using the walled pipe with one open end, or in the case of the walled pipe with two open ends, by using of the apparatus such as driller, pump, digging bucket to remove the dirt from inside the walled pipe 26.
Pile 47, is precast by concrete, stainless steel, wood, or being an intermediate force transferring pipe such as illustrated on
The hydraulic oil from the hydraulic source 36 was transferred via tuyere pipes 37 and 38 to the distribution unit 68. From this distribution unit 68 the hydraulic oil was distributed via the tuyere pipes 40 and 41 to be transferred to splitter 43.
From distribution unit 68, the oil was transferred to cylinder 71 by means of the tuyere pipe 70 causing cylinder 71 carrying the pressing stand 60 tp move along rail 67 (fixedly mounted on clamping frame 65) by means of wheel 57, carrying the pressing stand 60 to the position of the walled pipe.
From the distribution unit 68, the hydraulic oil was supplied to cylinder 39 via tuyere pipe 69 causing cylinder 39 carrying the sliding frame of the pressing stand 48 to rotate about the base of the pressing stand 60, until reaching the pile pressing angle 47 as designed.
From splitter 43, the hydraulic oil was distributed via the tuyere pipe 45 to a tuyere flange 49. Then the oil was continuously supplied to the clamping cylinder 52 fixed on the force-resistant flange 50. Cylinder 52 moved upwards and downwards carrying the holding clamp 53 to tightly clamp (or to loosen) the pile 47.
From splitter 43, the hydraulic oil was supplied to cylinder 42 by means of tuyere 44 causing cylinder 42 to move upwards and downwards. Cylinder 42 carrying the sliding clamp 66 moved upwards and downwards along the sliding arm 46 fixedly mounted on the sliding frame 48. The sliding clamp 66 carrying the connecting arm 61, the reinforcing unit 58, the supporting flange 55, the supporting frame 54, the holding clamp 53, the clamping cylinder 52, the force-resistant frame 51, the force-resistant flange 50, the tuyere flange 49 moved together upwards and downwards, causing the pile 46 to move downwardly (when being pressed), or upwardly (when being drawn) in accordance with a specific direction, specific co-ordinates to the designed depth or pressing/drawing force.
Gear box 59 was fixedly mounted on the supporting flange 55, therefore when moving upwards and downwards cylinder 42 shall carry gear box 59 to move in accordance with a specific direction and co-ordinate.
From splitter 43, the oil was transferred via the tuyere pipe 56 to gear box 59 causing the gear box to rotate (about one specific axis) and to tightly clamp (or to loosen) the walled pipe 62 as follows (according to
The installation process according to the invention is performed in the following manner:
The installation process for pile assembly according to the invention comprises the steps of:
Selecting the number of the walled pipes, the type of the with two open ends or with one open end according to
Selecting the material to be pressed into the earth which can be hard materials such as pre-cast concrete piles, stainless steel piles, wooden piles or soft materials according to
Selecting the arrangement of the piles in vertical direction or slanting direction, the arrangement of the centers of the walled pipes on a straight line or a curve according to
Selecting the type of material to be filled in the gap between the walled pipe and the materials are pressed into the earth;
Inserting the walled pipes into the earth, linking the walled pipes to the clamping frame of the apparatus according to
Linking the walled pipes to the clamping frame 1 of the pressing machine according to
Inserting the selected materials into the interior of the walled pipe, until reaching the bottom;
Clamping the holding clamps 53 according to
Adding the material units until achieving a desired depth or pressing force;
Filling the gap between the pressed material and the walled pipe, if any, by any flexible materials such as mortar, concrete, or sand, wherein the filling can be carried out before or after the pressing of the material.
Number | Date | Country | Kind |
---|---|---|---|
1-2012-00193 | Jan 2012 | VN | national |
Filing Document | Filing Date | Country | Kind | 371c Date |
---|---|---|---|---|
PCT/VN2012/000001 | 5/11/2012 | WO | 00 | 2/10/2014 |
Publishing Document | Publishing Date | Country | Kind |
---|---|---|---|
WO2013/110096 | 7/25/2013 | WO | A |
Number | Name | Date | Kind |
---|---|---|---|
5419658 | DeWitt | May 1995 | A |
20080310923 | Jinnings et al. | Dec 2008 | A1 |
20120097476 | Jung et al. | Apr 2012 | A1 |
20120099931 | Heichel et al. | Apr 2012 | A1 |
20120241039 | Jung et al. | Sep 2012 | A1 |
Number | Date | Country |
---|---|---|
101586337 | Nov 2009 | CN |
2212499 | Sep 2003 | RU |
800284 | Jan 1981 | SU |
2208088 | Oct 2003 | SU |
Entry |
---|
International Search Report for PCT Application No. PCT/VN2012/000001 issued Aug. 16, 2012. |
International Preliminary Report on Patentability for PCT Application No. PCT/VN2012/000001 issued Jul. 22, 2014. |
Number | Date | Country | |
---|---|---|---|
20140321923 A1 | Oct 2014 | US |